+ All Categories
Home > Documents > Preventive Environmental Protection in Hospitals · Microsoft PowerPoint - pre-1 awareness_e.ppt...

Preventive Environmental Protection in Hospitals · Microsoft PowerPoint - pre-1 awareness_e.ppt...

Date post: 14-Oct-2020
Category:
Upload: others
View: 2 times
Download: 0 times
Share this document with a friend
20
Mag. Petra Wolf, Dr. Johannes Fresner Leonardo Projekt "QESTRAIN – Personnel training model for integrated quality-environment-safety management systems in hospitals and public health service Preventive Environmental Protection in Hospitals Awarness raising Training at UKH Graz
Transcript

Mag. Petra Wolf, Dr. Johannes Fresner

Leonardo Projekt "QESTRAIN – Personnel training model for integrated quality-environment-safetymanagement systems in hospitals and public health service

Preventive Environmental Protection in Hospitals

Awarness raising

Training at UKH Graz

CO2 emission worldwide:

CO2 concentration in the atmosphere

CO2 amounts

Savings of Results in a reduction of CO2-emission of

1 liter light fuel oil ca. 3,2 kg/l

1 liter heavy fuel oil ca. 3,1 kg/l

1 Nm³ natural gas ca. 1,8 kg/Nm³

So good so far ????

I think, there is room for five computer on the worldmarket, not more!!

Thomas WatsonChairman of the Board von IBM, 1943

Short history ...

• August 1981: first IBM 5150 PC presented

costs 3.500 US $35.000 PC sold8-bit Chip, 4,77 Megahertz, memory: 48 kb!! August 2001: 600 Mio. PC around the world

• AND: Bill Gates is today one of the richest men on earth

PC sales in Germany

5,5 6,37 7,7 8,6

024

68

10

1998 1999 2000 2001 2002

(in Million)

The production of one PC:• need of ca. 16 – 19 tons raw materials

(a car: 28 tons) • 700 different materials,

appr. 3000 l water and 2.000 kWh electricity• at the production: big amount (appr. 60 kg) of partly

hazardous waste (e.g. FCKW for cooling)• the lifecycle of some parts is theoretical up to 20 years,

but is not used efficiently (only 2-4 years)

Source: Blauer Engel für PCs RAL-ZU 78

Sustainabilityis a form of the

economic developmenteconomic developmentto to satisfysatisfy thethe needsneeds ofof todaytoday, , withoutwithout

reducingreducing thethe chanceschances ofof futurefuturegenerations generations to to satisfy their needssatisfy their needs..

Considers:technology employeesraw materialsprocessespartnersproducts

Preventive company specificenvironmental protection

ECOPROFIT Company: Eloxal HeubergerAnodizing plant, 20 employees, ISO 14000

• new pipelines, longer dripping times, daily inspection and testing, reducing water consumption by 46 % (14,000 m³)

0

10

20

30

40

50

60

70

80

90

100

1995 1997 1998 2001 2002

Year

per c

ent [

%]

ECOPROFIT Company: Eloxal HeubergerSpecific water consumption

Better waste separation

Tailings per nursing day

0,00kg

0,20kg

0,40kg

0,60kg

0,80kg

1,00kg

1,20kg

1,40kg

1,60kg

1

2000

2001 2002

Since 2000 savings have amounted to € 9,320.- a year

Thermal energy

Heating energy 2000 - 2002

0

200000

400000

600000

800000

1000000

1200000

1400000

1600000

1

2000

2001 2002

Since 2000 savings have amounted to € 5,500.- a year

Various savings

• detergents• exact training on use and dosage• dosing system on each cleaning carriage

-60.61%Window cleaner-41.67%Dishes, manual-80.00%Cleaning powder-12.82%Betacide, sanitary-71.43%Sanitary cleaner-71.11%Alfa surface cleaner

Possible obstacles for implementing Cleaner Production options

attitudeobstacles in the structure, mentality,attitude, ...

economicuneconomical, financing, ...

technicalno technical solution available

Source: Schnitzer, Technical University Graz

„idea killers“

• We have always worked like this• We are too big/too small for this• Do not forget we have to earn money• This does not affect my department• Nobody told me what to do• I am still waiting for the O.K.• It is not my business• I have to wait for the boss• I forgot• I am very busy• Let John do this• I did not understand• It is too early for this• Now it is too late

IDEA KILLERS


Recommended