Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 1 of 23 PROCEEDINGS OF THE 140 th CONSENT COMMITTEE MEETING (CCM-CFO-Non-EIA) HELD ON 3-4-2013 (Wednesday) AT 3:00 PM Members present: Sl.No Name Designation 1. Sri. H P Prakash, IFS Member Secretary and Chairman of the Committee 2. Sri.D.R.Kumaraswamy, Senior Environmental Officer -HWM Cell and CEO-2 (I/C) and Member 3. Sri Vijaykumar Board member---------Member 4. Smt. Vijaya Hegde, Environmental Officer and Member Convener 5. Sri S. Pranesh. KASSIA Karnataka Small Scale Industries’ Association----------Member Members Absent: 1. Chairman, CII, Karnataka State Council, Bangalore The following subjects were discussed in the meeting: SL NO. SUBJECT Decision Taken 1. M/s. Gadag Enviro Tech, Plot. No. 48-P, Narasapura Growth Center, KIADB Indl. Area, Gadag District. The committee recommended to issue the first CFO for the operation of Common Biomedical waste treatment facility for the period from 01.07.2012 to 30.06.2013 with conditions. 2. M/s. AT India Auto Parts Private Ltd, Plot No. 33 and 34, Bidadi Industrial Area, Bidadi, Ramnagar Taluk and District. The committee recommended to issue the first CFO to the industry for the metal casting and machining of capacity 1423 TPM for the period up to 30.06.2013 with conditions. 3. M/s. ITC R & D Centre, Plot No. 3, 1 st Phase, Peenya Industrial Area, Bangalore. The committee recommended to issue the first CFO for the expansion activity with its validity period to merge with that of its existing consent, i.e., with validity up to 30.06.2013 with conditions. However, the issue of CFO shall be taken up only after submission of copy of EC from the industry.
Transcript
Page 1: Proceedings of 03-04-2013

Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 1 of 23

PROCEEDINGS OF THE 140th CONSENT COMMITTEE MEETING (CCM-CFO-Non-EIA) HELD ON 3-4-2013 (Wednesday) AT 3:00 PM Members present:

Sl.No Name Designation

1. Sri. H P Prakash, IFS

Member Secretary and Chairman of the Committee

2. Sri.D.R.Kumaraswamy,

Senior Environmental Officer -HWM Cell and CEO-2 (I/C) and Member

3. Sri Vijaykumar Board member---------Member

4. Smt. Vijaya Hegde,

Environmental Officer and Member Convener

5. Sri S. Pranesh.

KASSIA Karnataka Small Scale Industries’ Association----------Member

Members Absent:

1. Chairman, CII, Karnataka State Council, Bangalore The following subjects were discussed in the meeting:

SL NO.

SUBJECT

Decision Taken

1. M/s. Gadag Enviro Tech, Plot. No. 48-P, Narasapura Growth Center, KIADB Indl. Area, Gadag District.

The committee recommended to issue the first CFO for the operation of Common Biomedical waste treatment facility for the period from 01.07.2012 to 30.06.2013 with conditions.

2. M/s. AT India Auto Parts Private Ltd, Plot No. 33 and 34, Bidadi Industrial Area, Bidadi, Ramnagar Taluk and District.

The committee recommended to issue the first CFO to the industry for the metal casting and machining of capacity 1423 TPM for the period up to 30.06.2013 with conditions.

3. M/s. ITC R & D Centre, Plot No. 3, 1st Phase, Peenya Industrial Area, Bangalore.

The committee recommended to issue the first CFO for the expansion activity with its validity period to merge with that of its existing consent, i.e., with validity up to 30.06.2013 with conditions. However, the issue of CFO shall be taken up only after submission of copy of EC from the industry.

Page 2: Proceedings of 03-04-2013

Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 2 of 23

4. M/s. GE India Technology Centre Private Ltd, # 122, EPIP, Phase-II, Hoody village, Whitefield, Bangalore – 66.

The committee recommended to issue CFO for the new activity as per the CFE expansion order with the validity period to merge with that of the existing CFO, i.e., for the period up to 30.06.2014 with conditions.

5. M/s. Madhavi Edible Bran Oils (Raichur) Pvt. Ltd, Plot 212/P-5, Raichur Growth Center, KIADB Industrial Area, Kuknoor Village, Raichur District.

The committee recommended to issue CFO for the period 01.07.2012 to 30.06.2013 with conditions to establish only solvent extraction plant and not the refinery which requires EC. A commitment in this regard shall be obtained before the issue of CFO.

6. M/s. Precot Meridian Ltd, Plot No. 14 (P), 15, 16, 26, 27 & 28P, SEZ Textile, KIADB Industrial Area, Hassan Taluk & District.

The committee recommended to issue CFO for the period 01.07.2012 to 30.06.2013 with conditions.

7. Global Ecocarb Pvt. Ltd, Sy. No. 12/3, 9/2, 9/9, 13/5 and 16/7 of Bennanayakanahalli Village, Settikere Road, Tiptur Taluk, Tumkur District.

The committee recommended to issue CFO for the period 01.07.2012 to 30.06.2013 with conditions.

8 M/s Rajshil Papers Pvt. Ltd., 6A, KIADB Ind Area, Nanjanagud-571302

The committee recommended to issue CFO for the period 01.07.2012 to 30.06.2013 with conditions.

9 M/s Bando (India) Pvt Ltd., Plot No. 275 to 279, Narsapura, KIADB Ind Area, Kolar Tq and Dist

The committee recommended to issue CFO for the period 01.07.2012 to 30.06.2013 with conditions.

Other Issues: Apart from the above issues, SEO-HWM has brought to the notice of the committee about issue of authorizations to 317 industries under Hazardous Waste (Management,, Handling and Trans boundary Movement) Rules, between the period 1-4-2012 to 31-3-2013. The details of the industries are as per

Page 3: Proceedings of 03-04-2013

Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 3 of 23

Sd/

Chairperson of the Committee and Member Secretary

Sd/ Member Convener

To, 1. Sri K Vijaykumar, BE, MIE, FIV, Shursti, Kadri Kibbattalu, House No. 3-19-

1619/14, 3rd Ward, Kadri, Mangalore-575002, for kind information 2. The Chairman, CII, Karnataka State Council, No. 1086, 12th main, HAL 2nd stage,

Indiranagar, Bangalore-08 for kind information 3. Sri Pranesh, KASSIA, 1/106, 17th cross, Magadi Chord Road, Bangalore-40 for

information. 4. Corporate cell for information and n/a. 5. CEO-1 and CEO-2 6. SEO-HWM, SEO-Mines, SEO-Infrastructure, SEO-17 category, 7. EO1-17 cat, EO2-17 cat, EO-Non EIA-Bangalore region, EO-Non EIA-other than

Bangalore region, 8. PA to Chairman to bring it to the notice of Hon’ble Chairman. 9. PA to Member Secretary to bring it to the notice of Hon’ble Chairman. 10. DEO-Mines, DEO-Bangalore region, DEO1-other than Bangalore, DEO-2 other

than Bangaore, DEO-17 cat, 11. All AEOs

Annexure-1. The committee ratified the action taken by the SEO-(HWM) cell in issuing the authorisations:

Page 4: Proceedings of 03-04-2013

Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 4 of 23

Annexure-1

Sl.No  Name & Address of the Industry  Period of   Authorization  from   and to 

1  Millennium  Chemi  Pharma  (Mysore)  Pvt  LtdNo.  49,  Mysore  Belgola  Industrial  Area,  Metagalli, Mysore ‐ 570 016 

22‐Nov‐2011  30‐Jun‐16 

2  Ripple  Fragrances  Exports  Pvt  Ltd(Candle Unit), Plot No. 154‐156, Belagola Industrial Area (Metagalli) Mysore ‐ 570 016 

30‐Jan‐2012  31‐Dec‐16 

3  Ripple  Fragrances  Pvt  LtdPlot  No.  154‐156,  belagola  Industrial  Area  (Metagalli) Mysore‐570 016 

1‐Jan‐2012  31‐Dec‐16 

4  Yshawi  Fish  &  Oil  CompanyPithrody, Udyavara‐ 574 118 

3‐Dec‐2011  30‐Jun‐16 

5  Dhruvadesh  Motors  Pvt  LtdNo.  150/3, Opp.  Standard  tile's  Factory,  Bellary  Road, New Police Station, Yelahanka, Bangalore ‐ 560 064 

2‐Mar‐2012  30‐Sep‐16 

6  Metcraft  Engineering Plot  No.  235,  2nd  Phase,  KIADB  Industrial  area, Harohalli, Ramanagara 

3‐Oct‐2011  30‐Jun‐16 

7  Guhring  India  Pvt  LtdPlot No. 129,  IV Phase, Bommasandra  Industrial Area, Bangalore ‐ 560 099 

8‐Sep‐2011  31‐Dec‐15 

8  Advaith  Motors  Pvt  LtdPlot No. 26, A, B, C, Mysore Hunsur Main Road, Belwadi Industrial Area, Mysore ‐ 570 018 

16‐Jan‐2012  30‐Sep‐16 

9  Sri.  Siddhartha  Institute  of  TechnologyMaralur, Tumkur ‐ 572 105 

1‐Jan‐2012  31‐Dec‐16 

10  Batliboi  LtdNo. 24, 3rd Main, Veerasandra  Industrial Area, 19 KM, Hosur Road, Bangalore ‐ 560 100 

23‐Jan‐2012  30‐Sep‐16 

11  Syed  Zakir  Hussain  &  OthersNo. 332/1, Thimmaiah Road, Vasanth Nagar, Bangalore ‐ 560 052 

6‐Jun‐2012  31‐Dec‐15 

12  Yashawini  IndustriesNo. C‐94, Industrial Estate, Yadavagiri, Mysore‐570 020 

15‐Mar‐2012  30‐Jun‐16 

13  Viya  Manga  Wheelers  Pvt  LtdNo.  552/512,  Maruthi  Nagar,  Kogilu  Main  Road, Yelahanka, Bangalore ‐ 560 064 

24‐Nov‐2011  30‐Sep‐16   

14  Omni  Matrix  Pvt  LtdPlot No. 48 K 1 & K 2, Yellupura KIADB  Industrial Area, 

20‐Jan‐2012  31‐Dec‐16 

Page 5: Proceedings of 03-04-2013

Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 5 of 23

Doddaballapur, Bangalore ‐ 561 203 15  Charoen  Pokphand  (I)  Pvt  Ltd

Feed Mill Division, sy.no. 130, Opp Grinwell, Boodigere Road, Off Old Madras Road, Bangalore ‐ 560 049 

