Presenting Northwind. Frank Coenen For InControl SA CEO Northwind NV. Northwind project. Concession granted: 15 May 2006 Fully permitted Permit for construction and exploitation Export Cable Permit Land cable Declaration of public use Flemish road permit Federal road permit - PowerPoint PPT Presentation
Transcript:

PowerPoint-presentatie

Presenting NorthwindFrank CoenenFor InControl SACEO Northwind NV

1Northwind projectConcession granted: 15 May 2006Fully permittedPermit for construction and exploitationExport Cable PermitLand cableDeclaration of public useFlemish road permitFederal road permitBuilding permit

Area: 14,5 kmWater depth:16 to 29 mDistance from shore:37 km

2

216 MW

72 Vestas turbines V112 3 MW

Yearly production estimated: 0,875 Terrawatthours= 875 million kilowatthours

Meaning:

1% of the yearly electricity consumption in Belgium in 2011.

Green energy for 230.000 households each year.*

Reduce CO2 emission by 245.000 tons each year.**

* cfr VREG** cfr Eurostat

3

Northwind projectGeneral informationTurbine model:Vestas V112 3.0 MWRotor diameter:112 m

Foundation type:Monopiles

Export cable:220 kVLength export cable:43 km

Construction will start: spring 2013

4

Shareholders5

Parkwind

Monopile Transition piece Windturbine123456 Inter array cablesOHVS (transformation station)Export cableConnection to transmission grid

6Offshore windfarmProject management

EPCI - Engineering Procurement Construction Installatie

Supply monopiles Supply Transition pieces Supply & termination inter-array cables Installation hammer Detailed design Supply foundation installation vessel

7

Contractors

WE PowerMoet dit allemaal nog naar het Nederlands vertaald? En van sommige kan ik de logos niet vinden7Installation export cable & dredging:Supply and termination land cable:

WTG installation vessel:

Supply and termination export cable:

8

Contractors

Vanden Bergh logo???!8WTG:

Supply & installation Offshore High Voltage Station: HV equipment:CG Power systems

Foundation design certification:

Power purchase agreement:9

Contractors

Financial & legal

BnP Parisbas Fortis Mott MacdonaldGreen giraffeLoyens & LoeffWhite & CaseContrastJLTFreshfieldsKPMG

Insurance

ProfinMarsh BelgiumCodan Forsikring A/SAXA Versicherung AGAXIS Specialty Europe Ltd.HDI-Gerling Verzekeringen N.V10

Partners

Belgian content:50%Deme-GeoSea Jan De Nul CG Power systems Belgium GI WindforceVanden Bergh/Heijmans

11

Belgian content Other than procurement WE-Power Aspiravi Offshore Electrabel Loyens Loeff Lawyers White & Case Lawyers Brussels & London Contrast Lawyers Marsh Belgium KPMG Tax advice Freshfields Lawyers Brussels BNPParibasFortis Belfius Bank ING Bank IMDC Tractebel-Technum ONDD-Delcredere.

Moet dit allemaal nog naar het Nederlands vertaald? En van sommige kan ik de logos niet vinden11TeamPartnersInControl SAWE PowerABSAspiravi offshoreChevalyseEnsolEPCMIMDCNoren quality consultingOffshore wind power consultingPolymiraQualsurvSGSTechnum TractebelVerenigde fiducairesWind Support Limited

12

Belgian supportFOD economy Federal authoritiesMUMMFlemish authoritiesEliaCREGDG Leefmilieu