    PRINCE2Glossary of Terms

    COPYRIGHT NOTICEThis document is the copyrighted intellectual property

    of ILX Group plc and may not be copied,disassembled or in any way modified

    without the express and written permissionof ILX Group plc.

    Version: 2.0050609

  • 8/3/2019 Prince2 2009 Glossary

    2/17

    PRINCE2 is a Registered Trade Mark of the Office of Government Commerce in the United Kingdom and other countries.Based on OGC PRINCE2 material. Reproduced under licence from OGC.

    PRINCE2Glossary of terms

    Term Definition

    accept (risk response) A risk response to a threat where a conscious anddeliberate decision is taken to retain the threat, havingdiscerned that that it is more economical to do so than toattempt a risk response action. The threat should continueto be monitored to ensure that it remains tolerable.

    acceptance The formal act of acknowledging that the project has metagreed acceptance criteria and thereby met therequirements of its stakeholders.

    acceptance criteria A prioritized list of criteria that the project product must meetbefore the customer will accept it, i.e. measurabledefinitions of the attributes that must apply to the set of

    products to be acceptable to key stakeholders.

    activity An activity is a process, function or task that occurs overtime, has recognizable results and is managed. They areusually defined as part of processes or plans.

    agile methods Agile methods are (mostly) software development methodsthat apply the project approach of using short time-boxediterations where products are incrementally developed.PRINCE2 is compatible with agile principles.

    approval The formal confirmation that a product is complete andmeets its requirements (less any concessions) as definedby its Product Description.

    approver The person or group (e.g. a Project Board) who is identifiedas qualified and authorized to approve a (management orspecialist) product as being complete and fit for purpose.

    assumption A statement that is taken as being true for the purposes ofplanning, but which could change later. An assumption ismade where some facts are not yet known or decided, andis usually reserved for matters of such significance that ifthey change, or turn out not to be true, then there will needto be considerable re-planning.

    assuranceAll the systematic actions necessary to provide confidencethat the target (system, process, organization, programme,project, outcome, benefit, capability, product output,deliverable) is appropriate. Appropriateness might bedefined subjectively or objectively in differentcircumstances. The implication is that assurance will have alevel of independence from that which is being assured.See Project Assurance and quality assurance

    authority The right to allocate resources and make decisions (applies

    to project, stage and team levels).

    authorization The point at which an authority is granted.

  • 8/3/2019 Prince2 2009 Glossary

    3/17

    PRINCE2 is a Registered Trade Mark of the Office of Government Commerce in the United Kingdom and other countries.Based on OGC PRINCE2 material. Reproduced under licence from OGC.

    avoid (risk response) A risk response to a threat where the threat either can nolonger have an impact or can no longer happen.

    baseline Reference levels against which an entity is monitored andcontrolled.

    baseline managementproduct

    A type of management product that defines aspects of theproject and, once approved, is subject to change control.

    benefit The measurable improvement resulting from an outcomeperceived as an advantage by one or more stakeholders.

    Benefits Review Plan Defines how and when a measurement of the achievementof the projects benefits can be made. If the project is beingmanaged within a programme this information may becreated and maintained at the programme level.

    benefits tolerance The permissible deviation in the expected benefit that isallowed before the deviation needs to be escalated to thenext level of management. Benefits tolerance isdocumented in the Business Case. See tolerance.

    Business Case The justification for an organizational activity (project) whichtypically contains costs, benefits, risks and timescales, andagainst which continuing viability is tested.

    centre of excellence A corporate co-ordinating function for portfolio, programmesand projects providing standards, consistency of methodsand processes, knowledge management, assurance andtraining

    Change Authority A person or group to which the Project Board may delegateresponsibility for the consideration of requests for change oroff-specifications. The Change Authority may be given achange budget and can approve changes within thatbudget.

    change budget The money allocated to the Change Authority available tobe spent on authorized requests for change.

    change control The procedure that ensures that all changes that may affectthe projects agreed objectives are identified, assessed andeither approved, rejected or deferred.

    checkpoint A team-level, time-driven review of progress.