2‐Dec‐2012  30‐Sep‐15 

16  Tech  Steel  Products  LtdNo. 671, Nagawara, Thanisandra Main Road, SRK Nagar, Bangalore ‐ 560 077 

1‐Oct‐2011  30‐Sep‐16 

17  Shirdi  Sai  Engineering  CollegeSai  Leo  Nagar,  Samandur,  Guddanahalli,  Anekal, Bangalore ‐ 562 106 

1‐Jan‐2012  31‐Dec‐16 

18  Hindustan  Construction  Co.  LtdPadue  Cavern  Project,  H.No.  18‐3  (1),  Ashiyana,  Near Masjid, Shirva, Udupi ‐ 574 116 

7‐Dec‐2011  30‐Sep‐16 

19  AG  Flex  Technologies  (P)  LtdNo. 257, 258, Hebbal Industrial Area, Mysore‐ 570 016 

23‐Dec‐2011  30‐Jun‐16 

20  Volvo  India  Pvt  LtdNo.  66/1,  Lakeview  Building  2nd  floor,  Bagmane  Tech Park, Byrasandra, Bangalore ‐ 560 093 

8‐Dec‐2012  31‐Dec‐16 

21  Grace  TexproNo.  24  F2,  1st  Phase,  Kumbalgodu  Industrial  Area, Behind  Pepsi  Factory, Mysore  Road,  Bangalore  ‐  560 074 

17‐Oct‐2011  30‐Sep‐16 

22  Tauruz No. 7, Panthrapalya Next to BM Valley High School 

2‐Dec‐2012  30‐Sep‐16 

23  DIC  India  Ltd#  66A,  Bommasandra  Industrial  Area,  Hosur  Road, Bangalore ‐ 560 099 

7‐Nov‐2011  30‐Sep‐16 

24  Kohinoor  IndustriesBellampalli Village, Kukkikatte, Udupi 

14‐Dec‐2011  30‐Sep‐16 

25  Automotive  Axles  Ltd  Unit  2No. 34 & 35 P, Hootagali  Industrial Area, Hunsur Road, Mysore ‐ 570 018 

9‐Jan‐2012  30‐Jun‐16 

26  Samsung  India  Software  Operations  Pvt  LtdNo.  66/1,  Bagmane  Lakeview,  Block  'B'  Bagmane Techpark, CV Raman Nagar, Bangalore ‐ 560 093 

20‐Jan‐2012  31‐Dec‐16 

27  Sony  India  Pvt  LtdVridavan Tech Village (SEZ) 2nd Floor, Hibiscus Tower‐2, Outer Ring Road, Devarabisenhalli, Varthur, Bangalore ‐ 560 037 

1‐Jan‐2012  31‐Jun‐2016 

28  Trelleborg  Sealing  Solutions  India  Pvt  LtdNo.  22/9,  Sy.No.  9,  Beratana  Agrahara,  Hosur  Main Road, Bangalore ‐ 560 100 

6‐Feb‐2012  30‐Sep‐16 

29  GE  Money  Financial  Service  Pvt  Ltd 29‐Feb‐2012  31‐Dec‐16 

Page 6: Proceedings of 03-04-2013

Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 6 of 23

No.  148,  Infantry  Road,  2nd  Floor,  Embassy  Square, Bangalore ‐ 560 001 

30  SBI  Cards  A  Payments  Service  (P)  LtdNo.  148,  Infantry  Road,  2nd  Floor,  Embassy  Square, Bangalore ‐ 560 001 

29‐Feb‐2012  31‐Dec‐16 

31  Cauvery  Motors  Pvt  LtdPlot No. 49/50,  Industrial Estate, Hebbal Mysore  ‐ 570 016 

22‐Dec‐2011  30‐Sep‐16 

32  Carl  Bechem  Lubricants  India  Pvt  LtdNo.  28,  Bidadi  Industrial  Area,  Bidadi, Harohalli  Road, Bangalore Rural District 

16‐Jan‐2012  30‐Jun‐16 

33  Mann  and  Hummel  Filter  Pvt  LtdPlot  No.  231/1,  11th  Main  Road,  3rd  Phase,  Peenya Industrial Area, Bangalore ‐ 560 058 

27‐Feb‐2012  31‐Dec‐16 

34  Saravana  Alloys  Steels  Pvt  LtdSy.No. 41, Kasankadi Road, Hirebaganal Village, Koppal 

10‐Feb‐2012  30‐Jun‐16 

35  Southern  Auto  Products No. 41, A, 2nd Phase, Peenya Industrial Area, Bangalore ‐ 560 058 

24‐Feb‐2012  31‐Dec‐16 

36  Navodaya  Medical  CollegeHospital & Research Center, Raichur Dist. 

20‐Mar‐2012  30‐Jun‐12 

37  MK  Auto  Tech  Pvt  LtdChallakere  Branch,  Hotteppanahally,  Challakere, Chitradurga Dist. 

1‐Feb‐2012  30‐Sep‐16 

38  Sri.  M.  Visvesvaraya  Institute  of  TechnologiesKrishnadevarayan  Agrahar,  Hunasamaranahalli, International Airport Road, Bangalore ‐ 562 157 

30‐Mar‐2012  31‐Dec‐16 

39  Wintek  Flexo  PrintsNo. 33 & 34, Prathiba  Industrial Estate, JP Nagar, Kashi Nagar, Yelachanahalli, Bangalore ‐ 560 078 

2‐Feb‐2012  31‐Dec‐16 

40  Tokia  Rubber  Auto  Parts  India  Pvt  LtdPlot  No.  337,  Harohalli  KIADB  Industrial  Area, Kanakapura Taluk, Ramanagar Dist 

1‐Mar‐2012  30‐Jun‐16 

41  Visvesvaraya  Technological  UniversityMacche Village, Belguam ‐ 590 018 

1‐Jan‐2012  31‐Dec‐16 

42  New  Horizon  Educational  &  Cultural  TrustSy.No.  14,  39,  40,  41,  42 of  Kadubiseenahalli, Varthur Hobli, Outer Ring Road, Bangalore East 

1‐Feb‐2012  31‐Dec‐16 

43  Fast  Tracksy.no. 58/2, Marpady Village, Alangar, Moodabidri, D.K.  

9‐Mar‐2012  30‐Sep‐16 

44  Symbol  Technologies  Pvt  Ltd(A  Motorola  Company) RMZ  Ecospace,  Block‐3  B,  Sarjapura Outer  Ring  Road, Varthur, Bangalore ‐ 560 103 

2‐Mar‐2012  31‐Dec‐16 

Page 7: Proceedings of 03-04-2013

Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 7 of 23

45  Huawei  Technologies  India  Pvt  LtdLevel‐3,  Leela  Galleria,  The  Leela  Palace  23,  Air  Port Road, Bangalore ‐ 560 008 

2‐Mar‐2012  31‐Dec‐16 

46  Sogefi  MNR  Filtration  India  Pvt  LtdNo. 1, Sy.No. 87, Kasavanahalli Main Road, Carmelaram, Bangalore ‐ 560 035 

6‐Feb‐2012  31‐Dec‐16 

47  Tata  Motors  LtdDharwad  Works,  Munmigatti, Dharwad‐580 007 

22‐Jan‐2012  31‐Dec‐16 

48  Crest  Composite  &  Plastics  Pvt  LtdPlot No. 552  (B) & 558 C, KIADB Belur  Industrial Area, Dharwad 

15‐Mar‐2012  30‐Jun‐16 

49  GM  Institute  of  TechnologyPB Road, Davangere‐577 006 

16‐Jan‐2012  31‐Dec‐16 

50  Yuken  India  LtdEngineering & Foundry Division Sy.No. 84‐171, 85‐172, Hedaginabele Village, Madivala, Malur Taluk, Kolar 

25‐Jan‐2012  30‐Jun‐16 

51  Premiere  IlluminationsNo.  27/H,  3rd  Stage,  Industrial  Suburb, Mysore  ‐  570 008 

22‐Mar‐2012  30‐Jun‐16 

52  KPR  Fertilisers  Ltdsy.no.  108,  109,  Halavarthi  Village,  Near  Kunikeri Thanda, Koppal ‐ 583 231 

1‐Aug‐2012  30‐Jun‐16 

53  Chettinad  Cement  Corporation  LtdKallur  Project,  Sangem  K,  Bhaktampalli,  Chamdapur, Chincholi Taluk, Gulbarga‐ 585 305 

