+ All Categories
Home > Documents > Problem Motivation - UCR Computer Science and Engineeringameadows/msproject/slides-handout.pdf ·...

Problem Motivation - UCR Computer Science and Engineeringameadows/msproject/slides-handout.pdf ·...

Date post: 15-Jun-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
6
1 Magic Camera Master’s Project Defense By Adam Meadows Project Committee: Dr. Eamonn Keogh Dr. Doug Tolbert Roadmap • Problem • Motivation • Background Stepping Through Magic Camera • Results • Conclusion Future Work Problem To organize an image containing a collection of objects in front of a solid background Motivation Incorporation into Digital Cameras – Sorting Tables – Insect Boards Background Multidimensional Scaling (MDS) – Transforms a dissimilarity matrix into a collection of points in 2d (or 3d) space – Euclidean distances between the points reflect the given dissimilarity matrix – Similar objects are spaced close together, dissimilar objects are spaced farther apart Stepping Through Magic Camera Identifying Objects Calculating Similarities Creating Resulting Image
Transcript
Page 1: Problem Motivation - UCR Computer Science and Engineeringameadows/msproject/slides-handout.pdf · Adam Meadows Project Committee: Dr. Eamonn Keogh Dr. Doug Tolbert Roadmap •Problem

1

Magic Camera

Master’s Project DefenseBy

Adam Meadows

Project Committee:Dr. Eamonn KeoghDr. Doug Tolbert

Roadmap

• Problem• Motivation• Background• Stepping Through Magic Camera• Results• Conclusion• Future Work

Problem

• To organize an image containing acollection of objects in front of a solidbackground

Motivation

• Incorporation into Digital Cameras– Sorting Tables– Insect Boards

Background

• Multidimensional Scaling (MDS)– Transforms a dissimilarity matrix into a

collection of points in 2d (or 3d) space– Euclidean distances between the points

reflect the given dissimilarity matrix– Similar objects are spaced close together,

dissimilar objects are spaced farther apart

Stepping Through Magic Camera

• Identifying Objects

• Calculating Similarities

• Creating Resulting Image

Page 2: Problem Motivation - UCR Computer Science and Engineeringameadows/msproject/slides-handout.pdf · Adam Meadows Project Committee: Dr. Eamonn Keogh Dr. Doug Tolbert Roadmap •Problem

2

Identifying Objects

• Convert to black and white image– Threshold: calculated automatically or specified

• Each connected comp treated as an object• Each obj. cropped by B-box + 5 pixel border• Edges of adjacent objects filtered out• Objects rotated to “face” same direction

Filtering Adjacent Objects

Object Rotation

• Find major axis– Align with image’s major axis

• Find centroid– Rotate so centroid is at bottom/left of obj

http://www.mathworks.com/access/helpdesk/help/toolbox/images/regionprops.html

Calculating Similarities

• Numerical representation of objects– Shape, color, texture

• Create dissimilarity matrix– Euclidean dist between each pair of objs

Shape

• Each object translated into a time series

• Dist from the center of obj to perimeter– Code provided by Dr. Keogh

Shape II

Page 3: Problem Motivation - UCR Computer Science and Engineeringameadows/msproject/slides-handout.pdf · Adam Meadows Project Committee: Dr. Eamonn Keogh Dr. Doug Tolbert Roadmap •Problem

3

Color

• RGB values independently averaged– 1000 random pixels chosen– Pixels not unique (if obj < 1000 pixels)

Texture

• Std deviation of 9 pixel neighborhood– averaged over 1,000 random pixels– Pixels not unique (if obj < 1,000 pixels)

Creating New Image

• Extracting Background

• Finding New Positions

• Fixing Overlaps

Extracting Background

• Use B&W image to id background• Independently avg RGB values• Create a new solid background image

– same dimensions as original image

Finding New Positions

• Use MDS to get coordinates for objs– Using dissimilarity matrix

• Reverse Y values– Images are indexed top-down

Fixing Overlaps

• Start placing objects in given order– Randomly chosen if not specified

• If overlap detected– Move object min dist to rectify– In one direction (up, down, left, right)

Page 4: Problem Motivation - UCR Computer Science and Engineeringameadows/msproject/slides-handout.pdf · Adam Meadows Project Committee: Dr. Eamonn Keogh Dr. Doug Tolbert Roadmap •Problem

4

Fixing Overlaps II

NotResults

Explanation Explanation II

Page 5: Problem Motivation - UCR Computer Science and Engineeringameadows/msproject/slides-handout.pdf · Adam Meadows Project Committee: Dr. Eamonn Keogh Dr. Doug Tolbert Roadmap •Problem

5

Page 6: Problem Motivation - UCR Computer Science and Engineeringameadows/msproject/slides-handout.pdf · Adam Meadows Project Committee: Dr. Eamonn Keogh Dr. Doug Tolbert Roadmap •Problem

6

Conclusion

• Input image– Collection of objects on solid background

• Output image– Similar objects grouped close to each other– All objects “face” same direction

Future Work

• Develop color method– Try it with some real data (butterflies, etc.)

• Add combination of similarity measures– Shape & color, color & texture, etc.

• Add optional How-To– Display original image– User clicks an object– Line drawn to new location

Questions ?


Recommended