+ All Categories
Home > Documents > PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION...

PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION...

Date post: 23-Jan-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
142
Edition April 2008 PRIMEQUEST 580A/540A/580/540/480/440 Installation Planning Manual (errata 2008/09/19 incorporated)
Transcript
Page 1: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

Edition April 2008

PRIMEQUEST 580A/540A/580/540/480/440Installation Planning Manual

(errata 2008/09/19 incorporated)

Page 2: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

Comments… Suggestions… Corrections…The User Documentation Department would like to know your opinion on this manual. Your feedback helps us to optimize our documentation to suit your individual needs.

Fax forms for sending us your comments are included at the back of the manual.

There you will also find the addresses of the relevant User Documentation Department.

Copyright and Trademarks

This manual is printed on paper treated with chlorine-free bleach.

Copyright © FUJITSU LIMITED and Fujitsu Technology Solutions GmbH 2005 -2009.

All rights reserved.Delivery subject to availability; right of technical modifications reserved.

All hardware and software names used are trademarks of their respective manufacturers.

Page 3: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

Environmental protection and serviceThe PRIMEQUEST systems have a long life expectancy, not only because of the excellent expansion options they offer, but also because of the quality of the products.

As technology continues to develop, however, ever greater volumes of data will need to be processed. More and more demands are being placed on storage capacity, speed and computer system design. So when you eventually want to replace your PRIMEQUEST system with a newer model and dispose of the old device, we can also offer you support in this area.

Recycling old computer equipment is already a tradition at Fujitsu Technology Solutions: We have been redeeming and reusing old computer systems for many years now. Even at the design stage, particular emphasis is placed on the reusability of components and materials.

Your PRIMEQUEST system is manufactured to the greatest possible extent from environ-mentally friendly materials that can be fully recycled.

Read on through the next sections for a brief look at some of the measures we have intro-duced in an effort to protect the environment as well as our tips and suggestions for environ-mentally friendly handling of your system.

Environmentally friendly product design and development

This product has been designed in accordance with Fujitsu Technology Solutions Guideline FSC 03230 “environmentally friendly product design and development”.

This means that the designers have taken into account critical factors such as durability, selection of materials and coding, emissions, packaging, the ease with which the product can be dismantled and the extent to which it can be recycled.

This saves resources and thus reduces the harm done to the environment.

Production and development of the PRIMEQUEST systems are certified in accordance with the environment management system DIN ISO 14001.

Note on saving energy

If your device does not have to remain switched on permanently, only switch it on when you are ready to use it and then switch it off again during long breaks and when you finish your work.

1

Page 4: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

Environmental protection and service

Note on dealing with consumables

Please dispose of printer consumables and batteries in accordance with local government regulations.

Note on labeling plastic housing parts

Please avoid sticking your own labels on plastic housing parts wherever possible, since this makes it difficult to recycle them.

Take-back, recycling and disposal

Our remarketing and recycling center is certified in accordance with the ECO Audit Regulation of the European Community. Contact it for details on redeeming and reusing devices and consumables within Europe:

Tel. +49 (0) 5251 8 18010Fax +49 (0) 5251 8 18015URL http://www.ts.fujitsu.com/recycling

You can also consult your local Fujitsu Technology Solutions branch office/subsidiary.

Service

If you have any complaints in relation to missing/faulty parts, please contact the complaints department of Fujitsu Technology Solutions:

Tel. +49 (0) 5251 8 22222Fax +49 (0) 5251 8 22029

You can also submit complaints via the internet:

http://abgadwda.abg.fsc.net/RLC/Email: [email protected]

In case of a technical problem with Fujitsu Technology Solutions products, or If you have questions on setup or operation: our technical support specialists can offer fast and competent assistance: http://www.ts.fujitsu.com/support/helpdesk.html

You will also find information here on products, telephone numbers, etc.

The Call Management Center (CMC) can be reached in Germany as follows:

Tel. +49 01805 4040Fax +49 01805 336779

2

Page 5: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

DE Dieses Gerät ist entsprechend der europäischen Richtlinie 2002/96/EGüber Elektro- und Elektronikaltgeräte (waste electrical and electronic equipment - WEEE) gekennzeichnet. Die Richtlinie gibt den Rahmen für eine EU-weit gültige Rücknahme und Verwertung der Altgeräte vor.

EN This appliance is labelled in accordance with European Directive 2002/96/EG concerning used electrical and electronic appliances (waste electrical and electronic equipment - WEEE). The guideline determines the framework for the return and recycling of used appliances as applicable throughout the EU.

AR 2002/96/(waste electrical and electronic equipment - WEEE).

.BG 2002/96/EG

(waste electrical and electronic equipment - WEEE).

CS Tento spot ebi je ozna en v souladu s evropskou sm rnicí 2002/96/EG o nakládání s použitými elektrickými a elektronickými za ízeními (waste electrical and electronic equipment - WEEE). Tato sm rnice stanoví jednotný evropský (EU) rámec pro zp tný odb r a recyklování použitých za ízení.

DA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF om affald af elektrisk- og elektronisk udstyr (waste electrical and electronic equipment - WEEE). Dette direktiv angiver rammerne for indlevering og recycling af kasserede apparater gældende for hele EU.

EL µ µ 2002/96/(waste electrical and electronic equipment - WEEE).

µ µ ’ .ES Este aparato está marcado con la Directiva europea 2002/96/CE relativa al uso de aparatos eléctricos y electrónicos

(Residuos de aparatos eléctricos y electrónicos). La directiva proporciona el marco general válido en todo el ámbito de la Unión Europea para la retirada y la reutilización de los residuos de los aparatos eléctricos y electrónicos.

ET Käesolev seade on märgistatud vastavalt direktiivile 2002/96/EÜ elektri-ja elektroonikaseadmete jäätmete kohta. Direktiiv sätestab elektri- ja elektroonikaseadmete jäätmete tagastamise ja ringlussevõtu raamtingimused Euroopa Liidus.

FA 2002/96/EG ((waste electrical and electronic equipment - WEEE .

.FI Tämän laitteen merkintä perustuu käytettyjä sähkö- ja elektroniikkalaitteita (waste electrical and electronic equipment -

WEEE) koskevaan direktiiviin 2002/96/EG. Tämä direktiivi määrittää käytettyjen laitteiden palautus- ja kierrätys-säännökset koko EU:n alueella.

FR Cet appareil est marqué selon la directive européenne 2002/96/CE relative aux appareils électriques et électroniques usagés(waste electrical and electronic equipment - WEEE). La directive définit le cadre pour une reprise et une récupération des appareils usagés applicables dans les pays de la CE.

HE 2002/96/EG (waste electrical and electronic equipment - WEEE).

, , .HR Ovaj je ure aj ozna en u skladu s europskom smjernicom 2002/96/EG o otpadnim elektri nim i elektronskim ure ajima

(waste electrical and electronic equipment - WEEE). Smjernica odre uje okvir za povratak i zbrinjavanje otpadnih ure aja valjan u cijeloj Europskoj Uniji.

HU Ez a készülék az elhasznált villamossági és elektronikai készülékekr l szóló 2002/96/EK irányelvnek megfelel jelölést kapott.Ez az irányelv a már nem használt készülékek visszavételének és hasznosításának EU-szerte érvényes kereteit határozza meg.

IT Questo apparecchio dispone di contrassegno ai sensi della direttiva europea 2002/96/CE in materia di apparecchi elettrici ed elettronici (waste electrical and electronic equipment - WEEE). Questa direttiva definisce le norme per la raccolta e il riciclaggio degli apparecchi dismessi valide su tutto il territorio dell’Unione Europea.

KO / (waste electrical and electronic equipment - WEEE)2002/96/EG .

EU .LT Šis prietaisas yra pažym tas pagal Europos bendrijos direktyv 2002/96/EG d l naudot elektrini ir elektronini prietais

(waste electrical and electronic equipment - WEEE). Ši direktyva apibr žia visoje ES galiojan i naudot prietais gr žinimo ir perdirbimo tvark .

LV Š ier ce ir mar ta atbilstoši Eiropas direkt vai 2002/96/EG par elektriskaj m un elektroniskaj m ier c m (waste electrical and electronic equipment – WEEE). Direkt va nosaka veidu, k ES teritorij j realiz nolietoto ier u nodošana un p rstr de.

Page 6: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

MK 2002/96/ (waste electrical and electronic equipment – WEEE).

, .MS Alat ini bersesuaian dengan garis panduan Eropa 2002/96/EG tentang alat-alat tua elektrik dan elektronik (waste electrical

and electronic equipment - WEEE) .Garis panduan tersebut memberi rangka rujukan yang berlaku di seluruh Eropa untuk penerimaan balik dan penggunaan alat-alat tua.

NL Dit apparaat is gekenmerkt in overeenstemming met de Europese richtlijn 2002/96/EGbetreffende afgedankte elektrische en elektronische apparatuur (waste electrical and electronic equipment - WEEE). De richtlijn geeft het kader aan voor de in de EU geldige terugneming en verwerking van oude apparaten.

NO Dette apparatet er klassifisert i henhold til det europeiske direktivet 2002/96/EF om avhending av elektrisk- og elektronisk utstyr (waste electrical and electronic equipment – WEEE). Direktivet angir rammene for innlevering og gjenvinning av innbytteprodukter.

PL Urz dzenie to oznaczono zgodnie z europejsk wytyczn 2002/96/EG o zu ytych urz dzeniach elektrycznych i elektronicznych (waste electrical and electronic equipment - WEEE). Wytyczna ta okre la ramy obowi zuj cego w ca ej Unii Europejskiej odbioru i wtórnego wykorzystania starych urz dze .

PT Este aparelho está marcado em conformidade com a Directiva 2002/96/CE relativa aos resíduos de equipamentos eléctricos e electrónicos (waste electrical and electronic equipment - WEEE). A directiva estabelece o quadro para a criação de um sistema de recolha e valorização dos equipamentos usados válido em todos os Estados Membros da União Europeia.

RO Acest aparat este marcat corespunz tor directivei europene 2002/9/CE în privin a aparatelor electrice i electronice vechi (waste electrical and electronic equipment – WEEE). Directiva prescrie cadrul pentru o preluare înapoi, valabil în întreaga UE, i valorificarea aparatelor vechi.

RU 2002/96/EG (waste electrical and electronic equipment - WEEE).

.SK Tento spotrebi je ozna ený v súlade s európskou smernicou 2002/96/EG o nakladaní s použitými elektrickými a

elektronickými zariadeniami (waste electrical and electronic equipment - WEEE). Táto smernica stanoví jednotný európsky (EU) rámec pre spätný odber a recyklovanie použitých zariadení.

SL Ta naprava je ozna ena v skladu z evropsko smernico o odpadni elektri ni in elektronski opremi (waste electrical and electronic equipment - WEEE). V okviru smernice sta dolo ena prevzem in recikliranje starih naprav, ki veljata v celotni Evropski uniji.

SQ Ky aparat përmban shënjën e aparaturave elektrike dhe elektroteknike sipas Udhëzimit 2002/96/EG (waste electrical and electronic equipment - WEEE). Udhëzimi jep kuadrin ligjor për te drejtën e kthimit mbrapsht të aparaturave të përdorura në të gjithë BE.

SR Ovaj je aparat ozna en u skladu sa evropskom smernicom 2002/96/EGo otpadnim elektri nim i elektronskim aparatima (waste electrical and electronic equipment - WEEE). Smernica odre uje okvir za povratak i reciklažu otpadnih aparata koji važi u celoj Evropskoj Uniji.

SV Denna enhet är märkt i enlighet med der europeiska direktivet 2002/96/EG om avfall som utgörs av eller innehåller elektroniska produkter (waste electrical and electronic equipment - WEEE). Direktivet anger ramarna för inom EU giltigt återtagande och korrekt återvinning av uttjänta enheter.

TH European Guideline 2002/96/EG -( - – WEEE)

-TR Bu cihaz, ömrünü doldurmu elektrikli ve elektronik cihazlar ile ilgili Avrupa yönetmeli i 2002/96/EG’ye (waste electrical and

electronic equipment – WEEE) uygun ekilde i aretlenmi tir.Bu yönetmelik, eski cihazların geri alımı ve de erlendirilmesi ile ilgili AB-çapındaki uygulamaların çerçevesini belirtmektedir.

UK 2002/96/EG , (waste electrical and electronic equipment - WEEE).

, ,.

ZF 2002/96/EG WEEE

ZH 2002/96/EG waste electrical and electronic equipment – WEEE

Page 7: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

U41631-J-Z816-5-76 TEMPERATURE 1

The effect of temperature onthe reliability of IT installations

High ambient temperatures and the associated high component temperatures have adeleterious effect on all technical products and thus also on IT installations.

The following areas are particularly affected:

• FunctionalityThe propagation time of electrical signals increases with temperature. If the tem-perature increases beyond certain limits (at present approx. 100 °C crystal tempera-ture) this will lead to malfunctions, particularly in the case of fast processors.

• WearStorage media, and in this case particularly magnetic tapes, suffer from wear due tofriction. The amount of wear increases with temperature, and beyond a certain point(from about 45 °C tape temperature) it rises drastically.

• Failure rate and MTBFThe failure rate of a component, λ, is generally determined by mechanisms whosereaction time increases when heated and thus at higher temperatures. This meansthat the failure rate will also increase with temperature. The actual rate of increasewill depend on numerous additional factors, such as different component technology,where the component is installed, and so on.

The measure of a system’s reliability is generally given in terms of its MTBF (meantime between failures), which is the reciprocal of the failure rate (MTBF = 1/λ ). Ac-cording to the information in the document MIL-HDBK-217F (Reliability Prediction ofElectronic Equipment. Department of Defense, Washington, D.C. 1990) the variationwith ambient temperature of the MTBF value for an IT installation follows the pathshown in the following diagram. This graph is normalized on the MTBF value at anambient temperature of 25 °C.

You can see from this diagram that increasing the ambient temperature by around15 °C will halve the MTBF.

Relative MTBF depending on the ambienttemperature

020406080

100120140

15 25 35 45 55

Ambient temperature (°C)

Rel

.MT

BF

(%)

Rel. MTBF

Page 8: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

The effect of temperature on the reliability of IT installations

TEMPERATURE 2 U41631-J-Z816-5-76

Installation instructions

IT installations are generally designed in such a way that cooling air is drawn in throughthe door at the front and the warmed air expelled through the back of the system cabi-net.

The volume of air actually throughput will depend on the power of the fans that areused; for a fully configured high-end system it may be as much as 1200 m3/h. The heatthat needs to be extracted corresponds to the mains power consumption and this willdepend on the configuration. High-end systems may convert up to 4 kW to heat.

The following points should be noted to ensure optimal cooling:

In the machine room

• Provide an air-conditioning system with sufficient power to deal with the amount ofheat that will have to be extracted.

• Make air intake available from the false floor near to the front of the cabinets.

• Install suitable floor plates (e. g. slotted) to provide the required throughput of air.

• Extract exhaust air from the area behind the system cabinets.

• Always arrange cabinets with fronts and backs side by side (see the followingillustration).

• Where cabinets are arranged in several rows, always position the rows front-to-frontor back-to-back (see the following illustration).

• Make sure that rows are no closer together than the installation distance (1 m).

• Do not place isolated units in the corner of a room; they should be at least 1 m awayfrom all walls.

Inside the system

• Where units are not fully configured all vacant slots must be covered with blankingplates.

• Cables must be arranged to obstruct the air-flow as little as possible.

• Keep the openings for air intake and outlet clear.

Page 9: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

The effect of temperature on the reliability of IT installations

U41631-J-Z816-5-76 TEMPERATURE 3

Floor ( false floor )

Air intake

Ceiling

Air outlet

Sketch of the cooling function

Page 10: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

The effect of temperature on the reliability of IT installations

TEMPERATURE 4 U41631-J-Z816-5-76

Checklist for cooling-related malfunctions

Temperature of the input air (room temperature) is too high(desired temperature < 25 °C, maximum value < 32 °C)

Measuring points

The temperature should be measured at two places within the air intake area at the frontof the system:1. At floor level underneath the front door of the cabinet.2. In the middle of the front door of the cabinet.

Check the following

• Is the air-conditioner powerful enough and is it working properly?

• Have the cabinets been arranged as specified in the above installation instructions?

• Are the air intake and outlet openings of the room’s ventilation system located asspecified in the above installation instructions?

Temperature of the exhaust air from the system is too high = not enoughthroughput(desired temperature < Tinput + 10 °C)

Measuring points

The temperature should be measured at three places at the rear of the system:1. At the back of the cabinet in the middle of the back door.2. At the back of the cabinet next to the top air outlet opening on the back door.3. At the back of the cabinet 0.1 m below the room ceiling.

Check the following

• Are the cabinet’s air intake and outlet openings clear?

• Have the cables been positioned as directed by the installation instructions?

• Have all the necessary blanking plates been installed?

Page 11: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

FOR SAFE OPERATIONThis manual contains important information regarding the use and handling of this product. Read this manual thoroughly. Use the product according to the instructions and information available in this manual. Keep this manual handy for further reference.

Fujitsu and Fujitsu Technology Solutions make every effort to prevent users and bystanders from being injured or from suffering damage to their property. Use the product according to this manual.

ABOUT THIS PRODUCTThis product server is designed and manufactured for use in standard applications such as office work, personal device, household appliance, and general industrial applications. This product is not intended for use in nuclear-reactor control systems, aeronautical and space systems, air traffic control systems, mass transportation control systems, medical devices for life support, missile launch control systems or other specialized uses in which extremely high levels of reliability are required, the required levels of safety cannot be guaranteed, or a failure or operational error could be life-threatening or could cause physical injury (referred to hereafter as “high-risk” use). You shall not use this product without securing the sufficient safety required for the high-risk use. If you wish to use this product for high-risk use, please consult with sales representatives in charge before such use.

U41631-J-Z816-5-76

Page 12: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

RADIO FREQUENCY INTERFERENCE STATEMENT

The following notice is for EU users only.

The following notice is for USA users only.

Laser standards

WARNING: This is a product which meets Class A of EN55022. In a domestic environment this product may cause radio interference in which case the user may be required to take adequate measures.

This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. This equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with the instruction manual, may cause harmful interference to radio communications. Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense.

This equipment includes Class 1 laser products and complies with FDA Radiation Performance Standards, 21 CFR 1040.10 and 1040.11, and the International Laser Safety Standards IEC60825-1: 2001.

U41631-J-Z816-5-76

Page 13: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

TRADEMARK ACKNOWLEDGEMENTSAdobe, Acrobat, and Reader are either registered trademarks or trademarks of Adobe Systems Incorporated in the United States and/or other countries.Ethernet is a registered trademark of Fuji Xerox Co., Ltd. and Xerox Corporation in the United States and other countries.All other product names mentioned herein are the trademarks or registered trademarks of their respective owners.Every system and product name in this manual are not always noted with trademark (™) or registered trademark (®) symbols.

The contents of this manual shall not be disclosed in any way or reproduced in any media without the express written permission of Fujitsu Limited or Fujitsu Technology Solutions GmbH.