15‐Mar‐2012  30‐Jun‐16 

54  Mivin  Engineering  Technologies  Pvt  LtdPlot No. 531, 4th Phase, Peenya 2nd Stage, Bangalore ‐ 560 058 

24‐Mar‐2012  30‐Sep‐16 

55  BVVS  Basaveshwar  Engineering  CollegeBagalkot ‐ 587 102 

12‐Mar‐2012  31‐Dec‐16 

56  SLK  Software  Services  Pvt  LtdNo.  193,  Chandrappa  Complex,  New  BEL  Road, Mathikere, Bangalore ‐ 560 054 

22‐Mar‐2012  31‐Dec‐16 

57  Kemwell  Pvt  Ltd  Unit  Bio  Pharma34th  KM,  Tumkur  Road,  T‐Begur,  Nelamangala, Bangalore ‐ 562 123 

6‐Mar‐2012  30‐Jun‐16 

58  Golden  Heights59th  C  Cross,  4th  Block,  Rajajinagar,  Bangalore  ‐  560 010 

28‐Feb‐2012  31‐Dec‐16 

59  Sri.  Revana  Siddeshwara  Educations  TurstNo.  1,  Lakshinilaya,  4th  Cross,  Papanna  Lane, Ganganagar, Bangalore ‐ 560 010 

8‐Mar‐2012  31‐Dec‐16 

Page 8: Proceedings of 03-04-2013

Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 8 of 23

60  Sambhram  Institute  of  TechnologyAmba  Bhavani  Temple  Road, M.S.  Palya,  Bangalore  ‐ 560 070 

2‐Feb‐2012  31‐Dec‐16 

61  Devaraj Urs. Academy of Higher Education & ResearchTamaka, Kolar 

22‐Feb‐2012  31‐Dec‐16 

62  Futuristic  Diagnostic  Imaging  Center  Pvt  LtdPlot  No.  282,  4th  Phase,  Link  Road,  Jigani  Industrial Area, Bangalore ‐ 560 105 

4‐Feb‐2012  30‐Jun‐16 

63  Malik  EngineeringPlot No. 126, KIADB Industrial Estate, 2nd Phase, Jigani Anekal Taluk, Bangalore ‐ 562 106 

28‐Mar‐2012  30‐Sep‐16 

64  KBD  Sugars  &  Distilleries  Ltd20th Mile, Tumkur Road, Nelamangala, Bangalore ‐  

16‐Mar‐2012  30‐Jun‐16 

65  Arshed  Ispatsy.no. 76/B, 74/1, 74/2, 73/B, 64/B, 75 & 42/5, Kerchalli Village, Koppal 

19‐Apr‐2012  30‐Jun‐15 

66  Bhagyodaya  Motors  Pvt  LtdOpp. DC. Office Hospet Road, Koppal Dist. 

16‐Apr‐2012  30‐Sep‐16 

67  KBN  College  of  Engineering Gulbarga ‐ 585 104 

30‐Mar‐2012  30‐Jun‐16 

68  Associate  Decon  LtdPlot  No.  1,  4th  Phase,  KIADB  Industrial  Area, Huralagere,  Malur  Railway  Station,  Malur  ‐  563  160, Kolar 

19‐Apr‐2012  30‐Jun‐16 

69  Ajax  Fiori  Engineering  (I)  Pvt  LtdNo.  3,  KIADB  Industrial  Area,  Bashettihalli, Doddaballapur ‐ 561 203 

28‐Mar‐2012  31‐Dec‐16 

70  Pride  CoatNo.  26,  KNS  Engg.  College,  Thirumenahalli,  Jakkur, Yelahanka, Bangalore ‐ 560 064 

10‐Apr‐2012  30‐Jun‐16 

71  Vega  Funmobiles  Pvt  LtdPlot No.  635  B,  Peeranwadi  Khadarwadi  Village  Road, Udyambag, Belgaum Dist. 

26‐Apr‐2012  30‐Jun‐16 

72  S.  Nijalingappa  Medical  College  &  Hangai  Shri Kumareshwar  Hospital  &  Research  CenterNavangagar, Bagalkot Dist.q 

5‐Mar‐2012  30‐Jun‐16 

73  Vega  Auto  Accessoreis  Pvt  LtdBEMICEL Industrial Estate, Udyambag, Belgaum Dist. 

26‐Apr‐2012  30‐Jun‐16 

74  A  Shama  Rao  FoundationSrinivasa Institute Medical Sciencws & Research Center Village No. 49, Surathkal, Mangalore D.K. 

30‐Jan‐2012  30‐Jun‐16 

75  Hypartek  Fluid  Power  Pvt  LtdSy.No.  56,  Balagaranahalli,  Neralur,  Bandapura  Road, 

26‐Mar‐2012  30‐Sep‐16 

Page 9: Proceedings of 03-04-2013

Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 9 of 23

Attibele, Bangalore ‐ 562 107 76  RL  Jalappa  Institute  of  Technology

Kodigehalli, Doddaballapur ‐ 562 203 30‐Mar‐2012  31‐Dec‐16 

77  KNS  Institute  of  TechnologyHegdenagar, Thirumenahalli, Bangalore ‐ 560 064 

7‐Mar‐2012  31‐Dec‐16 

78  Universal  Air  Products  Pvt  LtdPlot No. 10 Part 1, KIADB  Industrial Area, Kunigal ‐ 572 130, Tumkur 

9‐Dec‐2011  30‐Sep‐16 

79  JSW  Steel  Processing  Center  LtdTorangagallu, Bellary ‐ 583 275 

23‐Mar‐2012  30‐Jun‐16 

80  STS  Titelflex  India  Pvt  LtdKIADB    Industrial Area, Doddaballapur, Bangalore  ‐ 561 203 

21‐Mar‐2012  31‐Dec‐16 

81  Sri.  Krishnarajendra  Silver  Jubilee  Technological Institute KR Circle, Bangalore ‐ 560 001 

28‐Mar‐2012  31‐Dec‐16 

82  Glodman  Sachs  Service  Pvt  LtdSunriver  Building,  Embassy  Glof,  Link  Business  Park, Intermediate Ring Road, Bangalore ‐ 560 078 

24‐Jan‐2011  31‐Dec‐15 

83  Advaith  Motors  Pvt  LtdPlot No. 26, A, B, C, Mysore Hunsur Main Road, Belwadi Industrial Area, Mysore ‐ 570 016 

6‐Jan‐2012  30‐Sep‐16 

84  ACC  LtdKurugodu Road, Kudithini Village, Bellary (Taluk & Dist) 

30‐Jan‐2012  30‐Jun‐16 

85  Ankith  Fasteners  (P)  Ltdsy.no.  294,  4th  Main,  Haragadde  Village,  Adjacentto Jigani Industrial Area, Anekal Taluk, Bangalore  

13‐May‐2011  30‐Jun‐15 

86  Autoliv  India  Pvt  LtdPlot No. 44, KIADB  Industrial Area, Kadakola,  Jayapura Hobli, Mysore ‐ 571 311 

9‐May‐2012  30‐Jun‐16 

87  Embassy  TechsquareKatha  No.  298/189/172,  Sy.No.  10/1A‐‐‐173  of Kadubeesanahalli Village, Varthur Hobli, Bangalore 

25‐Apr‐2012  30‐Jun‐16 

88  SS  Institute  of Medical  Sciences  and  Research  CentreNH‐4, Bypass, PB Road, Davangere‐577 005 

15‐Mar‐2012  30‐Jun‐16 

89  Al  Ameen  Medical  College  &  HospitalAthani Road, Bijapur 580 108 

2‐Apr‐2012  30‐Jun‐16 

90  First  Sources  Solutions  LtdAkshay Centre, Gokul Road, Hubli, Dharwad District 

9‐Apr‐2012  31‐Dec‐16 

91  First  Sources  Solutions  LtdAkshay Centre, Gokul Road, Hubli, Dharwad District 

6‐Mar‐2012  30‐Sep‐16 

92  KSRTC  Nelamangala  Depot,  Arasinakunte  Village,  NH‐4, 

6‐Mar‐2012  30‐Sep‐16 

Page 10: Proceedings of 03-04-2013

Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 10 of 23

Tumkur Road, Bangalore Rural District 93  Innova  Consumer  Care  (P)  Ltd

Katha  No.  91,  sy.no.  28‐29,  Soukya  Road, Kacharakanahalli,  Jadigenahalli  Hobli,  Hoskote  Taluk, Bangalore Rural Dist. 