    Checkpoint Report A progress report of the information gathered at acheckpoint, which is given by a team to the ProjectManager, and provides reporting data as defined in theWork Package.

    closure notification Advice from the Project Board to inform all stakeholders andthe host locations that the project resources can bedisbanded and support services, such as space, equipmentand access, demobilized. It should indicate a closure datefor costs to be charged to the project.

    closure recommendation A recommendation prepared by the Project Manager for theProject Board to send as a project closure notification whenthe board is satisfied that the project can be closed.

  • 8/3/2019 Prince2 2009 Glossary

    4/17

    PRINCE2 is a Registered Trade Mark of the Office of Government Commerce in the United Kingdom and other countries.Based on OGC PRINCE2 material. Reproduced under licence from OGC.

    CommunicationManagement Strategy

    A description of the means and frequency ofcommunication between the project, the projectsstakeholders.

    concession An off-specification that is accepted by the Project Boardwithout corrective action.

    configuration item An entity that is subject to configuration management. Theentity may be a component of a product, a product, or a setof products in a release.

    Configuration Item Record A record that describes the status, version and variant of aconfiguration item, and any details of important relationshipsbetween them.

    configuration management Technical and administrative activities concerned with thecreation, maintenance, and controlled change ofconfiguration throughout the life of a product.

    Configuration ManagementStrategy

    A description of how and by whom the projects productswill be controlled and protected.

    configuration managementsystem

    The set of processes, tools and databases that are used tomanage configuration data. Typically, a project will use theconfiguration management system of either the customer orsupplier organization.

    constraints The restrictions or limitations that the project is bound by.

    contingency Something held in reserve typically to handle time and costvariances, or risks. PRINCE2 does not advocate the use of

    contingency as:

    Estimating variances are managed by setting tolerances

    Risks are managed through appropriate risk responses(including the fallback response which is contingent on therisk occurring).

    corporate or programmestandards

    These are over-arching standards that the project mustadhere to. They will influence the four project strategies(Communication Management Strategy, ConfigurationManagement Strategy, Quality Management Strategy andRisk Management Strategy) and the project controls.

    corrective action A set of actions to resolve a threat to a plans tolerances ora defect in a product.

    cost tolerance The permissible deviation in a plans cost that is allowedbefore the deviation needs to be escalated to the next levelof management. Cost tolerance is documented in therespective plan. See tolerance.

  • 8/3/2019 Prince2 2009 Glossary

    5/17

    PRINCE2 is a Registered Trade Mark of the Office of Government Commerce in the United Kingdom and other countries.Based on OGC PRINCE2 material. Reproduced under licence from OGC.

    customer The person or group who commissioned the work and willbenefit from the end results.

    customers qualityexpectations

    A statement about the quality expected from the projectproduct, captured in the Project Product Description.

    Daily Log Used to record problems/concerns that can be handled bythe Project Manger informally.

    deliverable See output.

    dependencies (plan) The relationship between products or activities. Forexample, Product C cannot start to be developed untilProducts A and B have been completed. Dependencies canbe internal or external.

    Internal dependencies are those under the control of theProject Manager. External dependencies are those outsidethe control of the Project Manager for example, thedelivery of a product required by this project from anotherproject.

    dis-benefit Outcomes perceived as negative by one or morestakeholders. They are actual consequences of an activitywhereas, by definition, a risk has some uncertainty aboutwhether it will materialize.

    DSDM Atern An agile project delivery framework developed and ownedby the DSDM consortium. Atern uses a time-boxed anditerative approach to product development and is

    compatible with PRINCE2.

    embedding (PRINCE2) What an organization needs to do to adopt PRINCE2 as itscorporate project management method. It is different totailoring which defines what a project needs to do to applythe method to a specific project environment.

    End Project Report A report given by the Project Manager to the Project Board,that confirms the handover of all products and provides anupdated Business Case and an assessment of how well theproject has done against the original Project InitiationDocumentation.

