Lean Construction Institute Prevention through Design (PtD) By Michael Mills, Kevin Coen, Dan Lavoie, Gary Cunningham Liberty Mutual Insurance
Transcript
Page 1: Prevention through Design (PtD) - Mills.pdfLiberty Mutual Insurance Lean Construction Institute 2 Objec&ves Review the benefits of Preven1on through Design (PtD) Discuss how PtD and

Lean Construction Institute

Prevention through Design (PtD)

By Michael Mills, Kevin Coen, Dan Lavoie, Gary Cunningham Liberty Mutual Insurance

Page 2: Prevention through Design (PtD) - Mills.pdfLiberty Mutual Insurance Lean Construction Institute 2 Objec&ves Review the benefits of Preven1on through Design (PtD) Discuss how PtD and

Lean Construction Institute Liberty Mutual Insurance 2

Objec&ves ReviewthebenefitsofPreven1onthroughDesign(PtD)

DiscusshowPtDandLeancomplimenteachother.

BecomefamiliarwithhowtoestablishaPtDProcess

Iden1fyandmanagepoten1alrisksofcollabora1vePtDprocesses

Page 3: Prevention through Design (PtD) - Mills.pdfLiberty Mutual Insurance Lean Construction Institute 2 Objec&ves Review the benefits of Preven1on through Design (PtD) Discuss how PtD and

Lean Construction Institute Liberty Mutual Insurance 3

What is Preven&on through Design?

It’saPROCESS

Addressessafetyandhealthneeds

Duringthedesignstage

An1cipatesandpreventsorminimizeshazardsandrisks

Bydesigningouttherisk!

Page 4: Prevention through Design (PtD) - Mills.pdfLiberty Mutual Insurance Lean Construction Institute 2 Objec&ves Review the benefits of Preven1on through Design (PtD) Discuss how PtD and

Lean Construction Institute Liberty Mutual Insurance 4

Benefits of Preven&on through Design

CostSavings• DesignOutRisk• ReduceInjuryCosts

EmployeeAcceptance• InvolvedinProcess• Collabora1ononSolu1ons

ImprovedEfficiencies• EliminateInefficientProcesses• ReduceComponents

PtD = ROI

Page 5: Prevention through Design (PtD) - Mills.pdfLiberty Mutual Insurance Lean Construction Institute 2 Objec&ves Review the benefits of Preven1on through Design (PtD) Discuss how PtD and

Lean Construction Institute Liberty Mutual Insurance 5

Similar to Lean

Focusesonelimina1ngWastewhichleadstoRisk.

Collaborateprocessthatinvolvesfrontlineworkers.

EngageseveryoneinthebuildingprocessfromArchitectstoContractors.

Demonstrateaddi1onalvaluetoOwnersofcollabora1onwithContractors.

CaneliminaterisktoOwner’semployeesaswellasContractoremployees.

Page 6: Prevention through Design (PtD) - Mills.pdfLiberty Mutual Insurance Lean Construction Institute 2 Objec&ves Review the benefits of Preven1on through Design (PtD) Discuss how PtD and

Lean Construction Institute Liberty Mutual Insurance 6

An Overview of the Process

Plan•  DevelopaPtDProjectPlan

Assess•  ConductRiskAssessment

Design•  DevelopDesignExpecta1onsforRiskReduc1on(DERR)

Review•  ConductDesignReview

Verify• MonitorConstruc1on/Installa1on/ProcessChangeandVerify

Learn•  ReviewProjectandDocumentLessonsLearned

EliminateInjuries

Page 7: Prevention through Design (PtD) - Mills.pdfLiberty Mutual Insurance Lean Construction Institute 2 Objec&ves Review the benefits of Preven1on through Design (PtD) Discuss how PtD and

Lean Construction Institute Liberty Mutual Insurance 7

PLAN

DevelopPtDProjectPlan

•  EstablishscopeofthePtDPlan•  Iden1fykeystakeholdersanddefineresponsibili1es

•  EstablishaDesignReviewTeam• Determineexper1seneededfrominternalandexternalsources