22‐Feb‐2012  30‐Jun‐16 

94  Shakunt Enterprises Pvt LtdPlot No. 577, C & 577,  "D" Belur Industrial Area, Dharwad‐580 011 

14‐Mar‐2012  30‐Jun‐16 

95  M.S.  Ramaiah  Medical  CollegeMSR Nagar, MSRIT Post, Bangalore ‐ 560 054 

14‐Mar‐2012  30‐Jun‐16 

96  Radhamani  Exports  LtdPlot No.  314  (P)  315  (P),  315  (P),  316,  318 &  319  (P) Bommasandra  Jigani  Link  Road,  Industrial  Area, Bangalore ‐ 560 105 

24‐Mar‐2012  30‐Sep‐16 

97  Megamlies  Bearing  Cups  Pvt  LtdPlot No. 86 (C2), 5th Road, KIADB Industrial Area, Jigani, Bangalore ‐ 560 105 

31‐Mar‐2012  31‐Dec‐16 

98  Dolphin  Die  Cast  (P)  LtdNo.  266  B,  Bommasandra  Jigani  Link  Road,  Jigani Industrial Area, Bangalore ‐ 560 105 

28‐May‐2012  30‐Jun‐16     

99  Momentive  Performance  Materials  (India)  Pvt  LtdSy.No.  9  Phase‐2,  Electronic  City,  Hosur  Road, Bangalore ‐ 560 100 

20‐Mar‐2012  30‐Jun‐16 

100  Mphasis  LtdTanglin  Development  LtdSEZ  Bangalore  Mysore  High  Way  Road,  Mylasandra Village, RVCE, Bangalore ‐ 560 059 

5‐Apr‐2012  30‐Jun‐16 

101  Sparkvee  Fine  Chemicals  Pvt  LtdSy.No.  106,  Plot No.  55,  56,  71 &  72,  KIADB,  Raichur Growth Center, Chicksugur, Raichur Dist 

25‐Apr‐2012  30‐Jun‐16 

102  Udupi  Power  Corporation  LtdBerth  No.  15,  UPCL,  Jetty  within  NMPT  Premises Panambur, Mangalore 

12‐Jun‐2012  30‐Jun‐12 

103  Protective  Coating  Pvt  LtdPlot  No.  B‐210,  2nd  Stage,  Peenya  Industrial  Area, Bangalore ‐ 560 058 

23‐May‐2012  30‐Jun‐16 

104  BOC  India  Ltd1800  TPD,  JSW  Steel  Ltd,  Premises,  Toranagallu‐585 123, Bellary 

4‐Jun‐2012  30‐Jun‐12 

105  Rangoli  PrintsNo. 42, Kudlu Main Road, Hosur Road, Bangalore ‐ 560 068 

4‐Jun‐2012  30‐Jun‐16 

Page 11: Proceedings of 03-04-2013

Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 11 of 23

106  Savannah  Hotels  Pvt  LtdNo. 43/3, Whitefield Road, Bangalore ‐ 560 067 

27‐Apr‐2012  30‐Sep‐16 

107  RV  College  of  Engineering Mysore Main Road, Bangalore ‐ 560 059 

22‐Mar‐2012  31‐Dec‐16 

108  Rajarajeswari  Medical  College  and  HospitalKambipura Mysore Road, Bangalore ‐ 560 074 

3‐Jan‐2012  30‐Jun‐16 

109  Carclo  Technical  Plastics  Pvt  LtdNo.  27  A  (2)  KIADB  Industrial  Area,  Doddaballapura, Bangalore ‐ 561 203 

11‐May‐2012  31‐Dec‐16 

110  RS  Surfa  CoatsSy.No.  30,  Seetharampalya,  Opp  Graphite  India, Mahadevapura, Bangalore 

23‐Jul‐2011  30‐Jun‐16 

111  Sheraton  BangaloreBrigade  Gateway  No.  26/1,  Dr.  Rajkumar  Road, Malleswaram (west) Bangalore ‐ 560 055 

3‐Dec‐2011  30‐Sep‐16 

112  Tanglin  Development  LtdSy.No.  29,  31,  Pattanagere  Village,  &  12/1,  12/2,  of Mylasandra  Village,  Kengeri,  RVCE,  Mysore  Road, Bangalore ‐ 560 059 

20‐Apr‐2012  31‐Dec‐16 

113  KHF  Components  Pvt  LtdSite Nos. 20, 20/1, Survey No. 12, Double Road, Hoody Village, Mahadevapura Post, Bangalore ‐ 560 048 

7‐Dec‐2011  31‐Dec‐2015 

114  Rushil  Décor  LimitedPlot No. 58, 59, 60 Amble KIADB Industrial Area, Amble Hobli, Chikmagalur Taluk & District 

9‐Jul‐2012  30‐Sep‐2016 

115  R‐Chem  Organics  (Bangalore)  Pvt  LtdPlot No.  7 G &  F,  KIADB  Industrial Area,  Somanahalli, Maddur Taluk, Mandya Dist. 

29‐May‐2012  30‐Jun‐12 

116  Tasty  World  Pvt  LtdPlot  No.  10  P,  &  11  KIADB  Industrial  Area,  Amble, Chikmagalur 

16‐Jun‐2012  31‐Dec‐16 

117  Jain  Motors#  868,  N3‐N7,  Shankar  Vihar  Extension,  PB  Road, Davangere 

30‐May‐2012  30‐Sep‐16 

118  Vinayaka  CNC  Centre  Pvt  LtdNo. A‐347, 9th Main Road, 2nd Stage, Peenya Industrial Estate, Bangalore ‐ 560 058 

6‐Jun‐2012  30‐Sep‐12 

119  Vinayaka  CNC  Centre  Pvt  LtdNo. A‐347, 9th Main Road, 2nd Stage, Peenya Industrial Estate, Bangalore ‐ 560 058 

6‐Jun‐2012  30‐Sep‐12 

120  Tanglin  Development  LtdNo.  29,  31  of  Pattnagere  Village,  &  12/1,  12/2,  of Mylasandra  Village,  Kengeri Hobli,  RVCE  Post, Mysore 

20‐Apr‐2012  31‐Dec‐16 

Page 12: Proceedings of 03-04-2013

Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 12 of 23

Road, Bangalore ‐ 560 059 121  KPR  Fertilisers  Ltd

Sy.No.  109/6  &  109/10,  Halavarthi  Village,  Kunikeri Post, Koppal 

16‐May‐2012  30‐Jun‐16 

122  Allied  Blenders  &  Distillers  Pvt  Ltd8th  Mile  Stone,  Tumkur  Road,  Nagsandra  Post, Bangalore North Taluk, Bangalore ‐ 560 073 

19‐Apr‐2012  30‐Sep‐16 

123  SS  Industries Shed No. 7 A, Veerasandra Industrial Area, Hosur Road, Bangalore ‐ 560 100 

5‐Mar‐2012  30‐Jun‐16 

124  Bostik  India  Pvt  Ltd  Unit  IIPlot  No.  16,  B  &  C,  Bommasandra  Industrial  Area, Anekal, Bangalore ‐ 560 001 

7‐Jun‐2012  30‐Sep‐16 

125  Wonderflex  No. 270, 4th Phase, Peenya Industrial Area, Bangalore ‐ 560 058 

20‐Jun‐2012  30‐Sep‐16 

126  GE  India  Pvt  LtdDivision:  Wind  Energy  No.  601,  6th  Floor  Tower  B,RMZ  Infinity,  Benniganahalli,  Old  Madras  Road, Bangalore ‐ 560 016 

15‐Jun‐2012  31‐Dec‐16 

127  Biocon  Research  LtdPlot  No.  2  of  Bommasandra  Link  Road,  Anekal  Taluk, Bangalore Urban Dist. 

22‐May‐2012  30‐Jun‐16 

128  Mani  Precision  Products  Pvt  LtdB‐163,  3rd  Cross,  Peenya  Industrial  Estate,  1st  Stage, Bangalore ‐ 560 058 

23‐May‐2012  31‐Dec‐16 

129  Wadhavan  Holding  Pvt  LtdPlot  No.  345‐A,  Hebbal  Industrial  Area, Mysore  ‐  570 016 

18‐Jun‐2012  30‐Sep‐12 

130  Motherson  Automotive  Technologies  &  EngineeringPlot No. 11, 2nd Phase, Sector I, Bidadi Industrial Area, Ramanagara Taluk & Dist ‐ 562 109 

2‐Sep‐2011  30‐Sep‐16 

131  United  Breweries  LtdThandya  Industrial Area,  Toremavu &  Immavu Village, Nanjangagud Taluk, Mysore District 

21‐Jul‐2012  30‐Jun‐17 

132  Kushal  PolycoatsNo.  177,  Bilekahalli  Village,  Bannerghatta  Road, Bangalore ‐ 76 

1‐Jul‐2012  30‐Jun‐17 

133  Kaleesuwari  Refinery  Pvt  LtdPlot  No.  2,  Antharasanahalli  Industrial  Area,  Tumkur 572 106 

12‐Jul‐2012  30‐Jun‐17 

134  Island  Star  Mall  Developers  Pvt  LtdNo.  106/107,  Opposite  to  Mahadevapura  BBMP,  1st 

5‐Jul‐2012  30‐Jun‐17 

Page 13: Proceedings of 03-04-2013

Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 13 of 23

Floor, White field Road, Bangalore ‐ 560 048 135  Mahanth  Motors

No. 432, Opp GMIT College, Harihar Road, Davangere ‐ 577 006 

19‐Jun‐2012  30‐Sep‐16 

136  Aditya  Auto  Products  &  Engg  (I)  Pvt  Ltd23/24,  Peenya  II  Phase,  Peenya  Industrial  Area, Bangalore ‐ 560 058 

1‐Jul‐2012  30‐Jun‐17 

137  Whitford  India  Pvt  LtdPlot No.  86  (M&N),  1st  Phase,  KIADB  Industrial  Area, Jigani, Bangalore ‐ 560 105 

17‐Feb‐2012  30‐Jun‐16 

138  Mandhana  Industries  LtdNo. 26/A,  II Phase, Peenya  Industrial Area, Bangalore  ‐ 560 058 

14‐May‐2012  31‐Dec‐16 

139  Microlite  Industries Plot  No.  93‐A,  Jigani  Industrial  Area,  II  Phase,  Jigani Hobli, Anekal Taluk, Bangalore 

22‐Aug‐2012  30‐Jun‐17 

140 M/s. College of Dental Science, Davangere. 01/07/2012 to 30‐06‐2017 

141  M/s. Bapuji Dental College &Hospital, M.C.C.’B’ Block, Davangere

10/08/2012 to 30‐06‐2017 

142  M/s. Metal Impact Pvt.Ltd.,Unit VI, No.109, II Phase,Bommasandra Industrial Area, Bangalore-560099.

10/07/2012 to 30‐06‐2017 

143  M/s. Yagachi Vidyunmaam Pvt. Ltd., Plot. No.3,4 & 5,Thimmanahalli industrial Area, Kandali Post, Hassan-573217

04/08/2012 to

31‐12‐2016 

144  M/s. Armstrong Acmite India manufacturing Pvt.Ltd., Plot No. 41-B, 2nd Phase, Peenya Indl Area, Bangalore-560058

01/10/2012 to

30‐09‐2017 

145  M/s.Dakshin Foundry Private Limited, Unit-1,Plot No 28-B to H,KIADB Industrial Area, Hosakote, Bangalore 562114.

28/06/2012 to 31‐12‐2016 

146  M/s. Mind Tree Limited, plot 150, EPIP , 2nd Phase, Hoody Village, Whitefield , KR Puram, Bangalore 560066.

20/05/2011 to 30‐06‐2015 

147  M/s. Linen Park Fabric SPS Pvt. Ltd.,Plot No.38-A, 2nd Phase,2nd Sector, Bidadi Industrial Area, Ramanagara Taluk & District .

