PROJECTS Company Year Location Areva T&D Areva T&D Areva T&D 2009 2009 2010 Turkey Turkey Turkey Areva T&D Areva T&D Areva T&D Alstom Grid Alstom Grid GE Grid 2010 2010 2010 2011 2011 2015 Turkey Turkey Turkey Turkey Turkey Turkey Alstom Grid Project Name 380kV Toscelik AIS Substation 380kV Yolbulan AIS Substation 154kV Batısökle Cement Production Plant AIS 154kV Boreas WPP 154kV Mazı-3 WPP 154kV Bahçe WPP 154kV Soma-1 WPP 154kV Soma-2 WPP 154kV Pekim WPP Ankara - Konya High Speed Train 2013 Turkey Alstom Grid Alstom Grid Alstom Grid GE Grid GE Grid 380kV Zetes-2 GIS 380kV Zetes-3 GIS 380kV Izdemir GIS 2011 2014 2014 2015 2017 Turkey Turkey Turkey Turkey Turkey Alstom Grid GE Grid GE Grid GE Grid GE Grid GE Grid GE Grid GE Grid 380kV Cenal Karabiga GIS 380kV Soma-B GIS 380kV TEİAŞ Yenikapı GIS 380kV TEİAŞ Yenibosna GIS 380kV TEİAŞ Erenköy GIS 380kV TEİAŞ Belek GIS 380kV TEİAŞ Çiğdem GIS 380kV TEİAŞ Sağmalcılar GIS 380kV TEİAŞ Ataşehir GIS 380kV TEİAŞ Çağlayan GIS 2011 2015 2016 2016 2016 2017 2017 2017 Turkey Turkey Turkey Turkey Turkey Turkey Turkey Turkey GE Grid BEST GE Grid 2016 2017 2017 Albania Georgia Turkey GE Grid GE Grid 154kV Devoll Elbasan-2 AIS 154kV Marneuli AIS 154kV TEİAŞ Alaşehir Havza AIS 380kV Samsung & Acwa Power CCPP 154kV Kayalı CCPP Turkey Turkey 2015 2015 Type Steel Factory Steel Factory Cement Factory Wind Power Plant Wind Power Plant Wind Power Plant Wind Power Plant Wind Power Plant Wind Power Plant Railway Thermal Power Plant Thermal Power Plant Thermal Power Plant Thermal Power Plant Thermal Power Plant Gas Insulated Substation Gas Insulated Substation Gas Insulated Substation Gas Insulated Substation Gas Insulated Substation Gas Insulated Substation Gas Insulated Substation Gas Insulated Substation Air Insulated Substation Air Insulated Substation Air Insulated Substation Combined Cycle P. Plant Combined Cycle P. Plant Scoope of: Scada / Automation, Telecommunication, Network, etc. *The projects has been presented in following pages.
Transcript
  • PROJECTSCompany YearLocation

    Areva T&DAreva T&DAreva T&D

    200920092010

    TurkeyTurkeyTurkey

    Areva T&DAreva T&DAreva T&DAlstom GridAlstom GridGE Grid

    201020102010201120112015

    TurkeyTurkeyTurkeyTurkeyTurkeyTurkey

    Alstom Grid

    Project Name

    380kV Toscelik AIS Substation380kV Yolbulan AIS Substation154kV Batısökle Cement Production Plant AIS

    154kV Boreas WPP154kV Mazı-3 WPP154kV Bahçe WPP154kV Soma-1 WPP154kV Soma-2 WPP154kV Pekim WPP

    Ankara - Konya High Speed Train 2013Turkey

    Alstom GridAlstom GridAlstom GridGE GridGE Grid

    380kV Zetes-2 GIS380kV Zetes-3 GIS380kV Izdemir GIS

    20112014201420152017

    TurkeyTurkeyTurkeyTurkeyTurkey

    Alstom GridGE GridGE GridGE GridGE GridGE GridGE GridGE Grid

    380kV Cenal Karabiga GIS380kV Soma-B GIS

    380kV TEİAŞ Yenikapı GIS380kV TEİAŞ Yenibosna GIS380kV TEİAŞ Erenköy GIS380kV TEİAŞ Belek GIS380kV TEİAŞ Çiğdem GIS380kV TEİAŞ Sağmalcılar GIS380kV TEİAŞ Ataşehir GIS380kV TEİAŞ Çağlayan GIS

    20112015201620162016201720172017

    TurkeyTurkeyTurkeyTurkeyTurkeyTurkeyTurkeyTurkey

    GE GridBEST GE Grid

    201620172017

    AlbaniaGeorgiaTurkey

    GE GridGE Grid

    154kV Devoll Elbasan-2 AIS 154kV Marneuli AIS154kV TEİAŞ Alaşehir Havza AIS

    380kV Samsung & Acwa Power CCPP154kV Kayalı CCPP

    TurkeyTurkey

    20152015

    Type

    Steel FactorySteel FactoryCement Factory

    Wind Power PlantWind Power PlantWind Power PlantWind Power PlantWind Power PlantWind Power Plant