All Rights Reserved, Copyright FUJITSU LIMITED and Fujitsu Technology Solutions GmbH 2005-2009

U41631-J-Z816-5-76

Page 14: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF
Page 15: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

Revision History (1/3)

Edition DateRevised section

(Added/ Deleted/ Altered)Details

01 2005-07-11 ⎯ ⎯02 2005-09-15 Entire manual (Altered)

Section 2.2.1 (1) (Altered/Added)

Section 2.2.1 (2) (Added)

• Technical brush-up• Modification of the manual

title• Addition of PRIMEQUEST

series

• Modification of the conceptof units operational grouping

• Addition of description for concentration of small equipment

• Addition of conditions for using mobile phones

03 2006-02-20 Section 1.2 (Altered)

Section 2.1 (Altered)

Section 2.2.2 (Altered)

Section 2.2.4 (Added)

Section 2.3.3 (Altered)

• Modification of the external view of the PCI_Box

• Addition of GSWB-XG to Figure 2.1

• Addition of GSWB-XG to Figure 2.3

• Addition of singlemode Fibre Channel Cable to Table 2.2

• Addition of figures (units in the PRIMEQUEST 480/440 main unit, and external interface ports in the PCI_Box)

• Modification of the ACS numbers in the input power system diagrams

Note: In this table, a revised section is indicated by its section number in the current edition. An asterisk (*) indicates a section in the previous edition.

U41631-J-Z816-5-76

Page 16: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

04 2006-04-17 Section 1.3 (Altered)

Section 2.2.2 (Altered)

Section 2.2.3 (Altered)

Section 2.3 (Altered)

• Modification of model names and addition of remarks for model names

• Modification of the connector type of Gigabit Ethernet card (optical) in Figure 2.3

• Addition of the model names of Fibre Channel cable with an adapter

• Modification of model names and addition of remarks for model names

05 2006-08-11 Entire manual (Added/Altered)

Section 1.3 (Altered)

Section 2.2.4 (Altered)

Section 2.4 (Altered)

• Addition of the information about PRIMEQUEST 580/540

• Correction of erroneous descriptions

• Modification of table formats and values for installation specifications

• Separation of entries for external interface and input cable connection port, and modification of explanatory text and figure titles

• Modification of specifications for AC cables

Note: In this table, a revised section is indicated by its section number in the current edition. An asterisk (*) indicates a section in the previous edition.

(2/3)

Edition DateRevised section

(Added/ Deleted/ Altered)Details

U41631-J-Z816-5-76

Page 17: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

06 2007-03-05 Entire manual

Section 2.1 (Altered)

Section 2.2.2 (Altered)

Section 2.4 (Altered)

• Correction of erroneous descriptions

• Addition of GTHB to Figure 2.1

• Addition of GTHB to Figure 2.3

• Modification of plug type for Japan

07 2007-08-31 Section 2.1 (Altered)

Section 2.2.1 (Altered)

Section 2.2.2 (Altered)

• Addition of PEXU to Figure 2.1

• Addition of PEXU to Figure 2.2

• Addition of PEXU to Figure 2.3

08 2008-03-10 Entire manual • Addition of information of PRIMEQUEST 580A/540A

09 2008-04-10 Section 2.2.1 (correction) • Correction of the order codes of UPS cables

Fujitsu Technology Solutions adapts text and figures, substitutes the order number of the manual, adds Fujitsu Technology Solutions’ order numbers in manual references, changes the description where the PRIMEQUEST manuals are available, substitutes the comment form and corrects text according to the table of corrections (errata) 2008/09/19.Note:The PRIMEQUEST 540A model is not supported by Fujitsu Technology Solutions.

Note: In this table, a revised section is indicated by its section number in the current edition. An asterisk (*) indicates a section in the previous edition.

(3/3)

Edition DateRevised section

(Added/ Deleted/ Altered)Details

U41631-J-Z816-5-76

Page 18: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF
Page 19: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

Preface1

This manual describes requirements and concepts for installation and facility planning for the PRIMEQUEST 580A, 540A*, 580, 540, 480, and 440. Installation and facility planning should be performed together with your assigned Fujitsu or Fujitsu Technology Solutions representatives according to the instructions provided in this manual.

This manual is intended for persons introducing and planning the installation of a PRIMEQUEST server, or those who manage server operations. The reader of this manual is expected to have some knowledge of or experience with server installation planning.

Structure and Contents of this ManualThis manual is organized as described below:

CHAPTER 1 Installation ReferenceThis chapter provides equipment configurations, external views, installation specifications, and outline drawings of PRIMEQUEST units.

CHAPTER 2 Connection ReferenceThis chapter provides cable connection diagrams and lists of required cables.

CHAPTER 3 Precautions Pertaining to Delivery and InstallationThis chapter describes precautions regarding delivery and installation of the equipment.

Acronyms and Abbreviations, Index

Acronyms & AbbreviationsThis section defines acronyms and abbreviations used in this manual.

IndexThe index provides page references for keywords to allow the reader to quickly find necessary information.

*: not supported by Fujitsu Technology Solutions

U41631-J-Z816-5-76 i

Page 20: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

Preface

Other Reference ManualsThe manuals listed below are related to this manual.Before installing the equipment, first read the supplied printed manual PRIMEQUEST500A/500/400 Series Installation Manual (U41632-J-Z816-x-76, adapted Fujitsumanual C122-E001EN) and see the related manuals:

SPARC Enterprise/PRIMEQUEST Series Common Installation Planning Manual (U41296-J-Z816-x-76, adapted Fujitsu manual C120-H007EN)PRIMEQUEST 580/540/480/440 System Design Guide (U41630-J-Z816-x-76, adapted Fujitsu manual C122-B001EN)The manuals are available as PDF files at http://manuals.ts.fujitsu.com/

Environmental Requirements for Using This ProductThis product is a general-purpose computer intended for use in a computer room.

Conventions for Alert MessagesThis manual uses the following conventions to show the alert messages. An alert message consists of an alert signal and alert statements.

Alert messages in the textIn the text, the alert messages are indented to distinguish them from regular text. A wider space precedes and follows the message to show where the message begins and ends.

(Example)

The template is created on a scale of 1:50. When printing the template from Acrobat® Reader® or Adobe® Reader® software, be sure to uncheck the checkbox of Fit to page on the Print dialog box.

Reader Feedback

This indicates information that could help the user to use the product more effectively.

• The Remote Customer Support System (REMCS) is not supported in Europe.• In this manual, it is assumed that two BMMs (optional products) can be connected to a single IO

Unit; this is reflected both in the explanations and in the figures included in this manual. At present, however, the PRIMEQUEST 480/440 series supports only connection to one BMM (BMM#0) per IO Unit.

• If you find any errors or unclear statements in this manual, please fill in the comment form sheet at the back of this manual and forward it to the indicated address.

• This manual is subject to revision without prior notice.• The PDF version of this manual is best viewed in Adobe® Reader® with a magnification of

100% and Single Page for the page layout.

ii U41631-J-Z816-5-76

Page 21: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

Contents

Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iStructure and Contents of this Manual . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iOther Reference Manuals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iiEnvironmental Requirements for Using This Product . . . . . . . . . . . . . . . . . . . . . iiConventions for Alert Messages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ii

CHAPTER 1 Installation Reference . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-11.1 Equipment Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-11.2 Views of the Units . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-71.3 Installation Specifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-111.4 Equipment Floor Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-341.5 Equipment Installation Patterns and Service Area . . . . . . . . . . . . . . . . . . . 1-371.6 Floor Plan of Openings in Floor and Template . . . . . . . . . . . . . . . . . . . . . . 1-41

1.6.1 Floor plans for openings in the floor . . . . . . . . . . . . . . . . . . . . . . . . . 1-431.6.2 Templates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-48

1.7 Cooling Air and Exhaust Flows . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-50

CHAPTER 2 Connection Reference. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-12.1 Connection Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-12.2 Signal Cable Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-4

2.2.1 Basic interfaces and peripherals . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-42.2.2 LAN and other device connections . . . . . . . . . . . . . . . . . . . . . . . . . 2-82.2.3 Notes on cabling PRIMEQUEST 580A/540A/580/540/480/440 . . . 2-112.2.4 Details of cable connection ports . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-12

2.3 Power Cable Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-222.3.1 Input power system diagram for the PRIMEQUEST 540A/540/440 2-232.3.2 Input power system diagram for the PRIMEQUEST 580A/580/480 2-262.3.3 Input power system diagram for the Extended I/O Cabinet and the

PCI_Box . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-312.4 Input Power Supply Unit Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-38

2.4.1 PRIMEQUEST 580A/540A/580/540/480/440 main unit . . . . . . . . . 2-382.4.2 Cables between PCI_Box and ACS in the Extended I/O Cabinet . . 2-392.4.3 Cables between ACS in the Extended I/O Cabinet and power

distribution board . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-402.5 AC Cable Connection under a Free-Access Floor

(Only for Use inside Japan and General Use outside Japan) . . . . . . . . . . . 2-412.6 Circuit Breaker Characteristics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-42

U41631-J-Z816-5-76 iii

Page 22: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

Contents

CHAPTER 3 Precautions Pertaining to Delivery and Installation . . . . . . . 3-13.1 Elevator Load Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-13.2 Earthquake Preparedness Measures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-2

3.2.1 Earthquake-proofing construction method . . . . . . . . . . . . . . . . . . . . 3-33.2.2 Examples of installing units using earthquake-proofing construction

methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-53.2.3 Seismic isolation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-9

Acronyms & Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . AB-1

Index . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . IN-1

iv U41631-J-Z816-5-76

Page 23: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

Contents

Figures

Figure 1.1 Configuration of the PRIMEQUEST 580A/540A/580/540/480/440 main unit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3

Figure 1.2 Configuration of the PRIMEQUEST 580A/540A/580/540/480/440 main unit and the Extended I/O Cabinet . . . . . . . . . . . . . . . . . . . 1-4

Figure 1.3 Configuration of the PRIMEQUEST 580/480 main unit and the Extended Power Cabinet . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5

Figure 1.4 Configuration of the PRIMEQUEST 580/480 main unit, the Extended I/O Cabinet, and the Extended Power Cabinet . . . 1-6

Figure 1.5 External view of the PRIMEQUEST 580A/540A/580/540/480/440 main unit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-7

Figure 1.6 External view of the Extended Power Cabinet . . . . . . . . . . . . . . . 1-8Figure 1.7 External view of the Extended I/O Cabinet . . . . . . . . . . . . . . . . . . 1-9Figure 1.8 External view of the PCI_Box . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-10Figure 1.9 PRIMEQUEST 580A/540A/580/540/480/440 floor plan . . . . . . . . 1-34Figure 1.10 Extended Power Cabinet floor plan . . . . . . . . . . . . . . . . . . . . . . . 1-35Figure 1.11 Extended I/O Cabinet floor plan . . . . . . . . . . . . . . . . . . . . . . . . . . 1-36Figure 1.12 Service area for the PRIMEQUEST 580A/540A/580/540/480/440

main unit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-37Figure 1.13 Service area for the PRIMEQUEST 580A/540A/580/540/480/440

main unit and the Extended I/O Cabinet . . . . . . . . . . . . . . . . . . . 1-38Figure 1.14 Service area for the PRIMEQUEST 580/480 main unit

and the Extended Power Cabinet . . . . . . . . . . . . . . . . . . . . . . . . . 1-39Figure 1.15 Service area for the PRIMEQUEST 580/480 main unit, the

Extended I/O Cabinet, and the Extended Power Cabinet . . . . . . 1-40Figure 1.16 Symbols used in floor plans and templates . . . . . . . . . . . . . . . . . 1-42Figure 1.17 Floor openings for the PRIMEQUEST 580A/540A/580/540/480/440

main unit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-44Figure 1.18 Floor openings for the PRIMEQUEST 580A/540A/580/540/480/440

main unit and the Extended I/O Cabinet . . . . . . . . . . . . . . . . . . . 1-45Figure 1.19 Floor openings for the PRIMEQUEST 580/480 main unit and the

Extended Power Cabinet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-46Figure 1.20 Floor openings for the PRIMEQUEST 580/480 main unit, the

Extended I/O Cabinet, and the Extended Power Cabinet . . . . . . 1-47Figure 1.21 Template for the PRIMEQUEST 580A/540A/580/540/480/440

main unit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-48Figure 1.22 Template for the PRIMEQUEST 580A/540A/580/540/480/440

main unit and the Extended I/O Cabinet . . . . . . . . . . . . . . . . . . . 1-48Figure 1.23 Template for the PRIMEQUEST 580/480 and the Extended Power

Cabinet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-49

U41631-J-Z816-5-76 v

Page 24: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

Contents

Figure 1.24 Template for the PRIMEQUEST 580/480 main unit, the Extended I/O Cabinet, and the Extended Power Cabinet . . . . . . . . . . . . . . . . . . . . . . . . . 1-49Figure 1.25 Cooling air and exhaust flows of

the PRIMEQUEST 580A/540A/580/540/480/440 main unit . . . . . 1-50Figure 1.26 Cooling air and exhaust flows of the Extended Power Cabinet . . 1-51Figure 1.27 Cooling air and exhaust flows of the Extended I/O Cabinet . . . . . 1-51Figure 1.28 Cooling air and exhaust flows of the PCI_Box . . . . . . . . . . . . . . . 1-52Figure 2.1 Equipment cable connections (1/2) . . . . . . . . . . . . . . . . . . . . . . . 2-2Figure 2.2 PRIMEQUEST 580A/540A/580/540/480/440 interface cable

connections (basic interfaces and peripherals) . . . . . . . . . . . . . . 2-5Figure 2.3 PRIMEQUEST 580A/540A/580/540/480/440 cable connections

(LAN and other device connections) . . . . . . . . . . . . . . . . . . . . . . . 2-8Figure 2.4 External interface connection ports in the

PRIMEQUEST 540A/540/440 main unit . . . . . . . . . . . . . . . . . . . . 2-13Figure 2.5 External interface connection ports in the

PRIMEQUEST 580A/580/480 main unit . . . . . . . . . . . . . . . . . . . . 2-14Figure 2.6 External interface ports in the KVMH . . . . . . . . . . . . . . . . . . . . . . 2-15Figure 2.7 External interface ports in the CPCB . . . . . . . . . . . . . . . . . . . . . . 2-15Figure 2.8 External interface ports in the MMBH . . . . . . . . . . . . . . . . . . . . . . 2-15Figure 2.9 External interface ports in the GSWB-1G . . . . . . . . . . . . . . . . . . . 2-16Figure 2.10 External interface ports in the GSWB-XG . . . . . . . . . . . . . . . . . . . 2-16Figure 2.11 External interface ports in the GTHB . . . . . . . . . . . . . . . . . . . . . . 2-16Figure 2.12 External interface ports in the IOUH . . . . . . . . . . . . . . . . . . . . . . . 2-17Figure 2.13 Input cable connection ports in the Extended Power Cabinet . . . 2-18Figure 2.14 Input cable connection ports in the Extended I/O Cabinet

(connected to PRIMEQUEST 540A/540/440 unit) . . . . . . . . . . . . 2-19Figure 2.15 Input cable connection ports in the Extended I/O Cabinet

(connected to PRIMEQUEST 580A/580/480 unit) . . . . . . . . . . . . 2-20Figure 2.16 External interface ports in the PCI_Box . . . . . . . . . . . . . . . . . . . . 2-21Figure 2.17 Input power system diagram for the PRIMEQUEST 540A/540/440

(standard configuration) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-23Figure 2.18 PSU locations in the standard PRIMEQUEST 540A/540/440

configuration (including a single power feed option and redundant power supply unit) . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-24

Figure 2.19 Input power system diagram for the PRIMEQUEST 540A/540/440 (dual power feed configuration) . . . . . . . . . . . . . . . . . . . . . . . . . . 2-25

Figure 2.20 PSU locations in the PRIMEQUEST 540A/540/440 with a Dual Power Feed Option . . . . . . . . . . . . . . . . . . . . . . . . . . 2-26

Figure 2.21 Input power system diagram for the PRIMEQUEST 580A/580/480 (standard configuration) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-27

vi U41631-J-Z816-5-76

Page 25: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

Contents

Figure 2.22 PSU locations in the standard PRIMEQUEST 580A/580/480 configuration (including a single power feed option and redundant power supply unit) . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-28

Figure 2.23 Input power system diagram for the PRIMEQUEST 580A/580/480 and Extended Power Cabinet (dual power feed configuration) . . 2-29

Figure 2.24 PSU locations in the PRIMEQUEST 580A/580/480 with a Dual Power Feed Option . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-30

Figure 2.25 Input power system diagram of PCI_Boxes in a single power feed configuration (including a redundant PSU) for use in Japan . . . . 2-32

Figure 2.26 Input power system diagram of PCI_Boxes in a dual power feed configuration for use in Japan . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-33

Figure 2.27 Input power system diagram of PCI_Boxes in a single power feed configuration (including a redundant PSU) for use outside Japan (general) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-34

Figure 2.28 Input power system diagram of PCI_Boxes in a dual power feed configuration for use outside Japan (general) 2-35

Figure 2.29 Input power system diagram of PCI_Boxes in a single power feed configuration (including a redundant PSU) for use in Europe . . . 2-36

Figure 2.30 Input power system diagram of PCI_Boxes in a dual power feed configuration for use in Europe . . . . . . . . . . . . . . . . . . . . . . . . . . 2-37

Figure 2.31 AC cable connection under a free-access floor (only for use inside Japan and general use outside Japan) . . . . . 2-41

Figure 2.32 Characteristics of circuit breakers in customers' distribution panels installed in Japan . . . . . . . . . . . . . 2-43

Figure 2.33 Characteristics of circuit breakers in customers' distribution panels installed outside Japan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-44

Figure 3.1 Earthquake-proofing construction method (anchoring on the floor surface) . . . . . . . . . . . . . . . . . . . . . . . . . . 3-3

Figure 3.2 Earthquake-proofing construction method (through-floor anchoring) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-4

Figure 3.3 Example of installing a PRIMEQUEST 580A/540A/580/540/480/440 system by using the earthquake-proofing construction method . . 3-5

Figure 3.4 Example of installing a PRIMEQUEST 580A/540A/580/480 system with an Extended Power Cabinet by using the earthquake-proofing construction method . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-6

Figure 3.5 Example of installing a PRIMEQUEST 580A/540A/580/540/480/440 system with an Extended I/O Cabinet by using the earthquake-proofing construction method . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-7

Figure 3.6 Example of installing a PRIMEQUEST 580A/580/480 system with an Extended Power Cabinet and Extended I/O Cabinet by using the earthquake-proofing construction method . . . . . . . . 3-8

U41631-J-Z816-5-76 vii

Page 26: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

Contents

Figure 3.7 Opening on the free-access floor when a seismic-isolation leveling foot is used . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-9

viii U41631-J-Z816-5-76

Page 27: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

U41631-J-Z816-5-76 ix

Contents

Tables

Table 1.1 Units and their specifications. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1Table 1.2 PRIMEQUEST 580A main unit installation specifications

(Model name: MC5C0P3a1x) . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-12Table 1.3 PRIMEQUEST 540A main unit installation specifications

(Model name: MC4C0P3a1x) . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-15Table 1.4 PRIMEQUEST 580 main unit installation specifications

(Model name: MC5B0P2a1x) . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-17Table 1.5 PRIMEQUEST 540 main unit installation specifications

(Model name: MC4B0P2a1x) . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-20Table 1.6 PRIMEQUEST 480 main unit installation specifications

(Model name: MC5A0P1a1x) . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-22Table 1.7 PRIMEQUEST 440 main unit installation specifications

(Model name: MC4A0P1a1x) . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-25Table 1.8 Extended Power Cabinet installation specifications

(Model name: MC-57DPa1x, MC-77UGDax) . . . . . . . . . . . . . . . . 1-27Table 1.9 Extended I/O Cabinet installation specifications

(Model name: MC-77RKa1x, MC-87RKa1x) . . . . . . . . . . . . . . . . . 1-30Table 1.10 PCI_Box installation specifications (Model name: MC-07PBa1x) . 1-32Table 2.1 Cable list (basic interface and peripherals) . . . . . . . . . . . . . . . . . . 2-6Table 2.2 Cable list (LAN and other device connections) . . . . . . . . . . . . . . . 2-9Table 2.3 AC cable specifications for the

PRIMEQUEST 580A/540A/580/540/480/440 main unit . . . . . . . . 2-38Table 2.4 Specifications of the AC cables used between a PCI_Box

and ACS in the Extended I/O Cabinet . . . . . . . . . . . . . . . . . . . . . . 2-39Table 2.5 Specifications of the AC cables between ACS in the Extended I/O

Cabinet and power distribution board . . . . . . . . . . . . . . . . . . . . . . 2-40Table 2.6 Requirements for circuit breakers in

customers' distribution panels installed in Japan . . . . . . . . . . . . . 2-42Table 2.7 Requirements for circuit breakers in customers’ distribution

panels installed outside Japan . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-44Table 3.1 Elevator load requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1

Page 28: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF
Page 29: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 1 Installation Reference1

This chapter provides the information required for installing the PRIMEQUEST 580A/540A/580/540/480/440 server.