    End Stage Assessment The review by the Project Board and Project Manager of theEnd Stage Report to decide whether to approve the nextStage Plan. According to the size and criticality of theproject, the review may be formal or informal. The authorityto proceed should be documented as a formal record.

    End Stage Report A report given by the Project Manager to the Project Boardat the end of each management stage of the project. Thisprovides information about the project performance duringthe stage and the project status at stage end.

  • 8/3/2019 Prince2 2009 Glossary

    6/17

    PRINCE2 is a Registered Trade Mark of the Office of Government Commerce in the United Kingdom and other countries.Based on OGC PRINCE2 material. Reproduced under licence from OGC.

    enhance (risk response) A risk response to an opportunity where proactive actionsare taken to:

    Enhance the probability of the event occurring

    Enhance the impact of the event should it occur.

    event-driven control This is a control that takes place when a specific eventoccurs. This could be, for example, the end of a stage, thecompletion of the Project Initiation Documentation, or thecreation of an Exception Report. It could also includeorganizational events that may affect the project, such asthe end of the financial year.

    exception A situation where it can be forecast that there will be adeviation beyond the tolerance levels agreed betweenProject Manager and Project Board (or between ProjectBoard and corporate or programme management).

    exception assessment This is a review by the Project Board to approve (or reject)an Exception Plan.

    Exception Plan This is a plan that often follows an Exception Report. For aStage Plan exception, it covers the period from the presentto the end of the current stage. If the exception were at aproject level, the Project Plan would be replaced.

    Exception Report A description of the exception situation, its impact, options,recommendation and impact of the recommendation. Thisreport is prepared by the Project Manager for the Project

    Board.

    Executive The single individual with overall responsibility for ensuringthat a project meets its objectives and delivers the projectedbenefits. This individual should ensure that the projectmaintains its business focus, that it has clear authority andthat the work, including risks, is actively managed. TheExecutive is the chair of the Project Board, representing thecustomer and is responsible for the Business Case.

    exploit (risk response) A risk response to an opportunity by seizing the opportunityto ensure that it will happen and that the impact will berealized.

    fallback (risk response) A risk response to a threat by putting in place a fallbackplan for the actions that will be taken to reduce the impact ofthe threat should the risk occur.

    follow-on actionrecommendations

    Recommended actions related to unfinished work, ongoingissues and risks, and any other activities needed to take aproduct to the next phase of its life. These are summarizedand included in the End Stage Report (for phasedhandover) and End Project Report.

  • 8/3/2019 Prince2 2009 Glossary

    7/17

  • 8/3/2019 Prince2 2009 Glossary

    8/17

    PRINCE2 is a Registered Trade Mark of the Office of Government Commerce in the United Kingdom and other countries.Based on OGC PRINCE2 material. Reproduced under licence from OGC.

    format and composition. PRINCE2 has two logs: the DailyLog and the Lessons Log.

    management product Those products that will be required as part of managing theproject, and establishing and maintaining quality (forexample, Highlight Reports, End Stage Reports etc.). The

    management products stay constant, whatever the type ofproject, and can be used as described, or with any relevantmodifications, for all projects. There are three types ofmanagement product: baselines, records and reports.

    management stage A management stage is the section of the project that theProject Manager is managing on behalf of the Project Boardat any one time, at the end of which the Project Boardwishes to review progress to date, the state of the ProjectPlan, Business Case and risks, and the next Stage Plan inorder to decide whether to continue with the project.

    milestone A significant event in the plans schedule such as

    completion of key Work Packages, a technical stage, or amanagement stage.

    off-specification Something that should be provided by the project, butcurrently is not (or is forecast not to be) provided and thatthe Project Manager is unable to resolve within agreedtolerances. This might be a missing product or a product notmeeting its specifications. It is one type of issue.

    operational and maintenanceacceptance

    A specific type of acceptance by the person or group whowill support the product once it is handed over into theoperational environment.

