+ All Categories
Home > Documents > Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

Date post: 16-Jan-2016
Category:
Upload: reginald-blaze-parker
View: 215 times
Download: 0 times
Share this document with a friend
Popular Tags:
43
Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation
Transcript
Page 1: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

Produced by:

The Predictable Future

Ron Babich, Vice PresidentHard Dollar Corporation

Page 2: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

Hard Dollar Corporate Objectives

Slide 2

• Leading PCM solution

• 100% customer success

• The “Southwest Airlines” of software employers

• Fast Growing

HD CUSTOMERS BY INDUSTRY

Page 3: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

“Future Man” Predicts…No offense

Future Man but do you have all your marbles?

Page 4: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

Uni

Planning/Design Estimating Scheduling Progress Finance

4

Unified Visibility - Control

Page 5: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

The Reality…Now

Direct Causes of Failure • Errors or oversights in the planning and preparation phase

Indirect Causes of Technical Failure • Inadequate execution of operation and maintenance

http://www.exprobase.com/Default.aspx?page=181#LinkImprovements

Page 6: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

Planning/Design •Numerous Take Off Systems

•Spreadsheet Output

•Lack of Change Support in Real Time

6

Unified Visibility - Control

Page 7: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

Estimate

• Centralized History

• Lack of Detail

• Integration to Schedule

• “Norms” Data

• Dependency on Spreadsheet

7

Unified Visibility - Control

Page 8: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

Schedule

• % Complete – Lack of Quantity Information

• Disconnected from Progress and Estimating Tools

• CPI not included

• Scheduled work varies from how the work was estimated

8

Unified Visibility - Control

Page 9: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

Progress

• Disconnect from Finance

• Level of Detail not Matched with Plan and Reported in Finance

• Discipline of Collection

• % Complete Guess vs. Actual Quantities

9

Unified Visibility - Control

Page 10: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

Finance

• Manual Reconciliation to Estimate Origin

• Level of Detail not Matched with Plan

• Cash Flow Calculations

• Resource Ties

• Accrued Earned Calculations

10

Unified Visibility - Control

Page 11: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

• Is it possible to manage the unplanned?

• Use historical data for agile planning?

• Use ‘What if?’ scenarios on the fly?

The Future is…Predictable?

Page 12: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

The Future Lies in History

Slide 12

Page 13: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

Where did the Number come from?

13Proprietary & Confidential

Page 14: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

Common Failures by Stages

Setting goals• Unclear description of STO goals

Planning• Procedures not easy to follow or up-to-date• Tools are incorrectly specified• Improper technical skills requirements• Unclear or incomplete work orders

http://www.exprobase.com/Default.aspx?page=181#LinkImprovements

Page 15: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

Common Failures by Stages

Execution• Inadequate failure diagnosis • Failures not detected during testing or inspection• Bad on-site load measurement • Inadequate quality control of executed work • Delayed installation of component • Installation of wrong or damaged components • Ignored maintenance

http://www.exprobase.com/Default.aspx?page=181#LinkImprovements

Page 16: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

Common Failures by Stages

Reporting• Bad cause description

Data Analyses• Inadequate utilization of company internal data

• Inadequate exchange of reliability data between operating companies

Improvements• No improvements suggested at all

• Insufficient quality on suggestions http://www.exprobase.com/Default.aspx?page=181#LinkImprovements

Page 17: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

Global spending in 2011 on oil & gas STO services

will total $13.17bn.

Predicting the Present

Source: visiongain

$676 Million+ at Risk

Page 18: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

Audited Spreadsheet Errors

• Audits done shows that nearly 90% of the spreadsheets contained serious errors

• The average cell error rates (the ratio of cells with errors to all cells with formulas) is 5.2%

Source http://www.strategy-at-risk.com/2009/03/03/the-risk-of-spreadsheet-errors/

Page 19: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

This Formula Has Legs

Slide 19

E = 1 – (1 – e) n

Page 20: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

Dilution in the Culture

“Evidence shows that most downstream and midstream operators…leave 3% to 5% of potential cost-reduction savings on the table annually because addressing them requires a change in organizational behavior and business culture.”