1.1 Equipment Configuration

Table 1.1 lists the units that comprise the PRIMEQUEST server and their specifications. Figure 1.1 to Figure 1.4 show a sample system configuration.

Table 1.1 Units and their specifications

Unit Specifications RemarksPRIMEQUEST 580/480 main unit

Unit that can contain up to eight system boards (maximum of 32 CPUs) and up to eight IO Units

Standard equipment

PRIMEQUEST 540/440 main unit

Unit that can contain up to four system boards (maximum of 16 CPUs) and up to four IO Units

Standard equipment

Extended Power Cabinet

Power supply cabinet that is connected to the PRIMEQUEST 580A/540A/580/540/480/440 main unit for dual power feed configuration

Extended I/O Cabinet Cabinet that contains PCI_Boxes and that is connected to the PRIMEQUEST 580/480 or PRIMEQUEST 540/440 main unit

U41631-J-Z816-5-76 1-1

Page 30: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 1 Installation Reference

*1 PCI Express units can be connected to only the PRIMEQUEST 580A/540A/580/540 main unit. Up to 16 units can be connected to the PRIMEQUEST 580A/580 main unit, and up to 8 units can be connected to the PRIMEQUEST 540A/540 main unit.

PCI_Box Device used to expand the number of PCI or PCI Express slots.Up to eight units can be connected to the PRIMEQUEST 580A/580/480 main unit.Up to four units can be connected to the PRIMEQUEST 540/440 main unit.Four PCI or PCI Express units can be added with each addition of a PCI_Box. (*1)(PCI units and PCI Express units can be mounted together.)Each PCI unit has three PCI slots, and each PCI Express unit has two PCI Express slots.

Unit Specifications Remarks

1-2 U41631-J-Z816-5-76

Page 31: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

1.1 Equipment Configuration

Figure 1.1 Configuration of the PRIMEQUEST 580A/540A/580/540/480/440 main unit

U41631-J-Z816-5-76 1-3

Page 32: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 1 Installation Reference

Figure 1.2 Configuration of the PRIMEQUEST 580A/540A/580/540/480/440 main unit and the Extended I/O Cabinet

1-4 U41631-J-Z816-5-76

Page 33: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

1.1 Equipment Configuration

Figure 1.3 Configuration of the PRIMEQUEST 580/480 main unit and the Extended Power Cabinet

U41631-J-Z816-5-76 1-5

Page 34: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 1 Installation Reference

Figure 1.4 Configuration of the PRIMEQUEST 580/480 main unit, the Extended I/O Cabinet, and the Extended Power Cabinet

1-6 U41631-J-Z816-5-76

Page 35: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

1.2 Views of the Units

1.2 Views of the Units

The following figures show different views of the units:

External view of the PRIMEQUEST 580A/540A/580/540/480/440 main unit (Figure 1.5)External view of the Extended Power Cabinet (Figure 1.6)External view of the Extended I/O Cabinet (Figure 1.7)External view of the PCI_Box (Figure 1.8)

Figure 1.5 External view of the PRIMEQUEST 580A/540A/580/540/480/440 main unit

U41631-J-Z816-5-76 1-7

Page 36: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 1 Installation Reference

Figure 1.6 External view of the Extended Power Cabinet

1-8 U41631-J-Z816-5-76

Page 37: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

1.2 Views of the Units

Figure 1.7 External view of the Extended I/O Cabinet

U41631-J-Z816-5-76 1-9

Page 38: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 1 Installation Reference

Figure 1.8 External view of the PCI_Box

1-10 U41631-J-Z816-5-76

Page 39: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

1.3 Installation Specifications

1.3 Installation Specifications

The following tables list the installation specifications for the units:

PRIMEQUEST 580A main unit installation specifications (Model name: MC5C0P3a1x) (Table 1.2)PRIMEQUEST 540A main unit installation specifications (Model name: MC4C0P3a1x) (Table 1.3)PRIMEQUEST 580 main unit installation specifications (Model name: MC5B0P2a1x) (Table 1.4)PRIMEQUEST 540 main unit installation specifications (Model name: MC4B0P2a1x) (Table 1.5)PRIMEQUEST 480 main unit installation specifications (Model name: MC5A0P1a1x) (Table 1.6)PRIMEQUEST 440 main unit installation specifications (Model name: MC4A0P1a1x) (Table 1.7)Extended Power Cabinet installation specifications (Model name: MC-57DPa1x, MC-77UGDax) (Table 1.8)Extended I/O Cabinet installation specifications (Model name: MC-77RKa1x, MC-87RKa1x) (Table 1.9)PCI_Box installation specifications (Model name: MC-07PBa1x) (Table 1.10)

Remarks: In model names, a is any digit from 1 to 9 or any letter from A to Z, while x is any letter from A to Z or blank.

U41631-J-Z816-5-76 1-11

Page 40: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 1 Installation Reference

Table 1.2 PRIMEQUEST 580A main unit installation specifications (Model name: MC5C0P3a1x)

Item Value

Dimensions[mm (in.)]

Width 738 (29.06)Depth (*1) 1100 (43.31)Height 1800 (70.87)

Weight [kg (lb)] (*2) 730 (1608)Air conditioning Maximum heat dissipation [kJ/Hr (BTU/h)] (*3) 39200 (37161)

Exhaust air flow (*10)[m3/min (ft3/min)]

With fans operating at low speed

49.1 (1733.9)

With fans operating at high speed

62.2 (2196.6)

Temperature and humidity (*4)

Operating Temperature [°C (°F)] (*5)Humidity [%RH] 20 to 80Maximum wet bulb temperature [°C (°F)]

26 (78.8)

Stand-by Temperature [°C (°F)] 0 to 40 (32 to 104)Humidity [%RH] 20 to 80Maximum wet bulb temperature [°C (°F)]

26 (78.8)

Not operating (*6)

Temperature [°C (°F)] 0 to 50 (32 to 122)Humidity [%RH] 8 to 80Maximum wet bulb temperature [°C (°F)]

27 (80.6)

Noise [dB (A)] (*7) (*10) 66Sound power level [B (A)] (*7) (*10) 8.5Allowable vibration

[m/s2]

Operating (including standby) 2.5 (Synthetic seismic vibration)

Not operating (*6) 4.0 (Synthetic seismic vibration)

Allowable dust [mg/m3] 0.15

1-12 U41631-J-Z816-5-76

Page 41: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

1.3 Installation Specifications

*1: This value does not include any projection.

*2: Value for the case with the maximum number of optional units allowed installed.The weight of the unit based on the equipment configuration can be calculated from the following formula:

When 32-GB memory is mounted, the formula is as follows:

A = Number of SBs mounted: From a minimum of one to a maximum of eight

B = Number of IOUs mounted: From a minimum of one to a maximum of eight

C = Number of GSWBs or GTHBs mounted:From a minimum of zero to a maximum of two

D = Number of Additional Power Supply Units mounted:From a minimum of zero to a maximum of one

*3: When up to 2 TB-memory is mounted, the maximum heat dissipation is 44,600 KJ/h.

Power supply Input voltage tolerance and No. of phases 200 to 240 VAC ± 10 %1φ

Frequency and tolerance 50/60 Hz +2/-4 HzMaximum power consumption/apparent power (*8)

Operating Five SBs or five IO Units or more

10,900 W/11,000 VA

Four SBs or less and four IO Units or less

6,490 W/6,630 VA

Not operating Five SBs or five IO Units or more

300 VA

Four SBs or less and four IO Units or less

300 VA

Power factor 0.9 or moreInrush current [A] [Inrush duration] (*9) 100 or lessLeakage current [mA] (*9) 3.5 or lessCB/breaker capacity [A] 20

Unit weight = 492 + (12 x A) + (15 x B) + (1 x C) + (10 x D)

Unit weight = 492 + (13 x A) + (15 x B) + (1 x C) + (10 x D)

Item Value

U41631-J-Z816-5-76 1-13

Page 42: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 1 Installation Reference

*4: There must be no condensation.

*5: The temperature requirement depends on the installation altitude.

- 5 to 35 °C (41 to 95.0 °F)[if installed at an altitude of 0 to 1500 m (0 to 4921.2 ft)]

- 5 to 33 °C (41 to 91.4 °F)[if installed at an altitude of 1500 to 2000 m (4921.2 to 6561.6 ft)]

- 5 to 32 °C (41 to 89.6 °F)[if installed at an altitude of 2000 to 2500 m (6561.6 to 8202 ft)]

- 5 to 30 °C (41 to 86 °F)[if installed at an altitude of 2500 to 3000 m (8202 to 9842.4 ft)]

*6: "Not operating" means the time when the equipment is stored.

*7: The noise and sound power level vary on the ambient temperature.

*8 When up to 2 TB-memory is mounted, the maximum power consumption/apparent power is 12,400 W/12,500 VA.

*9: These values are for each power cable.

*10: If the intake air temperature is high (within the normal temperature) in normal operation, the FAN rotate at high speed. [addition according to the manual errata 2008/09/19]

1-14 U41631-J-Z816-5-76

Page 43: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

1.3 Installation Specifications

Table 1.3 PRIMEQUEST 540A main unit installation specifications (Model name: MC4C0P3a1x)

Item Value

Dimensions[mm (in.)]

Width 738 (29.06)Depth (*1) 1100 (43.31)Height 1800 (70.87)

Weight [kg (lb)] (*2) 605 (1332)Air conditioning Maximum heat dissipation [kJ/Hr (BTU/h)] (*3) 22680 (21496)

Exhaust air flow (*10)[m3/min (ft3/min)]

With fans operating at low speed

39.1 (1380.8)

With fans operating at high speed

49.7 (1755.1)

Temperature and humidity (*4)

Operating Temperature [°C (°F)] (*5)Humidity [%RH] 20 to 80Maximum wet bulb temperature [°C (°F)]

26 (78.8)

Stand-by Temperature [°C (°F)] 0 to 40 (32 to 104)Humidity [%RH] 20 to 80Maximum wet bulb temperature [°C (°F)]

26 (78.8)

Not operating (*6)

Temperature [°C (°F)] 0 to 50 (32 to 122)Humidity [%RH] 8 to 80Maximum wet bulb temperature [°C (°F)]

27 (80.6)

Noise [dB (A)] (*7) (*10) 66Sound power level [B (A)] (*7) (*10) 8.5Allowable vibration

[m/s2]

Operating (including standby) 2.5 (Synthetic seismic vibration)

Not operating (*6) 4.0 (Synthetic seismic vibration)

Allowable dust [mg/m3] 0.15

Power supply Input voltage tolerance and No. of phases 200 to 240 VAC ± 10 %1φ

Frequency and tolerance 50/60 Hz +2/-4 HzMaximum power consumption/apparent power (*8)

Operating 6,300 W/6,400 VANot operating 300 VA

Power factor 0.9 or moreInrush current [A] [Inrush duration] (*9) 100 or lessLeakage current [mA] (*9) 3.5 or lessCB/breaker capacity [A] 20

U41631-J-Z816-5-76 1-15

Page 44: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 1 Installation Reference

*1: This value does not include any projection.

*2: Value for the case with the maximum number of optional units allowed installed.The weight of the unit based on the equipment configuration can be calculated from the following formula:

When 32-GB memory is mounted, the formula is as follows:

E = Number of SBs mounted: From a minimum of one to a maximum of four

F = Number of IOUs mounted: From a minimum of one to a maximum of four

G = Number of GSWBs or GTHBs mounted:From a minimum of zero to a maximum of two

H = Number of Dual Power Feed Options mounted:From a minimum of zero to a maximum of one

*3: When up to 2 TB-memory is mounted, the maximum heat dissipation is 24,900 KJ/h.

*4: There must be no condensation.*5: The temperature requirement depends on the installation altitude.

- 5 to 35 °C (41 to 95.0 °F)[if installed at an altitude of 0 to 1500 m (0 to 4921.2 ft)]

- 5 to 33 °C (41 to 91.4 °F)[if installed at an altitude of 1500 to 2000 m (4921.2 to 6561.6 ft)]

- 5 to 32 °C (41 to 89.6 °F)[if installed at an altitude of 2000 to 2500 m (6561.6 to 8202 ft)]

- 5 to 30 °C (41 to 86 °F)[if installed at an altitude of 2500 to 3000 m (8202 to 9842.4 ft)]

*6: "Not operating" means the time when the equipment is stored.*7: The noise and sound power level vary on the ambient temperature.*8: When up to 2 TB-memory is mounted, the maximum power consumption/

apparent power is 6,920 W/7,040 VA.*9: These values are for each power cable.

*10: If the intake air temperature is high (within the normal temperature) in normal operation, the FAN rotate at high speed. [addition according to the manual errata 2008/09/19]

Unit weight = 464 + (12 x E) + (15 x F) + (1 x G) + (26 x H)

Unit weight = 464 + (13 x E) + (15 x F) + (1 x G) + (10 x H)

1-16 U41631-J-Z816-5-76

Page 45: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

1.3 Installation Specifications

Table 1.4 PRIMEQUEST 580 main unit installation specifications (Model name: MC5B0P2a1x)

Item Value

Dimensions[mm (in.)]

Width 738 (29.06)Depth (*1) 1100 (43.31)Height 1800 (70.87)

Weight [kg (lb)] (*2) 730 (1608)Air conditioning Maximum heat dissipation [kJ/Hr (BTU/h)] (*3) 39240 (37192)

Exhaust air flow (*10)[m3/min (ft3/min)]

With fans operating at low speed

49.1 (1733.9)

With fans operating at high speed

62.2 (2196.6)

Temperature and humidity (*4)

Operating Temperature [°C (°F)] (*5)Humidity [%RH] 20 to 80Maximum wet bulb temperature [°C (°F)]

26 (78.8)

Stand-by Temperature [°C (°F)] 0 to 40 (32 to 104)Humidity [%RH] 20 to 80Maximum wet bulb temperature [°C (°F)]

26 (78.8)

Not operating (*6)

Temperature [°C (°F)] 0 to 50 (32 to 122)Humidity [%RH] 8 to 80Maximum wet bulb temperature [°C (°F)]

27 (80.6)

Noise [dB (A)] (*7) (*10) 66Sound power level [B (A)] (*7) (*10) 8.5Allowable vibration

[m/s2]

Operating (including standby) 2.5 (Synthetic seismic vibration)

Not operating (*6) 4.0 (Synthetic seismic vibration)

Allowable dust [mg/m3] 0.15

U41631-J-Z816-5-76 1-17

Page 46: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 1 Installation Reference

*1: This value does not include any projection.

*2: Value for the case with the maximum number of optional units allowed installed.The weight of the unit based on the equipment configuration can be calculated from the following formula:

When 32-GB memory is mounted, the formula is as follows:

A = Number of SBs mounted: From a minimum of one to a maximum of eight

B = Number of IOUs mounted: From a minimum of one to a maximum of eight

C = Number of GSWBs or GTHBs mounted:From a minimum of zero to a maximum of two

D = Number of Additional Power Supply Units mounted:From a minimum of zero to a maximum of one

*3: When up to 2 TB-memory is mounted, the maximum heat dissipation is 44,600 KJ/h.

Power supply Input voltage tolerance and No. of phases 200 to 240 VAC ± 10 %1φ

Frequency and tolerance 50/60 Hz +2/-4 HzMaximum power consumption/apparent power (*8)

Operating Five SBs or five IO Units or more

10,900 W/11,000 VA

Four SBs or less and four IO Units or less

6,300 W/6,400 VA

Not operating Five SBs or five IO Units or more

300 VA

Four SBs or less and four IO Units or less

300 VA

Power factor 0.9 or moreInrush current [A] [Inrush duration] (*9) 100 or lessLeakage current [mA] (*9) 3.5 or lessCB/breaker capacity [A] 20

Unit weight = 492 + (12 x A) + (15 x B) + (1 x C) + (10 x D)

Unit weight = 492 + (13 x A) + (15 x B) + (1 x C) + (10 x D)

Item Value

1-18 U41631-J-Z816-5-76

Page 47: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

1.3 Installation Specifications

*4: There must be no condensation.

*5: The temperature requirement depends on the installation altitude.

- 5 to 35 °C (41 to 95.0 °F)[if installed at an altitude of 0 to 1500 m (0 to 4921.2 ft)]

- 5 to 33 °C (41 to 91.4 °F)[if installed at an altitude of 1500 to 2000 m (4921.2 to 6561.6 ft)]

- 5 to 32 °C (41 to 89.6 °F)[if installed at an altitude of 2000 to 2500 m (6561.6 to 8202 ft)]

- 5 to 30 °C (41 to 86 °F)[if installed at an altitude of 2500 to 3000 m (8202 to 9842.4 ft)]

*6: "Not operating" means the time when the equipment is stored.

*7: The noise and sound power level vary on the ambient temperature.

*8 When up to 2 TB-memory is mounted, the maximum power consumption/apparent power is 12,400 W/12,500 VA.

*9: These values are for each power cable.