    outcome The result of change, normally affecting real-worldbehaviour and/or circumstances. Outcomes are desiredwhen a change is conceived. They are achieved as a resultof the activities undertaken to effect the change.

    output A specialist product that is handed over to a user(s). Notethat management products are not outputs but createdsolely for the purpose of managing the project.

    performance targets A plans goals for time, cost, quality, scope, benefits andrisk.

    plan A detailed proposal for doing or achieving somethingdetailing the what, when, how and by whom. In PRINCE2there are only the following types of plan: Project Plan,Stage Plan, Team Plan, Exception Plan and BenefitsReview Plan.

    planned closure The PRINCE2 activity to close a project.

    planning horizon The period of time for which it is possible to accurately plan.

  • 8/3/2019 Prince2 2009 Glossary

    9/17

    PRINCE2 is a Registered Trade Mark of the Office of Government Commerce in the United Kingdom and other countries.Based on OGC PRINCE2 material. Reproduced under licence from OGC.

    portfolio All the programmes and stand-alone projects beingundertaken by an organization, a group of organizations, oran organizational unit.

    premature closure The PRINCE2 activity to close a project before its planned

    closure. The Project Manager must ensure that work inprogress is not simply abandoned, but that the projectsalvages any value created to date, and checks that anygaps left by the cancellation of the project are raised tocorporate or programme management.

    prerequisites (plan) Any fundamental aspects that must be in place, and remainin place, for the plan to succeed.

    PRINCE2 A method that supports some selected aspects of projectmanagement. The acronym stands for Projects in aControlled Environment.

    PRINCE2 principle The guiding obligations for good project managementpractice that are the basis of a project being managed usingPRINCE2.

    PRINCE2 project A project that applies the PRINCE2 principles.

    probability This is the evaluated likelihood of a particular threat oropportunity actually happening, including a consideration ofthe frequency with which this may arise.

    problem/concern A type of issue (other than a request for change or off-specification) that the Project Manager needs to resolve or

    escalate.

    procedure A specified series of actions for a particular aspect ofproject management established specifically for the project,for example a risk management procedure.

    process A structured set of activities designed to accomplish aspecific objective. A process takes one or more definedinputs and turns them into defined outputs.

    producer The person or group responsible for developing a product.

    product An input or output, whether tangible or intangible, that can

    be described in advance, created and tested. PRINCE2 hastwo types of products management products andspecialist products.

    product breakdown structure A hierarchy of all the products to be produced during a plan.

    product checklist A list of the major products of a plan, plus key dates in theirdelivery.

    Product Description A description of a products purpose, composition,derivation and quality criteria. It is produced at planningtime, as soon as possible after the need for the product isidentified.

    product flow diagram A diagram showing the sequence of production andinterdependencies of the products listed in a product

  • 8/3/2019 Prince2 2009 Glossary

    10/17

    PRINCE2 is a Registered Trade Mark of the Office of Government Commerce in the United Kingdom and other countries.Based on OGC PRINCE2 material. Reproduced under licence from OGC.

    breakdown structure.

    product status account A report on the status of products. The required productscan be specified by identifier or the part of the project inwhich they were developed.

    product-based planning A technique leading to a comprehensive plan based on thecreation and delivery of required outputs. The techniqueconsiders prerequisite products, quality requirements andthe dependencies between products.

    programme A temporary flexible organization structure created tocoordinate, direct and oversee the implementation of a setof related projects and activities in order to deliver outcomesand benefits related to the organizations strategicobjectives. A programme is likely to have a life that spansseveral years.

    project A temporary organization that is created for the purpose ofdelivering one or more business products according to anagreed Business Case.

    project approach A description of the way in which the work of the project isto be approached. For example: are we building a productfrom scratch or buying in a product that already exists?