Page 8: Prevention through Design (PtD) - Mills.pdfLiberty Mutual Insurance Lean Construction Institute 2 Objec&ves Review the benefits of Preven1on through Design (PtD) Discuss how PtD and

Lean Construction Institute Liberty Mutual Insurance 8

Plan and Track

Sample Tracking Sheet to Monitor PtD Project Progress

Page 9: Prevention through Design (PtD) - Mills.pdfLiberty Mutual Insurance Lean Construction Institute 2 Objec&ves Review the benefits of Preven1on through Design (PtD) Discuss how PtD and

Lean Construction Institute Liberty Mutual Insurance 9

Design Review Team

• Management:bothuppermanagementandlinesupervision•  Employees• Architects,designers,andengineers•  Safetyandhealthprofessionals•  Contractors•  Suppliersofequipment,machineryortools• Othersasneeded,suchasIndustrialHygienist,Purchasing,orLegalCounsel

•  InsuranceBroker

Page 10: Prevention through Design (PtD) - Mills.pdfLiberty Mutual Insurance Lean Construction Institute 2 Objec&ves Review the benefits of Preven1on through Design (PtD) Discuss how PtD and

Lean Construction Institute Liberty Mutual Insurance 10

ASSESS

ConductRiskAssessment

•  SelectRiskAssessmentmethod•  ConductRiskAssessmentofplannedprocessoropera1ons

•  Priori1zerisks

Page 11: Prevention through Design (PtD) - Mills.pdfLiberty Mutual Insurance Lean Construction Institute 2 Objec&ves Review the benefits of Preven1on through Design (PtD) Discuss how PtD and

Lean Construction Institute Liberty Mutual Insurance 11

Insurance Broker

•  CommercialGeneralLiability:GeneralContractor(GC)•  Trigger:BodilyInjury(BI)/PropertyDamage(PD)arisingfromanoccurrence

•  CG2243–fullprofessionalliabilityexclusion•  CG2279–excludesprofessionalservices(exceptmeansandmethods)

•  CG2280–offerslimiteddesignrelatederrors

•  Professional:Designer/Engineering•  Trigger:Negligence/StandardofCare,doesn’tneedoccurrence•  Doesnotcoverconstruc1onmeansandmethods(temporaryjobsitestructures)

•  “OtherInsurance”clause

Page 12: Prevention through Design (PtD) - Mills.pdfLiberty Mutual Insurance Lean Construction Institute 2 Objec&ves Review the benefits of Preven1on through Design (PtD) Discuss how PtD and

Lean Construction Institute Liberty Mutual Insurance 12

Risk Assessment Process

Sample Process from ANSI/ASSE Z590.3 – 2011

Page 13: Prevention through Design (PtD) - Mills.pdfLiberty Mutual Insurance Lean Construction Institute 2 Objec&ves Review the benefits of Preven1on through Design (PtD) Discuss how PtD and

Lean Construction Institute Liberty Mutual Insurance 13

Risk Assessment

• AssessExis1ngandFutureBuildings,StructuresorProcesses•  Choosetheriskassessmenttool.• Meetwithkeystakeholderstoiden1fytasksandhazards.• Determineiftraininginhowtoperformariskassessmentisneeded.

•  Reviewplanstoiden1fytasksandhazards.•  Brainstormtoan1cipatesourcesofhighestrisk.•  Setpriori1esforriskstotargetforreduc1on.

