Current Members of PIDG
Austria Switzerland
Australia The Netherlands
Germany United Kingdom
Ireland World Bank Group
Sweden (through the IFC)
Investment in New Infrastructure in Africa
65%Governments
20%PSI
15%ODA
• Current investment totals c US$24 billion per year.
• WB/AfDB estimate that this needs to be more than doubled if even basic needs are to be met within the coming decade.
Distribution of Current Investment
Constraints to PSI
Lack of an appropriate enabling environment
Shortage of long-term FX debt
Shortage of local debt
Limited local capacity
What PIDG and its Partners are doing to help
• PPIAF (a PIDG partner) - helps improve the enabling environment
• InfraCo Africa – develops projects for the market• EAIF – provides long-term hard currency debt to
bridge financing gaps• GuarantCo – provides local currency guarantees
to local debt providers• TAF – helps build local implementing capacity
InfraCo Africa
February 2011
Creating viable infrastructure investments across Sub-Saharan Africa
Lack of resourcesLack of technical expertise
Lack of funds
Africa faces a Capacity Gap
7
Developing Countries:
• In developed countries governments have the capacity and funds to develop PPP projects “in-house” and attract private sector investors
• Developing country governments face a capacity gap:
Capacity Gap
Project/PPP Development Cycle has Three Main Components
Conceptualize Develop Build & Operate
Developed Countries:
InfraCo was created to bridge the Capacity Gap
Government’s Role
Government’s Role
Private Sector’s Role
Private Sector’s Role
InfraCo and Procurement
8
• As a publicly funded entity, InfraCo must ensure value for money and transparency in all its procurement activities
• InfraCo follows PIDG (European Union) procurement regulations:• All contracts are procured competitively and assessed
transparently
• Major contracts (e.g. EPC, O&M) are advertised widely in the business press and the European Journal
• Consultancy work is procured through competitive bidding, or if there is only one qualified bidder, value-for-money benchmarking is used
• InfraCo selects equity investors through a competitive bidding process and uses competition to ensure costs of debt are kept low
Governments across Africa are Partnering with InfraCo
Cape Verde: 26MW Wind Farm Project
Ghana: 340MW Gas Turbine Power Plant
Guinea: Mini-hydro Project
Senegal: Wind Power
Zambia: Agricultural Irrigation
Zambia: Hydro Power Project
Kenya:Nairobi Rail
eleQtra Offices
Senegal: River Transport
Mozambique: Bio-ethanol
Uganda:Multi-sector, road & water transport, water, power
9
Some InfraCo ProjectsCenpower, Ghana:• 340 MW Combined-Cycle Gas Turbine power
plant near Tema
• Approx. project cost $400m
• InfraCo has led development in partnership with local private developer
• Site, Permits and Generation license secure
• InfraCo secured PPA with ECG, has managed EPC procurement
• Equity investment secured from Africa Finance Corporation
• Competitive EPC procurement ongoing with bids received from multiple bidders
10
Some InfraCo ProjectsBugala Island, Lake Victoria, Uganda:• Two New Ferries plus two landings:
– Design and Build contract with Johs. Gram-Hanssen A/S of Denmark and local Lake Victoria shipyard
– Ferries $3.5m each / 120t carrying capacity / 60 vehicles 120 passengers / 10 knots
– Training of Ferry Crew
– Full cost recovery vehicle tariffs
• 65 km road / 1.6 MW solar-diesel power plant / distribution network on island / water supply
• Total project cost $40m
• Financing through GuarantCo (tenor extension), USAID (60% guarantee), Finnfund, Nedbank
11
Some InfraCo Projects
Chiansi Irrigation, Zambia:• $30m investment in irrigation infrastructure
• Water rights secured to extract from Kafue river
• Project will lease 2,300 ha of smallholder and commercial farm land for 25 years
• Landowners participate in project equity and receive share of cash flows from farming activities
• Smallholder farmers receive access to market garden irrigated plots
• Pilot project established in 2009 is producing wheat and soya on 150 ha of smallholder land
• Capital financing from ORIO, FMO, Lundin for Africa, EAIF and commercial investors
12
Some InfraCo ProjectsRiver Transport, Senegal:• Up to $700m River Transport project for iron
ore, phosphate and general cargo transport on the Senegal River including transfer to Panamax dry bulk ship in new port in St. Louis
• Senegal River Development Authority - OMVS - (advised by the Port of Rotterdam) have signed MoU with InfraCo to develop project as a PPP
• The Project is currently in the Evaluation stage
Nairobi Commuter Rail, Kenya:• JDA signed with Kenya Rail, currently in
feasibility stage • $200m refurbishment and extension of
commuter rail system in Nairobi• Permission from Kenyan Public Utility
Oversight Authority to do a negotiated contract on the basis that “the services offered by InfraCo are unique”
13
Some InfraCo ProjectsCape Verde Wind Farm:• 26 MW power plant, total project cost
€65m
• Will provide 25% of national power needs replacing expensive fossil fuel generation
• InfraCo began development in partnership with Electra and GoCV in 2006
• InfraCo secured site, permits, PPA, government guarantee and finance and managed procurement
• Vestas selected as EPC contractor following competitive process
• Financing secured from AFC, Finnfund, AfDB and EIB
• Construction started in November 2010 and will be completed by late 2011
14
6MW
8MW
4MW
8MW
Cape Verde – Case Study – Awarded Contracts
Cape Verde Awarded Contracts:• Owners Engineer - €300,000
• Wind Assessment - €40,000
• Environmental Consultant - €230,000
• Lenders Engineer - €130,000
• Financial Advisor Contract - €700,000
• Owners Legal Counsel - €1,500,000
• Lenders Legal Counsel - €1,100,000
• Wind Farm EPC contract - €45m
• Wind Farm Maintenance Contract - €500k / yr
15
6MW
8MW
4MW
8MW