*10: If the intake air temperature is high (within the normal temperature) in normal operation, the FAN rotate at high speed. [addition according to the manual errata 2008/09/19]

U41631-J-Z816-5-76 1-19

Page 48: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 1 Installation Reference

Table 1.5 PRIMEQUEST 540 main unit installation specifications (Model name: MC4B0P2a1x)

Item Value

Dimensions[mm (in.)]

Width 738 (29.06)Depth (*1) 1100 (43.31)Height 1800 (70.87)

Weight [kg (lb)] (*2) 605 (1332)Air conditioning Maximum heat dissipation [kJ/Hr (BTU/h)] (*3) 22680 (21496)

Exhaust air flow (*10)[m3/min (ft3/min)]

With fans operating at low speed

39.1 (1380.8)

With fans operating at high speed

49.7 (1755.1)

Temperature and humidity (*4)

Operating Temperature [°C (°F)] (*5)Humidity [%RH] 20 to 80Maximum wet bulb temperature [°C (°F)]

26 (78.8)

Stand-by Temperature [°C (°F)] 0 to 40 (32 to 104)Humidity [%RH] 20 to 80Maximum wet bulb temperature [°C (°F)]

26 (78.8)

Not operating (*6)

Temperature [°C (°F)] 0 to 50 (32 to 122)Humidity [%RH] 8 to 80Maximum wet bulb temperature [°C (°F)]

27 (80.6)

Noise [dB (A)] (*7) (*10) 66Sound power level [B (A)] (*7) (*10) 8.5Allowable vibration

[m/s2]

Operating (including standby) 2.5 (Synthetic seismic vibration)

Not operating (*6) 4.0 (Synthetic seismic vibration)

Allowable dust [mg/m3] 0.15

Power supply Input voltage tolerance and No. of phases 200 to 240 VAC ± 10 %1φ

Frequency and tolerance 50/60 Hz +2/-4 HzMaximum power consumption/apparent power (*8)

Operating 6,300 W/6,400 VANot operating 300 VA

Power factor 0.9 or moreInrush current [A] [Inrush duration] (*9) 100 or lessLeakage current [mA] (*9) 3.5 or lessCB/breaker capacity [A] 20

1-20 U41631-J-Z816-5-76

Page 49: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

1.3 Installation Specifications

*1: This value does not include any projection.

*2: Value for the case with the maximum number of optional units allowed installed.The weight of the unit based on the equipment configuration can be calculated from the following formula:

When 32-GB memory is mounted, the formula is as follows:

E = Number of SBs mounted: From a minimum of one to a maximum of four

F = Number of IOUs mounted: From a minimum of one to a maximum of four

G = Number of GSWBs or GTHBs mounted:From a minimum of zero to a maximum of two

H = Number of Dual Power Feed Options mounted:From a minimum of zero to a maximum of one

*3: When up to 2 TB-memory is mounted, the maximum heat dissipation is 24,200 KJ/h.

*4: There must be no condensation.*5: The temperature requirement depends on the installation altitude.

- 5 to 35 °C (41 to 95.0 °F)[if installed at an altitude of 0 to 1500 m (0 to 4921.2 ft)]

- 5 to 33 °C (41 to 91.4 °F)[if installed at an altitude of 1500 to 2000 m (4921.2 to 6561.6 ft)]

- 5 to 32 °C (41 to 89.6 °F)[if installed at an altitude of 2000 to 2500 m (6561.6 to 8202 ft)]

- 5 to 30 °C (41 to 86 °F)[if installed at an altitude of 2500 to 3000 m (8202 to 9842.4 ft)]

*6: "Not operating" means the time when the equipment is stored.*7: The noise and sound power level vary on the ambient temperature.*8: When up to 2 TB-memory is mounted, the maximum power consumption/

apparent power is 6,720 W/6,790 VA.*9: These values are for each power cable.*10: If the intake air temperature is high (within the normal temperature) in

normal operation, the FAN rotate at high speed. [addition according to the manual errata 2008/09/19]

Unit weight = 464 + (12 x E) + (15 x F) + (1 x G) + (26 x H)

Unit weight = 464 + (13 x E) + (15 x F) + (1 x G) + (10 x H)

U41631-J-Z816-5-76 1-21

Page 50: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 1 Installation Reference

Table 1.6 PRIMEQUEST 480 main unit installation specifications (Model name: MC5A0P1a1x)

Item Value

Dimensions[mm (in.)]

Width 738 (29.06)Depth (*1) 1100 (43.31)Height 1800 (70.87)

Weight [kg (lb)] (*2) 720 (1584)Air conditioning Maximum heat dissipation

(*9)[kJ/Hr (BTU/h)]

Five SBs or five IO Units or more

36600 (34689)

Four SBs or less and four IO Units or less

20500 (19430)

Exhaust air flow

[m3/min (ft3/min)]

With fans operating at low speed

49.1 (1733.9)

With fans operating at high speed

62.2 (2196.6)

Temperature and humidity (*3)

Operating Temperature [°C (°F)] (*4)Humidity [%RH] 20 to 80Maximum wet bulb temperature [°C (°F)]

26 (78.8)

Stand-by Temperature [°C (°F)] 0 to 40 (32 to 104)Humidity [%RH] 20 to 80Maximum wet bulb temperature [°C (°F)]

26 (78.8)

Not operating (*5)

Temperature [°C (°F)] 0 to 50 (32 to 122)Humidity [%RH] 8 to 80Maximum wet bulb temperature [°C (°F)]

27 (80.6)

Noise [dB (A)] (*6) (*9) 66Sound power level [B (A)] (*6) (*9) 8.5Allowable vibration

[m/s2]

Operating (including standby) 2.5 (Synthetic seismic vibration)

Not operating (*5) 4.0 (Synthetic seismic vibration)

Allowable dust [mg/m3] 0.15

Power supply Input voltage tolerance and No. of phases 200 to 240 VAC ± 10 %1φ

Frequency and tolerance 50/60 Hz +2/-4 Hz

1-22 U41631-J-Z816-5-76

Page 51: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

1.3 Installation Specifications

*1: This value does not include any projection.

*2: Value for the case the maximum allowable number of optional units is mounted.The weight of the unit based on the equipment configuration can be calculated from the following formula:

A = Number of SBs mounted: From a minimum of one to a maximum of eight

B = Number of IOUs mounted: From a minimum of one to a maximum of eight

C = Number of GSWBs mounted: From a minimum of zero to a maximum of two

D = Number of Additional Power Supply Units mounted:From a minimum of zero to a maximum of one

*3: There must be no condensation.

Power supply Maximum power consumption/apparent power (*7)

Operating Five SBs or five IO Units or more

10,600 W/10,700 VA

Four SBs or less and four IO Units or less

5,890 W/6,000 VA

Not operating Five SBs or five IO Units or more

300 VA

Four SBs or less and four IO Units or less

300 VA

Power factor 0.9 or moreInrush current [A] [Inrush duration] (*8) 100 or lessLeakage current [mA] (*8) 3.5 or lessCB/breaker capacity [A] 20

Unit weight = 492 + (12 x A) + (15 x B) + (1 x C) + (10 x D)

Item Value

U41631-J-Z816-5-76 1-23

Page 52: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 1 Installation Reference

*4: The temperature requirement depends on the installation altitude.

- 5 to 35 °C (41 to 95.0 °F)[if installed at an altitude of 0 to 1500 m (0 to 4921.2 ft)]

- 5 to 33 °C (41 to 91.4 °F)[if installed at an altitude of 1500 to 2000 m (4921.2 to 6561.6 ft)]

- 5 to 32 °C (41 to 89.6 °F)[if installed at an altitude of 2000 to 2500 m (6561.6 to 8202 ft)]

- 5 to 30 °C (41 to 86 °F)[if installed at an altitude of 2500 to 3000 m (8202 to 9842.4 ft)]

*5: "Not operating" means the time when the equipment is stored.

*6: The noise and sound power level vary on the ambient temperature.

*7 The maximum power consumption and apparent power used when memory has been expanded to a maximum of 1 terabyte are 12,400 W and 12,500 VA, respectively.

*8: These values are for each power cable.

*9: If the intake air temperature is high (within the normal temperature) in normal operation, the FAN rotate at high speed. [addition according to the manual errata 2008/09/19]

1-24 U41631-J-Z816-5-76

Page 53: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

1.3 Installation Specifications

Table 1.7 PRIMEQUEST 440 main unit installation specifications (Model name: MC4A0P1a1x)

Item Value

Dimensions[mm (in.)]

Width 738 (29.06)Depth (*1) 1100 (43.31)Height 1800 (70.87)

Weight [kg (lb)] (*2) 600 (1320)Air conditioning Maximum heat dissipation [kJ/Hr (BTU/h)] (*8) 20500 (19430)

Exhaust air flow

[m3/min (ft3/min)]

With fans operating at low speed

39.1 (1380.8)

With fans operating at high speed

49.7 (1755.1)

Temperature and humidity (*3)

Operating Temperature [°C (°F)] (*4)Humidity [%RH] 20 to 80Maximum wet bulb temperature [°C (°F)]

26 (78.8)

Stand-by Temperature [°C (°F)] 0 to 40 (32 to 104)Humidity [%RH] 20 to 80Maximum wet bulb temperature [°C (°F)]

26 (78.8)

Not operating (*5)

Temperature [°C (°F)] 0 to 50 (32 to 122)Humidity [%RH] 8 to 80Maximum wet bulb temperature [°C (°F)]

27 (80.6)

Noise [dB (A)] (*6) (*8) 66Sound power level [B (A)] (*6) (*8) 8.5Allowable vibration

[m/s2]

Operating (including standby) 2.5 (Synthetic seismic vibration)

Not operating (*5) 4.0 (Synthetic seismic vibration)

Allowable dust [mg/m3] 0.15

Power supply Input voltage tolerance and No. of phases 200 to 240 VAC ± 10 %1φ

Frequency and tolerance 50/60 Hz +2/-4 HzMaximum power consumption/apparent power

Operating 5,890 W/6,000 VANot operating 300 VA

Power factor 0.9 or moreInrush current [A] [Inrush duration] (*7) 100 or lessLeakage current [mA] (*7) 3.5 or lessCB/breaker capacity [A] 20

U41631-J-Z816-5-76 1-25

Page 54: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 1 Installation Reference

*1: This value does not include any projection.

*2: Value for the case the maximum allowable number of optional units is mounted.The weight of the unit based on the equipment configuration can be calculated from the following formula:

E = Number of SBs mounted: From a minimum of one to a maximum of four

F = Number of IOUs mounted: From a minimum of one to a maximum of four

G = Number of GSWBs mounted: From a minimum of zero to a maximum of two

H = Number of Dual Power Feed Options mounted:From a minimum of zero to a maximum of one

*3: There must be no condensation.

*4: The temperature requirement depends on the installation altitude.

- 5 to 35 °C (41 to 95.0 °F)[if installed at an altitude of 0 to 1500 m (0 to 4921.2 ft)]

- 5 to 33 °C (41 to 91.4 °F)[if installed at an altitude of 1500 to 2000 m (4921.2 to 6561.6 ft)]

- 5 to 32 °C (41 to 89.6 °F)[if installed at an altitude of 2000 to 2500 m (6561.6 to 8202 ft)]

- 5 to 30 °C (41 to 86 °F)[if installed at an altitude of 2500 to 3000 m (8202 to 9842.4 ft)]

*5: "Not operating" means the time when the equipment is stored.

*6: The noise and sound power level vary on the ambient temperature.

*7: These values are for each power cable.

*8: If the intake air temperature is high (within the normal temperature) in normal operation, the FAN rotate at high speed. [addition according to the manual errata 2008/09/19]

Unit weight = 464 + (12 x E) + (15 x F) + (1 x G) + (26 x H)

1-26 U41631-J-Z816-5-76

Page 55: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

1.3 Installation Specifications

Table 1.8 Extended Power Cabinet installation specifications (Model name: MC-57DPa1x, MC-77UGDax)

Item Value

Dimensions[mm (in.)]

Width 300 (11.81)Depth (*1) 1100 (43.31)Height 1800 (70.87)

Weight [kg (lb)] (*2) 300 (660)Air conditioning Maximum heat dissipation

[kJ/Hr (BTU/h)]Five SBs or five IO Units or more

5500 (5213)

Four SBs or less and four IO Units or less

3200 (3033)

Exhaust air flow (*8)[m3/min (ft3/min)]

With fans operating at low speed

3.8 (134.2)

With fans operating at high speed

5.5 (194.2)

Temperature and humidity (*3)

Operating Temperature [°C (°F)] (*4)Humidity [%RH] 20 to 80Maximum wet bulb temperature [°C (°F)]

26 (78.8)

Stand-by Temperature [°C (°F)] 0 to 40 (32 to 104)Humidity [%RH] 20 to 80Maximum wet bulb temperature [°C (°F)]

26 (78.8)

Not operating (*5)

Temperature [°C (°F)] 0 to 50 (32 to 122)Humidity [%RH] 8 to 80Maximum wet bulb temperature [°C (°F)]

27 (80.6)

Noise [dB (A)] (*6) (*8) 66 (included in the main unit)

Sound power level [B (A)] (*6) (*8) 8.5 (included in the main unit)

Allowable vibration

[m/s2]

Operating (including standby) 2.5 (Synthetic seismic vibration)

Not operating (*5) 4.0 (Synthetic seismic vibration)

Allowable dust [mg/m3] 0.15

U41631-J-Z816-5-76 1-27

Page 56: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 1 Installation Reference

*1: This value does not include any projection.

*2: Value for the case the maximum allowable number of optional units is mounted.The weight of the unit based on the equipment configuration can be calculated from the following formula:

J = Number of Additional Power Supply Units mounted:From a minimum of zero to a maximum of one

*3: There must be no condensation.

Power supply Input voltage tolerance and No. of phases 200 to 240 VAC ± 10 %1φ

Frequency and tolerance 50/60 Hz +2/-4 HzMaximum power consumption/apparent power

Operating Five SBs or five IO Units or more

10,900 W/11,000 VA (For PRIMEQUEST 580A/580)10,600 W/10,700 VA (For PRIMEQUEST 480)

Four SBs or less and four IO Units or less

6,490 W/6,630 VA (For PRIMEQUEST 580A/580)5,890 W/6,000 VA (For PRIMEQUEST 480)

Not operating Five SBs or five IO Units or more

300 VA

Four SBs or less and four IO Units or less

300 VA

Power factor 0.9 or moreInrush current [A] [Inrush duration] (*7) 100 or lessLeakage current [mA] (*7) 3.5 or lessCB/breaker capacity [A] 20

Unit weight = 290 + (10 x J)

Item Value

1-28 U41631-J-Z816-5-76

Page 57: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

1.3 Installation Specifications

*4: The temperature requirement depends on the installation altitude.

- 5 to 35 °C (41 to 95.0 °F)[if installed at an altitude of 0 to 1500 m (0 to 4921.2 ft)]

- 5 to 33 °C (41 to 91.4 °F)[if installed at an altitude of 1500 to 2000 m (4921.2 to 6561.6 ft)]

- 5 to 32 °C (41 to 89.6 °F)[if installed at an altitude of 2000 to 2500 m (6561.6 to 8202 ft)]

- 5 to 30 °C (41 to 86 °F)[if installed at an altitude of 2500 to 3000 m (8202 to 9842.4 ft)]

*5: "Not operating" means the time when the equipment is stored.

*6: The noise and sound power level vary on the ambient temperature.

*7: These values are for each power cable.

*8: If the intake air temperature is high (within the normal temperature) in normal operation, the FAN rotate at high speed. [addition according to the manual errata 2008/09/19]

U41631-J-Z816-5-76 1-29

Page 58: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 1 Installation Reference

Table 1.9 Extended I/O Cabinet installation specifications (Model name: MC-77RKa1x, MC-87RKa1x)

Item Value

Dimensions[mm (in.)]

Width 680 (29.77)Depth (*1) 1100 (43.31)Height 1800 (70.87)

Weight [kg (lb)] (*2) 600 (1320)Air conditioning Maximum heat dissipation [kJ/Hr (BTU/h)] 20500 (19430)

Exhaust air flow (*8)[m3/min (ft3/min)]

With fans operating at low speed

35.9 (1268.5)

With fans operating at high speed

46.7 (1649.9)

Temperature and humidity (*3)

Operating Temperature [°C (°F)] (*4)Humidity [%RH] 20 to 80Maximum wet bulb temperature [°C (°F)]

26 (78.7)

Stand-by Temperature [°C (°F)] 0 to 40 (32 to 104)Humidity [%RH] 20 to 80Maximum wet bulb temperature [°C (°F)]

26 (78.7)

Not operating (*5)

Temperature [°C (°F)] 0 to 50 (32 to 122)Humidity [%RH] 8 to 80Maximum wet bulb temperature [°C (°F)]

27 (80.6)

Noise [dB (A)] (*6) (*8) 66 (included in the main unit)

Sound power level [B (A)] (*6) (*8) 8.5 (included in the main unit)

Allowable vibration

[m/s2]

Operating (including standby) 2.5 (Synthetic seismic vibration)

Not operating (*5) 4.0 (Synthetic seismic vibration)

Allowable dust [mg/m3] 0.15

1-30 U41631-J-Z816-5-76

Page 59: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

1.3 Installation Specifications

*1: This value does not include any projection.

*2: Value for the case the maximum allowable number of optional units is mounted.The weight of the unit based on the equipment configuration can be calculated from the following formula:

K= Number of PCI_Boxes mounted:From a minimum of one to a maximum of eight

*3: There must be no condensation.

*4: The temperature requirement depends on the installation altitude.

- 5 to 35 °C (41 to 95.0 °F)[if installed at an altitude of 0 to 1500 m (0 to 4921.2 ft)]

- 5 to 33 °C (41 to 91.4 °F)[if installed at an altitude of 1500 to 2000 m (4921.2 to 6561.6 ft)]

- 5 to 32 °C (41 to 89.6 °F)[if installed at an altitude of 2000 to 2500 m (6561.6 to 8202 ft)]

- 5 to 30 °C (41 to 86 °F)[if installed at an altitude of 2500 to 3000 m (8202 to 9842.4 ft)]

*5: "Not operating" means the time when the equipment is stored.

*6: The noise and sound power level vary on the ambient temperature.

*7: These values are for each power cable.

*8: If the intake air temperature is high (within the normal temperature) in normal operation, the FAN rotate at high speed. [addition according to the manual errata 2008/09/19]

Power supply Input voltage tolerance and No. of phases 200 to 240 VAC ± 10 %1φ

Frequency and tolerance 50/60 Hz +2/-4 HzMaximum power consumption/apparent power

Operating 5,890 W/6,000 VANot operating 200 VA

Power factor 0.9 or moreInrush current [A] [Inrush duration] (*7) 100 or lessLeakage current [mA] (*7) 4.4 or lessCB/breaker capacity [A] 15

Unit weight = 264 + (42 x K)

Item Value

U41631-J-Z816-5-76 1-31

Page 60: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 1 Installation Reference

Table 1.10 PCI_Box installation specifications (Model name: MC-07PBa1x)

Item Value

Dimensions[mm (in.)]