Page 14: Prevention through Design (PtD) - Mills.pdfLiberty Mutual Insurance Lean Construction Institute 2 Objec&ves Review the benefits of Preven1on through Design (PtD) Discuss how PtD and

Lean Construction Institute Liberty Mutual Insurance 14

Iden&fying Tasks and Corresponding Hazards

• Useasystemsapproach•  Examine:

•  Plansandspecifica1ons•  Workexpecta1onsandwaste•  Commonbehaviorsandwaste•  Similarbuildingsoropera1ons(includinglosshistory,riskassessmentsandjobhazardanalyses)

•  Maintenanceproceduresandwaste•  Relevantcodes,standardsandregula1ons

•  Interviewcurrentorintendedusers

Page 15: Prevention through Design (PtD) - Mills.pdfLiberty Mutual Insurance Lean Construction Institute 2 Objec&ves Review the benefits of Preven1on through Design (PtD) Discuss how PtD and

Lean Construction Institute Liberty Mutual Insurance 15

Brainstorm Future Hazards

•  Buildinganewplant,tankswillbeinstalledtofeedtheproduc1onprocess.

Task:1.  Workersneedtoclimbto

thetopofthetanktomeasurefluidinsidefromthetop.

Risks:•  FallsfromHeightswhileclimbingandworking/takingreadingsontopoftank.

Page 16: Prevention through Design (PtD) - Mills.pdfLiberty Mutual Insurance Lean Construction Institute 2 Objec&ves Review the benefits of Preven1on through Design (PtD) Discuss how PtD and

Lean Construction Institute Liberty Mutual Insurance 16

Assessing the Risks

• Questions to consider •  What aspect of the technology or activity produces waste

and risk? •  What action or inaction causes risk? •  Where are the potential sources of high severity injuries?

•  High/low pressure or temperature, work at elevation, unplanned energy release, hazardous material release, etc.

•  Any standard controls for common risks without performing detailed Risk Assessment (e.g. parapet or guardrail at roof perimeter)?

From ANSI/ASSE Z590.3 – 2011 PtD Guidelines for Addressing Occupational Hazards and Risks in Design and Redesign.

Page 17: Prevention through Design (PtD) - Mills.pdfLiberty Mutual Insurance Lean Construction Institute 2 Objec&ves Review the benefits of Preven1on through Design (PtD) Discuss how PtD and

Lean Construction Institute Liberty Mutual Insurance 17

DevelopNewControls

No

DesignFallArrestSystem

andAnchorPoints

Yes

Eliminatethehazardbychangingaprocess

Cantheneedforworkersto

accessthetanktopbeeliminated?

Canthefallhazardbeeliminatedthruworkprocess

change?

Canweengineerorguardagainstthehazard?

Designawaytomeasurelevelsfromtheground.

Changethedesignofthetanktops.ElevaDonRiskiseliminated.

No

No

Designguardrailsfor

thetanktop

Yes

Yes

Page 18: Prevention through Design (PtD) - Mills.pdfLiberty Mutual Insurance Lean Construction Institute 2 Objec&ves Review the benefits of Preven1on through Design (PtD) Discuss how PtD and

Lean Construction Institute Liberty Mutual Insurance 18

Redesign to Eliminate Risk

•  Redesignoftanks/processtointegratemeasurementsystemswithgaugesatgroundlevelsothatworkerscantakemeasurementswithoutneedtoaccesstopoftanks.•  Process/equipmentchangeeliminatestheneedforthepartofthetaskthathasrisk.

•  Climbingandtopoftankmeasurementnolongerdonesinceworkersdon’tneedtobeateleva1ontoperformtask.

Workersmustperiodicallyclimbto

accesstopoftankstotakemeasurementsfromtopof

tanks.Collaborate with the customer to work on both risk and waste!

Page 19: Prevention through Design (PtD) - Mills.pdfLiberty Mutual Insurance Lean Construction Institute 2 Objec&ves Review the benefits of Preven1on through Design (PtD) Discuss how PtD and

Lean Construction Institute Liberty Mutual Insurance 19

DESIGN

DevelopDesignExpecta1onsforRiskReduc1on(DERR)

• UsetheHierarchyofControlstoselectthemosteffectriskreduc1onstrategies.

• DevelopDesignExpecta1onstoaddresspriori1esfromtheRiskAssessment.

• ProvidetoArchitects/Designersforinclusioninprojectdesignplanning.

• CommunicateguidanceonPtDprocessexpecta1ons.