28/08/2012 to 30‐09‐2016 

148  M/s.KDDL Limited , Unit- KHAN –II and Unit- EigenNo.408, 4th Main, 1st cross, 4th Phase, Peenya Indul Area,Bangalore-58

12/07/2012 to 30‐06‐2017 

149  M/s. Unique Punch System Pvt.Ltd, Unit-11, 485/7, 14thcross,IV Phase, Peenya Industrial Area, Bangalore-58

12/07/2012 to  

31‐12‐2016 

150  M/s. Vinayaka Cars Pvt. Ltd., No.35, Kranti Kavi Sarvagna Road, Srirampura, Bangalore.

03/12/2011 to 30‐09‐2016 

Page 14: Proceedings of 03-04-2013

Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 14 of 23

151  M/s.TVS Automobiles Solutions Limited, No.7D, Viswesharaya Industrial Area, White Field Road, Bangalore- 560048.

01/10/2012 to 30‐09‐2017 

152  M/s. Metal Impact Pvt. Ltd., Unit-III, #109, 2nd Phase, Bommasandra Industrial Area, Bangalore -560099

07/08/2012 to  

30‐06‐2017 

153  M/s.Chuan  Shun  Electric  Company  India  Pvt.  Ltd., No. 139/2    (New  No.  5265/601)  Jigani,  Bangalore  Main Road, Anekal Taluk, Bangalore‐560105. 

25/07/2012 to 31‐12‐2017 

154  M/s. KEMS Forgings Limited, Unit 1, 35/B, KIADB Industrial Area, Hosakote, Bangalore Rural-562114

23/08/2012 to 30‐06‐2017 

155  M/s.Khivraj Motors, No.174/1C, & Khatha No.431, Hoodi Village, Mahadevpura ,Bangalore.

25/07/2012 to 30‐09‐2016 

156  M/s.MindTree Ltd., Plot No.150, EPIP 2nd Phase, Hoody village, Bangalore-560066.

01/07/2012 to 30‐06‐2017 

157  M/s.Innmar Tourism & Hotel Pvt.Ltd., No.134-136, Road No.1,EPIP Area, Whitefield, Bangalore-560066.

22/05/2012 to 30‐09‐2016 

158  M/s.Shree Mahalaxmi Motors,Sy. 296, 8 CP2, CP3, CP4, CP5, CP6 of koteshwara Village.,Kundapur Taluk, Udupi.

06/07/2012 to 30‐09‐2016 

159  M/s. Supreme Auto Dealers Private Limited, Sy No.88, Madapatna , Kushalnagar, Somwarpete Taluk, Coorg District.

1‐Oct‐2012  30‐09‐2017 

160  M/s. Dickinson Fowler Pvt. Ltd., Plot No. 109A, 2nd stage, Bommasandra Industrial Area, Hebbagodi, Bangalore -560099.

21-08-2012 to 30/09/2016

161  M/s. Sudhir Intra Vidyut Ltd.No.31, Bommasandra Industrial Area ,Bangalore -560099.

23/05/2012 to 30‐09‐2016 

162  M/s.HCL Technologies Ltd., No.47/8, Doddathogur Village, Begur Hobli, I Phse, Electronic City, Bangalore -100.

16/08/2012 to 31‐12‐2016 

163  M/s.Micro Labs Limited, Plot No.7B, Veerasandra Industrial Area, Veerasandra , Anekal Taluk,Bangalore -560100.

01/08/2012 to 30‐09‐2016 

164  M/s.Nash Industries (I) Pvt. Ltd(E.O.U), Shed No.235,8th main, 3rd cross, III Phase, Peenya Industrial Area, Bangalore- 560058.

04/09/2012 to 30‐06‐2017 

165  M/s.Oracle Financial Services Software Ltd., GlopalEnterprises India Pvt. Ltd.,Global Axis(SEZ), 152, EPIP Zone, Whitefield, Bangalore-66.

01/07/2012 to 30‐06‐2017 

166  M/s.Gopalan Enterprises ,”Celesstial Green /Signature Towers”, No. 6, C.V. Raman Nagar,Benniganahali, Old Madras Road, Bangalore.

01/07/2012 to 30‐06‐2017 

167  M/s.Gopalan Global Axix, Phase-I, by M/s.Gopalan Enterprises (India) Pvt. Ltd., Plot No. 152, Sy No 147, 157, & 158, Hoody Village, K.R. Puram Hobli , Bangalore East.

21/08/2012 to 30‐06‐2017 

Page 15: Proceedings of 03-04-2013

Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 15 of 23

168  M/s. Mandovi Motors Private Limited, Sy No.88, Madapatna, Kushalnagar, Somwarpet taluk , Coorg District.

01/10/2012 to 30‐09‐2017 

169  M/s. Ecof Industries Private Limited, No.42(B-1 and B-2), KIADB Industrial Area, Hosakote Taluk, Bangalore Rural District-562114.

05/10/2011 to 30‐06‐2016 

170  M/s. KPR Sugar Mills Limited, Almel Village, Sindagi Taluk, District.

05/09/2012 to 30‐06‐2017 

171  M/s. Best sellers Apparels Pvt.Ltd., No-16/334, Bajal street, Manipal-576104.

18/08/2012 to 30‐09‐2016 

172  M/s. Kirloskar Electric Company Ltd., (UNIT-V), Transformer Division, Belvadi Indl. Area, Mysore-18

01/10/2012 to 30‐09‐2017 

173  M/s. Banashankari Industries Pvt. Ltd., Plot No. 197, KIADB Inustrial Area, 3rd Phase, Malur, Malur taluk, Kolar District.

18/07/2012 to 30‐06‐2017 

174  M/s.Bhagyalakshmi Powder Coatings, No.3 & 4, 17th cross, Doddanna Industrial Estate, Peenya 2nd stage ,Bangalore-58.

01/07/2012 to 30‐06‐2017 

175  M/s.Ajax fiori Engineering Pvt.Ltd.,Plot No. 16 & 17, Indl Area, Doddaballapura-Tq, Bangalore Rural district.

30/08/2012 to  

30‐06‐2017 

176  M/s.Lakshmi Components Pvt.Ltd., No42 D PillagumpaIndl Area, Hosakote, Bangalore

11/09/2012 to 30/06/2017. 

177  M/s.Reliance Industry Limited , No.62/2, Richmond road, Bangalore-560025

13/02/2012 to 31‐12‐2016 

178  M/s. TVS Automobiles Solutions Ltd., No.26/2 & 27/2, Kenchanahalli Village, Kengeri Hobli, Bangalore South, Bangalore.

01/10/2012 to 30‐09‐2017 

179  M/s.Suraj INN Pvt.Ltd., Sy.No. 46/2, 47/2, 48/2, 48/1, Wing F-Service Apartment, Mantri Flora, Ambalipura Village, Sarjapura Road,BangaloreEast Taluk, Bangalore.

05/10/2012 to 30‐06‐2017 

180  M/s. Restolex Coir Products Pvt.Ltd., Plot No.24A,Tamaka Industrial Area,Kolar Taluk &District

12/10/2012 to 30‐06‐2017 

181  M/s. KSRTC , Divisional workshop, Bangalore Central Division Shanthinagar, Bangalore-27.

01/10/2012 to 30‐09‐2017 

182  M/s. M.K. Fasteners, Plot No.221, 3rd Phase, Bommasandra Industrial Area,Hosur Road, Bangalore.

18/09/2012 to 31‐12‐2016 

183  M/s.Indo Schottle Auto Parts, Unit 2, Plot No.7 & 8, QUEST Special Economic Zone, 437/A, Hattargi Village, Yamkanmardi Hobli, Belgaum District-591243.

