EL-MF877-00 Page 1 Template Revision B
PSG instructions for this template are available at EL-MF877-01
Product End-of-Life Disassembly Instructions Product Category: Notebooks and Tablet PCs
Marketing Name / Model [List multiple models if applicable.] HP ProBook x360 11 G1 Education Edition
Purpose: The document is intended for use by end-of-life recyclers or treatment facilities. It provides the basic instructions for the disassembly of HP products to remove components and materials requiring selective treatment, as defined by EU directive 2002/96/EC, Waste Electrical and Electronic Equipment (WEEE).
1.0 Items Requiring Selective Treatment 1.1 Items listed below are classified as requiring selective treatment. 1.2 Enter the quantity of items contained within the product which require selective treatment in the right column, as applicable.
Item Description Notes Quantity of items included in product
Printed Circuit Boards (PCB) or Printed Circuit Assemblies (PCA)
With a surface greater than 10 sq cm
1
Batteries All types including standard alkaline and lithium coin or button style batteries
2
Mercury-containing components For example, mercury in lamps, display backlights, scanner lamps, switches, batteries
0
Liquid Crystal Displays (LCD) with a surface greater than 100 sq cm
Includes background illuminated displays with gas discharge lamps
1
Cathode Ray Tubes (CRT) 0 Capacitors / condensers (Containing PCB/PCT) 0 Electrolytic Capacitors / Condensers measuring greater than 2.5 cm in diameter or height
0
External electrical cables and cords 0 Gas Discharge Lamps 0 Plastics containing Brominated Flame Retardants weighing > 25 grams (not including PCBs or PCAs already listed as a separate item above)
0
Components and parts containing toner and ink, including liquids, semi-liquids (gel/paste) and toner
Include the cartridges, print heads, tubes, vent chambers, and service stations.
0
Components and waste containing asbestos 0 Components, parts and materials containing refractory ceramic fibers
0
EL-MF877-00 Page 2 Template Revision B
PSG instructions for this template are available at EL-MF877-01
Components, parts and materials containing radioactive substances
0
2.0 Tools Required List the type and size of the tools that would typically be used to disassemble the product to a point where components and materials requiring selective treatment can be removed.
Tool Description Tool Size (if applicable)
Screwdriver #1 Electric torx screw driver(T8)
Screwdriver#2 Electric cross screw driver #1
Fixture #3 Support Fixture
Fixture #4 solder Fixture
Description #5 3.0 Product Disassembly Process
3.1 List the basic steps that should typically be followed to remove components and materials requiring selective treatment:
1. Follow steps described in Disassembly instruction (file attached) 2. If parts can be removed without using a tool, remove it first 3. Use correct screwdriver and torque value before unlock the screw. 4. 5. 6. 7. 8. 9.
3.2 Optional Graphic. If the disassembly process is complex, insert a graphic illustration below to identify the items contained in the product that require selective treatment (with descriptions and arrows identifying locations).
MANUFACTURING PROCESS INSTRUCTIONS
MECHANICAL ASSEMBLY MODEL : Autobot
Auditor : Tabulator: Alicia Chien Tzan.uen-tung
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator: Issue department: Alicia Chien NPSU-PPE Auditor : Tzan.uen-tung
1(1/1)
1. Loosen BTCB screw (6052B0386801)*6.
and Set screw *2 (Fig.1)
Electric torx screw driver(T8)
Electric torx screw driver(#1) 1
Fig.1
5 4 3 2
1 6
1.0 2016/10/24
7 8
Loosen BTCB screw s
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator: Issue department: Alicia Chien NPSU-PPE Auditor : Tzan.uen-tung
2(1/1)
Disassemble BTCB & TPCB
1. Disassemble BTCB & TPCB
2 3
1
1.0 2016/10/24
1
4 4
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator: Issue department: Alicia Chien NPSU-PPE Auditor : Tzan.uen-tung
3(1/1)
Disassemble FFC
1.Use Support Fixture, Disassemble
FFC(Fig.1)
Support Fixture 1
Support Fixture
2nd CCD
FFC Click pad FFC KB FFC
Fig.1
Fig.2
1.0 2016/10/24
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator: Issue department: Alicia Chien NPSU-PPE Auditor : Tzan.uen-tung