Width 482 (18.98)Depth (*1) 768 (30.24)Height 174 (6.85)

Weight [kg (lb)] (*2) 42 (92)Air conditioning Maximum heat dissipation [kJ/Hr (BTU/h)] 2550 (2416.9)

Exhaust air flow (*8)[m3/min (ft3/min)]

With fans operating at low speed

4.49 (158.6)

With fans operating at high speed

5.85 (206.2)

Temperature and humidity (*3)

Operating Temperature [°C (°F)] (*4)Humidity [%RH] 20 to 80Maximum wet bulb temperature [°C (°F)]

29 (84.2)

Stand-by Temperature [°C (°F)] 0 to 40 (32 to 104)Humidity [%RH] 20 to 80Maximum wet bulb temperature [°C (°F)]

29 (84.2)

Not operating (*5)

Temperature [°C (°F)] 0 to 50 (32 to 122)Humidity [%RH] 8 to 80Maximum wet bulb temperature [°C (°F)]

29 (84.2)

Noise [dB (A)] (*6) (*8) 66 (included in the main unit)

Sound power level [B (A)] (*6) (*8) 8.5 (included in the main unit)

Allowable vibration

[m/s2]

Operating (including standby) 2.5 (Synthetic seismic vibration)

Not operating (*5) 4.0 (Synthetic seismic vibration)

Allowable dust [mg/m3] 0.15

Power supply Input voltage tolerance and No. of phases 200 to 240 VAC ± 10 %1φ

Frequency and tolerance 50/60 Hz +2/-4 HzMaximum power consumption/apparent power

Operating 736 W/750 VANot operating 20 VA

Power factor 0.9 or moreInrush current [A] [Inrush duration] (*7) 30 or lessLeakage current [mA] (*7) 3.5 or less

1-32 U41631-J-Z816-5-76

Page 61: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

1.3 Installation Specifications

*1: This value does not include any projection.

*2: Value for the case the maximum allowable number of optional units is mounted.

*3: There must be no condensation.

*4: The temperature requirement depends on the installation altitude.

- 5 to 35 °C (41 to 95.0 °F)[if installed at an altitude of 0 to 1500 m (0 to 4921.2 ft)]

- 5 to 33 °C (41 to 91.4 °F)[if installed at an altitude of 1500 to 2000 m (4921.2 to 6561.6 ft)]

- 5 to 32 °C (41 to 89.6 °F)[if installed at an altitude of 2000 to 2500 m (6561.6 to 8202 ft)]

- 5 to 30 °C (41 to 86 °F)[if installed at an altitude of 2500 to 3000 m (8202 to 9842.4 ft)]

*5: "Not operating" means the time when the equipment is stored.

*6: The noise and sound power level vary on the ambient temperature.

*7: These values are for each power cable.

*8: If the intake air temperature is high (within the normal temperature) in normal operation, the FAN rotate at high speed. [addition according to the manual errata 2008/09/19]

U41631-J-Z816-5-76 1-33

Page 62: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 1 Installation Reference

1.4 Equipment Floor Plan

The figures in this section show the floor plan for the equipment.

PRIMEQUEST 580A/540A/580/540/480/440 floor plan (Figure 1.9)Extended Power Cabinet floor plan (Figure 1.10)Extended I/O Cabinet floor plan (Figure 1.11)

Figure 1.9 PRIMEQUEST 580A/540A/580/540/480/440 floor plan

: Leveling pad

: Caster

: Inlet air area

: Interface cable hole

[Legend]

190

(7.5

)28

8 (1

1.3)

557

(21.

9)28

8 (1

1.3)

85 (3.3

)89

5 (3

5.2)

980

(38.

6)

40 (1.6)

480 (18.9)100 (3.9)

600 (23.6)

52.25 (2.1)

680 (26.8)

45 (

1.8)

136

(5.4

)

40 (1.6)

52.25 (2.1)

627.75 (24.7)

640 (25.1)

20(0.7)

640 (25.1)

475 (18.7)102.5 (4.0)

852

(33.

5)

761

(30.

0)

575.5 (22.7)

820

(32.

3)

911

(35.

9)

68.5

(2.

7)51

.5 (

2.0)

1100

(43

.3)

138

(5.4

)

100 (3.9)

944

(37.

2)

Front

* This is a top view of the unit.

29 (1.1)

738 (29.0)

29 (1.1)

Unit: mm (in.)

1-34 U41631-J-Z816-5-76

Page 63: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

1.4 Equipment Floor Plan

Figure 1.10 Extended Power Cabinet floor plan

: Leveling pad

: Caster

: Inlet air area

: Interface cable hole

[Legend]

Front

255 (10.0)250.75 (9.9)

300 (11.8)329 (13.0)

29 (1.1)

60 (2.4) 15

5.6

(6.1

)82

4.4

(32.

5)92

0 (3

6.2)

930

(36.

6)50 (1

.9)

980

(38.

6)23

(0.9

)

90(3.5

120(4.7)

* This is a top view of the unit.

23 (0.9

)

1026

(40.

4)

Unit: mm (in.)

U41631-J-Z816-5-76 1-35

Page 64: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 1 Installation Reference

Figure 1.11 Extended I/O Cabinet floor plan

Front

45 (1.8

)

155

(6.1

)

825

(32.

5)93

5 (3

6.8)

1026

(40.

4)

35 (1.4

)47

(1.9

)16

2(6

.4)

250

(9.8

)25

0 (9

.8)

492

(19.

4)12

3(4

.8)

822

(32.

4)98

0 (3

8.6)

24.5

(1.0

)21

.5 (0

.8)45 (1.8)590 (23.2)

478 (18.8)101 (4.0)519 (20.4)

680 (26.8)709 (27.9)

29(1.1)

224.

6 (8

.8)

Unit: mm (in.)

: Leveling pad

: Caster

: Inlet air area

: Interface cable hole

[Legend]

* This is a top view of the unit.

1-36 U41631-J-Z816-5-76

Page 65: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

1.5 Equipment Installation Patterns and Service Area

1.5 Equipment Installation Patterns and Service Area

This section explains the installation pattern for each piece of equipment and the service area required for each installation pattern.

Service area for the PRIMEQUEST 580A/540A/580/540/480/440 main unit (Figure 1.12)Service area for the PRIMEQUEST 580A/540A/580/540/480/440 main unit and the Extended I/O Cabinet (Figure 1.13)Service area for the PRIMEQUEST 580/480 main unit and the Extended Power Cabinet (Figure 1.14)Service area for the PRIMEQUEST 580/480 main unit, the Extended I/O Cabinet, and the Extended Power Cabinet (Figure 1.15)

Figure 1.12 Service area for the PRIMEQUEST 580A/540A/580/540/480/440 main unit

PRIMEQUEST580A/540A/580/

540/480/440main unit 11

00 (

43.3

)80

0 (3

1.5)

800

(31.

5)

2700

(10

6.3)

Service area

Service area

(980

(38

.6))

(851

.5 (

33.5

))(8

68.5

(34

.2))

Front

28 (1.1)804 (31.7)

38 (1.5)

* This is a top view of the unit.

Unit: mm (in.)Installation area: 2.2 m2

(including service area)

U41631-J-Z816-5-76 1-37

Page 66: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 1 Installation Reference

Figure 1.13 Service area for the PRIMEQUEST 580A/540A/580/540/480/440 main unit and the Extended I/O Cabinet

Extended I/O Cabinet

2700

(11

06.3

)

580A/540A/580/540/480/440

main unit

PRIMEQUEST

Service area

Service area

800

(31.

5)80

0 (

31.5

)11

00 (

43.3

)

(980

(38

.6))

(851

.5 (

33.5

))(8

68.5

(34

.2))

1422 (55.9) 28 (1.1)

1450 (57.0)

* This is a top view of the unit.

Front

Unit: mm (in.)Installation area: 3.9 m2

(including service area)

1-38 U41631-J-Z816-5-76

Page 67: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

1.5 Equipment Installation Patterns and Service Area

Figure 1.14 Service area for the PRIMEQUEST 580/480 main unit and the Extended Power Cabinet

* This is a top view of the unit.

(868

.5 (

34.2

))(8

51.5

(33

.5))

(980

(38

.6))

38 (1.5)

Front

1100

(43

.3)

800

(31.

5)80

0 (3

1.5)

Service area

Service area

580A/580/480main unit

PRIMEQUEST

1042 (41.6)

2700

(11

06.3

)

ExtendedPower Cabinet

1080 (42.5)

Unit: mm (in.)Installation area: 2.9 m2

(including service area)

U41631-J-Z816-5-76 1-39

Page 68: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 1 Installation Reference

Figure 1.15 Service area for the PRIMEQUEST 580/480 main unit, the Extended I/O Cabinet, and the Extended Power Cabinet

(868

.5 (

34.2

))(8

51.5

(33

.5))

(980

(38

.6))

1100

(43

.3)

800

(31.

5)80

0 (3

1.5)

Service area

Service area

580A/580/480 main unit

PRIMEQUEST

2700

(11

06.3

)

ExtendedPowerCabinet

1726 (67.9)

ExtendedI/O Cabinet

* This is a top view of the unit.

Front

Unit: mm (in.)Installation area: 4.7 m2

(including service area)

1-40 U41631-J-Z816-5-76

Page 69: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

1.6 Floor Plan of Openings in Floor and Template

1.6 Floor Plan of Openings in Floor and Template

This section provides the floor plan for openings in the floor. Templates are provided in Section 1.6.2, "Templates" to allow you to plan your configuration before moving equipment.

• Floor plan for openings in the floor

The floor plan for openings in a free-access floor corresponds to the bottom of the unit. Because this plan shows the dimensions of the openings in units of 50 mm, the shapes and locations of cable and ventilation openings in the figure may not match exactly with the bottom of the unit.There are the following two types of openings in the free-access floor:

Interface cable openingUnder-floor opening

• Template

The templates for floor connections use a scale of one to fifty (1:50). These templates can be used to create an equipment layout.

U41631-J-Z816-5-76 1-41

Page 70: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 1 Installation Reference

• Symbols used

Figure 1.16 shows the symbols used in the figures for floor plan openings and in the template.

Figure 1.16 Symbols used in floor plans and templates

Leveling pad

Service area

Front

1-42 U41631-J-Z816-5-76

Page 71: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

1.6 Floor Plan of Openings in Floor and Template

1.6.1 Floor plans for openings in the floorThis section describes the floor plans for openings to accommodate each unit.

Floor openings for the PRIMEQUEST 580A/540A/580/540/480/440 main unit (Figure 1.17)Floor openings for the PRIMEQUEST 580A/540A/580/540/480/440 main unit and the Extended I/O Cabinet (Figure 1.18)Floor openings for the PRIMEQUEST 580/480 main unit and the Extended Power Cabinet (Figure 1.19)Floor openings for the PRIMEQUEST 580/480 main unit, the Extended I/O Cabinet, and the Extended Power Cabinet (Figure 1.20)

U41631-J-Z816-5-76 1-43

Page 72: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 1 Installation Reference

Figure 1.17 Floor openings for the PRIMEQUEST 580A/540A/580/540/480/440 main unit

28 (1.1)738 (29.0)38 (1.4)

804 (31.6)

81.25 (3.2) 81.25 (3.2)575.5 (22.7)

69 (2.7)600 (23.6)69 (2.7)

220

(8.6

)51

.5 (

2.0)

800

(31.

5)11

00 (

43.3

)80

0 (3

1.4)

113.

5 (4

.5)

866

(34.

1)12

0.5

(4.7

)

204.

5 (8

.1)

684

(26.

9)21

1.5

(8.3

)

194 (7.6)

250

(9.8

)68

.5 (

2.6)

113.

5 (4

.5)

807

(31.

7)17

9.5

(7.0

)

204.

5 (8

.1)

625

(29.

6)27

0.5

(10.

6)

150 x 350 (5.9x13.8)

200x350 (7.9x13.8)

120x350(4.7x13.8)

Floorboard with small holesand open are of 50%450x450 (17.7x17.7)

Floorboard with small holesand open are of 50%450x450 (17.7x17.7)

Front

Unit: mm (in.)[Legend]

: Leveling pad

: Caster

: Inlet air area

: Interface cable hole

1-44 U41631-J-Z816-5-76

Page 73: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

1.6 Floor Plan of Openings in Floor and Template

Figure 1.18 Floor openings for the PRIMEQUEST 580A/540A/580/540/480/440 main unit and the Extended I/O Cabinet

100 (3.9)

150x350 (5.9x13.8)

265

(10.

4)

89 (3.5)

265

(10.

4)

100 (3.9)89 (3.5)

200x350 (7.9x13.8)

1450 (57.0)

800

(31.

5)11

00 (

43.3

)80

0 (3

1.5)

250

(9.8

)68

.5 (

2.7)

220

(8.7

)51

.5 (

2.0)

120.

5 (4

.7)

179.

5 (7

.1)

807

(31.

8)11

3.5

(4.5

)

211.

5 (8

.3)

270.

5 (1

0.6)

625

(24.

6)20

4.5

(8.1

)

844

(33.

2)10

26 (

40.4

)83

0 (3

2.7)

24.5

(1.

0)21

.5 (

0.8)

69.5

(2.

7)89

0 (3

5.0)

66.5

(2.

6)

176.

5 (6

.9)

179.

5 (7

.1)

670

(26.

4)

81.25 (3.2)575.5 (22.7)

101.25 (4.0)

590 (23.2)74 (2.9)

28 (1.1)1422 (55.9)

69 (2.7)600 (23.6)89 (3.5)590 (23.2)74 (2.9)

194 (7.6)

150x250 (5.9x9.8)

150x250 (5.9x9.8)

150x350 (5.9x13.8)

200x350 (7.9x13.8)

120x350 (4.7x13.8)

Front

Unit: mm (in.)[Legend]

: Leveling pad

: Caster

: Inlet air area

: Interface cable hole

Floorboard with small holesand open area of 50%450 x 450 (17.7 x 17.7)

Floorboard with small holesand open are of 50%450x450 (17.7x17.7)

U41631-J-Z816-5-76 1-45

Page 74: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 1 Installation Reference

Figure 1.19 Floor openings for the PRIMEQUEST 580/480 main unit and the Extended Power Cabinet

1080 (42.5)

38 (1.5)

845.

5 (3

3.3)

1026

(40

.4)

828.

5 (3

2.6)

23 (

0.9)

83 (

3.3)

860

(33.

9)83

(3.

3)

178.

6 (7

.0)

668.

8 (2

6.3)

178.

6 (7

.0)

113.

5 (4

.5)

807

(31.

8)17

9.5

(7.1

)

204.

5 (8

.1)

625

(24.

6)27

0.5

(10.

6)

129 (5.1)

800

(31.

5)11

00 (

43.3

)80

0 (3

1.5)

113.

5 (4

.5)

866

(34.

1)12

0.5

(4.7

)

204.

5 (8

.1)

684

(26.

9)21

1.5

(8.3

)

68.5

(2.

7)22

0(8

.7)

51.5

(2.

3)

78.25 (3.1)307 (12.1)575.5 (22.7)81.25 (3.2)

74 (2.9)299 (11.8)600 (23.6)69 (2.7)

194 (7.6)

1042 (41.0)

100x100(3.9x3.9)

150x350 (5.9x13.8)

200x350 (7.9x13.8)

120x350 (4.7x13.8)

Front

Unit: mm (in.)[Legend]

: Leveling pad

: Caster

: Inlet air area

: Interface cable hole

250

(9.8

)Floorboard with small holesand open are of 50%450x450 (17.7x17.7)

Floorboard with small holesand open are of 50%450x450 (17.7x17.7)

1-46 U41631-J-Z816-5-76

Page 75: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

1.6 Floor Plan of Openings in Floor and Template

Figure 1.20 Floor openings for the PRIMEQUEST 580/480 main unit, the Extended I/O Cabinet, and the Extended Power Cabinet

100 (3.9)

265

(10.

4)

150x250 (5.9x9.8)

200x350 (7.9x13.8)150x350 (5.9x13.8)

89 (3.5)

265

(10.

4)

89 (3.5) 100 (3.9)

845.

5 (3

3.3)

1026

(40

.4)

828.

5 (3

2.6)

23 (

0.9)

83 (

3.3)

860

(33.

9)83

(3.

3)

178.

6 (7

.0)

668.

8 (2

6.3)

178.

6 (7

0.0)

250

(9.8

)68

.5 (

2.7)

220

(8.7

)51

.5 (

2.0)

113.

5 (4

.5)

807

(31.

8)17

9.5

(7.1

)

204.

5 (8

.1)

625

(24.

6)27

0.5

(10.

6)

24.5

(1.

0)

844

(33.

2)10

26 (

40.4

)83

0 (3

2.7)

21.5

(0.

8)

69.5

(2.

7)89

0 (3

5.0)

66.5

(2.

6)

179.

5 (7

.1)

670

(26.

4)17

6.5

(6.9

)

1100

(43

.3)

113.

5 (4

.5)

866

(34.

1)12

0.5

(4.7

)

204.

5 (8

.1)

684

(26.

9)21

1.5

(8.3

)

74 (2.9)299 (11.8)

78.25 (3.1)307 (12.1)

1726 (68.0)

129 (5.1)689 (27.1)

100x100(3.9x3.9)

575.5 (22.7)

101.25 (4.0)

590 (23.2)74 2.9)

600 (23.6)89 (3.5)590 (23.2)74 (2.9)

150x250 (5.9x9.8) 150x350 (5.9x13.8)

200x350 (7.9x13.8)

120x350 (4.7x13.8)

Front

Unit: mm (in.)

[Legend]

: Leveling pad

: Caster

: Inlet air area

: Interface cable hole

Floorboard with small holesand open are of 50%450x450 (17.7x17.7)

Floorboard with small holesand open are of 50%450x450 (17.7x17.7)

U41631-J-Z816-5-76 1-47

Page 76: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 1 Installation Reference

1.6.2 TemplatesThis section describes the template for each cabinet.

The template is created on a scale of 1:50. When printing the template from Acrobat® Reader® or Adobe® Reader® software, be sure to uncheck the checkbox of Fit to page on the Print dialog box.

Template for the PRIMEQUEST 580A/540A/580/540/480/440 main unit (Figure 1.21)Template for the PRIMEQUEST 580A/540A/580/540/480/440 main unit and the Extended I/O Cabinet (Figure 1.22)Template for the PRIMEQUEST 580/480 and the Extended Power Cabinet (Figure 1.23)Template for the PRIMEQUEST 580/480 main unit, the Extended I/O Cabinet, and the Extended Power Cabinet (Figure 1.24)

Figure 1.21 Template for the PRIMEQUEST 580A/540A/580/540/480/440 main unit

Figure 1.22 Template for the PRIMEQUEST 580A/540A/580/540/480/440 main unit and the Extended I/O Cabinet

Front

Front

1-48 U41631-J-Z816-5-76

Page 77: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

1.6 Floor Plan of Openings in Floor and Template

Figure 1.23 Template for the PRIMEQUEST 580/480 and the Extended Power Cabinet

Figure 1.24 Template for the PRIMEQUEST 580/480 main unit, the Extended I/O Cabinet, and the Extended Power Cabinet

Front

Front

U41631-J-Z816-5-76 1-49

Page 78: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 1 Installation Reference

1.7 Cooling Air and Exhaust Flows

This section explains the cooling air and exhaust flows of each cabinet.