    Project Assurance The Project Boards responsibilities to assure itself that theproject is being conducted correctly. The Project Boardmembers each have a specific area of focus for ProjectAssurance, namely business assurance for the Executive,user assurance for the Senior User(s), and supplier

    assurance for the Senior Supplier(s).

    project authorizationnotification

    Advice from the Project Board to inform all stakeholders andthe host locations that the project has been authorized andto request any necessary logistical support (e.g.communication facilities, equipment and any projectsupport) sufficient for the duration of the project.

    Project Brief Statement that describes the purpose, cost, time andperformance requirements, and constraints for a project. Itis created pre-project during the Starting up a Projectprocess and is used during the Initiating a Project processto create the Project Initiation Documentation and its

    components. It is superseded by the Project InitiationDocumentation and not maintained.

    Project InitiationDocumentation

    A logical set of documents which brings together the keyinformation needed to start the project on a sound basis andto convey that information to all concerned with the project.

    project initiation notification Advice from the Project Board to inform all stakeholders andthe host locations that the project is being initiated and torequest any necessary logistical support (e.g.communication facilities, equipment and any projectsupport) sufficient for the initiation stage.

    project lifecycle The period from the start-up of a project to the acceptanceof the project product.

  • 8/3/2019 Prince2 2009 Glossary

    11/17

    PRINCE2 is a Registered Trade Mark of the Office of Government Commerce in the United Kingdom and other countries.Based on OGC PRINCE2 material. Reproduced under licence from OGC.

    project management The planning, delegating, monitoring and control of allaspects of the project, and the motivation of those involved,to achieve the project objectives within the expectedperformance targets for time, cost, quality, scope, benefitsand risks.

    project management team Covers the entire management structure of the ProjectBoard, and Project Manager, plus any Team Manager,Project Assurance and Project Support roles.

    project management teamstructure

    An organization chart showing the people assigned to theproject management team roles to be used, and theirdelegation and reporting relationship.

    Project Manager The person given the authority and responsibility to managethe project on a day-to-day basis to deliver the requiredproducts within the constraints agreed with the ProjectBoard.

    project mandate An external product generated by the authoritycommissioning the project that forms the trigger for Startingup a Project.

    project office A temporary office set up to support the delivery of aspecific change initiative being delivered as a project. Ifused, the Project Office undertakes the responsibility of theProject Support role.

    Project Plan A high-level plan showing the major products of the project,when they will be delivered and at what cost. An initialProject Plan is presented as part of the Project Initiation

    Documentation. This is revised as information on actualprogress appears. It is a major control document for theProject Board to measure actual progress againstexpectations.

    project product What the project must deliver in order to gain acceptance.

    Project Product Description A special type of Product Description used to gainagreement from the user on the projects scope andrequirements, to define the customers quality expectation,and to define the acceptance criteria for the project.

    project start-up notification Advice to the host locations that the project is about to start

    and requesting any required Project Support services.

    Project Support An administrative role in the project management team.Project Support can be in the form of advice and help withproject management tools, guidance, administrativeservices, such as filing, and the collection of actual data.

    proximity (of risk) The time factor of risk, i.e. the occurrence of risks will bemore likely at particular times, and the severity of theirimpact will vary depending on when they occur.

    quality The totality of features and inherent or assignedcharacteristics of a product, person, process, service and/or

    system that bear on its ability to show that it meetsexpectations or satisfies stated needs, requirements orspecification.

  • 8/3/2019 Prince2 2009 Glossary

    12/17

    PRINCE2 is a Registered Trade Mark of the Office of Government Commerce in the United Kingdom and other countries.Based on OGC PRINCE2 material. Reproduced under licence from OGC.

    quality assurance Independent check that products will be fit for purpose ormeet requirements.

    quality control The process of monitoring specific project results todetermine if they comply with relevant standards andidentifying ways to eliminate causes of unsatisfactory

    performance.

    quality criteria A description of the quality specification that the productmust meet, and the quality measurements that will beapplied by those inspecting the finished product.

    quality inspection A systematic, structured assessment of a product carriedout by two or more carefully selected people (the reviewteam), in a planned, documented and organized fashion.

    quality management The coordinated activities to direct and control anorganization with regard to quality.