Disassemble CCD Bracket
Fig.1
FOR non 2nd CCD & 2nd CCD model
1. Disassemble CCD Bracket(6053B1390701),screw M2*2(6052B0156301)*2.
4(1/1)
Electric cross screw driver #1 1
1.0 2016/10/24
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator: Issue department: Alicia Chien NPSU-PPE Auditor : Tzan.uen-tung
Disassemble 2nd CCD
5(1/1)
Electric cross screw driver #1 1
Fig.1
FOR 2nd CCD
1. Disassemble CCD(6054B1863401) screw M1.6*2(6052B0204401)*1.
Disassemble 2nd Webcam/B screw M2*2.3(6052B0276401)*1 (Fig.1)
2. Disassemble 2nd Webcam FPC,CCD/B CNTR Disassemble Gasket(6054B0019901)*1(Fig.2)
Fig.2
靠左靠下貼附固定
1.0 2016/10/24
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator: Issue department: Alicia Chien NPSU-PPE Auditor : Tzan.uen-tung
Disassemble T/P Bracket
Electric cross screw driver #1 1
Fig.2
4 5
6(1/1)
1. Disassemble TP Mylar(6054B1862701)
(Fig.1)
2. Disassemble TP Bracket(6053B1390501)
screw M2*2.3 (6052B0276401) * 5 (Fig.2)
3 2 1
Fig.1
1.0 2016/10/24
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator: Issue department: Alicia Chien NPSU-PPE Auditor : Tzan.uen-tung
Disassemble TP BRKT\TP
Module
1. Disassemble screw M1.6*2 (6052B0204401) * 2 (Fig.1)。
2. . Disassemble T/P FFC (6035B0161201)
Disassemble Gasket (6054B0110501) * 2,
Disassemble TP Module、TP BRKT(Fig.2)
7(1/1)
Fig.2
1 2
Fig.1
Electric cross screw driver #1 1
1.0 2016/10/24
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator: Issue department: Alicia Chien NPSU-PPE Auditor : Tzan.uen-tung
8(1/1)
1. Disassemble Gasket (6054B0110501) * 3 , Disassemble Thermal
Pad(6054B0363502)*1 Acid tape(6054B1783301) (图 一)
2. Use solder Fixture Disassemble KB BRKT(Fig.2)
Disassemble KB BRKT
Fig.1
solder Fixture 1
Fig.2
1.0 2016/10/24
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator: Issue department: Alicia Chien NPSU-PPE Auditor : Tzan.uen-tung
9(1/1)
Disassemble KB
1. Disassemble KB FFC
Disassemble Keyboard Mylar
(6054B1862901) (Fig.1)
Fig.1
1.0 2016/10/24
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator: Issue department: Alicia Chien NPSU-PPE Auditor : Tzan.uen-tung
1. Disassemble all Cable CONN、FFC、Antenna (Fig.1)
2. Disassemble K-Lockscrew
M2.5*5(6052A0003501)*1(Fig.2)
10(1/1)
Disassemble Cable、FFC 、Antenna
Fig.1
Fig.2
1.0 2016/10/24
Electric cross screw driver #1 1
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator: Issue department: Alicia Chien NPSU-PPE Auditor : Tzan.uen-tung
11(1/1)
Disassemble SSD & WLAN
Fig.1
Fig.2
1. Disassemble WLAN CARD screw
M2*3(6052B0156101)*1 (Fig.1) FOR SSD SKU 2. Disassemble SSD CARD screw
M2*3(6052B0156101)*1(Fig.2)。
Electric cross screwdriver #1 1
CCD
1.0 2016/10/24
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator: Issue department: Alicia Chien NPSU-PPE Auditor : Tzan.uen-tung
1.Disassemble MB Tin foil (Fig.1) 2. Disassemble Battery screw M2*3(6052B0156101)*6 (Fig.1)
12(1/1)
Disassemble BATT
Electric cross screwdriver #1 1
3
Fig.1
1 2
4
3
5 6
1.0 2016/10/24
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator: Issue department: Alicia Chien NPSU-PPE Auditor : Tzan.uen-tung
13(1/1)
1. Disassemble Speaker screw M2*4.5(6052B0386901)*4(Fig.1)。
Disassemble Speaker
Electric cross screwdriver #1 1
Fig.1
2
4
3
1
1.0 2016/10/24
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator: Issue department: Alicia Chien NPSU-PPE Auditor : Tzan.uen-tung
14(1/1)
1. Disassemble Audio/Bscrew
M2.5*3(6052A0034901)*1 (Fig.1) 2. Disassemble M/B screw
M2.5*3(6052A0034901)*5(Fig.2)。 3. Disassemble RTC Battery(Fig.2)
Disassemble M/B/Audio board