Source: Alex Buehler, The Marshall-Teichert Group, Minneapolis, Minn.November 2010 edition of OIL & GAS FINANCIAL JOURNAL

Page 21: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

Is Software Used to Schedule the Project?

Case Study on STO on 44 Projects

Page 22: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

Case Study on STO

Is Pre-task Planning a Regular Part of Project Planning?

Page 23: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

Where do the Workers Come From?

Slide 23

Page 24: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

Duration of Project

Slide 24

Page 25: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

Industry Experts Know…

• An acceptable range of error for a detailed work order scope is of about 10%

• When work orders are "guesstimated" without any detail, the degree of error is very high. The error range could span from 25% up to 60% and more.

Page 26: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

Cascading KPIs

“How can we get by with one less water hauling truck this week?” or…

Source: Alex Buehler, The Marshall-Teichert Group, Minneapolis, Minn.November 2010 edition of OIL & GAS FINANCIAL JOURNAL

…“How can we provide enough information about a maintenance need to ensure the instrumentation technician arrives onsite with the correct parts and tools?””

Page 27: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

Characteristics of Credible Cost Planning

Clear Identification of Task

Broad Participation in Preparation

Availability of Valid Data

Standardized Structure For Estimate

Provision for ProgramUncertainties

Recognition of Inflation

Recognition of Excluded Costs

Independent Review Of Estimates

Page 28: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

• Layout project needs with the Cost Breakdown Schedule (CBS)

• Create task templates, norms, standardized coding, and work packages

1. Plan

Slide 28

Plan

Page 29: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

Rate Storage

Slide 29

Store Re-UsableUpdated Rates

Store Re-UsableUpdated Rates

Page 30: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

Assembly Storage

Slide 30

StandardizeCrew Make Up

And otherAssembly Like

Resources

StandardizeCrew Make Up

And otherAssembly Like

Resources

Page 31: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

Norms Database Storage

Slide 31

Build Best Practice

History to Draw

Durations

Build Best Practice

History to Draw

Durations

Page 32: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

Planning

Slide 32

Allow for Flexibility in

Scope

Allow for Flexibility in

Scope

Page 33: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

• Create cost and resource loaded schedules

• Dynamically link with Oracle’s Primavera (P6) or Microsoft Project

2. Schedule

Slide 33

Plan Schedule

Page 34: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

Estimating

Slide 34

Page 35: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

Scheduling

Slide 35

What If Scenarios, Changes, Resource-

ProductivityConsequences

What If Scenarios, Changes, Resource-

ProductivityConsequences

Page 36: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

• Track the actual data vs. projected data

• Use actual performance factors to drive accurate forecasts

• Cost visibility from start to finish

• Automated change tracking

• Team collaboration and updates

3. Execute

Slide 36

Plan Schedule Execute

Page 37: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

• Analyze trends and get alerts to successfully resolve issues

• Access web-based HD Projectfacts for instant reports

• Save full historical data for future use

4. Complete & Analyze

Slide 37

Plan Schedule Execute Complete & Analyze

Page 38: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

Spreadsheet Virus

Slide 38

Page 39: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

A Formula for Bad PI / Pie

Slide 39

• Audits done shows that nearly 90% of the spreadsheets contained serious errors

• Even experienced users succeed in only finding 54% on average

• Results show that 94% of spreadsheets have errors and that the average cell error rates (the ratio of cells with errors to all cells with formulas) is 5.2%

Source: http://www.strategy-at-risk.com/2009/03/03/the-risk-of-spreadsheet-errors/

Page 40: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

A Small Error

Slide 40

Page 41: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

A Small Error

Slide 41

Page 42: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

Avoiding Mistakes

Slide 42

Page 43: Produced by: The Predictable Future Ron Babich, Vice President Hard Dollar Corporation.

Produced by:

Ron Babich, Vice PresidentHard Dollar Corporation

[email protected]


Recommended