    Quality Management Strategy Defines the quality techniques and standards to be applied,and the various responsibilities for achieving the requiredquality levels, during the project.

    quality management system The complete set of quality standards, procedures andresponsibilities for a site or organization. In the projectcontext, sites and organizations should be interpreted asthe permanent or semi-permanent organization(s)sponsoring the project work, i.e. they are external to theprojects temporary organization. A programme, forinstance, can be regarded as a semi-permanentorganization that sponsors projects and may have a

    documented quality management system.

    quality records Evidence kept to demonstrate that the required qualityassurance and quality control activities have been carriedout.

    Quality Register Contains summary details of all planned and completedquality activities. The Quality Register is used by the ProjectManager and Project Assurance as part of reviewingprogress.

    quality review See quality inspection.

    quality review technique A quality inspection technique with defined roles and aspecific structure. It is designed to assess whether aproduct which takes the form of a document (or similar, e.g.a presentation) is complete, adheres to standards andmeets the quality criteria agreed for it in the relevantProduct Description. The participants are drawn from thosewith the necessary competence to evaluate its fitness-for-purpose.

    quality tolerance Quality tolerances for a product should be identified foreach quality criteria by defining an acceptable range ofvalues. Quality tolerance is documented in the ProjectProduct Description (for the project-level quality tolerance)

    and in the Product Description for each product to bedelivered.

  • 8/3/2019 Prince2 2009 Glossary

    13/17

    PRINCE2 is a Registered Trade Mark of the Office of Government Commerce in the United Kingdom and other countries.Based on OGC PRINCE2 material. Reproduced under licence from OGC.

    records Dynamic management products that maintain informationregarding project progress.

    reduce (risk response) A response to a risk where proactive actions are taken to:

    Reduce the probability of the event occurring, by performing

    some form of control

    Reduce the impact of the event should it occur.

    registers Formal repositories managed by the Project Manager thatrequire agreement by the Project Board on their format,composition and use. PRINCE2 has three registers: IssueRegister, Risk Register and Quality Register.

    reject (risk response) A response to a risk (opportunity) where a conscious anddeliberate decision is taken not to exploit or enhance theopportunity, having discerned that it is more economical todo so than to attempt a risk response action. Theopportunity should continue to be monitored.

    release The set of products in a handover. The contents of arelease are managed tested and deployed as a singleentity. See handover.

    reports Management products providing a snapshot of the status ofcertain aspects of the project.

    request for change A proposal for a change to a baseline. It is a type of issue.

    residual risk The risk remaining after the risk response has been applied.

    responsible authority The person or group commissioning the project (typicallycorporate or programme management) that has theauthority to commit resources and funds on behalf of thecommissioning organization.

    reviewer A person or group independent of the producer whoassesses whether a product meets its requirements asdefined in its Product Description.

    risk An uncertain event or set of events that, should it occur, willhave an effect on the achievement of objectives. A risk ismeasured by a combination of the probability of a perceived

    threat or opportunity occurring, and the magnitude of itsimpact on objectives.

  • 8/3/2019 Prince2 2009 Glossary

    14/17

    PRINCE2 is a Registered Trade Mark of the Office of Government Commerce in the United Kingdom and other countries.Based on OGC PRINCE2 material. Reproduced under licence from OGC.

    risk actionee Some actions may not be within the remit of the risk ownerto control explicitly; in that situation there should be anominated owner of the action to address the risk. He orshe will need to keep the risk owner apprised of thesituation

    risk appetite An organizations unique attitude towards risk-taking that inturn dictates the amount of risk that it considers isacceptable.

    risk estimation The estimation of probability and impact of an individualrisk, taking into account predetermined standards, targetrisk levels, interdependencies and other relevant factors

    risk evaluation The process of understanding the net effect of the identifiedthreats and opportunities on an activity when aggregatedtogether.

    risk management The systematic application of principles, approaches andprocesses to the tasks of identifying and assessing risks,and then planning and implementing risk responses.