Page 20: Prevention through Design (PtD) - Mills.pdfLiberty Mutual Insurance Lean Construction Institute 2 Objec&ves Review the benefits of Preven1on through Design (PtD) Discuss how PtD and

Lean Construction Institute Liberty Mutual Insurance 20

DERR – What Can Be Done to Reduce Risk

•  Createsaguidefordesigners,architects,engineers:

•  Whatyouwanttosee(ornotsee)incurrentandfuturedesignstoreducerisk.

•  Considerthelifecycleofwhatisbeingdesigned:

•  Construc1on,use,maintenanceanddisposal.

•  UsetheHierarchyofControlstoselectmosteffec1vesolu1ons.

Page 21: Prevention through Design (PtD) - Mills.pdfLiberty Mutual Insurance Lean Construction Institute 2 Objec&ves Review the benefits of Preven1on through Design (PtD) Discuss how PtD and

Lean Construction Institute

Example DERR’s

• Designcomponentsthatcanbepre-fabricatedoff-siteoronthegroundtoavoidassemblingorerec1ngatheightsandtoreduceworkerexposuretofallsfromheights.1

DesigntoReduceRiskDuringConstruc1on

• Walkwaysurfacesshallbeslipresistantunderexpectedenvironmentalcondi1onsanduse.2• Designchemicalprocessestobeconductedinclosedsystems,wherefeasible.3

DesigntoReduceRiskforAllUsers

• Wherefeasible,systemsshallbedesignedtoavoidconfinedspaceentry.3• Designthestructuresothatmaintenancecanbeperformedatgroundlevelorsafelyfromthestructure,forexample,posi1oningair-condi1oningunitsandlijplantatgroundlevel.1

DesigntoReduceRiskforMaintenance

1 Safe Design of Structures: Code of Practice July 2012 Safe Work Australia 2 ASTM: F1637 − 13 - Standard Practice for Safe Walking Surfaces 3 ANSI/ASSE Z590.3 – 2011 - Prevention through Design Guidelines

Page 22: Prevention through Design (PtD) - Mills.pdfLiberty Mutual Insurance Lean Construction Institute 2 Objec&ves Review the benefits of Preven1on through Design (PtD) Discuss how PtD and

Lean Construction Institute Liberty Mutual Insurance 22

REVIEW

ConductDesignReview

•  ReviewDrawings/Plans/ProcessDesignsforimprovementopportuni1es.

• VerifyplanadherencetoDERR.•  Communicatevariances.• Developalterna1vecontrolplanswithvendors.

Page 23: Prevention through Design (PtD) - Mills.pdfLiberty Mutual Insurance Lean Construction Institute 2 Objec&ves Review the benefits of Preven1on through Design (PtD) Discuss how PtD and

Lean Construction Institute

Roof Fall Risk Elimination

• A design review revealed no guardrails or safe access to the roof.

• No guardrail designed around the Green Roof.

• Workers access the roof through a window to perform maintenance.

Page 24: Prevention through Design (PtD) - Mills.pdfLiberty Mutual Insurance Lean Construction Institute 2 Objec&ves Review the benefits of Preven1on through Design (PtD) Discuss how PtD and

Lean Construction Institute

Prevention through Design

Page 25: Prevention through Design (PtD) - Mills.pdfLiberty Mutual Insurance Lean Construction Institute 2 Objec&ves Review the benefits of Preven1on through Design (PtD) Discuss how PtD and

Lean Construction Institute Liberty Mutual Insurance 25

VERIFY

MonitorConstruc1on/Installa1onProcessChangeandVerify

• MonitorandverifyImplementa1onofexpecta1ons.

• Addressneedsthatariseforchange.•  Ensureeffec1vecommunica1onwithvendors.

Page 26: Prevention through Design (PtD) - Mills.pdfLiberty Mutual Insurance Lean Construction Institute 2 Objec&ves Review the benefits of Preven1on through Design (PtD) Discuss how PtD and

Lean Construction Institute Liberty Mutual Insurance 26

Monitor Construc&on •  Drain Pipe location was

identified as a risk factor during the Design Review and location was redesigned to eliminate the trip/fall hazard.