Cooling air and exhaust flows of the PRIMEQUEST 580A/540A/580/540/480/440 main unit (Figure 1.25)Cooling air and exhaust flows of the Extended Power Cabinet (Figure 1.26)Cooling air and exhaust flows of the Extended I/O Cabinet (Figure 1.27)Cooling air and exhaust flows of the PCI_Box (Figure 1.28)

When planning the installation of the equipment, it is important to consider the flows of cooling air and exhaust. If the equipment is installed without giving proper consideration to these flows, a cabinet or rack may draw in the exhaust from another cabinet or rack and be adversely affected as a result. Particularly, a device that monitors the temperature of intake air may continue to output the alarm indicating abnormal intake temperature.

Figure 1.25 Cooling air and exhaust flows of the PRIMEQUEST 580A/540A/580/540/480/440 main unit

Right-side viewFront view

: Exhaust air: Intake air

PSU

(Power supply) section

Input section

SB

IOUIOU

FAN

etc

.X

AI/X

DI

FAN

1-50 U41631-J-Z816-5-76

Page 79: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

1.7 Cooling Air and Exhaust Flows

Figure 1.26 Cooling air and exhaust flows of the Extended Power Cabinet

Note: A blank panel is installed where a PCI_Box is not mounted. If a PCI_Box has not been added here, be sure to keep the blank panel installed to ensure normal cooling of the other PCI_Boxes.

Figure 1.27 Cooling air and exhaust flows of the Extended I/O Cabinet

: Exhaust air

: Intake air

Inputsection

PSU(Power supplysection

Right-side viewFront view

: Intake air

: Exhaust air

Front viewLeft-side view

PCI_Box#0

PCI_Box#1

PCI_Box#2

PCI_Box#3

PCI_Box#4

PCI_Box#5

PCI_Box#6

PCI_Box#7

U41631-J-Z816-5-76 1-51

Page 80: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 1 Installation Reference

Figure 1.28 Cooling air and exhaust flows of the PCI_Box

1-52 U41631-J-Z816-5-76

Page 81: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 2 Connection Reference1

This chapter provides cable connection diagrams and lists of the applicable cables.

2.1 Connection Overview

Figure 2.1 shows an overview of equipment cable connections:

U41631-J-Z816-5-76 2-1

Page 82: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 2 Connection Reference

Figure 2.1 Equipment cable connections (1/2)

PRIMEQUEST 580A/540A/580/540/480/440 main unit

Keyboard, Mouse

1000Base-T LAN

1000Base-T LAN

10GBase-LR LAN

Display

GSWB-XG(x0-2)1Gbp-LAN(x8)(1000Base-T)

10Gbp-LAN(x2)(10GBase-LR)

COM(x1)

USB1.1(x4)

GSWB-1G(x0-2)1Gbp-LAN(x8)(1000Base-T)

1000Base-T LAN

GTHB(Note 3)(x0-2)1Gbp-LAN(x16)(1000Base-T)

VGA(x1)DVD drive

LAN(x3:100Base-TX)

IOU(Note 1) (x0-8:PRIMEQUEST 580A/580/480) (x0-4:PRIMEQUEST 540A/540/440)

MMB(x2)

KVM

CPCB

PCI_Box(x0-8:PRIMEQUEST 580A/580/480)(x0-4:PRIMEQUEST 540A/540/440)

PCIU(x0-4) (Note 2)

: Option

PCI card type:

PCI Express card type:- Fibre Channel

To *1

To *1

To *1

- LAN interface- SCSI interface- Fibre Channel

PCI card type:- LAN interface- SCSI interface- Fibre Channel

USB1.1/2.0 equipment

SCSI equipment

Console

Console

Uninterruptible power supply (UPS)

Management LAN(for user, CE maintenance, REMCS)

UPC interface (x4)

PCI_Box CTL interface (x8)

Up to a combined totalof 2 units ofGSWB-1G,GSWB-XG, and /or GTHBcan bemounted.(Note 4)

PCI-X card (x4)

BMC module (x2)USB2.0 (x2)

COM (x1)

CH interface (x4)

Ultra320 SCSI port (x2)

Extended I/O Cabinet

PCI_Box CTL interface (x1)

PCI-X card (x3)

PEXU (x0-4) (Note 2) (Note 5)

PCI Express card (x2)

PCI Express unit interface (x2)

Up to 4 PCIUs or PEXUs can be mounted. PCIUs and PEXUs can be mounted together.

2-2 U41631-J-Z816-5-76

Page 83: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

2.1 Connection Overview

Note 1: The main unit does not include IO Units. At least one unit must be prepared.

Note 2: A PCI_Box does not include PCIU and PEXU. At least one unit must be prepared.

Note 3: GTHB is supported only in the PRIMEQUEST 580A/540A/580/540.

Note 4: GSWB and GTHB cannot be mounted together.

Note 5: Up to 16 PEXUs can be connected to the PRIMEQUEST 580A/580 main unit. Up to eight PEXUs can be connected to the PRIMEQUEST 540A/540 main unit.Up to two PEXUs can be connected to one IOU.

Note 6: PEXUs are connected by PCI unit cables (combination of CH#0/#1 and CH#2/#3 on the main unit side).

Figure 2.1 Equipment cable connections (2/2)

U41631-J-Z816-5-76 2-3

Page 84: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 2 Connection Reference

2.2 Signal Cable Connections

This section provides diagrams of signal-cable connections, lists of applicable cables, and notes on cabling.

Basic interfaces and peripherals (Section 2.2.1)LAN and other device connections (Section 2.2.2)Notes on cabling PRIMEQUEST 580A/540A/580/540/480/440 (Section 2.2.3)Details of cable connection ports (Section 2.2.4)

2.2.1 Basic interfaces and peripheralsFigure 2.2 shows the cable connections for the basic interfaces and peripheral units. Figure 2.1 lists the applicable cables.

2-4 U41631-J-Z816-5-76

Page 85: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

2.2 Signal Cable Connections

(1) Cable connection diagram

Remarks:The number in parenthesis corresponds to the number of the cables in Table 2.1.

Figure 2.2 PRIMEQUEST 580A/540A*/580/540/480/440 interface cable connections (basic interfaces and peripherals)

*: not supported by Fujitsu Technology Solutions

U41631-J-Z816-5-76 2-5

Page 86: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 2 Connection Reference

(2) Cable listWhen determining the total length of the external interface cable to be connected to the PRIMEQUEST 580A/540A/580/540/480/440, allow for an extra length of cable for pulling out the units.

Table 2.1 Cable list (basic interface and peripherals)

NO. Name Order code JapanOutside Japan Packaging

Length [m (ft.)]

(1) Twisted pair cable (Category 5 UTP cable)

TPCBL-B005 Y Y Optional: Select 5, 10, 15, 30, 50, or 100 m.This cable is required if 100Base-TX or 10Base-T is used. (category 5)RJ45 8 Pin - RJ45 8 Pin

5 (16)TPCBL-B010 Y Y 10 (33)TPCBL-B015 Y Y 15 (49)TPCBL-B030 Y Y 30 (98)TPCBL-B050 Y Y 50 (164)TPCBL-B100 Y Y 100 (328)

(2) Enhanced category 5 UTP cable

TPCBL-C005 Y Y Optional: Select 5, 10, 15, 30, 50, or 100 m.This cable is required if 1000Base-T, 100Base-TX, or 10Base-T is used.(category 5e)RJ45 8 Pin - RJ45 8 Pin

5 (16)TPCBL-C010 Y Y 10 (33)TPCBL-C015 Y Y 15 (49)TPCBL-C030 Y Y 30 (98)TPCBL-C050 Y Y 50 (164)

TPCBL-C100 Y Y100 (328)

(3) UPS cable DCBL-UPK05 Y Y This cable is required for connection to the UPS(F987xx).

5 (16)

DCBL-UPK15 Y Y 15 (49)

(4) UPS interface branch connector

UPS-B

Y Y

Branch connector box that is used to connect two UPS (F987xx) units to a single UPC interface. (Comes with a 2.2 m cable for connecting the device to the box.)

2.2 (7)

(5) UPS interface six-branch connector

UPS-B1

Y Y

Branch connector box that is used to connect six UPS (F987xx) units to a single UPC interface. (Comes with a 2.5 m cable for connecting the device to the box.)

2.5 (8)

(6) SCSI cable DCBL-SCP05 Y Y Optional: Select 5 or 10 m.VHDCI 68-pin, male to VHDCI 68-pin, male

5 (16)

DCBL-SCP10 Y Y 10 (33)

Y: Supported

2-6 U41631-J-Z816-5-76

Page 87: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

2.2 Signal Cable Connections

Y: Supported

(7) SCSI cableDCBL-SCN05 Y Y

Optional: Select 5 or 10 m.VHDCI 68-pin, male to HIDEC 68-pin, male

5 (16)

DCBL-SCN10 Y Y10 (33)

(8) RS232C cable(Dsub 9 Pin-9 Pin, cross cable)

FMV-CBL501 Y Y 1.5 (5)

(9) PCI_Box CTL cable(CA78005-0053) Y Y

One cable is supplied with the PCI_Box.

5 (16)

(10) PCIU cable (5m)MC-07CA11 Y Y

Two cables are required for connecting the PEXUs.

5 (16)

(11) USB extension cableMC-07UE11 Y Y

This cable is required for connecting the main unit to a keyboard/mouse.

3 (9)

(12) VGA extension cableMC-07VE11 Y Y

This cable is required for connecting the main unit to a display.

3 (9)

NO. Name Order code JapanOutside Japan Packaging

Length [m (ft.)]

U41631-J-Z816-5-76 2-7

Page 88: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 2 Connection Reference

2.2.2 LAN and other device connectionsFigure 2.3 shows the cable connections for a LAN and other device connections. Table 2.2 lists the applicable cables.

(1) Cable connection diagram

Remarks:The number in parenthesis corresponds to the number of the cables in Table 2.2.

Figure 2.3 PRIMEQUEST 580A/540A*/580/540/480/440 cable connections (LAN and other device connections)

*: not supported by Fujitsu Technology Solutions

(1)(2)

(1)(2)

(1)(2)

(5)

(3)(4)

(3)(4)

*1

*3

*3

1000Base-SX

10/100/1000Base-T

10/100/1000Base-T

(4)*3

1000Base-T

10GBase-LR

10GBase-SR

Fibre Channel cable connectors are available in two shape types (SC and LC). The type to be used depends on the cards or devices to be connected. Prepare a suitable cable after checking the type of equipment to be used.

The Fibre Channel card, Gigabit Ethernet card (optical and electricity), and 10Gigabit Ethernet card (optical) are mounted in IO Units or in PCI cassettes of PCI_Boxes.

Fibre Channel card (2G)Connector type: Duplex LC connector

Gigabit Ethernet card (optical) Connector type: Duplex LC

GSWB 10Gbp LAN port Connector type: Duplex SC

GTHB 1Gbp LAN portConnector type: RJ45

GSWB 1Gbp LAN portConnector type: RJ45

Gigabit Ethernet card (electricity) Connector type: RJ45

10Gigabit Ethernet card (optical) Connector type: Duplex LC

LAN system interface

PRIMEQUEST 580A/540A/580/540/480/440main unit

*2

*4

To *1

To *1To *2

To *3

To *3To *4

Printer, etc.Connector type: RJ45

10Gigabit Ether switchConnector type: Duplex SC

Gigabit Ether switchConnector type: RJ45

10Gigabit Ether switchConnector type: Duplex SC Duplex LC

Gigabit Ether switchConnector type: Duplex SC, Duplex LC, or MTRJ

Disk array deviceConnector type:Duplex SC or Duplex LC

Fibre Channel switchConnector type:Duplex SC or Duplex LC

2-8 U41631-J-Z816-5-76

Page 89: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

2.2 Signal Cable Connections

(2) Cable listWhen determining the total length of the external interface cable to be connected to the PRIMEQUEST 580A/540A/580/540/480/440, allow for an extra length of cable for pulling out the units.

Table 2.2 Cable list (LAN and other device connections)

No. Name Order code JapanOutside Japan

PackagingLength [m (ft.)]

1 Multimode Fibre Channel Cable

CBL-MLLB02 Y Y Optional: Select 2, 5, or 15 m.Dual LC connector - Dual LC connector cable Sheathless

2 (7)CBL-MLLB05 Y Y 5 (16)

CBL-MLLB15 Y Y15 (49)

CBL-MLLC05 Y Y Optional: Select 5, 10, 20, 30, 40, or 50 m.Dual LC connector - Dual LC connector cable Sheathed

5 (16)CBL-MLLC10 Y Y 10 (33)CBL-MLLC20 Y Y 20 (66)CBL-MLLC30 Y Y 30 (98)CBL-MLLC40 Y Y 40 (132)CBL-MLLC50 Y Y 50 (164)

CBL-MLLA1A(Note)

Y Y

Optional: 100 m.Dual LC connector - Dual LC connector cable Sheathed

100 (328)

2 Multimode Fibre Channel Cable

CBL-MLSB02 Y Y Optional: Select 2, 5, or 15 m.Dual LC connector - Dual SC connector cable Sheathless

2 (7)CBL-MLSB05 Y Y 5 (16)

CBL-MLSB15 Y Y15 (49)

CBL-MLSC05 Y Y Optional: Select 5, 10, 20, 30, 40, or 50 m.Dual LC connector - Dual SC connector cable Sheathed

5 (16)CBL-MLSC10 Y Y 10 (33)CBL-MLSC20 Y Y 20 (66)CBL-MLSC30 Y Y 30 (98)CBL-MLSC40 Y Y 40 (132)CBL-MLSC50 Y Y 50 (164)

CBL-MLSA1A(Note)

Y Y

Optional: 100 m.Dual LC connector - Dual SC connector cable Sheathed

100 (328)

Y: Supported

Note: Cannot be connected to the 10Gigabit Ethernet card (optical).

U41631-J-Z816-5-76 2-9

Page 90: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 2 Connection Reference

Y: Supported

3 Twisted pair cable(category 5 UTP cable)

TPCBL-B005 Y Y Optional: Select 5, 10, 15, 30, 50, or 100 m.This cable is required if 100Base-TX or 10Base-T is used. (Category 5)RJ45 8 Pin - RJ45 8 Pin

5 (16)TPCBL-B010 Y Y 10 (33)TPCBL-B015 Y Y 15 (49)TPCBL-B030 Y Y 30 (98)TPCBL-B050 Y Y 50 (164)TPCBL-B100 Y Y 100 (328)

4 Enhanced category 5 UTP cable

TPCBL-C005 Y Y Optional: Select 5, 10, 15, 30, 50, or 100 m.This cable is required if 1000Base-T, 100Base-TX, or 10Base-T is used.(Category 5e)RJ45 8 Pin-RJ45 8 Pin

5 (16)TPCBL-C010 Y Y 10 (33)TPCBL-C015 Y Y 15 (49)TPCBL-C030 Y Y 30 (98)TPCBL-C050 Y Y 50 (164)

TPCBL-C100 Y Y 100 (328)

5 Singlemode Fibre Channel Cable

L-A2AA005 Y Y Optional: Select 5, 10, 30, 50, 100, 200 m.Dual SC connector - Dual SC connector cableSheathed

5 (16)L-A2AA010 Y Y 10 (33)L-A2AA030 Y Y 30 (98)L-A2AA050 Y Y 50 (164)L-A2AA100 Y Y 100 (328)L-A2AA200 Y Y 200 (656)

No. Name Order code JapanOutside Japan

PackagingLength [m (ft.)]

2-10 U41631-J-Z816-5-76

Page 91: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

2.2 Signal Cable Connections

2.2.3 Notes on cabling PRIMEQUEST 580A/540A/580/540/480/440When determining the total length of the cable to be connected to the PRIMEQUEST 580A/540A/580/540/480/440, allow for an extra length of cable for pulling out the units.

Use a sheathless optical cable for the Fibre Channel cable. (If the sheath Fibre Channel cable has been laid, connect a sheathless optical Fibre Channel cable with an adapter (DCBL-FCE02 (SC-LC: 2m (6.6 ft.)), DCBL-FCE05 (SC-LC: 5m (16.4 ft.)), DCBL-FCG02 (LC-LC: 2m (6.6 ft.)), or DCBL-FCG05 (LC-LC: 5m (16.4 ft.))) to the sheath Fibre Channel cable.)Avoid laying the power cable close to metal cables such as RS232C or SCSI cables. If cables need to be crossed, avoid laying the sheathless optical cable under power cables or metal cables.

U41631-J-Z816-5-76 2-11

Page 92: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 2 Connection Reference

2.2.4 Details of cable connection portsThis section shows the locations of the external interface and ACS in each cabinet. Keep these locations of external interface and power input cable connection port shown below in mind when calculating the excess lengths of connection cables.

External interface connection ports in the PRIMEQUEST 540A/540/440 main unit (Figure 2.4)External interface connection ports in the PRIMEQUEST 580A/580/480 main unit (Figure 2.5)Units in the PRIMEQUEST 580A/540A/580/540/480/440 main unit (Figure 2.6 to Figure 2.12)Input cable connection ports in the Extended Power Cabinet (Figure 2.13)Input cable connection ports in the Extended I/O Cabinet (connected to PRIMEQUEST 540A/540/440 unit) (Figure 2.14)Input cable connection ports in the Extended I/O Cabinet (connected to PRIMEQUEST 580A/580/480 unit) (Figure 2.15)External interface ports in the PCI_Box (Figure 2.16)

2-12 U41631-J-Z816-5-76

Page 93: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

2.2 Signal Cable Connections

(1) External interface connection ports in the PRIMEQUEST 540A/540/440 main unit

Note: GTHB is supported only in the PRIMEQUEST 540A*/540.

Remark: The above unit contains a Dual Power Feed Option.

Figure 2.4 External interface connection ports in the PRIMEQUEST 540A/540/440 main unit

*: not supported by Fujitsu Technology Solutions

U41631-J-Z816-5-76 2-13

Page 94: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 2 Connection Reference

(2) External interface connection ports in the PRIMEQUEST 580A/580/480 main unit

Note: GTHB is supported only in the PRIMEQUEST 580A/580.

Remarks: The figure shows an example of the PRIMEQUEST system with an additional power supply option mounted.

