1Price Fighters Department
PRICE FIGHTERSBrief For
Future of DoD ContractCost/Price Analysis Meeting
9-10 January 2007
2Price Fighters Department
SECNAVSECNAVSecretary of the NavySecretary of the Navy
SECNAVSECNAVSecretary of the NavySecretary of the Navy
CNOCNOChief of Naval OperationsChief of Naval Operations
CNOCNOChief of Naval OperationsChief of Naval Operations
ASN(RDA)ASN(RDA)Assistant Secretary of the NavyAssistant Secretary of the Navy
for Research, Development and Acquisitionfor Research, Development and Acquisition
ASN(RDA)ASN(RDA)Assistant Secretary of the NavyAssistant Secretary of the Navy
for Research, Development and Acquisitionfor Research, Development and Acquisition
NAVAIRNAVAIRNaval Air
Systems Command
NAVAIRNAVAIRNaval Air
Systems Command
NAVSEANAVSEANaval Sea
Systems Command
NAVSEANAVSEANaval Sea
Systems Command
SPAWARSPAWARSpace and Naval Warfare
Systems Command
SPAWARSPAWARSpace and Naval Warfare
Systems Command
NAVFACNAVFACNaval Facilities
Engineering Command
NAVFACNAVFACNaval Facilities
Engineering Command
NAVSUPNAVSUPNaval Supply
Systems Command
NAVSUPNAVSUPNaval Supply
Systems Command
NAVICPNAVICPNaval Inventory Control Point
NAVICPNAVICPNaval Inventory Control Point
Where We Fit
Price FightersPrice FightersPrice FightersPrice Fighters
3Price Fighters Department
To provide responsive, expert value analysis, technical assistance, and
pricing validation support to buyers, managers, and users of equipment,
material, services, supplies, spare parts, and weapon systems in an accurate, cost
effective, and unbiased manner.
Price Fighters Mission
Save Program Dollars
4Price Fighters Department
The MDAP Process
ConceptConceptRefinementRefinement
System Development System Development & Demonstration& Demonstration
Production & Production & DeploymentDeployment
Operations & Operations & SupportSupport
AnalogyAnalogyParametricParametric
ActualsActualsEngineeringEngineering
MDAP Process
Cost Estimating Techniques
Negotiation SupportProposal ReviewCost EstimatingSite VisitsPre & Post Business Clearance
•Should Cost•Business Case Analysis
•Consulting Services
Price Fighters Services
Post Production Support
Technology Technology DevelopmentDevelopment
Concept Decision
Design Readiness
Review
FRP Decision Review
A B C FOCIOC
5Price Fighters Department
• Business Case Analysis (BCA)Business Case Analysis (BCA)• Cost Estimating Relationship (CER)
Analysis
• Cost Analysis / EstimatingCost Analysis / Estimating
• Cost Modeling
• Cost Realism Studies
• ECP EvaluationECP Evaluation• In-Process Review (IPR)
• Litigation Support
• Negotiation SupportNegotiation Support
• Obsolescence Study
• Physical Configuration Audit (PCA)
• Pre-Award Survey
• Post-Production Support
• Price Challenge Hotline
• Process Improvement Studies
• Proposal EvaluationProposal Evaluation
• Repair Analysis
• Risk Analysis/Management
• Should Cost Analysis
• Source Selection
• Lean / Six Sigma Support
• Tech Data Package Adequacy
Review
Supporting Current & Future Readiness
Products & Services
Providing expert, cost effective value analysis, technical assistance, and pricing validation support.
6Price Fighters Department
Should Cost
• Support spare parts buyers
• Bottoms up, engineering
based, cost analysis
• Alternate sources of supply
• Negotiation support
7Price Fighters Department
Tray, Conveyor Roller NSN 2590-01-359-9278Application: Cargo Handling SystemQuantity 3 units Should Cost Price: Technical review developedProposed Price: $4,850.25Negotiated Price: $702.61Savings: $12,442.92 (86% reduction)Resolution: Since this was an ESOC procurement, Price
Fighters was requested to find an alternate source for this part as quickly as possible. Within two weeks, Price Fighters had found and received a quote from another source that was 86% lower than the original quote.