•  Design changes were not communicated.

•  During the monitoring of construction the issue was found and corrected.

Page 27: Prevention through Design (PtD) - Mills.pdfLiberty Mutual Insurance Lean Construction Institute 2 Objec&ves Review the benefits of Preven1on through Design (PtD) Discuss how PtD and

Lean Construction Institute Liberty Mutual Insurance 27

LEARN

ReviewProjectandDocumentLessonsLearned

•  ReviewtheoverallPtDprocessforimprovements.

• UpdatetheDERR’sforuseonFutureProjects.

• DiscussLessonsLearnedandwhatcanbedonetoeliminateorreducemissedopportuni1esonfutureprojects.

Page 28: Prevention through Design (PtD) - Mills.pdfLiberty Mutual Insurance Lean Construction Institute 2 Objec&ves Review the benefits of Preven1on through Design (PtD) Discuss how PtD and

Lean Construction Institute Liberty Mutual Insurance 28

Lessons Learned •  LessonLearned-postconstruc1onchangescanbecostly.

•  DesignReviewTeamlearnedthevaultcoverswereslipperyatonefinishedentrance.

•  Matsplacedonthemtocutdownonslipfallexposureblockedrequiredven1ng.

•  Workingwiththeu1lityandDesignReviewTeam,thesizeofthecoverswasreduced,thevaultrelocatedandthemetalcoverstreatedwithaslipresistantmaterial.

Page 29: Prevention through Design (PtD) - Mills.pdfLiberty Mutual Insurance Lean Construction Institute 2 Objec&ves Review the benefits of Preven1on through Design (PtD) Discuss how PtD and

Lean Construction Institute Liberty Mutual Insurance 29

Renova&on

•  YoumayhaveasmallerDesignReviewTeam.•  Encourageemployeesimpactedbytherenova1ontopar1cipate.•  Takeadvantageoftheknowledgeandexperienceoffrontlineworkers.

•  Takethislessonslearnedfromcurrentsitestoyourrenova1ons.•  Usetheopportunitytocorrectissuesthatproducerisk.

Servicing lighting can be costly and high risk.

Design to reduce risk during maintenance.

Page 30: Prevention through Design (PtD) - Mills.pdfLiberty Mutual Insurance Lean Construction Institute 2 Objec&ves Review the benefits of Preven1on through Design (PtD) Discuss how PtD and

Lean Construction Institute

Evaluate All Risk

• Have your Design Review Team look at all aspects of the design both contractor and owner employee exposures.

•  It could save lives, dollars and prevent a liability incident.

Page 31: Prevention through Design (PtD) - Mills.pdfLiberty Mutual Insurance Lean Construction Institute 2 Objec&ves Review the benefits of Preven1on through Design (PtD) Discuss how PtD and

Lean Construction Institute Liberty Mutual Insurance 31

Roadmap to Risk Reduc&on

Page 32: Prevention through Design (PtD) - Mills.pdfLiberty Mutual Insurance Lean Construction Institute 2 Objec&ves Review the benefits of Preven1on through Design (PtD) Discuss how PtD and

Lean Construction Institute Liberty Mutual Insurance 32

Summary

•  PtDcanprovideROIwithcostsavings,improvedefficiencyandreducedinjures.

•  Startearlyinthedesignphaseforbestresults.•  Focusonthehighestrisks.• UsetheHierarchyofControlsformosteffec1vesolu1ons.• Defineandcommunicateexpecta1onsfordesignsthatwillreducerisk.

Page 33: Prevention through Design (PtD) - Mills.pdfLiberty Mutual Insurance Lean Construction Institute 2 Objec&ves Review the benefits of Preven1on through Design (PtD) Discuss how PtD and

Lean Construction Institute Liberty Mutual Insurance 33

Ques&ons and Comments