The 2nd Component Process Design and Visual Value Streams
May 1, 2023 www.leanteamsusa.com 2
www.leanteamsusa.com 3
Process Design CriteriaCustomer Requirements
CapabilityDemand (Current and Future)
Lead Time
Layout Flow
Cellular design, Product design, or Process design
People Required skills
Number
Support departments
Equipment Automation
DFOEE – Design For Overall Equipment Effectiveness
Support (tables, measurement, IT, security, material handling)
Facility Location
Energy
Structure
Health Safety Environment
Ergonomics, Equipment Safety, Prevention
Hazardous materials
May 1, 2023 www.leanteamsusa.com 4
Process Design Tools
• Computer Aided Design (CAD)• Flowchart • Value Stream Mapping (VSM)• Supplier Input Process Output Customer (SIPOC)• Spaghetti Map• Process statistical software
May 1, 2023 www.leanteamsusa.com 5
Process Design Steps
1. Business need statement2. Establish process design team3. Outline of customer demand and requirement4. Facility review5. Layout design6. Equipment requirements7. People requirements8. Health, Safety, and Environment requirements
May 1, 2023 6www.leanteamsusa.com
Process SIPOCRequirement
7www.leanteamsusa.com
Step1
Step 2
Step 3
Step 4
0.00
4.00
8.00
12.00
16.00 Task Cycle Time Required Takt Time = 14.98 Sec
Thickness10.5 mm
Color3.5 Delta E
Yield99.05%
Yield99.75%
X-Y Position
Pressure
Units Out5,300/day
Thickness
Heat
Yield99.75%
Units Out5,300/day
Units Out5,300/day
Yield99.995%
WIP1800 Units
WIP1700 Units
WIP1700 Units
Heat Height
ViscosityPressure
3 SIGMA 3 SIGMA4 SIGMA
4 SIGMA
Output
Processes Step1 Step 2 Step 3 Step 4 SystemScheduled Time (seconds) 79,207 79,207 79,207 79,207 Throughput (Units/hour) 300 280 342 400 Inventory Time (Hour) 6 6 5 4 Process Lead Time (Hour) 22Process Yield 99.50%Process Throughput (Units/hour) 280Mth. Sales forecast (Units) 121,600Days in month 23
May 1, 2023 8
DesignVisual Management
www.leanteamsusa.com
May 1, 2023 9
Visual Management RulesALL MUST BE SATISFIED
• 80:20 Manual: Automated data collection Simple and Affordable
• Real time measures• Must provide value
Value Stream Workers Leadership team
• Must inspire conversation in the Gemba• 80:20 Input measures: Output measures• Preventative measures (Inputs)
Quality Capability Safety
• Provides results of intended design (Outputs)• Clear indication of continuous improvement and the HOW