Case referred by: DSCC
Should Cost Example
8Price Fighters Department
Piston, Linear ActuatorNSN 1650-00-532-1805Application: C-130 Aircraft Quantity 62 units Should Cost Price: $2,313.47Proposed Price: $10,743.00Negotiated Price: $3,841.00 Savings: $427,924.00 (64% reduction)Resolution: Price Fighters developed a unique pricing
analysis using the contractor rates and the labor and material from the Should Cost Analysis. The buyer utilized the analysis to negotiate a lower cost.
Case referred by: DSCR
Should Cost Example
9Price Fighters Department
Price Challenge Hotline
• Prime venue for customer price challenges
• Can lead to should costs
• Over 129,000 inquiries
• $846M in savings
• $453K in awards
Web Page: www.navsup.navy.mil, click on the “Challenge High Priced Parts” bulls-eye iconPhone: 1-800 NAV-CHAL (1-800 628-2425), Fax: (757) 443-2019
Email: [email protected]
10Price Fighters Department
Good Price Challenge Candidates • Appears overpriced • Consolidation of identical items • New commercial source
Price Challenge Hotline
11Price Fighters Department
Price Challenge from Patrol Squadron 64, Naval Air Station, Willow Road, PANomenclature: Rigid Tubing AssemblyChallenged Price: $4,688.12Concerns: Price too highResults: Found item overpriced, pursued
refundCost Avoidance: $24,278.97Challenger’s Award: $1,425.00
Price Challenge Hotline Example
12Price Fighters Department
• IPT member• Assist in SOW development• BCA development
– Analyze and verify data set– Populate BCA
• Proposal review• Negotiations support• Total involvement from start to finish
PBL Support
13Price Fighters Department
H-60 Tip-To-Tail Phase II BCA
Agreement with Maritime Helicopter Systems Company (MHSCo) and Naval Inventory Control Point Philadelphia.
Covered 458 individual parts applicable to the SH-60B, SH-60F, HH-60H, MH-60S, and MH-60R aircraft and focused on integrating 34 suppliers under one prime integrator.
The With-out PBL (traditional support ): $258M With PBL program cost were proposed as
$241M Potential Savings/Cost Avoidance of $17M over
a 33 month period of performance.
PBL BCA Example
14Price Fighters Department
Weapon Systems Support
• Procurement Support / Cost Analysis
• Supports Program Managers and Contracting
• Proposal Evaluations
• ECPs
• Alpha Contracting
• Source Selection
15Price Fighters Department
Examples: Proposed SettledCost
AvoidanceCost ROI
E-2C FY04-07
Multi-Year$808M $706M $102M $172K 593
CV-22 Block Change
$241.5M $208M $33.5M $100K 330.5
MH-47G SLEP Program Lot 2
$282M $246M $36M $163K 223
F-18 E/F
Production$403.2M $360M $43.2M $40K 1080
TOTALS $1,734.7M $1,520M $214.7M $475K 452
Results
Boeing
N-G
Recent experience with many Primes, onUSN, USMC, USAF, USA, Joint projects
16Price Fighters Department
Customer: U. S. Army, Redstone Arsenal
Project: Procurement of Patriot Advanced Capability (PAC-3) Missiles
Effort: Supplemented Redstone Contracting team in review of contractor and
major subcontractors including labor hours, material, and negotiation supportResult: $56M savings and 4 additional missiles
Patriot (PAC-3) Missile
17Price Fighters Department
Special Projects
• Berry Amendment– Supporting DCMA on reviewing Corrective Action Plans and drafting Domestic
Non-Availability Determinations
• Bureau of Engraving and Printing– Supporting BEP on a $280M procurement of currency paper
• Acquisition Quality Assessment Program and Intrinsic Value
Analysis– Supporting NAVICP Contracting
– Price analysis for active procurements
– Sampling awarded procurements
18Price Fighters Department
Summary
• High-Quality Engineering-Based Cost Analysis Services
• Customer-Oriented
• Outstanding ROI (current average 20:1)
• Effective ISO-Certified QMS
• Best Value
• Services Easy To Obtain
19Price Fighters Department
Point of Contact
Buster JonesDirector, Price Fighters(757) 443-2468 DSN [email protected]