    Risk Management Strategy Describes the goals of applying risk management, adescription of the procedure that will be adopted, the rolesand responsibilities, risk tolerances, the timing of riskmanagement interventions, the tools and techniques thatwill be used, and the reporting requirements.

    risk owner A named individual who is responsible for the management,monitoring and control of all aspects of a particular risk

    assigned to them, including the implementation of theselected responses to address the threats or to maximizethe opportunities.

    risk profile Describes the types of risk that are faced by an organizationand its exposure to those risks.

    Risk Register A record of identified risks relating to an initiative, includingtheir status and history.

    risk response Actions that may be taken to bring the situation to a levelwhere the exposure to risk is acceptable to the organization.These responses fall into one of a number of risk response

    categories.

    risk response category For threats, the individual risk response category can beavoid, reduce, transfer, accept or share. For opportunities,the individual risk response category can be exploit,enhance, reject or share.

    risk tolerance The threshold levels of risk exposure which, whenexceeded, will trigger an Exception Report to bring thesituation to the attention of the Project Board. Risktolerances could include limits on the plans aggregatedthreats (e.g. aggregated risk costs to remain less than 10%

    of the plans budget), or limits on any individual threat (e.g.any threat to operational service). Risk tolerance isdocumented in the Risk Management Strategy.

  • 8/3/2019 Prince2 2009 Glossary

    15/17

    PRINCE2 is a Registered Trade Mark of the Office of Government Commerce in the United Kingdom and other countries.Based on OGC PRINCE2 material. Reproduced under licence from OGC.

    risk tolerance line A line drawn on the summary risk profile. Risks that appearabove this line cannot be accepted (lived with) withoutreferring them to a higher authority. For a project, theProject Manager would refer these risks to the ProjectBoard.

    role description Describes the set of responsibilities specific to a role.

    schedule Graphical representation of a plan (for example in a Ganttchart), typically describing a sequence of tasks, togetherwith resource allocations, which collectively deliver the plan.In PRINCE2, project activities should only be documentedin the schedules associated with a Project Plan, Stage Planor Team Plan. Actions that are allocated from day-to-daymanagement may be documented in the relevant project log(i.e. Risk Register, Daily Log, Issue Register, QualityRegister) if they do not require significant activity.

    scope The scope of a plan is the sum total of its products and the

    extent of their requirements. It is described by the productbreakdown structure for the plan and associated ProductDescriptions.

    scope tolerance The permissible deviation in a plans scope that is allowedbefore the deviation needs to be escalated to the next levelof management. Scope tolerance is documented in therespective plan in the form of a note or reference to theproduct breakdown structure for that plan. See tolerance.

    Senior Responsible Owner(SRO)

    The Senior Responsible Owner is a UK government termfor the individual responsible for ensuring that a project orprogramme of change meets its objectives and delivers theprojected benefits. They should be the owner of the overallbusiness change that is being supported by the project. TheSRO should ensure that the change maintains its businessfocus, has clear authority and that the context, includingrisks, is actively managed. This individual must be seniorand must take personal responsibility for successful deliveryof the project. They should be recognized as the ownerthroughout the organization.

    The SRO appoints the projects Executive (or in somecases may elect to be the Executive).

    Senior Supplier The Project Board role that provides knowledge andexperience of the main discipline(s) involved in theproduction of the projects deliverable(s). The SeniorSupplier represents the supplier interests within the projectand provides supplier resources.

    Senior User The Project Board role accountable for ensuring that userneeds are specified correctly and that the solution meetsthose needs.

    specialist product Specialist products are those products whose developmentis the subject of the plan. The specialist products arespecific to an individual project (for example, an advertising

    campaign, a car park ticketing system, foundations for abuilding, a new business process etc.) Also known as adeliverable or output.