    Railway

    Thermal Power PlantThermal Power PlantThermal Power PlantThermal Power PlantThermal Power Plant

    Gas Insulated SubstationGas Insulated SubstationGas Insulated SubstationGas Insulated SubstationGas Insulated SubstationGas Insulated SubstationGas Insulated SubstationGas Insulated Substation

    Air Insulated SubstationAir Insulated SubstationAir Insulated Substation

    Combined Cycle P. PlantCombined Cycle P. Plant

    Scoope of: Scada / Automation, Telecommunication, Network, etc.

    *The projects has been presented in following pages.

  • REFERENCE PROJECTS (1)

    PROJECT NAME YEARMAIN CONTRACTOR / CUSTOMER

    2013

    TCDD ANKARA - KONYA Fast Train P

    Burhaniye Municipality

    ZETES-2 GI1200 MW 380kV GIS

    YENİKAPI G154kV GIS

    FACTORY CFACTORY154kV AIS

    İZDEMİR GI350 MW380kV GIS

    SCOPESupply, Design, Documentation, Engineering, Commissioning, FAT/SAT...

    Substation Scada System( Areva / Alstom PACİS ). dundant Servers, 6 Clients, 18 BCU, 86 Protection lays, 4 154/27.5 KV TM, 4 Neutral Zone, 5 Siding Zone. condary Drawing.ergy Monitoring System.

    rojectReReSeEn

    2014

    2014

    2014

    S /

    2014

    IS

    2014

    EMENT

    S

    Water Treatment Plant Control and Monitoring System (Siemens)

    Substation Scada System( Areva / Alstom PACİS )

    Event Recorder System (Micom C264)

    Load Dispatching Center - RTU System (Areva / Alstom Micom C264)

    Substation Scada System( Alstom DS Agile PACİS ) Micom C264 BCU SystemData Exchange Scope of DS Agile PACiS and ABB RTU SCADA Maintenance Issues

  • REFERENCE PROJECTS (2)

    PROJECT NAME SCOPESupply, Design, Documentation, Engineering, Commissioning, FAT/SAT...

    YEARMAIN CONTRACTOR / CUSTOMER

    2015

    2015

    Ministry of Treasury and Finance

    Scada System (Zenon)Energy Monitoring System

    2015

    Kayseri Municipality Water Treatment Plant Control and Monitoring System (Siemens)

    2015

    HeNan Roady Road Machinery Comp. KAZAKHISTAN

    2015

    KAYALI CCP 77,13 MW 154 KV Neutral Gas CCP

    2015

    DBATT14 YENİBOSNA GIS 380/154/33kV GIS

    KARABİGA TEPP 1320MW 380kV TEPP GIS

    Aspalt Plant Automation System (Siemens)

    Substation Scada System (ABB MicroScada)Load Dispatching Center - RTU System (ABB RTU560 )National Control Center Telecommunication System (SDH, MUX, etc.) Primary Frequency Control TestReactive Power Control Test and Data Recording System

    Secondary Drawing RevisionsProtection Relays Tests and Commissioning (Alstom/Areva Micom) Substation Scada System (Alstom/Areva PACİS)

    Substation Scada System( Alstom / GE DS Agile PACİS ) Reaktive Power Control Test and Data Recording System Load Dispatching Center - RTU System (ABB RTU560 )Data Exchange Scope of DS Agile PACiS and ABB RTU TEİAŞ (NCC) National Control Center Telecommunication System (SDH, MUX, etc.)

  • REFERENCE PROJECTS (3)

    PROJECT NAME YEARMAIN CONTRACTOR / CUSTOMER

    2015

    2016

    Samsung & ACWA Power Kırıkkale CCP / 950 MW 380kV Nautral Gas CCP

    2016

    ZETES-3 GIS / 1320 MW 380KV GIS

    2016

    ADIGÜZEL-2 HEPP 154kV AIS

    2016

    ITM124 ERENKÖY 154/33kV GIS

    2016

    ITM89 ÇİĞDEM GIS 154/33kV GIS

    DEVOLL-ELBASAN 2 154kV AIS

    SCOPESupply, Design, Documentation, Engineering, Commissioning, FAT/SAT...