9‐Oct‐2012  31‐12‐2017 

184  M/s. Sasank Biotech Limited, Plot No. 120,121, 122,123,124,KIADB Industrial Area, Raichur Growth center, Raichur.

30/07/2012 to 30‐06‐2017 

185  M/s.Venkat Switchgears, #150, 10th Main Road, 3rd Phase, PIA Bangalore -560058.

10/10/2012 to 30‐06‐2017 

Page 16: Proceedings of 03-04-2013

Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 16 of 23

186  M/s. Vicat Sagar Cement Ltd., Chatrasala Village, Chincholi (Tq), Gulbarga District.

31/10/2012 to 30‐06‐2017 

187  M/s. Vibrant Parachem Pvt.Ltd., Plot No.57,58,69 & 70, KIADB Industrial Area, Raichur Growth center, Raichur.

11/10/2012 to 30‐06‐2017 

188  M/s. Orange County Resorts & Hotels Ltd., Chikkanahalli Village, Ammathi Hobli, Siddapura, Virajpet Taluk, Coorg District-571253.

01/10/2012 to 30‐09‐2017 

189  M/s. Vivek TextileProcessing,No.324/1, Hosur Road, Madiwala, Bangalore-560068.

26/10/2012 to 30‐06‐2017 

190  M/s. Unitex Apparells Ltd., unit III (Formerly known as Snow- White Hi-Tech Launderette) No.252,11th Main, III Phase, Peenya Industrial Area, Bangalore-560058.

22/10/2012 to 30‐09‐2017 

191  M/s. Yahoo Software Development India Pvt.Ltd.,Sun River Building EGLBP, Sr.No.10/2A &10/2B of Chalaghatta Village, Off Indiranagar- Koramangala Intermediate Ring road, Bangalore-560071.

01/08/2012 to 31‐12‐2016 

192  M/s. Texport Industries (P) Ltd. Unit-16 Sy.No. 110/2, Mylanahalli Village, Kasaba Hobli,Nelamangala Tq, Bangalore Rural District.

04/09/2012 to 30‐09‐2017 

193  M/s. Elastrex Polymers Pvt Ltd., No.70/4, Budhihal Village, Bangalore.

06/09/2012 to 31‐12‐2016 

194  M/s. Wilworth Earthmovers Pvt.Ltd., No.43, Sy.No. 5, Bhemenahalli, MK Post, BidadiHobli, Ramanagara Taluk & District.

15/11/2012 to 30‐09‐2017 

195  M/s. STI Sanoh India Ltd., # 471/D1,13th cross,3rd main,4th phase, Peenya Indl Area, Bangalore-560058.

03/10/2012 to  

31‐12‐2016 

196  Mahindra Reva Electric Vehicles Pvt Ltd., Anekal, Bangalore

26‐05‐2012  31‐12‐2016 

197  Primacy Industries Ltd., MAnaglore 22‐10‐2012  30‐09‐2016 198  M/s.  Ashirwad  pipes  (P)  Ltd.,  Plot No.27(P),  28(P),  29 

&30,  Bommasandra    Jigani  Link  Road,  Anekal  Tq, Bangalore Urban District‐560105. 

26/10/2012 to 31‐12‐2016 

199  M/s.Paloma Turning Company Pvt.Ltd., No.173/2, Bandapura Village Road, Anekal Taluk, Bangalore-562106.

24/08/2012 to 31‐12‐2016 

200  M/s. VRL Media Ltd.,Plot No.193-A, CMC Katha No.257 Peenya III Phase, Industrial Area, Laggere Village, Yeshwanthpura Hobli, Bangalore.

27/09/2012 to 31/12/2016. 

201  M/s. Shiny Industries, Plot no.8C-2 KIADB Industrial Area, Hoskote Taluk, Bangalore District-562114.

4‐Dec‐2012  30‐06‐2017 

202  M/s.Apotex reaserch Pvt.Ltd., Plot No.2, Sy.No.347 &348, 4th Phase,Bommasandra Indl Area, Jigani link road,Bangalore-560099

14/06/2012 to 30‐06‐2017 

203  M/s. Life Line Feeds(India) Pvt. Ltd.,-Poultry Fed Unit, Sy.No. 113/1A3, 114/2, Hale Lakya Village, Lakya Hobli, Chikamagalur Taluk and District.

15/09/2012 to 31/12/2016. 

Page 17: Proceedings of 03-04-2013

Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 17 of 23

204  M/s.Tech Mahindra Limited, 9/7, Hosur Road, Bangalore-560029.

16/08/2012 to 30‐06‐2017 

205  M/s.Sireesh Auto Pvt.Ltd., #108/2, 1st cross opp Multiplex Theater,Behind Bhagini Palace Restaurant, Marathalli, Bangalore-01

01/10/2012 to 30‐09‐2017 

206  M/s. Bearys Global Reaserch Triangle, Sy.No.63/3B, 146 (Old No.99), 145,146, 63/3A & 63/2, Goravigere, Kajisunnenahalli Village, Bidarahalli Hobli,Bangalore-25

11/12/2012 to 30‐06‐2017 

207  M/s.Promac Engineering Industries Ltd., 306,307,308,309-Part,311-Part of Harohalli 2nd Phase Industrial Area, Ramanagar District.

24/08/2012 to 30‐06‐2017 

208  M/s. Brigade Metropolis,-Commercial Sy.No.73/1,73/2, 74(Part), 75(Part),76/(1) (Part), 76/2(Part),77/1, 78,79,80/1,81/1,81/2, Mahadevpura Village, K.R. Puram Hobli,Bangalore.

12/09/2012 to 30‐06‐2017 

209  M/s. Chrome Motors, #320/4, Mysore Road, Opposite to BHEL factory,Bangalore-560026.

08/08/2012 to 30‐09‐2016 

210  M/s.Shiraguppi Sugar Works Limited, Kagwad Village, Athani Taluk, Belgaum District-590015.

15/11/2012 to 30‐06‐2017 

211  M/s.Chuckmatic Pvt.Ltd., Sy.No.87, Dharwad By pass (Next to Air-tech),NH-4, Narendra Village Dharwad -7

30/11/2012 to 30‐06‐2017 

212  M/s.Bhandari Precision Forgings Pvt.Ltd., A-271, 2nd Stage, Peenya Industrial Estate, Bangalore-560058.

03/12/2012 to 30‐06‐2017 

213  M/s.Yuken India Limited, B-80, 2nd Cross, 1st Stage, Peenya Industrial Area,Bnaglore-560058.

10/12/2010 to 30‐09‐2017 

214  M/s.Richa Global Exports Pvt.Ltd., KIADB ,Plot No.308 to 317P, Jigani Bommasandra link Road, Jigani, Anekal (Tq),Bnaglore-562106.

09/10/2012 to 30‐06‐2017 

215  M/s.Ramya Reprographic Pvt.Ltd., Katha No.16/2-B, Sy.No.16/2, Singasandra Village, Begur Hobli, Bangalore-560058.

27/09/2012 to 31‐12‐2016 

216  M/s.Zimoto Autocare, #21, 2nd Gate, Gokul Industrial Area, Hubli.

06/10/2012 to 30‐09‐2017 

217  M/s.Aarsha Chemicals Pvt.Ltd.,Plot No.115/A, KIADB Industrial Area, Honga, Belgaum District.

19/11/2012 to 30‐06‐2017 

218  M/s.Om Sai Gastech, No.20, Near Hindustan Granite, Subramanyapura Main Road, Uttarahalli, Bangalore-560061.

05/11/2012 to 30‐06‐2017 

219  M/s. Maxwatt Turbines Pvt.Ltd., Plot No. 113, Jigani Link Road, KIADB Industrial Area, Anekal Taluk, Bangalore-560105.

24/09/2012 to 30‐06‐2017 

220  M/s.KHT Motors, No.134/1, S.N.B Compound, Kundalahalli Post, Kundalahalli, Bnaglore-560037.

11‐Feb‐2010  30‐09‐2014 

221  M/s. Sterling’s Mac Hotels Pvt.Ltd., No.319, Farah Centre, CMH Road, Indira Nagar ,Bangalore-560038.

06/11/2012 to 30‐06‐2017 

222  M/s.VPL Chemicals Pvt.Ltd., Plot No.64,Sompura Industrial Area,Dobaspet, Nelamangala Taluk, Bangalore

02/07/2012 to 30‐06‐2017 

Page 18: Proceedings of 03-04-2013

Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 18 of 23

Rural District.

223  M/s. IDEB Buildcon P.Ltd., Sigma Soft Tech Park, No. 748, White field main road, Opp.to Varthur Kodi, Bangalore-560066.

20/11/2012 to 31‐12‐2016    

224  M/s. Bhoruka Power Corporation Limited 2x5 MW Manjanadka Mini Hydel Station, Karike Village, Bhagamandala Hobli, Madikeri Taluk, Kodagu District.

20/11/2012 to 31‐12‐2016 

225  M/s. Gland Chemicals Pvt.Ltd., Plot No.30A &B,II Phase, KIADB Industrial Area, Malur -563130

06/12/2012 to 30‐06‐2017 

226  M/s.TV Sundaram Iyengar and Sons Ltd., Survey No.2, Laksmi Sagar Manchanayakanahalli P.O,Bidadi Ramanagara Taluk, Bangalore-562109

03/01/2013 to 30‐09‐2017 

227  M/s.Pathi Prints, Plot No.285, Sub Layout, Bommasandra 1st Phase Industrial Area, Kachanayakanahalli, Jigani Hobli, Anekal Taluk,Bangalore District.

29/11/2012 to  

30‐06‐2017 

228  M/s.Suveswaru Enterprises Pvt.Ltd., Plot No.7, 2nd cross, 4th phase,Industrial Area, Bommasandra , B.J.L road, Bangalore-560099.