Fig.1
Electric cross screwdriver #1 1
Fig.2 Fig.2
1
2
3
4
5
1
4
1.0 2016/10/24
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator: Issue department: Alicia Chien NPSU-PPE Auditor : Tzan.uen-tung
15(1/1)
1. Disassemble MB screw M2.5*3(6052A0034901)*4 (Fig.1)
2. Disassemble (Fig.2)
Disassemble MB
Fig.1
Electric cross screwdriver #1
1
1
2 3
4
Fig.2
1.0 2016/10/24
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator: Issue department: Alicia Chien NPSU-PPE Auditor : Tzan.uen-tung
16(1/1)
1. Disassemble Thermal Module 6043B0212401(Auras)
6043B0212411(CCI) screw M2*2.3(6052B0276401) *4 (Fig.1)
Electric cross screwdriver #1 1
Disassemble Thermal Module
Fig.1
1
2 3
4
1.0 2016/10/24
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator: Issue department: Alicia Chien NPSU-PPE Auditor : Tzan.uen-tung
17(1/1)
1. Disassemble Hinge screw M2.5*2.5(6052B0329601)*6
M2.5*3(6052A0034901)*2 (Fig.1/Fig.2)。
Disassemble Hinge screw
Electric cross screwdriver #1 1
Fig.1
4
5
6
Fig.2
1 2 3
1.0 2016/10/24
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator: Issue department: Alicia Chien NPSU-PPE Auditor : Tzan.uen-tung
Disassemble B-Cover & A-Cover
Disassemble B-Cover & A-Cover
18(1/2)
1
6 6
4 5
2
FOR None-touch
3 3
Fig.1
1.0 2016/10/24
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator: Issue department: Alicia Chien NPSU-PPE Auditor : Tzan.uen-tung
Disassemble B-Cover & A-Cover
1.Disassemble B-Cover & A-Cover
18(2/2)
FOR touch
Fig.1
1.0 2016/10/24
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator: Issue department: Alicia Chien NPSU-PPE Auditor : Tzan.uen-tung
1. Disassemble LCM screw
screw M2*2.3(6052B0276401) * 4 (Fig.1)。
Fig.1
Electric cross screw driver #1 1
DisassembleLCM
1
3 2
4
19(1/1)
1.0 2016/10/24
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator: Issue department: Alicia Chien NPSU-PPE Auditor : Tzan.uen-tung
Disassemble LCD G-sensor/B
20(1/1)
Fig.2
Fig.1 G-sensor/B
1. Disassemble EDP Cable (6017B0793001) (Fig.1)
2. Disassemble G-sensor/B(1310A2880801) (Fig.2)
1.0 2016/10/24
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator: Issue department: Alicia Chien NPSU-PPE Auditor : Tzan.uen-tung
1. Disassemble Hinge screw
M2*2.3(6052B0276401)*4(Fig.1)。
2. Disassemble Hinge BRKT Tin foil (Fig.1)
Electric cross screw driver #1 1
Disassemble Hingescrew
21(1/1)
Fig.1
1.0 2016/10/24
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator: Issue department: Alicia Chien NPSU-PPE Auditor : Tzan.uen-tung
Disassemble Hingescrew
22(1/1)
1. Disassemble Hinge screw
M2.5*2.5(6052B0329601)*6 (Fig.1,2)。
Fig.1
轉動到90度
1
1 2
2
3
3
Electric cross screw driver #1 1
1.0 2016/10/24
Fig.2
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator: Issue department: Alicia Chien NPSU-PPE Auditor : Tzan.uen-tung
1. Disassemble Hinge Rubber
Disassemble Hinge Rubber
23(1/1)
Fig.1
Electric cross screw driver(#0) 1
1.0 2016/10/24
Fig.2
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator: Issue department: Alicia Chien NPSU-PPE Auditor : Tzan.uen-tung
24(1/1)
1. Disassemble Main AUX Antenna(Fig.1)。
Fig.1
Disassemble Antenna Cable
Main AUX
1.0 2016/10/24
Step:
Standard Operation Procedure
Document No. Autobot FA DIS ASS’Y SOP Station :
Name : Ver. : Date :
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard) Qty Holding fixture list (holding fixture standard) Qty
Tabulator: Issue department: Alicia Chien NPSU-PPE Auditor : Tzan.uen-tung
Disassemble Camera cable/Camera
1. Disassemble Camera cable 、Camera ,
Camera/B。 (Fig.1)
25(1/1)
Fig.1
1.0 2016/10/24