Figure 2.5 External interface connection ports in the PRIMEQUEST 580A/580/480 main unit

2-14 U41631-J-Z816-5-76

Page 95: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

2.2 Signal Cable Connections

(3) Units in the PRIMEQUEST 580A/540A/580/540/480/440 main unitKVMH

Figure 2.6 External interface ports in the KVMH

CPCB

Figure 2.7 External interface ports in the CPCB

MMBH

Figure 2.8 External interface ports in the MMBH

U41631-J-Z816-5-76 2-15

Page 96: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 2 Connection Reference

GSWB-1G

Figure 2.9 External interface ports in the GSWB-1G

GSWB-XG

Figure 2.10 External interface ports in the GSWB-XG

GTHB (PRIMEQUEST 580A/540A*/580/540)

Figure 2.11 External interface ports in the GTHB

*: not supported by Fujitsu Technology Solutions

2-16 U41631-J-Z816-5-76

Page 97: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

2.2 Signal Cable Connections

IOUH

Figure 2.12 External interface ports in the IOUH

VHDCI(Ultra320SCSI)

15.2(0.6)

6(0.2)

PCIU interface#0

PCIU interface#1

PCIU interface#2

PCIU interface#3

PCI-X slot#1

PCI-X slot#3PCI-X slot#2

PCI-X slot#0

BMC module (BMM)

RS-232C (COM)

USB (USB1.1/2.0)

55(2.2)

34(1.3)

27(1.1)

57 (2.3)

27(1.1)

60(2.4)

17(0.7)

20 (0.8

)46

4 (1

8.3)

432

(17.

0)160

(6.3

)16

1 (6

.3)

55 (2.2

)65 (2.6

)55 (2.2

)31

4(1

2.4)

86 (3.4

)

Unit: mm (in.)

U41631-J-Z816-5-76 2-17

Page 98: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 2 Connection Reference

(4) Input cable connection ports in the Extended Power Cabinet

Figure 2.13 Input cable connection ports in the Extended Power Cabinet

Rear view (with the door open)Front view (with the door open)

806

(31.

7)71 (2

.8)

208

(8.2

)71 (2

.8)71 (2

.8)

129 (5.1)

Input#10Input#11Input#12

Input#13Input#14

Unit: mm (in.)

2-18 U41631-J-Z816-5-76

Page 99: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

2.2 Signal Cable Connections

(5) Input cable connection ports in the Extended I/O Cabinet (connected to PRIMEQUEST 540A/540/440 unit)

Notes:

1. The 2U space at the bottom of the cabinet is required for use as cable processing space. Keep this space open. Do not mount any PCI_Box in it.

2. A blank panel is installed where a PCI_Box is not mounted. If a PCI_Box has not been added here, be sure to keep the blank panel installed to ensure normal cooling of the other PCI_Boxes.

Figure 2.14 Input cable connection ports in the Extended I/O Cabinet (connected to PRIMEQUEST 540A/540/440 unit)

U41631-J-Z816-5-76 2-19

Page 100: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 2 Connection Reference

(6) Input cable connection ports in the Extended I/O Cabinet (connected to PRIMEQUEST 580A/580/480 unit)

Notes:

1. The 2U space at the bottom of the cabinet is required for use as cable processing space. Keep this space open. Do not mount any PCI_Box in it.

2. A blank panel is installed where a PCI_Box is not mounted. If a PCI_Box has not been added here, be sure to keep the blank panel installed to ensure normal cooling of the other PCI_Boxes.

Figure 2.15 Input cable connection ports in the Extended I/O Cabinet (connected to PRIMEQUEST 580A/580/480 unit)

2-20 U41631-J-Z816-5-76

Page 101: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

2.2 Signal Cable Connections

(7) External interface ports in the PCI_Box

Figure 2.16 External interface ports in the PCI_Box

U41631-J-Z816-5-76 2-21

Page 102: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 2 Connection Reference

2.3 Power Cable Connections

This section provides diagrams of the input power circuit connection for the PRIMEQUEST 580A/540A/580/540/480/440 and the PCI_Box.

Input power system diagram for the PRIMEQUEST 540A/540/440 (Section 2.3.1)Input power system diagram for the PRIMEQUEST 580A/580/480 (Section 2.3.2)Input power system diagram for the Extended I/O Cabinet and the PCI_Box (Section 2.3.3)

Remarks:In model names, a is any digit from 1 to 9 or any letter from A to Z, while x is any letter from A to Z or blank.

2-22 U41631-J-Z816-5-76

Page 103: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

2.3 Power Cable Connections

2.3.1 Input power system diagram for the PRIMEQUEST 540A/540/440The figures in this section show the input power system diagrams for the PRIMEQUEST 540A/540/440.

Standard configuration (including single power feed system and redundant power supply unit) (Figure 2.17)Dual power feed configuration (Figure 2.19)

(1) Standard configuration (including single power feed system and redundant power supply unit)

This section shows the input power system and PSU locations in the standard PRIMEQUEST 540A/540/440 configuration (including a single power feed option and redundant power supply unit).

a) Input power system diagram

CB: Circuit Breaker

Note1: Connect the AC cables of this unit to their counterparts on the power distribution board on a one-to-one basis.

Note2: For information about the circuit breakers on the customer's distribution panel, see Section 2.6, "Circuit Breaker Characteristics."

Figure 2.17 Input power system diagram for the PRIMEQUEST 540A/540/440 (standard configuration)

(System #0)

AC power supply

AC cable (Note 1)

ACS#0

#2Input

PSU#A

05C

BPSU

#A04

CB

CB

PSU#A

02C

BPSU

#A03

#1Input

#0Input

PSU#A

01C

BPSU

#A00

CB

Main unit

Customer's distribution panel(200 VAC) (Note 2)

U41631-J-Z816-5-76 2-23

Page 104: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 2 Connection Reference

b) PSU locations

Figure 2.18 PSU locations in the standard PRIMEQUEST 540A/540/440 configuration (including a single power feed option and

redundant power supply unit)

2-24 U41631-J-Z816-5-76

Page 105: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

2.3 Power Cable Connections

(2) Dual power feed configurationThis section shows the input power system and PSU locations in the PRIMEQUEST 540A/540/440 containing a Dual Power Feed Option.

a) Input power system diagram

CB: Circuit Breaker

Note1: To implement a dual power feed configuration, purchase the MC-57DPa1x, a Dual Power Feed Option.

Note2: Connect the AC cables of this unit to their counterparts on the power distribution board on a one-to-one basis.

Note3: For information about the circuit breakers on the customer's distribution panel, see Section 2.6, "Circuit Breaker Characteristics."

Figure 2.19 Input power system diagram for the PRIMEQUEST 540A/540/440 (dual power feed configuration)

#0ACS

#2Input

PSU#A

05C

BPSU

#A04

CB

CB

PSU#A

02C

BPSU

#A03

#1Input

#0Input

PSU#A

01C

BPSU

#A00

CB

Main unit

AC cable (Note 2)

PSU#A

06C

BPSU

#A07

#3Input

#4Input

PSU#A

09C

BPSU

#A08

PSU#A

10C

BPSU

#A11

#5Input

#1ACS

Customer's distribuion panel(200 VAC) (Note 3)

CB

CB

CB

AC powersupply(System #1)

AC powersupply(System #0)

Dual Power Feed Option (Note 1)

U41631-J-Z816-5-76 2-25

Page 106: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 2 Connection Reference

b) PSU locations

*1: To implement a dual power feed configuration, purchase the MC-47DPa1x, a Dual Power Feed Option.

Figure 2.20 PSU locations in the PRIMEQUEST 540A/540/440 with a Dual Power Feed Option

2.3.2 Input power system diagram for the PRIMEQUEST 580A/580/480The figures in this section show the input power system diagrams for the PRIMEQUEST 580A/580/480.

Standard configuration (including single power feed system and redundant power supply unit) (Figure 2.21)Dual power feed configuration (Figure 2.23)

(1) Standard configuration (including single power feed system and redundant power supply unit)

This section shows the input power system and PSU locations in the standard PRIMEQUEST 580A/580/480 configuration (including a single power feed option and redundant power supply unit).

2-26 U41631-J-Z816-5-76

Page 107: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

2.3 Power Cable Connections

a) Input power system diagram

CB: Circuit breaker

Note1: If five or more system boards or five or more IO Units are to be mounted, the MC-57PSa1x Additional Power Supply Unit needs to be prepared.When an Additional Power Supply Unit is not mounted, a dummy component is mounted in the relevant slot.

Note2: Connect the AC cables of this unit to their counterparts on the power distribution board on a one-to-one basis.

Note3: For information about the circuit breakers on the customer's distribution panel, see Section 2.6, "Circuit Breaker Characteristics."

Figure 2.21 Input power system diagram for the PRIMEQUEST 580A/580/480 (standard configuration)

#0ACS

#2Input

PSU#A

05C

BPSU

#A04

CB

CB

PSU#A

02C

BPSU

#A03

#1Input

#0Input

PSU#A

01C

BPSU

#A00

CB

Main unit

AC cable (Note 2)

PSU#A

06C

BPSU

#A07

#3Input

#4Input

CB

PSU#A

08

#1ACS

Customer's distribution panel(200 VAC) (Note 3)

CB

CB

Ac powersupply(System #0)

Additional Power Supply Unit (Note 1)

PSU#A

09

U41631-J-Z816-5-76 2-27

Page 108: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 2 Connection Reference

b) PSU locations

*1 If five or more system boards or five or more IO Units are to be mounted, the MC-57PSa1x, Additional Power Supply Unit needs to be prepared.When an Additional Power Supply Unit is not mounted, a dummy component is mounted in the relevant slot.

Figure 2.22 PSU locations in the standard PRIMEQUEST 580A/580/480 configuration (including a single power feed option and redundant power

supply unit)

2-28 U41631-J-Z816-5-76

Page 109: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

2.3 Power Cable Connections

(2) Dual power feed configurationThis section shows the input power system and PSU locations in the PRIMEQUEST 580A/580/480 containing a Dual Power Feed Option.

a) Input power system diagram

CB: Circuit breaker

Note1: If five or more system boards or five or more IO Units are to be mounted, two sets of the MC-57PSa1x Additional Power Supply Units need to be prepared.When this option has not been prepared, a dummy component is mounted in the relevant slot.

Note2: If dual power feed is used, the MC-57DPa1x Dual Power Feed Option needs to be prepared.

Note3: Connect the AC cables of this unit to their counterparts on the power distribution board on a one-to-one basis.

Note4: For information about the circuit breakers on the customer’s distribution panel, see Section 2.6, "Circuit Breaker Characteristics."

Figure 2.23 Input power system diagram for the PRIMEQUEST 580A/580/480 and Extended Power Cabinet (dual power feed configuration)

#2ACS

#12Input

PSU#B

05C

BPSU

#B04

CB

CB

PSU#B

02C

BPSU

#B03

#11Input

#10Input

PSU#B

01C

BPSU

#B00

CB

Extended Power Cabinet

AC cable (Note 3)

PSU#B

06C

BPSU

#B07

#13Input

#14Input

CB

PSU#B

08

#3ACS

CB

CB

AC powersupply(System #1)

Additional Power Supply Unit (Note 1)

Additional Power Supply Unit (Note 1)

AC powersupply(System #0)

CB

CB

#1ACS

PSU#A

08C

B

#4Input

#3Input

PSU#A

07C

BPSU

#A06

Main unit

CB

PSU#A

00C

BPSU

#A01

#0Input

#1Input

PSU#A

03C

BPSU

#A02

CB

CB

PSU#A

04C

BPSU

#A05

#2Input

#0ACS

Dual Power Feed Option (Note 2)

Customer's distribution panel(200 VAC) (Note 4)

Customer's distribution panel(200 VAC) (Note 4)

PSU#B

09

PSU#A

09

U41631-J-Z816-5-76 2-29

Page 110: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 2 Connection Reference

b) PSU locations

*1 If five or more system boards or five or more IO Units are to be mounted, two sets of the MC-57PSa1x Additional Power Supply Units need to be prepared.When Additional Power Supply Units are not mounted, dummy components are mounted in the relevant slots.

Figure 2.24 PSU locations in the PRIMEQUEST 580A/580/480 with a Dual Power Feed Option

2-30 U41631-J-Z816-5-76

Page 111: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

2.3 Power Cable Connections

2.3.3 Input power system diagram for the Extended I/O Cabinet and the PCI_BoxThe figures in this section show the input power system diagrams for the PCI_Box.

Input power system diagram of PCI_Boxes in a single power feed configuration (including a redundant PSU) for use in Japan (Figure 2.25)Input power system diagram of PCI_Boxes in a dual power feed configuration for use in Japan (Figure 2.26)Input power system diagram of PCI_Boxes in a single power feed configuration (including a redundant PSU) for use outside Japan (general) (Figure 2.27)Input power system diagram of PCI_Boxes in a dual power feed configuration for use outside Japan (general) (Figure 2.28)Input power system diagram of PCI_Boxes in a single power feed configuration (including a redundant PSU) for use in Europe (Figure 2.29)Input power system diagram of PCI_Boxes in a dual power feed configuration for use in Europe (Figure 2.30)

U41631-J-Z816-5-76 2-31

Page 112: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 2 Connection Reference

(1) Single power feed for use in Japan (including a redundant power supply unit)

Figure 2.25 shows the input power system diagram of PCI_Boxes in a single power feed configuration (including a redundant PSU) for use in Japan.

CB: Circuit Breaker

Note1: For high reliability of the redundant configuration, connect Input #0 and Input #1 of each PCI_Box to different ACSs.

Note2: For information about the circuit breakers on the customer's distribution panel, see Section 2.6, "Circuit Breaker Characteristics."

Figure 2.25 Input power system diagram of PCI_Boxes in a single power feed configuration (including a redundant PSU) for use in Japan

2-32 U41631-J-Z816-5-76

Page 113: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

2.3 Power Cable Connections

(2) Dual power feed for use in JapanFigure 2.26 shows an input power system diagram of PCI_Boxes in a dual power feed configuration for use in Japan.

CB: Circuit Breaker

Note1: For high reliability of the redundant configuration, connect Input #0 and Input #1 of each PCI_Box to the ACSs on the different system.

Note2: For information about the circuit breakers on the customer's distribution panel, see Section 2.6, "Circuit Breaker Characteristics."

Figure 2.26 Input power system diagram of PCI_Boxes in a dual power feed configuration for use in Japan

U41631-J-Z816-5-76 2-33

Page 114: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 2 Connection Reference

(3) Single power feed (including a redundant PSU) for use outside Japan (general)

Figure 2.27 shows the input power system diagram of PCI_Boxes in a single power feed configuration (including a redundant PSU) for use outside Japan (general).

CB: Circuit Breaker

Note1: For high reliability of the redundant configuration, connect Input #0 and Input #1 of each PCI_Box to different ACSs.

Note2: For information about the circuit breakers on the customer's distribution panel, see Section 2.6, "Circuit Breaker Characteristics."

Figure 2.27 Input power system diagram of PCI_Boxes in a single power feed configuration (including a redundant PSU) for use outside Japan (general)

2-34 U41631-J-Z816-5-76

Page 115: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

2.3 Power Cable Connections

(4) Dual power feed for use outside Japan (general)Figure 2.28 shows the input power system diagram of PCI_Boxes in a dual power feed configuration for use outside Japan (general).

CB: Circuit Breaker

Note1: For high reliability of the redundant configuration, connect Input #0 and Input #1 of each PCI_Box to the ACSs on the different system.

Note2: For information about the circuit breakers on the customer's distribution panel, see Section 2.6, "Circuit Breaker Characteristics."

Figure 2.28 Input power system diagram of PCI_Boxes in a dual power feed configuration for use outside Japan (general)

U41631-J-Z816-5-76 2-35

Page 116: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 2 Connection Reference

(5) Single power feed (including a redundant PSU) for use in EuropeFigure 2.29 shows the input power system diagram of PCI_Boxes in a single power feed configuration (including a redundant PSU) for use in Europe.

CB: Circuit Breaker

Note1: For high reliability of the redundant configuration, connect Input #0 and Input #1 of each PCI_Box to different ACSs.

Note2: For information about the circuit breakers on the customer's distribution panel, see Section 2.6, "Circuit Breaker Characteristics."

Figure 2.29 Input power system diagram of PCI_Boxes in a single power feed configuration (including a redundant PSU) for use in Europe

2-36 U41631-J-Z816-5-76

Page 117: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

2.3 Power Cable Connections

(6) Dual power feed for use in EuropeFigure 2.30 shows the input power system diagram of PCI_Boxes in a dual power feed configuration for use in Europe.

CB: Circuit Breaker

Note1: For high reliability of the redundant configuration, connect Input #0 and Input #1 of each PCI_Box to the ACSs on the different system.

Note2: For information about the circuit breakers on the customer's distribution panel, see Section 2.6, "Circuit Breaker Characteristics."

Figure 2.30 Input power system diagram of PCI_Boxes in a dual power feed configuration for use in Europe

U41631-J-Z816-5-76 2-37

Page 118: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 2 Connection Reference

2.4 Input Power Supply Unit Connections

The following table lists the connection specifications for the input power supply unit.

PRIMEQUEST 580A/540A/580/540/480/440 main unit (Section 2.4.1)Cables between PCI_Box and ACS in the Extended I/O Cabinet (Section 2.4.2)Cables between ACS in the Extended I/O Cabinet and power distribution board (Section 2.4.3)

2.4.1 PRIMEQUEST 580A/540A/580/540/480/440 main unitTable 2.3 lists the specifications for connecting the input power supply unit to the PRIMEQUEST 580A/540A/580/540/480/440 main unit.

Table 2.3 AC cable specifications for the PRIMEQUEST 580A/540A/580/540/480/440 main unit

Note: Use the supplied accessory AC cable to connect the main unit. Do not use the accessory AC cable for other products.

Destination Plug type RemarksJAPAN Two-prong hook-type plug with

grounding electrode (250V30A) NEMA standard name: L6-30P

Power-receiving outlets must be available.Two-prong hook-type receptacle with grounding electrode (250V30A)NEMA L6-30REmbedded type: 3320-L6 (American Denki)Exposed type: 3321-L6 (American Denki)

Outside Japan(general)

NEMA L6-30P NEMA L6-30R (only for North America)30A-220 VAC

Europe IEC60309 (32A) IEC60309 (32A)

2-38 U41631-J-Z816-5-76

Page 119: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

2.4 Input Power Supply Unit Connections

2.4.2 Cables between PCI_Box and ACS in the Extended I/O CabinetTable 2.4 lists the specifications of the AC cables used between a PCI_Box and the ACS in the Extended I/O Cabinet.

Table 2.4 Specifications of the AC cables used between a PCI_Box and ACS in the Extended I/O Cabinet

Note: Use the supplied accessory AC cable to connect the main unit. Do not use the accessory AC cable for other products.

Destination Plug type RemarksJapan Two-prong twist-lock plug with

grounding electrode (250V30A)NEMA standard name: L6-15P

Outside Japan (including Europe)

Covered 3-pin plug (for power distribution box connection)

U41631-J-Z816-5-76 2-39

Page 120: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 2 Connection Reference

2.4.3 Cables between ACS in the Extended I/O Cabinet and power distribution boardTable 2.5 lists the specifications of the AC cables between the ACS in the Extended I/O Cabinet and the power distribution board.

Table 2.5 Specifications of the AC cables between ACS in the Extended I/O Cabinet and power distribution board

Note: Use the supplied accessory AC cable to connect the main unit. Do not use the accessory AC cable for other products.