    Load Dispatching Center - RTU System (ABB RTU560 )Substation Scada System( Alstom DS Agile PACİS ) National Control Center Telecommunication System (SDH, MUX, etc.) Network Installation (Fiber Optic, Ethernet, etc) OPGW/FO Splicing and Termination

    Load Dispatching Center - RTU System (ABB RTU560 )Zenon Scada and ABB RTU data exchange engineering Network Installation (Fiber Optic, Ethernet, etc) OPGW/FO Splicing and Termination Issues

    Load Dispatching Center - RTU System (ABB RTU560 )National Control Center Telecommunication System (SDH, MUX, etc.) Network Installation (Fiber Optic, Ethernet, etc) OPGW/FO Splicing and Termination

    National Control Center Telecommunication System (SDH, MUX, etc.) Remote Access System of IEDs.Scada and Communication Settings of Protections (Micom, Vamp) Transformer Monitoring System (Alstom Ms3000)Network Installation (Fiber Optic, Ethernet, etc) OPGW/FO Splicing and Termination Issues

    National Control Center Telecommunication System (SDH, MUX, etc.) Remote Access System of IEDs.Scada and Communication Settings of Protections (Micom, Vamp) Transformer Monitoring System (Alstom Ms3000)Network Installation (Fiber Optic, Ethernet, etc) OPGW/FO Splicing and Termination Issues

    Micom C264 RTU System.IEDs (transducer, protection relay, analyzer etc) settings and communication issues.

  • REFERENCE PROJECTS (4)

    PROJECT NAME YEARMAIN CONTRACTOR / CUSTOMER

    2016

    2017

    SAĞMALCILAR GIS 380/33kV GIS

    SCOPESupply, Design, Documentation, Engineering, Commissioning, FAT/SAT...

    National Control Center Telecommunication System (SDH, MUX, etc.) Remote Access System of IEDs.Scada and Communication Settings of Protections (Micom, Vamp) Transformer Monitoring System (Alstom Ms3000)Network Installation (Fiber Optic, Ethernet, etc) OPGW/FO Splicing and Termination Issues

    2017

    BELEK GIS /154kV GIS

    National Control Center Telecommunication System (SDH, MUX, etc.) Remote Access System of IEDs. Scada and Communication Settings of Protections (Micom, Vamp) Transformer Monitoring System (Alstom Ms3000)Network Installation (Fiber Optic, Ethernet, etc) OPGW/FO Splicing and Termination Issues

    2017

    ITM 172 ALAŞEHİR HAVZA 154kV AIS

    Substation Scada System (GE DS Agile / PACİS ) BCU Systems (Micom C264) database engineering.Scada Adaptation of GE and ABB Protections.IEC61850 Protections, PRP Network.

    2017

    ITM 159 ATAŞEHİR 380/33kV GIS

    2017

    TCDD ANKARA - KONYA Fast Train Project

    National Control Center Telecommunication System (SDH, MUX, etc.) Remote Access System of IEDs.Scada and Communication Settings of Protections (Micom, Vamp) Transformer Monitoring System (Alstom Ms3000)Network Installation (Fiber Optic, Ethernet, etc) OPGW/FO Splicing and Termination Issues.

    Substation Scada System (Areva / Alstom PACİS) *Scada System Maintenance Contract for 3 years.

    ITM 161 ÇAĞLAYAN GIS 380/154/33kV GIS

    National Control Center Telecommunication System (SDH, MUX, etc.) Remote Access System of IEDs.Scada and Communication Settings of Protections (Micom, Vamp) Transformer Monitoring System (Alstom Ms3000)Network Installation (Fiber Optic, Ethernet, etc) OPGW/FO Splicing and Termination Issues.

  • REFERENCE PROJECTS (5)

    PROJECT NAME YEARMAIN CONTRACTOR / CUSTOMER

    2017

    2017

    MARNEULİ AIS 154kV AIS

    SCOPESupply, Design, Documentation, Engineering, Commissioning, FAT/SAT...

    Substation Secondary Design and Drawing.Acceptance procedures of documents.

    2018

    TOSÇELİK IRON AND STEEL PLANT 380/33kV AIS

    Load Dispatching Center - RTU System (ABB RTU560 )BCU Systems (Micom C264) database engineering.Substation Scada System (PACiS - Ds Agile)Scada Adaptation of GE F650, L90, Micom C264, Micom P14x, P64x. Data exchange between Factory Automation System and PACiS.

    2018

    PETKİM ALİAĞA WPP 154KV/33kV AIS

    Substation Scada System for 154kV/34kV SS (ABB MicroScada) Optical Fiber Network Installation for Wind Turbines and Substation CCTV Security System for Wind Turbines and SubstationIP Phone Exchance for Wind Turbines and Substation

    2018

    SOMA-B THERMAL POWER PLANT 380/154/33kV TEPP

    2019

    BATMAN-2 AIS154kV AIS

    Substation Scada System (GE DS Agile / PACİS )Load Dispatching Center - RTU / Gateway System IEC61850 Protections, PRP Network.

    KOCATEPE WPP154kV AIS

    Load Dispatching Center - RTU System (ABB RTU560 )BCU Systems database engineering.