19/10/2012 to 31‐12‐2016 

229  M/s.Solidus Hi Tech Products Pvt.Ltd., No.120A, 2nd Phase, Jigini Industrial Area, Bangalore-562106.

25/10/2012 to 31‐12‐2016 

230  M/s.Dolan Techno Crafts Pvt., Ltd., Plot No.3A, 1st Main road, KIADB Industrial Area, Hoskote, Bangalore-562114

20/11/2012 to 30‐06‐2017 

231  M/s.VRL Media Limited., R.S. No.351/1, NH 4-Bnaglore Road, chebbi village,Varur Hubli-581207, Dharwad District.

19/10/2012 to 31‐12‐2016 

232  M/s.Kalyani Motors Pvt.Ltd., No.K,1319/2034C, BM Road, Opp.Rotary Hospital, Ramanagara-571511.

12/12/2012 to 30‐09‐2017 

233  M/s. Arihant Metals & Extended Pvt.Ltd., Plot NO.9-L, Yarandahalli,Bommasandra Industrial Area, 1st Phase, Anekal Taluk, Bangalore-99

23/11/2012 to 30‐06‐2017 

234  M/s.Motherson Sumi Systems Limited, Plot No.11, 2nd Phase, Bidadi Industrial Area, Ramanagara Taluk and District.

09/10/2012 to 31‐12‐2016 

235  M/s.Solidus Hi Tech Products Pvt.Ltd., No.9A, 1st Phase, Jigani Industrial Area, Anekal Taluk, Bangalore

25/10/2012 to 31‐12‐2016 

236  M/s.SLK Software Services Pvt.Ltd., 'V&A Grande', No.40/A, KHB Industrial Area, Yelahanka New Town, Bangalore-560064.

21/11/2012 to 31‐12‐2016 

237  M/s.Sireesh Auto Pvt.Ltd., B.B.M. Khatha No.360/321,10/2B,Byatarayana pura, Yalahanka Hobli, Bangalore North taluk.

04/09/2012 to 30‐09‐2017 

238  M/s.Bill Forge Pvt.Ltd., Plant-VI, Plot No.86(M& N)/4, KIADB Industrial Area, 1st Phase, Jigani Village, Anekal Taluk, Bangalore-560105.

10/09/2012 to 30‐06‐2017 

Page 19: Proceedings of 03-04-2013

Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 19 of 23

239  M/s.JMT Auto Limited, Plot No.224-A, KIADB Industrial Area, Belur-Dharwad-580011.

11‐Dec‐2012  30‐06‐2017 

240  M/s.SKF Technologies (India) Pvt.Ltd., Plot No.36(Part), 37,38&39,Kadakola Industrial Area, Phase-2, Kadakola , Mysore-571311

0301/2013 to 30‐06‐2017 

241  M/s.Honnassiri Motors India Pvt.Ltd., No.193/5, Hunsur Main Road, Hinkal,Mysore-570017.

03/01/2013 to 30‐09‐2017 

242  M/s.Indo Schottle Auto Parts Pvt.Ltd., 84/C, Honaga Industrial Area, KIADB, Balgaum-591156.

22/11/2012 to 30/06/2017.  

243  M/s.Manipal County ,365 off Hosur Road, Singasandara, Bangalore- 560068

01/01/2013 to            

31‐12‐2017 

244  M/s.Trelleborg Industrial Products India Pvt.Ltd., 19/1, Kalena Agrahara,Bannerghatta main road, Bangalore-560076.

9/7/2012 to   30‐09‐2017 

245  M/s.J.B.C.Garments Pvt Ltd.,, 100% Subsdiaryof Texport Industries Pvt.Ltd., No.219,11th main, 2nd cross, 3dr Phase, Peenya, Bangalore-560058.

05/12/2012 to 31‐12‐2016 

246  M/s. PSK Pharma Private Limited, 121/22 Mahajenahalli, Shimoga Road, Harihar-577601.

27/11/2012 to 30‐09‐2017 

247  M/s RS Surfacoats (Unit-II), Plot No.227, Hebbal Industrial Area, MysoreTaluk& district-570016.

10/01/2013 to 30‐06‐2017 

248  M/s.Faurecia Emissions Control Technologies India Pvt.Ltd., Plot No.1,Sector-1, Bidadi Industrial Area, 2nd Phase, Shanamangala village, Bidadi Hobli, Ramanagaram-562109.

03/01/2013 to 31‐12‐2017 

249  M/s.Nitesh Residency Hotel Ptv.Ltd.,(Ritz arlton) No.99, residency road, Bangalore-25.

22/01/2013 to 30‐06‐2017 

250  M/s.Galvano castins pvt.ltd., No.134, 3rd Phase, Peenya Industrial Area, Bangalore-560058.

03/01/2013 to 30‐06‐2017 

251  M/s.Himanshu Pharmaceuticals Pvt.Ltd., #113-C-1, Bommasandra Industrial Area, KIADB Phase-1, Anekal Taluk, Bangalore-99.

02/01/2013 to 30‐09‐2017 

252  M/s.Shailendra Techno Park Pvt. Ltd., Plot No.116, EPIP 1st phase, White field, Bangalore.

02/01/2013 to 31‐12‐2017 

253  M/s. Jamakhandi Sugar Limited,(Unit-II), Post NAD K D-586209, Indi Taluk, Bijapur District.

01/02/2013 to 30‐06‐2017 

254  M/s.Arjun Motors, No.937/4, New Kantharaj Urs Road, Mysore.

01/02/2013 to 30‐09‐2017 

255  M/s. Elite Vehicles Pvt.Ltd., Plot No.2, Dyavasandra Industrial Area, II Phase, K.R.Puram Hobli, Bangalore

12/06/2012 to 30‐09‐2016 

256  M/s.  Neo  Surface  Technology  (India)  Pvt.Ltd.,  Plot No.151  &  152,  KIADB  Indl  Area,  Mundargi  III  Stage, Bellary District. 

11/02/2013 to 30‐06‐2017 

257  M/s.Texport Industries Pvt Ltd., Unit 7, Survey No.48/1, Karihobanahalli,Peenya 2nd Stage, Bangalore-560058.

05/12/2012 to 31‐12‐2016 

Page 20: Proceedings of 03-04-2013

Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 20 of 23

258  M/s.NEO Industries Metal Process Pvt.Ltd., No.1262, Kurekuppa, Basapura Road, Kurekuppa Village, Sandur Taluk, Bellary District.

11/02/2013 to 30‐06‐2017 

259  M/s.Kaynes Technology India Pvt.Ltd., No.23-25, Belagola Food Industrial Area, Metagalli Post, Mysore-570016.

23/01/2013 to 31‐12‐2017 

260  M/s.BMM Ispat Ltd., Stage II, Unit-II, #114, Danapur Village, Hoskote Talulk, Bellary District, Karnataka.

24/11/2012 to 30‐06‐2017 

261  M/s.BMM Ispat Ltd.,Stage I, Unit-I #114, Danapur Village, Hoskote Talulk, Bellary District, Karnataka.

24/11/2012 to 30‐06‐2017 

262  M/s.  AXA  Business  Service  Pvt.Ltd.,  No.01  SJR  Plaza  , 29th   Main  Road,  BTM  Layout  1st  Stage,  Bangalore‐560068 

06/11/2012 to  

31‐12‐2016 

263  M/s. Honeywell Technology Solutions Lab Pvt.Ltd., 152/9 & 152/10, Galaxy building, Bilekahalli Village, Begur Hobli, Bangalore.

21/01/2013 to 31‐12‐2017 

264  M/s.Gomthi Life Science India Pvt.Ltd., Plot No.17F, Bidadi Idustrial Area,2nd Phase, Sector -1, Bidadi Hobli, Ramanagara District-562109.

12/02/2013 to 30‐06‐2017 

265  M/s. Ecof Industries Pvt.Ltd., Plot No.61 & 62, KIADB Industrial Area, Malur,Kolar District-563130

18/01/2013 to 30‐06‐2017 

266  M/s.Charishma Hotel Pvt.Ltd., Sy.No. 90/4, Munnekolalu Village,Marathahalli Outrt Ring Road, Bangalore-560037

15/01/2013 to 30‐09‐2017 

267  M/s.R.V.Bajaj, Khata No.20/21, 17th Cross, Behind Maruthi Mandir,Vijaya Nagar, Bangalore-560040

08/02/2013 to 30‐09‐2017 

268  M/s.Stovekraft Pvt.Ltd., No.81/1, 81/2, 89/2B Medamaranahalli,Harohalli Industrial Area, Kanakapura Taluk, Ramanagar District-562112.

12/2/2013 to 30‐06‐2017 

269  M/s.Bhushan Power & Steel Ltd., No.55, KIADB Industrial Area, Hoskote Taluk, Bangalore

04/02/2013 to 31‐12‐2017 

270  M/s.Bimal Auto Agency India (P) Ltd., No.A-37438, II main road,II stage PIE Bangalore-58.

12/2/2013 to 30‐06‐2017 

271  M/s.3D Concept Tooling Private Limited, #C-338, 1st Stage, Peenya Industrial Estate, Bangalore-560058.

15/02/2013 to 30‐09‐2017 

272  M/s.Southfield Points Limited, Plot No.102-B, 103,104,105 and 106,3rd Phase, KIADB Industrila Area, Malur, Kolar District.

31/01/2013 to  

30‐06‐2017 

273  M/s. Siemens technology and Services Pvt Ltd., No.105, Prestige Alecto- Phase-1, Electronic City, Hosur Road, Bangalore-100.

30/01/2013 to 30‐06‐2017 

274  M/s.Kalyani Motors Pvt.Ltd.,No.129/4, Kalyani Platina Tech Park(Opp.Brookfields Hospital) Kundalahalli Village Road, Bangalore-560066.