Destination Plug type RemarksJapan Two-prong twist-lock plug with

grounding electrode (250V30A)NEMA standard name: L6-30P

Prepare the following power-receiving outlets:Outlet for two-prong twist-lock plug with grounding electrode (250V30A) [NEMA L6-30R]Embedded type: 3320-L6 (American Denki)Exposed type: 3321-L6 (American Denki)

Outside Japan (general)

NEMA standard name: L6-30P NEMA L6-30R (for North America only)30A, 220 VAC

2-40 U41631-J-Z816-5-76

Page 121: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

2.5 AC Cable Connection under a Free-Access Floor (Only for Use inside Japan and General Use outside Japan)

2.5 AC Cable Connection under a Free-Access Floor (Only for Use inside Japan and General Use outside Japan)

If AC cables are connected to the main unit, Extended I/O Cabinet, Extended Power Cabinet, or Dual Power Feed Option under a free-access floor, it is recommended that the underfloor height be 300 mm (11.8 in.) or more in consideration of the shape of the AC cable connector, cable bending radius (see Figure 2.31 (1)).

However, if the underfloor height is less than 300 mm (11.8 in.), place outlets sideways (see Figure 2.31 (2)).

The AC cables of the main unit, Extended Power Cabinet, and Extended I/O Cabinet ACS each can be drawn about 2.5 m (9.8 in.) from the bottom of the unit. Prepare an outlet near the unit by considering this pull-out length.

Remark 1: In this figure, the main unit is shown as an example.

Remark 2: Values in ( ) are in inches.

Figure 2.31 AC cable connection under a free-access floor (only for use inside Japan and general use outside Japan)

(1) When the underfloor height is 300 mm (11.8 in.) or more

(2) When the underfloor height is less than 300 mm (11.8 in.)

Free-access floor

Free-access floor

Les

s th

an 3

00 (

11.8

)

Mor

e th

an

300

(11.

8)

250

(9.8

)

Unit: mm (in.)

OutletOutlet

U41631-J-Z816-5-76 2-41

Page 122: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 2 Connection Reference

2.6 Circuit Breaker Characteristics

This section describes the circuit breaker characteristics.

(1) For customers in JapanTable 2.6 lists the requirements for the circuit breakers. Figure 2.32 shows the characteristics of the circuit breakers.

Table 2.6 Requirements for circuit breakers in customers' distribution panels installed in Japan

If breakers other than those specified above are used, they may be tripped at the occurrence of a device-internal short circuit, which in turn may cause the entire device to shut down. This may occur even if a PSU is present that provides a redundant configuration.

Main unit (PRIMEQUEST 580A/540A/580/540/480/440 base cabinet) Extended

Power CabinetPCI_Box

The breaking capacity must be 30 A or greater. The tripping time must be equal to or slower than the characteristics shown in Figure 2.32.

The breaking capacity must be 20 A or greater. The tripping time must be equal to or slower than the characteristics shown in Figure 2.32.

2-42 U41631-J-Z816-5-76

Page 123: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

2.6 Circuit Breaker Characteristics

Figure 2.32 Characteristics of circuit breakers in customers' distribution panels installed in Japan

1 2 3 4 5 6 7 8 10 20 30 40 50 80 1001.5 150.01

0.02

0.04

0.06

0.1

0.2

0.4

0.6

1

2

4

6

10

20

40

1

2

4

6

10

60

40

20

120

180

Minimum

Maximum

Current (ratio to the rated current)

min

s

Breaking tim

e

U41631-J-Z816-5-76 2-43

Page 124: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 2 Connection Reference

(2) For customers outside JapanTable 2.7 lists the requirements for the circuit breakers. Figure 2.33 shows the characteristics of such circuit breakers.

Table 2.7 Requirements for circuit breakers in customers’ distribution panels installed outside Japan

Figure 2.33 Characteristics of circuit breakers in customers' distribution panels installed outside Japan

Main unit (PRIMEQUEST 580A/540A/580/540/480/440 base cabinet) Extended

Power CabinetPCI_Box

The breaking capacity must be 32 A or greater. The tripping time must be equal to or slower than the "D" characteristics (IEC898 or DIN0641 Part II) shown in Figure 2.33.

The breaking capacity must be 16 A or greater. The tripping time must be equal to or slower than "C" or "D" characteristics (IEC898 or DIN 0641 Part II) shown in Figure 2.33.

~~~DCB

1 2 3 4 5 6 7 8 10 20 30 40 50 80 1001.5 150.01

0.02

0.040.06

0.1

0.2

0.40.6

1

2

46

10

20

401

2

46

10

6040

20

120180

Current (ratio to the rated current)

Min

S

Breaking tim

e

2-44 U41631-J-Z816-5-76

Page 125: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 3 Precautions Pertaining to Delivery and Installation

1

This chapter contains precautions regarding delivery and installation of the equipment.

3.1 Elevator Load Requirements

The equipment is wider than a typical server system. To load this equipment on an elevator, you may need to remove side panels and/or doors. Before loading equipment mounted on an expansion rack onto an elevator, see the elevator load requirements listed in Table 3.1. In this table, dimensions are stated in units of mm (in), and weight is stated in units of kg (lb).

Table 3.1 Elevator load requirements

Y: The equipment can be loaded.

N: The equipment cannot be loaded.

Note: These units can be loaded by removing the front and rear doors.

Elevator code

Load

Inside dimensions of cageEffective doorway

dimensionsPRIMEQUEST

580A/540A*/580/540/480/440 main unit

*: not supported by Fujitsu Technology Solutions

Extended I/O

Cabinet

Extended Power

Cabinet

Main unit and

Extended Power

CabinetWidth Depth Height Width Height

P-6-C0 400(880)

1150 (45) 900 (35) 2300 (91) 800 (31) 2100 (83)N N N N

P-9-C0 600(1320)

1400 (55) 1100 (43) 2300 (91) 800 (31) 2100 (83)N N N N

P-11-C0 750(1650)

1400 (55) 1350 (53) 2300 (91) 800 (31) 2100 (83)Y Y Y N

P-13-C0 900(1980)

1600 (63) 1350 (53) 2300 (91) 900 (35) 2100 (83)Y Y Y N

P-15-C0 1000(2200)

1600 (63)1800 (71)

1500 (59) 1300 (51)

2300 (91) 900 (35) 1000 (39)

2100 (83)Y Y Y N

P-17-C0 1150(2530)

1800 (71)2000 (79)

1500 (59)1350 (53)

2300 (91) 1000 (39)1100 (43)

2100 (83)Y Y Y Y (Note)

P-20-C0 1350(2970)

1800 (71)2000 (79)

1700 (67) 1500 (59)

2300 (91) 1000 (39)1100 (43)

2100 (83)Y Y Y Y (Note)

P-24-C0 1600(3520)

2000 (79) 2150 (85)

1750 (69)1600 (63)

2300 (91) 1100 (43) 2100 (83)Y Y Y Y (Note)

U41631-J-Z816-5-76 3-1

Page 126: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 3 Precautions Pertaining to Delivery and Installation

3.2 Earthquake Preparedness Measures

Earthquake preparedness measures are intended to prevent computers from falling over, to ensure the safety of operators, to prevent damage, and to enable the quick recovery of systems. Fujitsu has standardized the following techniques to prevent damage to computer systems resulting from an earthquake.

Seismic isolation: Seismic isolation is provided by the seismic-isolation leveling feet to prevent the equipment from toppling over.

Securing techniques:Techniques that secure the equipment in place prevent toppling by providing resistance to the force of an earthquake.

Select the appropriate technique depending on the following factors:

Floor vibration levels at the location where the equipment is installedWhether or not a free-access floor is being usedStructure of the equipment

When selecting construction techniques for earthquake-preparedness measures and before starting construction work, contact Fujitsu's construction department.

3-2 U41631-J-Z816-5-76

Page 127: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

3.2 Earthquake Preparedness Measures

3.2.1 Earthquake-proofing construction methodThis section explains how to mount each unit by using the earthquake-proofing construction method.

(1) Anchoring to floor surfacesAnchoring items need to be prepared separately to install the unit using this method.

*1 Bolt length must be specified.*** = Bolt length (mm)The bolt length (mm) varies depending on the building structure. Consult with your Fujitsu engineer.

Figure 3.1 Earthquake-proofing construction method (anchoring on the floor surface)

(Floor)

N-F6-B12-***121(*1)

N-F6-WM12-121N-F6-WB12-121N-C230-4080-X003N-C230-4130-X514

Leveling foot

U41631-J-Z816-5-76 3-3

Page 128: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 3 Precautions Pertaining to Delivery and Installation

(2) Through-floor anchoringSpecial leveling feet must be prepared separately to anchor a unit by using this anchoring method.

Each leveling foot of a unit must be replaced with F6-DA6G when it is bolted from the underside of the floor.

Figure 3.2 Earthquake-proofing construction method (through-floor anchoring)

(Floor)

Unit

Bolt

Leveling foot (F6-DA6G)

3-4 U41631-J-Z816-5-76

Page 129: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

3.2 Earthquake Preparedness Measures

3.2.2 Examples of installing units using earthquake-proofing construction methodsThis section shows the locations of the anchoring elements used when installing units by using the earthquake-proofing construction method.

(1) Example of installing a PRIMEQUEST 580A/540A/580/540/480/440 system

Figure 3.3 Example of installing a PRIMEQUEST 580A/540A/580/540/480/440 system by using the earthquake-proofing construction method

AA

PRIMEQUEST 580A/540A/580/

540/480/440 main unit

69 (

2.7)

866

(34.

1)45

(1.

8)

128

(5.0

)80

7 (3

1.8)

45 (1.8

)

738 (29.1)

29

(1.1)

680 (26.8)29(1.1)

51.5

(2.

0)98

0 (3

8.6)

68.5

(2.

7)

600 (23.6)

40(1.6)

99 (3.9)40(1.6)

99(3.9)

1100

(43

.3)

Front of unitUnit: mm (in.)

U41631-J-Z816-5-76 3-5

Page 130: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 3 Precautions Pertaining to Delivery and Installation

(2) Example of installing the PRIMEQUEST 580A/540A/580/480 main unit with an Extended Power Cabinet

Figure 3.4 Example of installing a PRIMEQUEST 580A/540A/580/480 system with an Extended Power Cabinet by using the earthquake-proofing

construction method

68.5

(2.

7)98

0 (3

8.6)

51.5

(2.

0)

AA

PRIMEQUEST 580A/540A/580/480

main unit

69 (

2.7)

866

(34.

1)45

(1.

8)

680 (26.8)29(1.1)

600 (23.6)

40 (1.6)99 (3.9)40 (1.6)

99(3.9)

1100

(43

.3)

807(

31.8

)45

(1.

8)12

8 (5

.0)

60 (

2.9)

860

(33.

9)60 (2

.9)

1042 (41.0)300 (11.8) 29 (1.1)

45 (1.8)99(3.9)

4 (0.2)

Extended Power Cabinet

Front of unit Unit: mm (in.)

3-6 U41631-J-Z816-5-76

Page 131: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

3.2 Earthquake Preparedness Measures

(3) Example of installing the PRIMEQUEST 580A/540A/580/540/480/440 main unit with an Extended I/O Cabinet

Figure 3.5 Example of installing a PRIMEQUEST 580A/540A/580/540/480/440 system with an Extended I/O Cabinet by using the earthquake-proofing

construction method

Front of unit

PRIMEQUEST 580A/540A/580/

540/480/440 main unit

128

(5.0

)80

7 (3

1.8)

45 (1.8

)

29

(1.1)

680 (26.8)

600 (23.6)

40(1.6)

99(3.9)99(3.9)

1100

(43

.3)

51.5

(2.

0)98

0 (3

8.6)

68.5

(2.

7)

Extended I/O Cabinet

866

(34.

1)69

(2.

7)

4 (0.2)

680 (26.8)

1422 (56.0)

29(1.1)

729 (28.7)590 (23.2)

99(3.9)

99(3.9)

45 (1.8

)89

0 (3

5.0)

45 (

1.8)

Unit: mm (in.)

U41631-J-Z816-5-76 3-7

Page 132: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

CHAPTER 3 Precautions Pertaining to Delivery and Installation

(4) Example of installing the PRIMEQUEST 580A/580/480 main unit with an Extended Power Cabinet and Extended I/O Cabinet

Figure 3.6 Example of installing a PRIMEQUEST 580A/580/480 system with an Extended Power Cabinet and Extended I/O Cabinet

by using the earthquake-proofing construction method

Front of unit

807

(31.

8)

45 (

1.8)

128

(5.0

)

60 (

2.4)

860

(33.

9)60

(2.

4)

300 (16.8) 29 (1.1)

99 (3.9)

Extended Power Cabinet

51.5

(2.

0)

45 (

1.8)

890

(35.

0)45

(1.

8)

99(3.9)

99(3.9)

590 (23.2) 729 (28.7)

29 (1.1) 680 (26.8)

4 (0.2)

69

(2.1

)86

6 (3

4.1)

Extended I/O Cabinet

68.5

(2.

7)98

0 (3

8.6)

1100

(43

.3)

99(3.9)

99 (3.9)40 (1.6)

600 (23.6)

680 (26.8)

PRIMEQUEST 580A/580/480 main unit

259 (10.2)

1726 (68.0)

4 (0.2)

Unit: mm (in.)

3-8 U41631-J-Z816-5-76

Page 133: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

3.2 Earthquake Preparedness Measures

3.2.3 Seismic isolationThis section explains installing units using seismic isolation.

When a unit is installed using seismic isolation, the leveling feet of the unit must be replaced with seismic-isolation leveling feet (CA82001-3000).

If openings for cables or air conditioning are provided on the free-access floor, secure the following distances:1 105 mm (4.1 in.) or more from the center of a seismic-isolation leveling foot2 60 mm (2.4 in.) or more from the center of a caster

Figure 3.7 shows an example of opening on the free-access floor when a seismic-isolation leveling foot is used.

Figure 3.7 Opening on the free-access floor when a seismic-isolation leveling foot is used

Safety frame

Opening on the free-access floor

105 mm (4.1 in.) or more

Seismic-isolation leveling foot

Caster

60 mm (2.4 in.) or more

U41631-J-Z816-5-76 3-9

Page 134: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF
Page 135: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

Acronyms & AbbreviationsAACS AC Section

CCB Circuit BreakerCPU Central Processing Unit

DDLT Digital Linear Tape

FFC Fibre Channel

IIEC International Electrotechnical

Commission

LLAN Local Area Network

PPCI Peripheral Component InterconnectPSU Power Supply Unit (AC to DC)

SSB System BoardSCSI Small Computer System Interface

UUPS Uninterruptible Power SupplyUTP Unshielded Twisted Pair

VVHDCI Very High Density Cable Interconnect

WWAN Wide Area Network

U41631-J-Z816-5-76 AB-1

Page 136: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF
Page 137: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

Index

AAC cable connection

under free-access floor . . . . . . . . . . . . . 2-41AC cable specification

between ACS in Extended I/O Cabinet and PCI_Box . . . . . . . . . . . . . . . . . . . . . . . . . 2-39between ACS in Extended I/O Cabinet and po-wer distribution board . . . . . . . . . . . . . . 2-40main unit . . . . . . . . . . . . . . . . . . . . . . . . 2-38

Ccable connection . . . . . . . . . . . . . . . . . . . . . . 2-4cable connection diagram

basic interface and peripheral . . . . . . . . . 2-5LAN and other device . . . . . . . . . . . . . . . 2-8

cable connection port, detail of . . . . . . . . . . 2-12cable list

LAN and other device . . . . . . . . . . . . . . . 2-9cabling, note on . . . . . . . . . . . . . . . . . . . . . . 2-11circuit breaker in customers’ distribution panel, characteristic of

installed in Japan . . . . . . . . . . . . . . . . . . 2-43installed outside Japan . . . . . . . . . . . . . 2-44

circuit breaker in customers’ distribution panel, re-quirement for

installed in Japan . . . . . . . . . . . . . . . . . . 2-42installed outside Japan . . . . . . . . . . . . . 2-44

circuit breaking characteristic . . . . . . . . . . . 2-42for customer in Japan . . . . . . . . . . . . . . 2-42for customer outside Japan . . . . . . . . . . 2-44

connection overview . . . . . . . . . . . . . . . . . . . 2-1cooling air and exhaust flow . . . . . . . . . . . . 1-50

Eearthquake preparedness measures . . . . . . 3-2earthquake-proofing construction method . . 3-3elevator load requirement . . . . . . . . . . . . . . . 3-1

equipment configuration . . . . . . . . . . . . . . . . 1-1equipment floor plan . . . . . . . . . . . . . . . . . . 1-34equipment installation pattern and service area 1-37example of installing unit, using earthquake-proo-fing construction method . . . . . . . . . . . . . . . . 3-5

Ffloor plan for opening in floor . . . . . . . 1-41, 1-43Fujitsu Technology Solutions . . . . . . . . . . . . . . . ii . . . . . . . . . . . . . . . . (see also "Revision History")

Iinput power supply unit connection . . . . . . . 2-38input power system diagram

Extended I/O Cabinet . . . . . . . . . . . . . . . 2-31PCI_Box . . . . . . . . . . . . . . . . . . . . . . . . . 2-31PRIMEQUEST 540A/540/440 . . . . . . . . 2-23PRIMEQUEST 580A/580/480 . . . . . . . . 2-26

installation specification . . . . . . . . . . . . . . . . 1-11

Ppower cable connection . . . . . . . . . . . . . . . . 2-22

Sseismic isolation . . . . . . . . . . . . . . . . . . . . . . . 3-9service area . . . . . . . . . . . . . . . . . . . . . . . . . 1-37signal cable connection . . . . . . . . . . . . . . . . . 2-4

Ttemplate . . . . . . . . . . . . . . . . . . . . . . . 1-41, 1-48

Vview of unit . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-7

U41631-J-Z816-5-76 IN-1

Page 138: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF
Page 139: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

Comments on PRIMEQUEST 580A/540A/580/540/480/440Installation Planning Manual

U41631-J-Z816-5-76

Fujitsu Technology Solutions GmbHUser Documentation33094 PaderbornGermany

Fax: (++49) 700 / 372 00001

e-mail: [email protected] http://manuals.ts.fujitsu.com

CommentsSuggestionsCorrections

Submitted by

Page 140: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF
Page 141: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

Comments on PRIMEQUEST 580A/540A/580/540/480/440Installation Planning Manual

U41631-J-Z816-5-76

Fujitsu Technology Solutions GmbHUser Documentation33094 PaderbornGermany

Fax: (++49) 700 / 372 00001

e-mail: [email protected] http://manuals.ts.fujitsu.com

CommentsSuggestionsCorrections

Submitted by

Page 142: PRIMEQUEST 580A/540A/580/540/480/440 INSTALLATION …manuals.ts.fujitsu.com/file/6833/pq580a_440_ipm_v5b.pdfDA Dette apparat er klassificeret iht. det europæiske direktiv 2002/96/EF

Recommended