1173
Printing Due to the size of the book and the frequency it is updated, it is recommended that the electronic version be used and the whole document not be printed, but only specific pages. INTRODUCTION TO THRUWAY AUTHORITY WEIGHTED AVERAGE BID PRICE BOOK English Items Only This book is based on awarded Thruway contract bid results for the time period indicated on the report. The data is drawn from the TRNS PORT database. The selection filter includes items that have pay units of Lump Sum, Fixed Price, and Fixed Price Lump Sum. However, caution should be exercised when using Division-wide statistical data on these items , as they are not always comparable from one contract to another. The report organizes and displays the data, summarized by item, at both the contract and Division levels. Information displayed at the contract level includes TA number, contract number, awarded contract amount, letting date, bid quantity, minimum and maximum bid, number of bidders, winning unit bid, winning item total and average unit bid. Information displayed at the Division level includes number of contracts, total number of bidders, total quantity, minimum and maximum bid (using awar ded bidders only), Division weighted average unit bid (using all bid occurrences) and awarded weighted average unit bid (using awarded bidders only). The weighted average unit bids are based on statistical calculations. The object of using a weighted av erage instead of a normal average is to reduce the influence of outliers and take into account the influence of item quantity on the price. The Division weighted average bid is a unit price calculated using all bid occurrences. It is calculated by multipl ying the average unit bid by the bid quantity for each contract , summing each and dividing by the total quantity. A normal average would simply sum each unit bid price and divide by the number of bidders. The Awarded weighted average bid price is a unit price calculated using the winning bidders only. It is calculated by multiplying the winning unit bid by the bid quantity for each contract , summing each and dividing by the total quantity.
Transcript
  • Printing Due to the size of the book and the frequency it is updated, it is recommended that the electronic version be used and the whole document not be printed, but only specific pages.

    INTRODUCTION TO THRUWAY AUTHORITY WEIGHTED AVERAGE BID PRICE BOOK English Items Only This book is based on awarded Thruway contract bid results for the time period

    indicated on the report. The data is drawn from the TRNS PORT database. The selection filter includes items that have pay units of Lump Sum, Fixed Price, and Fixed Price Lump Sum. However, caution should be exercised when using Division-wide statistical data on these items, as they are not always comparable from one contract to another. The report organizes and displays the data, summarized by item, at both the contract and Division levels. Information displayed at the contract level includes TA number, contract number, awarded contract amount, letting date, bid quantity, minimum and maximum bid, number of bidders, winning unit bid, winning item total and average unit bid. Information displayed at the Division level includes number of contracts, total number of bidders, total quantity, minimum and maximum bid (using awar ded bidders only), Division weighted average unit bid (using all bid occurrences) and awarded weighted average unit bid (using awarded bidders only). The weighted average unit bids are based on statistical calculations. The object of using a weighted average instead of a normal average is to reduce the influence of outliers and take into account the influence of item quantity on the price. The Division weighted average bid is a unit price calculated using all bid occurrences. It is calculated by multiplying the average unit bid by the bid quantity for each contract, summing each and dividing by the total quantity. A normal average would simply sum each unit bid price and divide by the number of bidders. The Awarded weighted average bid price is a unit price calculated using the winning bidders only. It is calculated by multiplying the winning unit bid by the bid quantity for each contract, summing each and dividing by the total quantity.

  • 201.06

    12/23/2019Print Date:

    English Items ONLYEnglish Item

    NYS Thruway Authority - Weighted Average Bid Prices - Lettings 12/23/2016 Thru 12/23/2019

    Awarded TRNS*PORT Data Only

    201.06 - CLEARING AND GRUBBING - LS

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    5 110,000.00 110,000.00 2,629.89 110,000.00 31,525.98 1.0005/03/2017 4,804,804.80D214572TANY17-27B

    4 185,000.00 185,000.00 50,000.00 250,000.00 143,750.00 1.0008/02/2017 19,189,120.29D214564TANY17-18R

    6 31,350.00 31,350.00 31,350.00 449,000.00 191,725.00 1.0009/27/2017 11,165,222.73D214579TANY17-32B

    5 250,000.00 250,000.00 75,000.00 7,000,000.00 2,065,000.00 1.0004/11/2018 135,909,000.00D214568TANE 18-7

    4 1,000,000.00 1,000,000.00 175,000.00 1,000,000.00 537,500.00 1.0004/25/2018 39,311,727.80D214583TANY 18-12

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    201.06 - CLEARING AND GRUBBING - LSNew York Div. Totals For:

    24 5.00

    5

    593,900.20

    1,000,000.00 31,350.00 315,270.00

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    4 45,000.00 45,000.00 2,176.33 50,000.00 31,794.08 1.0003/29/2017 12,092,049.40D214565TAA 17-19

    8 40,000.00 40,000.00 25,000.00 300,000.00 141,250.00 1.0008/30/2017 2,527,450.00D214557TAA 17-11B

    8 10,000.00 10,000.00 8,000.00 100,000.00 33,937.50 1.0010/04/2017 7,791,645.00D214582TAA 17-33B

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    201.06 - CLEARING AND GRUBBING - LSAlbany Div. Totals For:

    20 3.00

    3

    68,993.86

    45,000.00 10,000.00 31,666.67

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    3 50,000.00 50,000.00 27,920.00 50,000.00 38,908.87 1.0002/01/2017 18,301,793.32D214551TAS 17-9

    3 175,000.00 175,000.00 100,000.00 200,000.00 158,333.33 1.0002/22/2017 26,272,250.00D214543TAS 17-7

    8 8,762.56 8,762.56 8,000.00 60,000.00 23,770.32 1.0004/05/2017 9,933,358.85D214544TAS 17-8

    6 15,000.00 15,000.00 6,000.00 70,000.00 38,500.00 1.0011/08/2017 17,056,044.53D214576TAS17-29B

    3 12,000.00 12,000.00 8,000.00 20,000.00 13,333.33 1.0005/30/2018 1,418,940.60D214659TAS 18-16B

    Page 2 of 1173

  • 201.06

    12/23/2019Print Date:

    English Items ONLYEnglish Item

    NYS Thruway Authority - Weighted Average Bid Prices - Lettings 12/23/2016 Thru 12/23/2019

    Awarded TRNS*PORT Data Only

    2 100.00 100.00 100.00 5,000.00 2,550.00 1.0002/06/2019 2,622,127.40D214706TAS 19-5B

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    201.06 - CLEARING AND GRUBBING - LSSyracuse Div. Totals For:

    25 6.00

    6

    45,899.31

    175,000.00 100.00 43,477.09

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    4 35,000.00 35,000.00 25,000.00 250,000.00 84,000.00 1.0009/06/2017 66,474,997.50D214545TAB 17-4

    4 85,000.00 85,000.00 20,000.00 761,000.00 334,611.18 1.0011/15/2017 20,290,085.09D214615TAN 17-44

    5 5,000.00 5,000.00 3,150.00 50,727.41 23,775.48 1.0001/10/2018 4,562,184.50D214577TAB 17-30

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    201.06 - CLEARING AND GRUBBING - LSBuffalo Div. Totals For:

    13 3.00

    3

    147,462.22

    85,000.00 5,000.00 41,666.67

    201.07 - CLEARING AND GRUBBING - ACRE

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    4 97,540.00 24,385.00 24,385.00 69,000.00 38,346.25 4.0008/02/2017 19,189,120.29D214564TANY17-18R

    6 20,158.35 8,880.33 6,500.00 35,000.00 16,430.06 2.2711/22/2017 13,989,000.00D214587TANY 17-38

    5 59,331.78 40,089.04 20,000.00 50,000.00 34,017.81 1.4801/24/2018 12,804,580.47D214511TANY 17-13

    5 38,500.00 35,000.00 20,000.00 75,000.00 47,600.00 1.1004/11/2018 135,909,000.00D214568TANE 18-7

    4 39,360.00 32,800.00 20,000.00 100,000.00 50,700.00 1.2008/29/2018 15,302,528.00D214692TANY 18-32

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    201.07 - CLEARING AND GRUBBING - ACRENew York Div. Totals For:

    24 10.05

    5

    35,246.53

    40,089.04 8,880.33 25,362.20

    Page 3 of 1173

  • 201.07

    12/23/2019Print Date:

    English Items ONLYEnglish Item

    NYS Thruway Authority - Weighted Average Bid Prices - Lettings 12/23/2016 Thru 12/23/2019

    Awarded TRNS*PORT Data Only

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    6 6,005.52 50,046.00 20,000.00 100,000.00 57,900.51 0.1212/28/2016 2,595,628.88D214437TAA 16-19

    4 25,000.00 25,000.00 3,264.49 35,000.00 20,816.12 1.0003/29/2017 12,092,049.40D214565TAA 17-19

    6 130,000.00 13,000.00 5,000.00 47,100.00 16,500.00 10.0004/19/2017 997,258.50D214519TAA 17-3

    3 22,500.00 15,000.00 10,000.00 31,000.00 18,666.67 1.5003/07/2018 11,744,155.48D214645TABS 18-3

    2 152,000.00 10,000.00 10,000.00 13,000.00 11,500.00 15.2003/28/2018 7,094,771.25D214532TABS 18-20

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    201.07 - CLEARING AND GRUBBING - ACREAlbany Div. Totals For:

    21 27.82

    5

    14,218.70

    50,046.00 10,000.00 12,059.87

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    3 8,480.00 106,000.00 53,898.08 124,000.00 94,632.69 0.0802/01/2017 18,301,793.32D214551TAS 17-9

    2 10,500.00 35,000.00 25,000.00 35,000.00 30,000.00 0.3002/15/2017 17,608,000.61D214546TAS 17-5

    3 7,192.00 1,160.00 1,160.00 15,000.00 8,591.40 6.2002/22/2017 26,272,250.00D214543TAS 17-7

    8 6,571.92 43,812.77 40,000.00 50,000.00 44,601.60 0.1504/05/2017 9,933,358.85D214544TAS 17-8

    6 77,140.00 40,600.00 17,255.00 65,000.00 44,434.17 1.9010/04/2017 3,245,982.75D214586TAS 17-36

    6 3,300.00 33,000.00 1,000.00 83,400.00 46,983.33 0.1011/08/2017 17,056,044.53D214576TAS17-29B

    3 51,500.00 25,000.00 11,000.00 25,000.00 19,333.33 2.0603/06/2019 3,446,350.00D214705TAS 19-4

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    201.07 - CLEARING AND GRUBBING - ACRESyracuse Div. Totals For:

    31 10.79

    7

    19,043.32

    106,000.00 1,160.00 15,262.64

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    2 7,200.00 60,000.00 60,000.00 75,000.00 67,500.00 0.1204/12/2017 10,076,722.70D214567TAB 17-21

    3 0.00 0.01 0.01 29,000.00 11,666.67 0.2001/31/2018 2,215,926.99D214649TAN 18-8

    7 700.00 1,000.00 1,000.00 20,000.00 8,314.29 0.7009/12/2018 27,420,064.30D214680TAB 18-29

    Page 4 of 1173

  • 201.07

    12/23/2019Print Date:

    English Items ONLYEnglish Item

    NYS Thruway Authority - Weighted Average Bid Prices - Lettings 12/23/2016 Thru 12/23/2019

    Awarded TRNS*PORT Data Only

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    201.07 - CLEARING AND GRUBBING - ACREBuffalo Div. Totals For:

    12 1.02

    3

    15,934.64

    60,000.00 0.01 7,745.10

    202.010001 - DISPOSAL OF BUILDINGS - LS

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    5 40,000.00 40,000.00 20,000.00 50,000.00 36,400.00 1.0004/11/2018 135,909,000.00D214568TANE 18-7

    4 3,500.00 3,500.00 3,500.00 25,000.00 9,417.50 1.0004/25/2018 39,311,727.80D214583TANY 18-12

    4 77,000.00 77,000.00 50,000.00 150,000.00 100,500.00 1.0008/29/2018 15,302,528.00D214692TANY 18-32

    3 350,000.00 350,000.00 350,000.00 2,161,000.00 305,200.00 1.0009/12/2018 12,819,320.40D214698TANE 18-36

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    202.010001 - DISPOSAL OF BUILDINGS - LSNew York Div. Totals For:

    16 4.00

    4

    112,879.38

    350,000.00 3,500.00 117,625.00

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    3 105,000.00 105,000.00 45,000.00 228,000.00 126,000.00 1.0001/31/2018 2,215,926.99D214649TAN 18-8

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    202.010001 - DISPOSAL OF BUILDINGS - LSBuffalo Div. Totals For:

    3 1.00

    1

    126,000.00

    105,000.00 105,000.00 105,000.00

    202.010002 - DISPOSAL OF BUILDINGS - LS

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    4 8,500.00 8,500.00 5,000.00 30,000.00 15,875.00 1.0008/29/2018 15,302,528.00D214692TANY 18-32

    Page 5 of 1173

  • 202.010002

    12/23/2019Print Date:

    English Items ONLYEnglish Item

    NYS Thruway Authority - Weighted Average Bid Prices - Lettings 12/23/2016 Thru 12/23/2019

    Awarded TRNS*PORT Data Only

    4 131,000.00 131,000.00 30,000.00 600,000.00 240,250.00 1.0009/12/2018 12,819,320.40D214698TANE 18-36

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    202.010002 - DISPOSAL OF BUILDINGS - LSNew York Div. Totals For:

    8 2.00

    2

    128,062.50

    131,000.00 8,500.00 69,750.00

    202.010003 - DISPOSAL OF BUILDINGS - LS

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    4 57,000.00 57,000.00 57,000.00 898,000.00 320,000.00 1.0008/29/2018 15,302,528.00D214692TANY 18-32

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    202.010003 - DISPOSAL OF BUILDINGS - LSNew York Div. Totals For:

    4 1.00

    1

    320,000.00

    57,000.00 57,000.00 57,000.00

    202.010004 - DISPOSAL OF BUILDINGS - LS

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    4 2,000.00 2,000.00 500.00 20,000.00 7,500.00 1.0008/29/2018 15,302,528.00D214692TANY 18-32

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    202.010004 - DISPOSAL OF BUILDINGS - LSNew York Div. Totals For:

    4 1.00

    1

    7,500.00

    2,000.00 2,000.00 2,000.00

    202.010005 - DISPOSAL OF BUILDINGS - LS

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    6 150,000.00 150,000.00 25,800.00 150,000.00 70,133.33 1.0011/22/2017 13,989,000.00D214587TANY 17-38

    Page 6 of 1173

  • 202.010005

    12/23/2019Print Date:

    English Items ONLYEnglish Item

    NYS Thruway Authority - Weighted Average Bid Prices - Lettings 12/23/2016 Thru 12/23/2019

    Awarded TRNS*PORT Data Only

    4 97,000.00 97,000.00 97,000.00 500,000.00 299,250.00 1.0008/29/2018 15,302,528.00D214692TANY 18-32

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    202.010005 - DISPOSAL OF BUILDINGS - LSNew York Div. Totals For:

    10 2.00

    2

    184,691.67

    150,000.00 97,000.00 123,500.00

    202.010007 - DISPOSAL OF BUILDINGS - LS

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    6 3,760.79 3,760.79 3,000.00 10,000.00 5,905.13 1.0011/22/2017 13,989,000.00D214587TANY 17-38

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    202.010007 - DISPOSAL OF BUILDINGS - LSNew York Div. Totals For:

    6 1.00

    1

    5,905.13

    3,760.79 3,760.79 3,760.79

    202.010008 - DISPOSAL OF BUILDINGS - LS

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    6 4,491.31 4,491.31 3,000.00 10,000.00 5,070.22 1.0011/22/2017 13,989,000.00D214587TANY 17-38

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    202.010008 - DISPOSAL OF BUILDINGS - LSNew York Div. Totals For:

    6 1.00

    1

    5,070.22

    4,491.31 4,491.31 4,491.31

    202.010009 - DISPOSAL OF BUILDINGS - LS

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    6 60,000.00 60,000.00 35,000.00 60,000.00 46,283.33 1.0011/22/2017 13,989,000.00D214587TANY 17-38

    Page 7 of 1173

  • 202.010009

    12/23/2019Print Date:

    English Items ONLYEnglish Item

    NYS Thruway Authority - Weighted Average Bid Prices - Lettings 12/23/2016 Thru 12/23/2019

    Awarded TRNS*PORT Data Only

    2 284,000.00 284,000.00 250,000.00 284,000.00 267,000.00 1.0010/10/2018 2,451,458.70D214697TANY 18-35

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    202.010009 - DISPOSAL OF BUILDINGS - LSNew York Div. Totals For:

    8 2.00

    2

    156,641.67

    284,000.00 60,000.00 172,000.00

    202.120001 - REMOVING EXISTING SUPERSTRUCTURES - LS

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    5 350,000.00 350,000.00 325,000.00 695,000.00 470,600.00 1.0005/03/2017 4,804,804.80D214572TANY17-27B

    6 141,080.00 141,080.00 141,080.00 1,000,000.00 414,013.33 1.0009/27/2017 11,165,222.73D214579TANY17-32B

    5 3,000,000.00 3,000,000.00 1,500,000.00 3,800,000.00 2,760,000.00 1.0004/11/2018 135,909,000.00D214568TANE 18-7

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    202.120001 - REMOVING EXISTING SUPERSTRUCTURES - LSNew York Div. Totals For:

    16 3.00

    3

    1,214,871.11

    3,000,000.00 141,080.00 1,163,693.33

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    8 525,000.00 525,000.00 225,000.00 525,000.00 370,625.00 1.0010/04/2017 7,791,645.00D214582TAA 17-33B

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    202.120001 - REMOVING EXISTING SUPERSTRUCTURES - LSAlbany Div. Totals For:

    8 1.00

    1

    370,625.00

    525,000.00 525,000.00 525,000.00

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    6 290,000.00 290,000.00 200,000.00 500,000.00 320,666.67 1.0011/08/2017 17,056,044.53D214576TAS17-29B

    Page 8 of 1173

  • 202.120001

    12/23/2019Print Date:

    English Items ONLYEnglish Item

    NYS Thruway Authority - Weighted Average Bid Prices - Lettings 12/23/2016 Thru 12/23/2019

    Awarded TRNS*PORT Data Only

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    202.120001 - REMOVING EXISTING SUPERSTRUCTURES - LSSyracuse Div. Totals For:

    6 1.00

    1

    320,666.67

    290,000.00 290,000.00 290,000.00

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    4 425,000.00 425,000.00 425,000.00 1,000,000.00 600,000.00 1.0009/06/2017 66,474,997.50D214545TAB 17-4

    5 40,000.00 40,000.00 40,000.00 193,117.09 102,623.42 1.0001/10/2018 4,562,184.50D214577TAB 17-30

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    202.120001 - REMOVING EXISTING SUPERSTRUCTURES - LSBuffalo Div. Totals For:

    9 2.00

    2

    351,311.71

    425,000.00 40,000.00 232,500.00

    202.120002 - REMOVING EXISTING SUPERSTRUCTURES - LS

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    5 1,500,000.00 1,500,000.00 850,000.00 2,000,000.00 1,670,000.00 1.0004/11/2018 135,909,000.00D214568TANE 18-7

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    202.120002 - REMOVING EXISTING SUPERSTRUCTURES - LSNew York Div. Totals For:

    5 1.00

    1

    1,670,000.00

    1,500,000.00 1,500,000.00 1,500,000.00

    202.19 - REMOVAL OF SUBSTRUCTURES - CY

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    5 72,275.00 175.00 105.76 200.00 160.15 413.0005/03/2017 4,804,804.80D214572TANY17-27B

    6 29,625.00 118.50 100.00 260.00 181.42 250.0009/27/2017 11,165,222.73D214579TANY17-32B

    6 39,693.00 661.55 200.00 750.00 451.93 60.0011/22/2017 13,989,000.00D214587TANY 17-38

    Page 9 of 1173

  • 202.19

    12/23/2019Print Date:

    English Items ONLYEnglish Item

    NYS Thruway Authority - Weighted Average Bid Prices - Lettings 12/23/2016 Thru 12/23/2019

    Awarded TRNS*PORT Data Only

    5 627,750.00 250.00 225.00 500.00 365.00 2,511.0004/11/2018 135,909,000.00D214568TANE 18-7

    4 82,280.00 220.00 78.00 225.00 168.25 374.0008/29/2018 15,302,528.00D214692TANY 18-32

    4 204,585.00 345.00 225.00 499.00 44,361.09 593.0009/12/2018 12,819,320.40D214698TANE 18-36

    2 3,250.00 250.00 250.00 540.00 395.00 13.0010/10/2018 2,451,458.70D214697TANY 18-35

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    202.19 - REMOVAL OF SUBSTRUCTURES - CYNew York Div. Totals For:

    32 4,214.00

    7

    6,509.09

    661.55 118.50 251.41

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    8 17,040.00 40.00 20.00 86.50 47.19 426.0008/30/2017 2,527,450.00D214557TAA 17-11B

    8 51,000.00 75.00 50.00 145.00 95.88 680.0010/04/2017 7,791,645.00D214582TAA 17-33B

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    202.19 - REMOVAL OF SUBSTRUCTURES - CYAlbany Div. Totals For:

    16 1,106.00

    2

    77.13

    75.00 40.00 61.52

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    6 133,000.00 125.00 55.00 190.00 121.17 1,064.0011/08/2017 17,056,044.53D214576TAS17-29B

    3 6,825.00 325.00 325.00 600.00 491.67 21.0003/06/2019 3,446,350.00D214705TAS 19-4

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    202.19 - REMOVAL OF SUBSTRUCTURES - CYSyracuse Div. Totals For:

    9 1,085.00

    2

    128.34

    325.00 125.00 128.87

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    4 96,750.00 90.00 90.00 185.00 122.50 1,075.0009/06/2017 66,474,997.50D214545TAB 17-4

    5 22,250.00 50.00 50.00 138.00 89.07 445.0001/10/2018 4,562,184.50D214577TAB 17-30

    Page 10 of 1173

  • 202.19

    12/23/2019Print Date:

    English Items ONLYEnglish Item

    NYS Thruway Authority - Weighted Average Bid Prices - Lettings 12/23/2016 Thru 12/23/2019

    Awarded TRNS*PORT Data Only

    3 19,175.00 65.00 65.00 115.00 83.33 295.0001/31/2018 2,215,926.99D214649TAN 18-8

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    202.19 - REMOVAL OF SUBSTRUCTURES - CYBuffalo Div. Totals For:

    12 1,815.00

    3

    107.94

    90.00 50.00 76.13

    202.2201 - REMOVAL OF STEEL SUPPORTED STRUCTURAL SLABS (WITH SHEAR CONNECTORS) - TYPE A - SF

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    3 151,126.00 19.00 19.00 20.00 19.67 7,954.0005/30/2018 1,418,940.60D214659TAS 18-16B

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    202.2201 - REMOVAL OF STEEL SUPPORTED STRUCTURAL SLABS (WITH SHEAR CONNECTORS) - TYPE A - SFSyracuse Div. Totals For:

    3 7,954.00

    1

    19.67

    19.00 19.00 19.00

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    4 407,694.00 7.00 7.00 14.00 10.75 58,242.0009/06/2017 66,474,997.50D214545TAB 17-4

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    202.2201 - REMOVAL OF STEEL SUPPORTED STRUCTURAL SLABS (WITH SHEAR CONNECTORS) - TYPE A - SFBuffalo Div. Totals For:

    4 58,242.00

    1

    10.75

    7.00 7.00 7.00

    202.2301 - REMOVAL OF STEEL SUPPORTED STRUCTURAL SLABS (WITHOUT SHEAR CONNECTORS) - SF

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    1 12,000.00 150.00 150.00 150.00 150.00 80.0001/11/2017 2,583,121.50D214518TAN 16-38B

    Page 11 of 1173

  • 202.2301

    12/23/2019Print Date:

    English Items ONLYEnglish Item

    NYS Thruway Authority - Weighted Average Bid Prices - Lettings 12/23/2016 Thru 12/23/2019

    Awarded TRNS*PORT Data Only

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    202.2301 - REMOVAL OF STEEL SUPPORTED STRUCTURAL SLABS (WITHOUT SHEAR CONNECTORS) - SFBuffalo Div. Totals For:

    1 80.00

    1

    150.00

    150.00 150.00 150.00

    202.99000125 - REMOVE AND STORE EXISTING CLAMSHELL AND ROTATING SIGNS - EACH

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    6 60,000.00 10,000.00 1,600.00 10,000.00 3,966.00 6.0011/22/2017 13,989,000.00D214587TANY 17-38