    Event Recorder System (Micom C264)

  • REFERENCE PROJECTS (6)

    PROJECT NAME YEARMAIN CONTRACTOR / CUSTOMER

    2019

    ÖKSÜT GOLD MINE154kV AIS

    SCOPESupply, Design, Documentation, Engineering, Commissioning, FAT/SAT...

    Substation Scada System (GE DS Agile / PACİS )Load Dispatching Center - RTU / Gateway System IEC61850 Protections, PRP Network.

    ALAŞEHİR SS380/154/33kV AIS

    DS Agile Database engineering and revision.Firmware upgrade of Micom C264 BCUs.Version upgrade of DS Agile.

    2019

  • TRAINING PROJECTS (7)

    TRANING TYPE

    THEORETICAL PRACTICAL ENGINEERING

    MAIN CONTRACTOR / CUSTOMER

    SCOPE

    PRACTICAL

    ENGINEERING

    THEORETICAL PRACTICAL ENGINEERING

    THEORETICAL PRACTICAL ENGINEERING

    THEORETICAL PRACTICAL ENGINEERING

    THEORETICAL PRACTICAL ENGINEERING

    THEORETICAL PRACTICAL ENGINEERING

    Scada System General ViewCommunication ProtocolsAlstom PACiS / GE DS Agile Micom IEDs (RTU, Protection and Automation Products) Softwares of Alstom / GE

    Alstom PACiS / GE DS Agile Connection to IEDs Setting Parametres and Download Configurations System Settings Micom IEDs - IEC61850 Configuration

    Alstom PACiS / GE DS Agile Detailed Database Engineering (SCE, SMT, IED Conf. etc.) Application on site.

    Alstom PACiS / GE DS Agile All Theoritical Traning Application on test platform

    ABB MicroScada EngineeringABB RTU560 Engineering

    Copadata / ZENON All Teoric Traning Application on test platform

    ABB MicroScada EngineeringABB RTU560 Engineering

    ABB MicroScada EngineeringABB RTU560 Engineering

    Alstom / GE PACiS GatewayABB RTU560 Engineering

    THEORETICAL PRACTICAL ENGINEERING

    PRODUCTS

  • PROJECT NAMEMAIN CONTRACTOR / CUSTOMER

    SCOPESupply, Design, Documentation, Installation, FAT/SAT, etc.

    Fiber Optic Patchcords Manufacturing for IEDs (Protection Relays). Factory Acceptance Test (FAT) and Site Acceptance Test (SAT). Installation and Cabling on site.Supply and installation of Coaxial cables for PLCs (Power Line Carrier). OPGW/FO Splicing and Termination Works.

    Fiber Optic Patchcords Manufacturing for IEDs (Protection Relays). Factory Acceptance Test (FAT) and Site Acceptance Test (SAT). Installation and Cabling on site.Supply and installation of Coaxial cables for PLCs (Power Line Carrier). OPGW/FO Splicing and Termination Works.

    Fiber Optic Patchcords Manufacturing for IEDs (Protection Relays). Factory Acceptance Test (FAT) and Site Acceptance Test (SAT). Installation and Cabling on site.Supply and installation of Coaxial cables for PLCs (Power Line Carrier). OPGW/FO Splicing and Termination Works.

    Fiber Optic Patchcords Manufacturing for IEDs (Protection Relays). Factory Acceptance Test (FAT) and Site Acceptance Test (SAT). Installation and Cabling on site.Supply and installation of Coaxial cables for PLCs (Power Line Carrier). OPGW/FO Splicing and Termination Works.

    ITM 155 BELEK154kV GIS

    ITM 161 ÇAĞLAYAN 380kV GIS

    ITM 215 BURSA DOĞU GIS 380kV GIS

    ITM SAĞMALCILAR GIS 154kV GIS

    ITM 186 BURSA GIS 154kV GIS

    ITM 206 GÜZYURDU 154kV AIS

    ITM OSMANİYE AIS154kV AIS

    ITM 235 GİRESUN 154kV GIS

    ITM 265 KIZILIRMAK 154kV GIS

    ITM 274 ALİAĞA-1 154kV GIS

    ITM 217 TAŞOLUK 154kV GIS

    NETWORK PROJECTS (8)

    Boş SayfaBoş SayfaBlank PageBlank Page04_Projects.pdfBoş SayfaBoş SayfaBlank PageBlank PageBlank PageBlank PageBlank PageBlank Page

    A5 - CV - vER1.pdfBoş SayfaBoş SayfaBlank PageBlank Page04_Projects.pdfBoş SayfaBoş SayfaBlank PageBlank PageBlank PageBlank PageBlank PageBlank Page

    Boş SayfaBoş SayfaBoş SayfaBoş SayfaBoş SayfaBoş SayfaBoş Sayfa


Recommended