Robert Baird President +1 215 353 0696 The 2 nd Component Process Design and Visual Value Streams 6/21/22 www.leanteamsusa.com
Transcript
Page 1: Process Design and Visual Value Streams

May 1, 2023 www.leanteamsusa.com

Robert BairdPresident

+1 215 353 0696

The 2nd Component Process Design and Visual Value Streams

Page 2: Process Design and Visual Value Streams

May 1, 2023 www.leanteamsusa.com 2

Page 3: Process Design and Visual Value Streams

www.leanteamsusa.com 3

Process Design CriteriaCustomer Requirements

CapabilityDemand (Current and Future)

Lead Time

Layout Flow

Cellular design, Product design, or Process design

People Required skills

Number

Support departments

Equipment Automation

DFOEE – Design For Overall Equipment Effectiveness

Support (tables, measurement, IT, security, material handling)

Facility Location

Energy

Structure

Health Safety Environment

Ergonomics, Equipment Safety, Prevention

Hazardous materials

Page 4: Process Design and Visual Value Streams

May 1, 2023 www.leanteamsusa.com 4

Process Design Tools

• Computer Aided Design (CAD)• Flowchart • Value Stream Mapping (VSM)• Supplier Input Process Output Customer (SIPOC)• Spaghetti Map• Process statistical software

Page 5: Process Design and Visual Value Streams

May 1, 2023 www.leanteamsusa.com 5

Process Design Steps

1. Business need statement2. Establish process design team3. Outline of customer demand and requirement4. Facility review5. Layout design6. Equipment requirements7. People requirements8. Health, Safety, and Environment requirements

Page 6: Process Design and Visual Value Streams

May 1, 2023 6www.leanteamsusa.com

Process SIPOCRequirement

Page 7: Process Design and Visual Value Streams

7www.leanteamsusa.com

Step1

Step 2

Step 3

Step 4

0.00

4.00

8.00

12.00

16.00 Task Cycle Time Required Takt Time = 14.98 Sec

Thickness10.5 mm

Color3.5 Delta E

Yield99.05%

Yield99.75%

X-Y Position

Pressure

Units Out5,300/day

Thickness

Heat

Yield99.75%

Units Out5,300/day

Units Out5,300/day

Yield99.995%

WIP1800 Units

WIP1700 Units

WIP1700 Units

Heat Height

ViscosityPressure

3 SIGMA 3 SIGMA4 SIGMA

4 SIGMA

Output

Processes Step1 Step 2 Step 3 Step 4 SystemScheduled Time (seconds) 79,207 79,207 79,207 79,207 Throughput (Units/hour) 300 280 342 400 Inventory Time (Hour) 6 6 5 4 Process Lead Time (Hour) 22Process Yield 99.50%Process Throughput (Units/hour) 280Mth. Sales forecast (Units) 121,600Days in month 23

Page 8: Process Design and Visual Value Streams

May 1, 2023 8

DesignVisual Management

www.leanteamsusa.com

Page 9: Process Design and Visual Value Streams

May 1, 2023 9

Visual Management RulesALL MUST BE SATISFIED

• 80:20 Manual: Automated data collection Simple and Affordable

• Real time measures• Must provide value

Value Stream Workers Leadership team

• Must inspire conversation in the Gemba• 80:20 Input measures: Output measures• Preventative measures (Inputs)

Quality Capability Safety

• Provides results of intended design (Outputs)• Clear indication of continuous improvement and the HOW

www.leanteamsusa.com