  • 8/3/2019 Prince2 2009 Glossary

    16/17

    PRINCE2 is a Registered Trade Mark of the Office of Government Commerce in the United Kingdom and other countries.Based on OGC PRINCE2 material. Reproduced under licence from OGC.

    sponsor The main driving force behind a programme or project.PRINCE2 does not define a role for the sponsor, but thesponsor is most likely to be the Executive on the ProjectBoard, or the person who has appointed the Executive.

    stage See management stage or technical stage

    Stage Plan A detailed plan used as the basis for project managementcontrol throughout a stage.

    stakeholder Any individual, group or organization that can affect, beaffected by, or perceive itself to be affected by, an initiative(programme, project, activity, risk).

    start-up The pre-project activities undertaken by the Executive andthe Project Manager to produce the outline Business Case,Project Brief and initiation Stage Plan.

    strategy An approach or line to take, designed to achieve a long-term aim. Strategies can exist at different levels at thecorporate, programme and project level. At the project level,PRINCE2 defines four strategies: CommunicationManagement Strategy, Configuration ManagementStrategy, Quality Management Strategy and RiskManagement Strategy.

    supplier The person, group or groups responsible for the supply ofthe projects specialist products.

    tailoring The appropriate use of PRINCE2 on any given project,ensuring that there is the correct amount of planning,

    control, governance and use of the processes and themes,whereas the adoption of PRINCE2 across an organization isknown as embedding.

    Team Manager The person responsible for the production of those productsallocated by the Project Manager as defined in a WorkPackage to an appropriate quality, in a timescale and at acost acceptable to the Project Board. This role reports to,and takes direction from, the Project Manager. If a TeamManager is not assigned, then the Project Managerundertakes the responsibilities of the Team Manager role.

    Team Plan An optional level of plan used as the basis for team

    management control when executing Work Packages.

    technical stage A method of grouping work together by the set oftechniques used, or the products created. This results instages covering elements such as design, build andimplementation. Such stages are technical stages and are aseparate concept from management stages.

  • 8/3/2019 Prince2 2009 Glossary

    17/17

    theme An aspect of project management that needs to becontinually addressed, and that requires specific treatmentfor the PRINCE2 processes to be effective.

    time tolerance The permissible deviation in a plans time that is allowed

    before the deviation needs to be escalated to the next levelof management. Time tolerance is documented in therespective plan. See tolerance.

    time-driven control Controls that are periodic to enable the next higher authorityto monitor progress, e.g. a control that takes place everytwo weeks. PRINCE2 offers two key time-driven progressreports: Checkpoint Report and Highlight Report.

    tolerance The permissible deviation above and below a plans targetfor time and cost without escalating the deviation to the nextlevel of management. There may also be tolerance levelsfor quality, scope, benefit and risk. Tolerance is applied at

    project, stage and team levels.

    transfer (risk response) A response to a threat where a third party takes onresponsibility for some of the financial impact of the threat(for example, through insurance or by means of appropriateclauses in a contract.)

    trigger An event or decision that triggers a PRINCE2 process.

    user acceptance A specific type of acceptance by the person or group whowill use the product once it is handed over into theoperational environment.

    user(s) The person or group who will use one or more of theprojects products.

    variant A means of distinguishing between derivatives of baselinedproducts. For example, an operations manual may have anEnglish variant and a Spanish variant.

    version A specific baseline of a product. Versions typically usenaming conventions that enable the sequence or date of thebaseline to be identified. For example Project Plan version 2is the baseline after Project Plan version 1.

    waterfall methods A waterfall method describes a development approach thatis linear and sequential with distinct goals for each phase ofdevelopment. Once a phase of development is completed,the development proceeds to the next phase and earlierphases are not revisited (hence the analogy that waterflowing down a mountain cannot go back).

    Work Package The set of information relevant to the creation of one ormore products. It will contain a description of the work, theProduct Description(s), details of any constraints onproduction, and confirmation of the agreement between theProject Manager and the person or Team Manager who isto implement the Work Package that the work can be done

    within the constraints.