    4 2,800.00 700.00 125.00 5,000.00 1,831.25 4.0008/29/2018 15,302,528.00D214692TANY 18-32

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    202.99000125 - REMOVE AND STORE EXISTING CLAMSHELL AND ROTATING SIGNS - EACHNew York Div. Totals For:

    10 10.00

    2

    3,112.10

    10,000.00 700.00 6,280.00

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    3 6,500.00 500.00 500.00 1,500.00 1,066.67 13.0001/31/2018 2,215,926.99D214649TAN 18-8

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    202.99000125 - REMOVE AND STORE EXISTING CLAMSHELL AND ROTATING SIGNS - EACHBuffalo Div. Totals For:

    3 13.00

    1

    1,066.67

    500.00 500.00 500.00

    202.99000225 - REMOVE AND STORE EXISTING LANE CONTROL LIGHT - EACH

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    6 106,452.85 3,041.51 516.59 3,500.00 1,530.52 35.0011/22/2017 13,989,000.00D214587TANY 17-38

    4 9,800.00 350.00 125.00 500.00 343.75 28.0008/29/2018 15,302,528.00D214692TANY 18-32

    2 1,200.00 300.00 300.00 505.00 402.50 4.0010/10/2018 2,451,458.70D214697TANY 18-35

    Page 12 of 1173

  • 25202.990002

    12/23/2019Print Date:

    English Items ONLYEnglish Item

    NYS Thruway Authority - Weighted Average Bid Prices - Lettings 12/23/2016 Thru 12/23/2019

    Awarded TRNS*PORT Data Only

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    202.99000225 - REMOVE AND STORE EXISTING LANE CONTROL LIGHT - EACHNew York Div. Totals For:

    12 67.00

    3

    967.21

    3,041.51 300.00 1,753.03

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    3 1,300.00 50.00 50.00 437.00 245.67 26.0001/31/2018 2,215,926.99D214649TAN 18-8

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    202.99000225 - REMOVE AND STORE EXISTING LANE CONTROL LIGHT - EACHBuffalo Div. Totals For:

    3 26.00

    1

    245.67

    50.00 50.00 50.00

    202.99000325 - REMOVE AND STORE EXISTING TOLL BOOTHS - EACH

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    6 191,492.51 17,408.41 1,300.00 17,408.41 5,028.10 11.0011/22/2017 13,989,000.00D214587TANY 17-38

    2 16,000.00 4,000.00 4,000.00 14,000.00 9,000.00 4.0010/10/2018 2,451,458.70D214697TANY 18-35

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    202.99000325 - REMOVE AND STORE EXISTING TOLL BOOTHS - EACHNew York Div. Totals For:

    8 15.00

    2

    6,087.27

    17,408.41 4,000.00 13,832.83

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    3 6,000.00 500.00 500.00 2,000.00 1,166.67 12.0001/31/2018 2,215,926.99D214649TAN 18-8

    Page 13 of 1173

  • 25202.990003

    12/23/2019Print Date:

    English Items ONLYEnglish Item

    NYS Thruway Authority - Weighted Average Bid Prices - Lettings 12/23/2016 Thru 12/23/2019

    Awarded TRNS*PORT Data Only

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    202.99000325 - REMOVE AND STORE EXISTING TOLL BOOTHS - EACHBuffalo Div. Totals For:

    3 12.00

    1

    1,166.67

    500.00 500.00 500.00

    203.01990006 - IMPERVIOUS EMBANKMENT IN-PLACE - CY

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    6 17,232.30 46.70 40.00 140.00 71.95 369.0009/27/2017 11,165,222.73D214579TANY17-32B

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.01990006 - IMPERVIOUS EMBANKMENT IN-PLACE - CYNew York Div. Totals For:

    6 369.00

    1

    71.95

    46.70 46.70 46.70

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    4 36,126.00 32.40 5.00 40.04 20.61 1,115.0011/15/2017 20,290,085.09D214615TAN 17-44

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.01990006 - IMPERVIOUS EMBANKMENT IN-PLACE - CYBuffalo Div. Totals For:

    4 1,115.00

    1

    20.61

    32.40 32.40 32.40

    203.02 - UNCLASSIFIED EXCAVATION AND DISPOSAL - CY

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    5 30,739.50 16.50 16.50 25.00 19.60 1,863.0005/03/2017 4,804,804.80D214572TANY17-27B

    4 372,619.20 26.05 26.05 80.00 57.01 14,304.0008/02/2017 19,189,120.29D214564TANY17-18R

    6 347,311.00 10.25 10.25 32.00 18.54 33,884.0009/27/2017 11,165,222.73D214579TANY17-32B

    6 483,480.00 28.44 3.00 78.81 42.51 17,000.0011/22/2017 13,989,000.00D214587TANY 17-38

    Page 14 of 1173

  • 203.02

    12/23/2019Print Date:

    English Items ONLYEnglish Item

    NYS Thruway Authority - Weighted Average Bid Prices - Lettings 12/23/2016 Thru 12/23/2019

    Awarded TRNS*PORT Data Only

    5 107,472.00 44.78 44.78 130.00 86.96 2,400.0001/24/2018 12,804,580.47D214511TANY 17-13

    5 10,778,700.00 57.00 55.00 130.00 81.40 189,100.0004/11/2018 135,909,000.00D214568TANE 18-7

    4 289,705.00 5.00 1.00 52.00 19.50 57,941.0004/25/2018 39,311,727.80D214583TANY 18-12

    4 139,150.00 50.00 32.00 50.00 42.25 2,783.0004/25/2018 976,957.00D214630TANY 18-2R

    4 1,090,070.00 61.00 61.00 75.00 65.75 17,870.0008/29/2018 15,302,528.00D214692TANY 18-32

    4 1,208,250.00 135.00 85.00 193.00 46,322.82 8,950.0009/12/2018 12,819,320.40D214698TANE 18-36

    2 366,600.00 65.00 65.00 70.00 67.50 5,640.0010/10/2018 2,451,458.70D214697TANY 18-35

    2 5,400.00 1,200.00 1,200.00 2,000.00 1,600.00 4.5004/24/2019 6,088,000.00D214716TANY19-10B

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.02 - UNCLASSIFIED EXCAVATION AND DISPOSAL - CYNew York Div. Totals For:

    51 351,739.50

    12

    1,237.29

    1,200.00 5.00 43.27

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    6 8,440.25 12.25 12.25 30.00 21.01 689.0012/28/2016 2,595,628.88D214437TAA 16-19

    4 93,000.00 50.00 37.96 200.00 86.99 1,860.0003/29/2017 12,092,049.40D214565TAA 17-19

    6 320,000.00 16.00 13.50 95.00 35.25 20,000.0004/19/2017 997,258.50D214519TAA 17-3

    8 70,500.00 15.00 11.00 20.00 15.00 4,700.0008/30/2017 2,527,450.00D214557TAA 17-11B

    8 79,175.00 5.00 5.00 26.00 11.97 15,835.0010/04/2017 7,791,645.00D214582TAA 17-33B

    3 182,715.00 13.00 13.00 29.00 21.67 14,055.0003/07/2018 11,744,155.48D214645TABS 18-3

    3 73,910.00 38.00 38.00 58.22 46.07 1,945.0003/07/2018 12,588,446.19D214646TAA 18-5

    2 2,497,706.25 18.75 18.75 23.00 20.88 133,211.0003/28/2018 7,094,771.25D214532TABS 18-20

    2 582,550.00 25.00 10.00 25.00 17.50 23,302.0004/04/2018 18,261,000.00D214670TAA 18-22

    2 4,200.00 100.00 100.00 165.00 132.50 42.0004/18/2018 3,779,407.00D214625TAA 18-19B

    3 337,195.00 39.67 33.00 48.00 40.22 8,500.0006/20/2018 11,432,209.72D214678TAA 18-27

    2 100,650.00 61.00 45.00 61.00 53.00 1,650.0006/27/2018 9,867,078.74D214679TAA 18-28

    3 88,790.00 65.00 63.83 115.00 81.28 1,366.0002/06/2019 17,312,428.15D214709TAA 19-8

    Page 15 of 1173

  • 203.02

    12/23/2019Print Date:

    English Items ONLYEnglish Item

    NYS Thruway Authority - Weighted Average Bid Prices - Lettings 12/23/2016 Thru 12/23/2019