01-01-2013 30‐09‐2017 

275  M/s. Honeywell Technology Solutions Lab Pvt.Ltd.,151/1, Mother Earth, Jupiter and Venus Building, Bilekahalli Village, Begur Hobli, Bangalore-560076.

21/01/2013 to 30‐06‐2017 

Page 21: Proceedings of 03-04-2013

Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 21 of 23

276  M/s.Aravinda Mills Ltd., # 63/9 Dodda Thogur Village, Electronic city Bangalore-561229, Karanataka

09/01/2013 to 31‐12‐2017 

277  M/s.Adarsh Tech Park-1, Sy.No.19/1, 19/2,19/3, 19/4, 20/1P,20/2P,20/3P,21,2(P),25,39,41/3A2,42/3B2,41/4 & 56 of Devarabeesanahalli Village, Varthur Hobli, BangaloreEast Taluk.

02/02/2013 to 30‐06‐2017 

278  M/s.Prestige Garden Constructions Pvt.Ltd., Forum Value Mall, No.62,Whitefield Main Road, Whitefield, Bangalore-560066.

01/02/2013 to 30‐06‐2017 

279  M/s. Kalyani Motors Pvt Ltd., Sy No. 58/1A & 61/22, Avalahalli, old Madras Road,Virgonagar Post, Bangalore-560049.

19/01/2013 to 30‐09‐2017 

280  M/s. X-changing technology Services (I) Pvt., Ltd., KEONICS- IT/SEZ area, Sy.No.135,136 & 156, Nadige Industrial Area, Machenahalli,Shimoga-577221

30/01/2013 to 31‐12‐2017 

281  M/s.SMR Automotive system India Limited., Survey No.96/3-P, 96/4-P&96/7-P, Kumbalgodu Industrial Area, II Phase, Big Banyan Tree Road, Geerupalya Village, Bangalore- Mysore Road Cross.Bangalore-74

02/02/2013 to 31‐12‐2017 

282  M/s.I.H.Castings, Survey No.336/2/2,Besides M/s.Patson Structural India Private Limited, KSSIDC Udyambag Industrial Area, Belagavi-590008.

28/01/2013 to 30‐06‐2017 

283  M/s. Sundaram Auto Components Ltd., Plsatic Division, TVS motorcompany ancillary units, Byathalli Village, Kadakola post, Mysore-571311.

07/01/2013 to 31‐12‐2017 

284  LeeBoy India Consturction Equpiment Pvt Ltd., Plot No. 289, 290,291 & 292, Bommasandra-Jigani link, KIADB Bommasandra 4th Phase Indul Area, Jigani Hobli, Anekal Tq, B’lore urban District.

23/01/2013 to 30‐09‐2017 

285  M/s.MSR Hotel (Bangalore) Pvt.Ltd., 3115, M.S. Ramaiah Road Gokula, Bangalore-560054.

07/02/2013 to 30‐06‐2017 

286  M/s. Adept Polymers Pvt.Ltd., B-121, 3rd Main, 2nd stage, Peenya Indl Estate, Bangalore-58

18/08/2012 to 31‐12‐2016 

287  M/s. Garden City Fashion Pvt.Ltd., No.B-175, 4th main, 2nd stage, Peenya Indl Estate, Bangalore-58

01/10/2012 to 30‐09‐2017 

288  M/s. Metal Arts, No.344, 9th cross, Peenya Indl Estate, Bangalore-58

17/08/2012 to 30‐06‐2017 

289  M/s. Hewlette Packard India Sales pvt.Ltd., No.66/2, Ward No. 83, 7th Floor, Wing A & B, BagmaneTech Park, Embassy Prime, C.V. Raman Nagara, Bangalore-34

23/07/2012 to 31‐12‐2016 

290  M/s. Shree Karan Metal Technologies , No.40/2, J.C. Indl Area, Yellachenahalli, Kanakapura Rd, Bangalore-62

04/09/2012 to 30‐06‐2017 

291  M/s. Texport Industries Pvt.Ltd., No.459, IV Phase, Peenya Indl Estate, Bangalore-58

29/08/2012 to 31‐12‐2016 

292  M/s.TVS Automobile Solutions Limited , No.1945 & 1945 A, P.B.Road, Davangere-577005

01/10/2012 to 30‐09‐2017 

Page 22: Proceedings of 03-04-2013

Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 22 of 23

293  M/s. General Motors Technical Center India Pvt.Ltd., Plot No.5-B, Kadugodi Indl Area, Biderahally Hobli, Bnagalore.

10/07/2012 to 30‐09‐2016 

294  M/s. Alufit (India) Pvt.Ltd., No.17/A, Phase-II, Peenya Indl Estate, Bangalore-58

21/08/2012 to 30‐06‐2017 

295  M/s. Agilent Technologies India Pvt.Ltd., C/o DHL Lemuir Logistics Pvt.Ltd., No.55/10, Haralakunte Village, Sectors-2, HSR Lay out Near KEB Power Station , Bangalore-34

01/07/2012 to 30‐06‐2017 

296  M/s. Press Comp International, No.A, 106, II Stage , PIE , Bnagalore-58

15/09/2012 to 31‐12‐2016 

297  M/s. Siri Technologies Pvt.Ltd., Plot No. 92/A & 92/B, Keonics Electronics City , 1st phase, Bnagalore-100

15/09/2012 to 31‐12‐2016 

298  M/s. Nash Industries , Plot No.8, 4th Phase, Bommasandra Industrial area, anekal Taluk , Bnagalore-99

07/08/2012 to 30‐06‐2017 

299  M/s. Deutsch IndiaPower ConnectorPvt. Limited, Plotno.104, “Prestige Omega”, EPIPZone, 1st Phase, White field, Bnagalore-66

01/08/2012 to 30‐06‐2017 

300  M/s. Sathya Fuel Chemtech, Plot No.60,184, Bandenallasandra Village, Bommasandra , Jigani Link Road, Bangalore-560105,

27/12/2012 to 30‐06‐2017 

301  M/s. New Sagar Industry, plot No. 88, KIADB, Kelegote Industrial area, NH-4, Bangalore Road, Chithradurga.

21/07/2012 to 30‐06‐2017 

302  M/s.Buddhaa Chemicals, Plot No.52, 15th Cross, Doddanna Industrial Area, Near Peenya 2nd Stage, Bangalore-560091

22.03.2013 to 30.06.2017 

303  M/s. Shree Nandi Chemicals, Plot No. 28, AIE, 2nd Stage, Tumkur Dist

11/01/2013 to 30‐06‐2015 

304  M/s. Banashankari Industries Private Limited,Plot No.197, KIADB Industrial Area,3rd Phase, Malur,Kolar District.

18/07/2012 to  

30‐06‐2017 

305  M/s. Jonas petro products Pvt. Ltd.Plot No. 277, Baikampady Industrial area, Mangalore-575011

01/11/2012 to 30‐06‐2017 

306  M/s.Shiva Enterprises, Plot No.311-A, 2nd Phase, KIADB Industrial Area, Harohalli, Kanakapura Taluk, Ramanagara district, Ramanagara

25/08/2012 to 30‐06‐2017 

307  M/s.Sagar Refineries, Plot No.5/A, KIADB Industrial Area, Tamaka, Kolar Taluk& District, Kolar

16/08/2012 to 30‐06‐2017 

308  M/s. BSK Pure Chem, Plot No. 127/A, KIADB Industrial Area Bommasandra, Bangalore-560099

28/12/2012 to 30‐06‐2017 

309  M/s. Eswari Metal Industries (Unit-I), Plot No. 101A, Baikampady Industrial Area, Mangalore – 575 011

23/05/2012 to 30‐06‐2015 

310  M/s.Aegan Batteries Ltd. Sy. No. 26/1, 27/3, Choodagondanahalli village, Lakkur Hobli, Malur Tq., Kolar Dist

09/07/2012 to 30‐06‐2016 

Page 23: Proceedings of 03-04-2013

Member Convenor Proceedings of the CCM-CFO (Non-EIA) meeting held on 3-4-2013 Page 23 of 23

311  M/s. Durga Metal Industries, Plot No. 325Q1, II Phase, KIADB Industrial Area, Harohalli, Kanakapura Taluk, Ramanagar District

06/03/2013 to 30‐06‐2017 

312  M/s. Enviro Green Alloys Inc. Plot No.32, Industrial Area, 1st Phase, Malur Taluk, Kolar district-563130

27/12/2012 to 30‐06‐2017 

313  M/s. Microlite Industries, Plot No. 93-A4, Jigani Industrial Area, II Phase, Jigani Hobli, Anekal Taluk, Bangalore

04/09/2012 to 30‐06‐2017 

314  M/s. Anitha Industries, Special Plot No.3 Industrial Estate, Antharasanahalli 2nd Stage, Tumkur.

01/07/2010 to 30‐06‐2015 

315  M/s. Lube Tech Petro Chemicals.,No. C-76 KSSIDC Veersandra Industrial Estate, Hosur Road, Bangalore-560100

22/08/2012 to 30‐06‐2017 

316  M/s. E Nano Incintech, Plot No. 342-B, 212, Harohalli Industrial area, Kanakpura Tq. Ramnagara Dist.

18/06/2012 to 30‐06‐2016 

317  M/s. Shree Raju Enterprises , Plot No. 24F1, KIADB Indl Area, 1st Phase, Kumbalgodu, Kengeri, Bnagalore-47.

05/04/2012 to 30‐06‐2016 