    Awarded TRNS*PORT Data Only

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.02 - UNCLASSIFIED EXCAVATION AND DISPOSAL - CYAlbany Div. Totals For:

    52 227,155.00

    13

    23.20

    100.00 5.00 19.54

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    3 224,102.00 17.80 17.80 24.50 21.01 12,590.0002/01/2017 18,301,793.32D214551TAS 17-9

    2 405,322.50 27.50 27.50 35.00 31.25 14,739.0002/15/2017 17,608,000.61D214546TAS 17-5

    3 353,933.00 21.50 20.81 22.00 21.44 16,462.0002/22/2017 26,272,250.00D214543TAS 17-7

    8 164,419.20 19.03 19.03 65.00 43.02 8,640.0004/05/2017 9,933,358.85D214544TAS 17-8

    4 11,985.00 85.00 50.00 250.00 109.50 141.0008/02/2017 4,567,890.12D214569TAS 17-25B

    6 89,342.00 7.75 7.75 18.50 11.29 11,528.0010/04/2017 3,245,982.75D214586TAS 17-36

    6 351,842.50 14.50 12.00 16.50 14.15 24,265.0011/08/2017 17,056,044.53D214576TAS17-29B

    3 2,865.00 15.00 15.00 30.00 23.33 191.0005/30/2018 1,418,940.60D214659TAS 18-16B

    4 158,900.00 70.00 65.00 75.00 58.14 2,270.0002/20/2019 11,542,898.50D214701TAS 19-3

    3 60,040.00 20.00 20.00 32.00 28.00 3,002.0003/06/2019 3,446,350.00D214705TAS 19-4

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.02 - UNCLASSIFIED EXCAVATION AND DISPOSAL - CYSyracuse Div. Totals For:

    42 93,828.00

    10

    23.01

    85.00 7.75 19.43

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    6 156,000.00 24.00 24.00 58.00 39.17 6,500.0002/22/2017 9,896,026.00D214530TAB 17-6

    2 139,185.00 27.00 26.00 27.00 26.50 5,155.0004/12/2017 10,076,722.70D214567TAB 17-21

    4 1,387,190.00 14.00 14.00 26.00 20.25 99,085.0009/06/2017 66,474,997.50D214545TAB 17-4

    4 207,360.00 12.96 12.96 38.00 21.45 16,000.0011/15/2017 20,290,085.09D214615TAN 17-44

    5 242,001.20 4.90 4.90 16.00 11.61 49,388.0001/10/2018 4,562,184.50D214577TAB 17-30

    3 187,519.00 11.50 11.50 15.00 12.92 16,306.0001/31/2018 2,215,926.99D214649TAN 18-8

    5 48,000.00 30.00 30.00 95.00 63.40 1,600.0007/11/2018 6,198,885.40D214685TAS 18-30

    Page 16 of 1173

  • 203.02

    12/23/2019Print Date:

    English Items ONLYEnglish Item

    NYS Thruway Authority - Weighted Average Bid Prices - Lettings 12/23/2016 Thru 12/23/2019

    Awarded TRNS*PORT Data Only

    7 222,700.00 34.00 15.00 80.00 36.14 6,550.0009/12/2018 27,420,064.30D214680TAB 18-29

    2 36,330.00 210.00 100.00 210.00 155.00 173.0004/03/2019 4,774,439.30D214724TAB 19-15I

    4 4,400.00 220.00 100.00 310.00 207.50 20.0004/17/2019 7,158,958.00D214731TAB 19-23B

    4 6,600.00 200.00 58.00 270.00 157.00 33.0004/24/2019 2,462,067.00D214730TAB 19-22B

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.02 - UNCLASSIFIED EXCAVATION AND DISPOSAL - CYBuffalo Div. Totals For:

    46 200,810.00

    11

    19.42

    220.00 4.90 13.13

    203.02010025 - UNCLASSIFIED EXCAVATION AND DISPOSAL 0-100 CY - CY

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    1 202,500.00 150.00 150.00 150.00 150.00 1,350.0007/05/2017 9,844,111.68D214594TANE 17-41

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.02010025 - UNCLASSIFIED EXCAVATION AND DISPOSAL 0-100 CY - CYNew York Div. Totals For:

    1 1,350.00

    1

    150.00

    150.00 150.00 150.00

    203.0202 25 - ROADWAY REMOVAL - SY

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    2 381,794.00 14.00 14.00 20.00 17.00 27,271.0002/15/2017 17,608,000.61D214546TAS 17-5

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.0202 25 - ROADWAY REMOVAL - SYSyracuse Div. Totals For:

    2 27,271.00

    1

    17.00

    14.00 14.00 14.00

    203.02020010 - UNCLASSIFIED EXCAVATION AND DISPOSAL, SORTED - CY

    Page 17 of 1173

  • 10203.020200

    12/23/2019Print Date:

    English Items ONLYEnglish Item

    NYS Thruway Authority - Weighted Average Bid Prices - Lettings 12/23/2016 Thru 12/23/2019

    Awarded TRNS*PORT Data Only

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    4 4,080.00 40.00 40.00 410.00 151.83 102.0004/25/2018 39,311,727.80D214583TANY 18-12

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.02020010 - UNCLASSIFIED EXCAVATION AND DISPOSAL, SORTED - CYNew York Div. Totals For:

    4 102.00

    1

    151.83

    40.00 40.00 40.00

    203.02020025 - UNCLASSIFIED EXCAVATION AND DISPOSAL 101-650 CY - CY

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    1 225,500.00 110.00 110.00 110.00 110.00 2,050.0007/05/2017 9,844,111.68D214594TANE 17-41

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.02020025 - UNCLASSIFIED EXCAVATION AND DISPOSAL 101-650 CY - CYNew York Div. Totals For:

    1 2,050.00

    1

    110.00

    110.00 110.00 110.00

    203.02030025 - UNCLASSIFIED EXCAVATION AND DISPOSAL 651-1300 CY - CY

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    1 255,000.00 75.00 75.00 75.00 75.00 3,400.0007/05/2017 9,844,111.68D214594TANE 17-41

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.02030025 - UNCLASSIFIED EXCAVATION AND DISPOSAL 651-1300 CY - CYNew York Div. Totals For:

    1 3,400.00

    1

    75.00

    75.00 75.00 75.00

    203.02990006 - PAVEMENT EXCAVATION - SF

    Page 18 of 1173

  • 06203.029900

    12/23/2019Print Date:

    English Items ONLYEnglish Item

    NYS Thruway Authority - Weighted Average Bid Prices - Lettings 12/23/2016 Thru 12/23/2019

    Awarded TRNS*PORT Data Only

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    4 8,400.00 100.00 25.00 100.00 63.50 84.0004/25/2018 39,311,727.80D214583TANY 18-12

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.02990006 - PAVEMENT EXCAVATION - SFNew York Div. Totals For:

    4 84.00

    1

    63.50

    100.00 100.00 100.00

    203.03 - EMBANKMENT IN PLACE - CY

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    5 80,234.00 22.00 13.37 35.00 22.07 3,647.0005/03/2017 4,804,804.80D214572TANY17-27B

    4 62,010.90 15.30 11.00 35.00 20.33 4,053.0008/02/2017 19,189,120.29D214564TANY17-18R

    6 299,816.50 11.50 7.00 25.00 13.75 26,071.0009/27/2017 11,165,222.73D214579TANY17-32B

    6 117,983.40 21.93 7.00 40.00 23.09 5,380.0011/22/2017 13,989,000.00D214587TANY 17-38

    5 588,000.00 30.00 18.00 34.00 25.40 19,600.0004/11/2018 135,909,000.00D214568TANE 18-7

    4 108,730.00 5.00 5.00 42.00 17.25 21,746.0004/25/2018 39,311,727.80D214583TANY 18-12

    4 22,000.00 55.00 9.00 55.00 35.25 400.0004/25/2018 976,957.00D214630TANY 18-2R

    4 171,666.00 22.00 15.00 40.00 24.25 7,803.0008/29/2018 15,302,528.00D214692TANY 18-32

    4 191,750.00 50.00 40.00 86.00 42,837.64 3,835.0009/12/2018 12,819,320.40D214698TANE 18-36

    2 70,038.00 18.00 18.00 43.00 30.50 3,891.0010/10/2018 2,451,458.70D214697TANY 18-35

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.03 - EMBANKMENT IN PLACE - CYNew York Div. Totals For:

    44 96,426.00

    10

    1,722.80

    55.00 5.00 17.76

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    6 15,365.50 19.75 9.00 40.00 21.97 778.0012/28/2016 2,595,628.88D214437TAA 16-19

    4 5,000.00 20.00 16.64 40.00 25.41 250.0003/29/2017 12,092,049.40D214565TAA 17-19

    Page 19 of 1173

  • 203.03

    12/23/2019Print Date:

    English Items ONLYEnglish Item

    NYS Thruway Authority - Weighted Average Bid Prices - Lettings 12/23/2016 Thru 12/23/2019

    Awarded TRNS*PORT Data Only

    8 127,800.00 18.00 5.00 26.50 17.31 7,100.0008/30/2017 2,527,450.00D214557TAA 17-11B

    8 29,325.00 7.50 7.00 21.00 12.88 3,910.0010/04/2017 7,791,645.00D214582TAA 17-33B

    3 70,180.00 12.10 5.00 12.10 8.37 5,800.0003/07/2018 11,744,155.48D214645TABS 18-3

    2 86,400.00 6.00 6.00 12.00 9.00 14,400.0003/28/2018 7,094,771.25D214532TABS 18-20

    2 238,560.00 40.00 30.00 40.00 35.00 5,964.0004/04/2018 18,261,000.00D214670TAA 18-22

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.03 - EMBANKMENT IN PLACE - CYAlbany Div. Totals For:

    33 38,202.00

    7

    15.28

    40.00 6.00 14.99

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    3 17,842.50 9.15 3.39 18.60 10.38 1,950.0002/01/2017 18,301,793.32D214551TAS 17-9

    2 28,525.00 12.50 12.00 12.50 12.25 2,282.0002/15/2017 17,608,000.61D214546TAS 17-5

    3 19,787.50 2.50 2.50 9.49 6.75 7,915.0002/22/2017 26,272,250.00D214543TAS 17-7

    8 10,710.87 8.17 3.50 60.00 24.20 1,311.0004/05/2017 9,933,358.85D214544TAS 17-8

    6 336,350.00 15.50 15.50 35.00 25.92 21,700.0010/04/2017 3,245,982.75D214586TAS 17-36

    6 847,096.00 19.00 9.00 19.00 13.35 44,584.0011/08/2017 17,056,044.53D214576TAS17-29B

    3 2,640.00 40.00 14.00 50.00 34.67 66.0005/30/2018 1,418,940.60D214659TAS 18-16B

    3 8,940.00 12.00 12.00 34.00 25.33 745.0003/06/2019 3,446,350.00D214705TAS 19-4

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.03 - EMBANKMENT IN PLACE - CYSyracuse Div. Totals For:

    34 80,553.00

    8

    16.29

    40.00 2.50 15.79

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    2 45,480.00 10.00 10.00 12.00 11.00 4,548.0004/12/2017 10,076,722.70D214567TAB 17-21

    4 68,880.00 12.00 8.00 16.00 11.00 5,740.0009/06/2017 66,474,997.50D214545TAB 17-4

    4 636,876.00 10.80 10.80 24.93 14.93 58,970.0011/15/2017 20,290,085.09D214615TAN 17-44

    5 6,088.00 4.00 0.01 11.00 5.65 1,522.0001/10/2018 4,562,184.50D214577TAB 17-30

    Page 20 of 1173

  • 203.03

    12/23/2019Print Date:

    English Items ONLYEnglish Item

    NYS Thruway Authority - Weighted Average Bid Prices - Lettings 12/23/2016 Thru 12/23/2019

    Awarded TRNS*PORT Data Only

    3 4,980.00 5.00 5.00 17.00 10.67 996.0001/31/2018 2,215,926.99D214649TAN 18-8

    7 11,000.00 10.00 6.00 33.00 13.14 1,100.0009/12/2018 27,420,064.30D214680TAB 18-29

    2 13,260.00 130.00 30.00 130.00 80.00 102.0004/03/2019 4,774,439.30D214724TAB 19-15I

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.03 - EMBANKMENT IN PLACE - CYBuffalo Div. Totals For:

    27 72,978.00

    7

    14.19

    130.00 4.00 10.78

    203.0395 17 - EXPANDED POLYSTYRENE FILL - CF

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    4 1,680,000.00 3.50 3.30 7.00 4.45 480,000.0009/06/2017 66,474,997.50D214545TAB 17-4

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.0395 17 - EXPANDED POLYSTYRENE FILL - CFBuffalo Div. Totals For:

    4 480,000.00

    1

    4.45

    3.50 3.50 3.50

    203.06 - SELECT FILL - CY

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    3 900.00 30.00 30.00 72.00 52.33 30.0001/31/2018 2,215,926.99D214649TAN 18-8

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.06 - SELECT FILL - CYBuffalo Div. Totals For:

    3 30.00

    1

    52.33

    30.00 30.00 30.00

    203.07 - SELECT GRANULAR FILL - CY

    Page 21 of 1173

  • 203.07

    12/23/2019Print Date:

    English Items ONLYEnglish Item

    NYS Thruway Authority - Weighted Average Bid Prices - Lettings 12/23/2016 Thru 12/23/2019

    Awarded TRNS*PORT Data Only

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    5 900.00 150.00 33.71 150.00 84.74 6.0005/03/2017 4,804,804.80D214572TANY17-27B

    4 48,646.50 39.55 18.00 44.00 30.39 1,230.0008/02/2017 19,189,120.29D214564TANY17-18R

    6 15,600.00 31.20 28.00 90.00 49.37 500.0009/27/2017 11,165,222.73D214579TANY17-32B

    6 240,266.04 43.26 3.00 63.80 37.10 5,554.0011/22/2017 13,989,000.00D214587TANY 17-38

    5 367,500.00 35.00 28.00 87.00 46.00 10,500.0004/11/2018 135,909,000.00D214568TANE 18-7

    4 184,700.00 50.00 20.00 103.00 52.00 3,694.0004/25/2018 39,311,727.80D214583TANY 18-12

    4 2,030.00 35.00 35.00 290.00 114.00 58.0004/25/2018 976,957.00D214630TANY 18-2R

    4 106,048.00 64.00 30.00 64.00 45.75 1,657.0008/29/2018 15,302,528.00D214692TANY 18-32

    4 23,349.00 43.00 25.00 172.00 23,023.18 543.0009/12/2018 12,819,320.40D214698TANE 18-36

    2 3,560.00 40.00 40.00 58.00 49.00 89.0010/10/2018 2,451,458.70D214697TANY 18-35

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.07 - SELECT GRANULAR FILL - CYNew York Div. Totals For:

    44 23,831.00

    10

    567.84

    150.00 31.20 41.65

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    6 29,955.25 42.25 21.45 115.00 50.12 709.0012/28/2016 2,595,628.88D214437TAA 16-19

    4 9,000.00 60.00 20.87 80.00 52.72 150.0003/29/2017 12,092,049.40D214565TAA 17-19

    8 720.00 18.00 17.00 75.00 38.75 40.0008/30/2017 2,527,450.00D214557TAA 17-11B

    8 2,250.00 50.00 17.75 77.00 49.59 45.0010/04/2017 7,791,645.00D214582TAA 17-33B

    3 20,162.50 25.00 25.00 74.00 43.00 806.5003/07/2018 11,744,155.48D214645TABS 18-3

    2 33,800.00 20.00 20.00 32.00 26.00 1,690.0003/28/2018 7,094,771.25D214532TABS 18-20

    2 177,125.00 65.00 42.00 65.00 53.50 2,725.0004/04/2018 18,261,000.00D214670TAA 18-22

    2 750.00 25.00 14.00 25.00 19.50 30.0006/27/2018 9,867,078.74D214679TAA 18-28

    3 4,925.00 25.00 19.00 28.75 24.25 197.0002/06/2019 17,312,428.15D214709TAA 19-8

    Page 22 of 1173

  • 203.07

    12/23/2019Print Date:

    English Items ONLYEnglish Item

    NYS Thruway Authority - Weighted Average Bid Prices - Lettings 12/23/2016 Thru 12/23/2019

    Awarded TRNS*PORT Data Only

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.07 - SELECT GRANULAR FILL - CYAlbany Div. Totals For:

    38 6,392.50

    9

    43.33

    65.00 18.00 43.60

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    3 29,285.95 39.31 17.18 42.00 32.83 745.0002/01/2017 18,301,793.32D214551TAS 17-9

    2 6,055.00 35.00 35.00 66.00 50.50 173.0002/15/2017 17,608,000.61D214546TAS 17-5

    3 11,132.00 23.00 17.03 35.00 25.01 484.0002/22/2017 26,272,250.00D214543TAS 17-7

    8 26,475.48 22.59 22.59 70.00 43.05 1,172.0004/05/2017 9,933,358.85D214544TAS 17-8

    6 5,000.00 100.00 13.00 100.00 64.67 50.0010/04/2017 3,245,982.75D214586TAS 17-36

    6 22,386.00 42.00 20.00 62.00 34.83 533.0011/08/2017 17,056,044.53D214576TAS17-29B

    3 61,500.00 100.00 90.00 102.00 97.33 615.0003/06/2019 3,446,350.00D214705TAS 19-4

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.07 - SELECT GRANULAR FILL - CYSyracuse Div. Totals For:

    31 3,772.00

    7

    47.03

    100.00 22.59 42.90

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    2 2,925.00 75.00 30.00 75.00 52.50 39.0004/12/2017 10,076,722.70D214567TAB 17-21

    4 62,020.00 10.00 10.00 76.00 46.50 6,202.0009/06/2017 66,474,997.50D214545TAB 17-4

    4 60,372.00 28.08 28.08 83.49 52.89 2,150.0011/15/2017 20,290,085.09D214615TAN 17-44

    5 104,880.00 40.00 31.00 46.00 41.29 2,622.0001/10/2018 4,562,184.50D214577TAB 17-30

    3 2,940.00 60.00 45.00 73.00 59.33 49.0001/31/2018 2,215,926.99D214649TAN 18-8

    7 4,480.00 56.00 40.00 110.00 66.29 80.0009/12/2018 27,420,064.30D214680TAB 18-29

    Page 23 of 1173

  • 203.07

    12/23/2019Print Date:

    English Items ONLYEnglish Item

    NYS Thruway Authority - Weighted Average Bid Prices - Lettings 12/23/2016 Thru 12/23/2019

    Awarded TRNS*PORT Data Only

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.07 - SELECT GRANULAR FILL - CYBuffalo Div. Totals For:

    25 11,142.00

    6

    46.73

    75.00 10.00 21.33

    203.0801 - SELECT GRANULAR FILL, SLOPE PROTECTION - TYPE A - CY

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    8 3,000.00 100.00 60.00 190.00 98.47 30.0010/04/2017 7,791,645.00D214582TAA 17-33B

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.0801 - SELECT GRANULAR FILL, SLOPE PROTECTION - TYPE A - CYAlbany Div. Totals For:

    8 30.00

    1

    98.47

    100.00 100.00 100.00

    203.08010017 - SELECT GRANULAR FILL, SLOPE PROTECTION (STRUCTURES) - CY

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    4 34,500.00 50.00 50.00 75.00 61.25 690.0009/06/2017 66,474,997.50D214545TAB 17-4

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.08010017 - SELECT GRANULAR FILL, SLOPE PROTECTION (STRUCTURES) - CYBuffalo Div. Totals For:

    4 690.00

    1

    61.25

    50.00 50.00 50.00

    203.0802 - SELECT GRANULAR FILL, SLOPE PROTECTION - TYPE B - CY

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    3 280.00 140.00 100.00 250.00 163.33 2.0003/07/2018 11,744,155.48D214645TABS 18-3

    Page 24 of 1173

  • 203.0802

    12/23/2019Print Date:

    English Items ONLYEnglish Item

    NYS Thruway Authority - Weighted Average Bid Prices - Lettings 12/23/2016 Thru 12/23/2019

    Awarded TRNS*PORT Data Only

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.0802 - SELECT GRANULAR FILL, SLOPE PROTECTION - TYPE B - CYAlbany Div. Totals For:

    3 2.00

    1

    163.33

    140.00 140.00 140.00

    203.13980017 - PIEZOMETER (OPEN MONITORING WELL) - LF

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    4 1,950.00 390.00 325.00 900.00 493.75 5.0004/25/2018 976,957.00D214630TANY 18-2R

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.13980017 - PIEZOMETER (OPEN MONITORING WELL) - LFNew York Div. Totals For:

    4 5.00

    1

    493.75

    390.00 390.00 390.00

    203.1601 - APPLYING WATER - PDD

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    4 36,000.00 200.00 1.00 210.00 152.75 180.0004/25/2018 976,957.00D214630TANY 18-2R

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.1601 - APPLYING WATER - PDDNew York Div. Totals For:

    4 180.00

    1

    152.75

    200.00 200.00 200.00

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    4 8,000.00 800.00 100.00 1,100.00 550.00 10.0009/06/2017 66,474,997.50D214545TAB 17-4

    Page 25 of 1173

  • 203.1601

    12/23/2019Print Date:

    English Items ONLYEnglish Item

    NYS Thruway Authority - Weighted Average Bid Prices - Lettings 12/23/2016 Thru 12/23/2019

    Awarded TRNS*PORT Data Only

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.1601 - APPLYING WATER - PDDBuffalo Div. Totals For:

    4 10.00

    1

    550.00

    800.00 800.00 800.00

    203.17130017 - RESIN ROCK BOLTS 1" (GRADE 150) - LF

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    5 37,500.00 750.00 120.00 750.00 424.00 50.0004/11/2018 135,909,000.00D214568TANE 18-7

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.17130017 - RESIN ROCK BOLTS 1" (GRADE 150) - LFNew York Div. Totals For:

    5 50.00

    1

    424.00

    750.00 750.00 750.00

    203.17560017 - STEEL TIES ( TEMPORARY ) - LF

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    4 6,565.00 65.00 53.00 210.00 97.00 101.0009/06/2017 66,474,997.50D214545TAB 17-4

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.17560017 - STEEL TIES ( TEMPORARY ) - LFBuffalo Div. Totals For:

    4 101.00

    1

    97.00

    65.00 65.00 65.00

    203.20 - SELECT GRANULAR SUBGRADE - CY

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    2 19,885.00 41.00 41.00 48.00 44.50 485.0002/15/2017 17,608,000.61D214546TAS 17-5

    4 23,100.00 30.00 30.00 100.00 49.00 770.0002/20/2019 11,542,898.50D214701TAS 19-3

    Page 26 of 1173

  • 203.20

    12/23/2019Print Date:

    English Items ONLYEnglish Item

    NYS Thruway Authority - Weighted Average Bid Prices - Lettings 12/23/2016 Thru 12/23/2019

    Awarded TRNS*PORT Data Only

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.20 - SELECT GRANULAR SUBGRADE - CYSyracuse Div. Totals For:

    6 1,255.00

    2

    47.26

    41.00 30.00 34.25

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    4 91,625.00 25.00 25.00 51.00 37.75 3,665.0009/06/2017 66,474,997.50D214545TAB 17-4

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.20 - SELECT GRANULAR SUBGRADE - CYBuffalo Div. Totals For:

    4 3,665.00

    1

    37.75

    25.00 25.00 25.00

    203.21 - SELECT STRUCTURE FILL - CY

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    5 132,000.00 66.00 40.00 66.00 55.58 2,000.0005/03/2017 4,804,804.80D214572TANY17-27B

    6 17,310.00 57.70 45.00 95.00 60.62 300.0009/27/2017 11,165,222.73D214579TANY17-32B

    6 48,373.00 39.65 37.00 73.00 57.38 1,220.0011/22/2017 13,989,000.00D214587TANY 17-38

    5 68,920.00 40.00 40.00 90.00 67.00 1,723.0004/11/2018 135,909,000.00D214568TANE 18-7

    4 400,400.00 70.00 54.90 100.00 72.73 5,720.0004/25/2018 39,311,727.80D214583TANY 18-12

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.21 - SELECT STRUCTURE FILL - CYNew York Div. Totals For:

    26 10,963.00

    5

    66.66

    70.00 39.65 60.84

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    8 23,430.00 33.00 30.00 70.00 42.50 710.0008/30/2017 2,527,450.00D214557TAA 17-11B

    8 20,000.00 50.00 40.00 140.00 64.88 400.0010/04/2017 7,791,645.00D214582TAA 17-33B

    Page 27 of 1173

  • 203.21

    12/23/2019Print Date:

    English Items ONLYEnglish Item

    NYS Thruway Authority - Weighted Average Bid Prices - Lettings 12/23/2016 Thru 12/23/2019

    Awarded TRNS*PORT Data Only

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.21 - SELECT STRUCTURE FILL - CYAlbany Div. Totals For:

    16 1,110.00

    2

    50.56

    50.00 33.00 39.13

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    8 1,400.10 93.34 25.00 93.34 61.34 15.0004/05/2017 9,933,358.85D214544TAS 17-8

    6 198,440.00 44.00 33.50 60.00 43.92 4,510.0011/08/2017 17,056,044.53D214576TAS17-29B

    3 12,100.00 110.00 90.00 110.00 100.67 110.0003/06/2019 3,446,350.00D214705TAS 19-4

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.21 - SELECT STRUCTURE FILL - CYSyracuse Div. Totals For:

    17 4,635.00

    3

    45.32

    110.00 44.00 45.73

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    4 108,675.00 45.00 45.00 80.00 59.50 2,415.0009/06/2017 66,474,997.50D214545TAB 17-4

    2 8,250.00 250.00 125.00 250.00 187.50 33.0004/03/2019 4,774,439.30D214724TAB 19-15I

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.21 - SELECT STRUCTURE FILL - CYBuffalo Div. Totals For:

    6 2,448.00

    2

    61.23

    250.00 45.00 47.76

    203.24000025 - SHOULDER BACKUP MATERIAL - TON

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    5 1,778.00 127.00 70.00 127.00 107.17 14.0005/03/2017 4,804,804.80D214572TANY17-27B

    4 1,848.00 231.00 200.00 600.00 315.25 8.0008/02/2017 19,189,120.29D214564TANY17-18R

    6 7,475.00 65.00 40.00 100.00 64.33 115.0009/27/2017 11,165,222.73D214579TANY17-32B

    Page 28 of 1173

  • 25203.240000

    12/23/2019Print Date:

    English Items ONLYEnglish Item

    NYS Thruway Authority - Weighted Average Bid Prices - Lettings 12/23/2016 Thru 12/23/2019

    Awarded TRNS*PORT Data Only

    5 160,325.00 64.13 48.00 65.00 58.43 2,500.0001/24/2018 12,804,580.47D214511TANY 17-13

    4 73,075.00 185.00 85.00 185.00 116.25 395.0008/29/2018 15,302,528.00D214692TANY 18-32

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.24000025 - SHOULDER BACKUP MATERIAL - TONNew York Div. Totals For:

    24 3,032.00

    5

    67.09

    231.00 64.13 80.64

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    6 2,200.00 88.00 18.00 105.00 68.00 25.0012/28/2016 2,595,628.88D214437TAA 16-19

    4 137,500.00 22.00 15.84 58.00 30.71 6,250.0003/29/2017 12,092,049.40D214565TAA 17-19

    3 102,000.00 17.00 1.00 20.00 12.67 6,000.0003/07/2018 11,744,155.48D214645TABS 18-3

    3 120,000.00 20.00 15.00 21.00 18.67 6,000.0003/07/2018 12,588,446.19D214646TAA 18-5

    2 4,300.00 10.00 10.00 29.00 19.50 430.0003/28/2018 7,094,771.25D214532TABS 18-20

    3 108,000.00 21.60 0.01 27.00 16.20 5,000.0006/20/2018 11,432,209.72D214678TAA 18-27

    2 110,000.00 27.50 16.00 27.50 21.75 4,000.0006/27/2018 9,867,078.74D214679TAA 18-28

    3 172,500.00 28.75 28.75 35.00 31.36 6,000.0002/06/2019 17,312,428.15D214709TAA 19-8

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.24000025 - SHOULDER BACKUP MATERIAL - TONAlbany Div. Totals For:

    26 33,705.00

    8

    22.14

    88.00 10.00 22.44

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    3 176,822.10 15.47 11.71 18.00 15.06 11,430.0002/01/2017 18,301,793.32D214551TAS 17-9

    2 160,050.00 30.00 16.00 30.00 23.00 5,335.0002/15/2017 17,608,000.61D214546TAS 17-5

    3 35,842.50 22.50 22.50 150.00 69.17 1,593.0002/22/2017 26,272,250.00D214543TAS 17-7

    8 15,460.83 32.01 25.00 100.00 49.14 483.0004/05/2017 9,933,358.85D214544TAS 17-8

    6 35,731.50 21.00 21.00 28.00 23.33 1,701.5011/08/2017 17,056,044.53D214576TAS17-29B

    4 41,800.00 55.00 28.00 55.00 139.00 760.0002/20/2019 11,542,898.50D214701TAS 19-3

    Page 29 of 1173

  • 25203.240000

    12/23/2019Print Date:

    English Items ONLYEnglish Item

    NYS Thruway Authority - Weighted Average Bid Prices - Lettings 12/23/2016 Thru 12/23/2019

    Awarded TRNS*PORT Data Only

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.24000025 - SHOULDER BACKUP MATERIAL - TONSyracuse Div. Totals For:

    26 21,302.50

    6

    26.95

    55.00 15.47 21.86

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    2 18,750.00 30.00 30.00 45.00 37.50 625.0004/12/2017 10,076,722.70D214567TAB 17-21

    4 106,200.00 30.00 16.00 35.00 28.00 3,540.0009/06/2017 66,474,997.50D214545TAB 17-4

    5 11,000.00 25.00 16.00 43.00 30.53 440.0001/10/2018 4,562,184.50D214577TAB 17-30

    3 5,880.00 60.00 55.50 65.00 60.17 98.0001/31/2018 2,215,926.99D214649TAN 18-8

    5 73,500.00 21.00 11.00 46.50 27.70 3,500.0007/11/2018 6,198,885.40D214685TAS 18-30

    7 49,700.00 20.00 20.00 50.00 39.00 2,485.0009/12/2018 27,420,064.30D214680TAB 18-29

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.24000025 - SHOULDER BACKUP MATERIAL - TONBuffalo Div. Totals For:

    26 10,688.00

    6

    31.41

    60.00 20.00 24.80

    203.25 - SAND BACKFILL - CY

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    6 531.00 265.50 50.00 265.50 176.75 2.0009/27/2017 11,165,222.73D214579TANY17-32B

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.25 - SAND BACKFILL - CYNew York Div. Totals For:

    6 2.00

    1

    176.75

    265.50 265.50 265.50

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    4 248.00 1.00 1.00 170.00 54.00 248.0009/06/2017 66,474,997.50D214545TAB 17-4

    Page 30 of 1173

  • 203.25

    12/23/2019Print Date:

    English Items ONLYEnglish Item

    NYS Thruway Authority - Weighted Average Bid Prices - Lettings 12/23/2016 Thru 12/23/2019

    Awarded TRNS*PORT Data Only

    5 4,824.00 40.00 40.00 70.00 49.75 120.6001/10/2018 4,562,184.50D214577TAB 17-30

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.25 - SAND BACKFILL - CYBuffalo Div. Totals For:

    9 368.60

    2

    52.61

    40.00 1.00 13.76

    203.33120017 - SCALING OF ROCK SLOPES AND REMOVAL OF SPOIL WITH OUT BLASTING - CY

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders

    Winning

    Unit Bid

    Average

    Unit Bid

    TA

    Number

    Min Unit

    BidExtended Win

    Bid Amt.

    4 112,500.00 125.00 125.00 400.00 256.25 900.0008/02/2017 19,189,120.29D214564TANY17-18R

    4 271,700.00 380.00 100.00 380.00 276.25 715.0008/29/2018 15,302,528.00D214692TANY 18-32

    Div. Wgt. Avg. Bid

    Using Al l Bid Occurences

    Using Awarded Bidder Only

    No of Bidders

    Awd. Min. Bid Awd. Max. Bid Awd. Wgt Avg. Bid

    Total Quantity

    No of Contract

    203.33120017 - SCALING OF ROCK SLOPES AND REMOVAL OF SPOIL WITH OUT BLASTING - CYNew York Div. Totals For:

    8 1,615.00

    2

    265.10

    380.00 125.00 237.89

    Letting

    Date

    Contract

    Number

    Awd. Contract

    Amt.

    Bid

    Quantity

    Max Unit

    Bid

    No. of

    Bidders


Recommended