Content Overview
2020 2013 2014 2015 2016 2017 2018 2019 Q1 2 3 4 Q1 2 3 4 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4
Q67
H61
HD100-H81
SB100-NRM 2011, Q1
SB102-D
before
HD101-H81
The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.
7-year life cycle includes an End of Life (EOL) period which is typically 18 months.
H81
● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)
HD171-H81
HD173-H81
Mini-ITX microATX ATX & EATX
Intel Desktop Chipset Q170
H110
SD100-Q170
2022, Q3
2021, Q4
SD101/SD103-Q170
SD100-H110
SD101/SD103-H110
HU171/HU173
The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.
7-year life cycle includes an End of Life (EOL) period which is typically 18 months.
● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)
Mini-ITX microATX ATX & EATX
2014 2015 2016 2017 2018 2019 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4
QM87
HM86
HM100-QM87
HM100-HM86
before
HM101-QM87
HM101-HM86
HM103-HM86
HM103-QM87
ULT
HU101/HU103
2020 2 3 4 Q1
2022 Q1 2 3
2021 Q1 2 3 4 4
SU171/SU173
Intel Mobile Chipset
The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.
7-year life cycle includes an End of Life (EOL) period which is typically 18 months.
● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)
Mini-ITX microATX ATX & EATX
2012 2013 2014 2015 2016 2017 2018 2019 Q1 2 3 4 Q1 2 3 4 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 before
QM57 CP100-NRM
2010, Q1
QM67 HR100-CRM
2011, Q2
HM76 CR101-D
QM77 CR100-CRM
Intel Mobile Chipset
The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.
7-year life cycle includes an End of Life (EOL) period which is typically 18 months.
● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)
Mini-ITX microATX ATX & EATX
Intel Atom Processor
2014 2015 2016 2017 2018 2019 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 before
BT160
BT161
Atom E3800 Series/ Celeron
BT101/BT103
BT100
2020 Q1 3 4 2
2022 Q1 2 3
2021 Q1 2 3 4 4
Pentium N3700/ Celeron N3050
BW171/BW173
2023 Q1 3 2 4
The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.
7-year life cycle includes an End of Life (EOL) period which is typically 18 months.
● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)
Mini-ITX microATX ATX & EATX
2012 2013 2014 2015 2016 2017 2018 2019 Q1 2 3 4 Q1 2 3 4 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 before
Atom D525/D425/N455
LR102-B18D/S/M 2011, Q3
LR100-N18D/S/M 2011, Q3
Atom D510/D410/N450
LR100-N16D/S/M 2010, Q1
CD101-N2550
Atom D2550/N2800/N2600
CD101-N2800
CD101-N2600
CD102-25N
CD102-26N
CD102-28N
Intel Atom Processor
The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.
7-year life cycle includes an End of Life (EOL) period which is typically 18 months.
● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)
Mini-ITX microATX ATX & EATX
AMD Chipset
2013 2014 2015 2022 Q1 2 3 4 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4
2023 before
G-Series SoC
KB160
KB161
R-Series A77E BE170
BE171
BE173
Q1 4 3 2
2016 2017 Q1 2 3 4 Q1 2 3 4
2018 2 3 Q1 4
..............
R-Series A70M
CM100-C
The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.
7-year life cycle includes an End of Life (EOL) period which is typically 18 months.
● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)
Mini-ITX microATX ATX & EATX
C226 Xeon E3-1200 v3
DL310-C226
2020 2013 2014 2015 2016 2017 2018 2019 Q1 2 3 4 Q1 2 3 4 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 before
Intel Server/Workstation Chipset
The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.
7-year life cycle includes an End of Life (EOL) period which is typically 18 months.
● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)
Mini-ITX microATX ATX & EATX
2020 2013 2014 2015 2016 2017 2018 2019 Q1 2 3 4 Q1 2 3 4 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4
Q87
H81
Q77
HD330-H81
HD310-Q87
MB330-CRM
before
HD330-Q87
MB331-CRM 2012, Q3
HD332-H81
Intel Desktop Chipset
SD331-Q170
2022, Q4
2022, Q1 Q170
SD330-Q170
SD330-H110
H110
SB300-C 2011, Q4
The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.
7-year life cycle includes an End of Life (EOL) period which is typically 18 months.
● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)
Mini-ITX microATX ATX & EATX
2012 2013 2014 2015 2016 2017 2018 2019 Q1 2 3 4 Q1 2 3 4 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4
B65
H61
PT332-DRM 2010, Q4
PT330-DRM 2010, Q1
Q57
SB331-D 2011, Q4
SB332-C
before
SB336-Ni
Intel Desktop Chipset
SB331-IPM 2011, Q3
SB330-CRM 2011, Q2
Q67
The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.
7-year life cycle includes an End of Life (EOL) period which is typically 18 months.
● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)
Mini-ITX microATX ATX & EATX
2012 2013 2014 2015 2016 2017 2018 2019 Q1 2 3 4 Q1 2 3 4 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4
CP330-NRM 2010, Q3
CP337-NRM 2010, Q4
QM57
before
Intel Mobile Chipset
The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.
7-year life cycle includes an End of Life (EOL) period which is typically 18 months.
● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)
Intel Server/Workstation Chipset Mini-ITX microATX
C226 Xeon E3-1200 v3
C216 Xeon E3-1200 v2
C602 Xeon E5-2600 v2 RL830-C602/C604
EATX
DL631-C226 ATX
CL630-CRM ATX
Q2, 2012
2020 2013 2014 2015 2016 2017 2018 2019 Q1 2 3 4 Q1 2 3 4 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 before
ATX & EATX
The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.
7-year life cycle includes an End of Life (EOL) period which is typically 18 months.
● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)
Mini-ITX microATX ATX & EATX
Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 before
Q87
H81
HD631-Q87 2014, Q1
HD630-H81 2014, Q1
HD632-H81 2014, Q2
HD620-H81 2014, Q3
SD630-H110
H110
Q1 2 3 Q1 2 3 4 4
Intel Desktop Chipset
2020 2015 2016 2017 2018 2019 2022 2021
HD636-H81CS
SD631-Q170
Q170
The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.
7-year life cycle includes an End of Life (EOL) period which is typically 18 months.
● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)
Intel Desktop Chipset
Mini-ITX microATX ATX & EATX
2012 2013 2014 2015 2016 2017 2018 2019 Q1 2 3 4 Q1 2 3 4 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4
PT630-NRM 2010, Q2
SB600-C 2011, Q4
SB601-C 2011, Q4
B65
Q57
before
PT631-IPM 2010, Q2
Q77
MB630-CRM
SB630-CRM 2011, Q4
Q67
The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.
7-year life cycle includes an End of Life (EOL) period which is typically 18 months.
● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)
ULT
HU968 Compact
Computer-On-Module
SU968 Compact
2020 2015 2016 2017 2018 2019 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 before
2022 Q1 2 3
2021 Q1 2 3 4 4
2014 Q1 3 2 4
Intel Mobile Chipset
QM170
HM170
SH960-QM170 Basic
SH960-HM170 Basic
Intel Mobile Chipset
2012 2013 2014 2015 2016 2017 2018 2019 Q1 2 3 4 Q1 2 3 4 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 before
QM77
CR902-B Basic
CR901-B Basic
CR900-B Basic
CR908-B Compact
CR960-QM77 Basic
ATX & EATX Computer-On-Module
The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.
7-year life cycle includes an End of Life (EOL) period which is typically 18 months.
● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)
QM87
HM960-QM87 Basic
HM961-QM87 Basic
HM920-QM87 Basic
2020, Q2
HM86
HM960-HM86 Basic
HM961-HM86 Basic
HM920-HM86 Basic
Intel Mobile Chipset
2012 2013 2014 2015 2016 2017 2018 2019 Q1 2 3 4 Q1 2 3 4 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 before
HM55 CP908-B Compact
2010, Q4
CP900-B Basic
2010, Q3
ATX & EATX Computer-On-Module
The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.
7-year life cycle includes an End of Life (EOL) period which is typically 18 months.
● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)
HM76
CR902-BL Basic
HR908-B Compact
HR900-B Basic
2011, Q3
QM67
CR960-HM76 Basic
Intel Atom Processor
2014 2015 2016 2017 2018 2019 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 before
BT700 Qseven
Atom E3800 Series/ Celeron
BT968 Compact
BT9A3 Mini
2020 Q1 4 2 3
ATX & EATX
Pentium N3700/ Celeron N3050
BW968
2022 Q1 2 3
2021 Q1 2 3 4 4
Computer-On-Module
The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.
7-year life cycle includes an End of Life (EOL) period which is typically 18 months.
● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)
2023,Q1
Intel Atom Processor
2012 2013 2014 2015 2016 2017 2018 2019 Q1 2 3 4 Q1 2 3 4 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 before
Atom D525/D425/N455
LR905-B18D/S/M Compact
2011, Q3
Atom D2550/N2800/N2600
CD905-B2550 Compact
CD905-B2800 Compact
CD905-B2600 Compact
CD9A3-25B20 Mini
CD9A3-26B20 Mini
CD9A3-28B20 Mini
Computer-On-Module
The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.
7-year life cycle includes an End of Life (EOL) period which is typically 18 months.
● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)
AMD Chipset
2013 2014 2015 2022
Q1 2 3 4 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 before
G-Series SoC
KB968 Compact
2016 2021
Q1 2 3 4 Q1 2 3 4 ..............
R-Series A70M CM901-B
Basic
OT905-B Compact
2012, Q2
G-Series A55E
2020, Q2
2017 Q1 2 3 4
Computer-On-Module
The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.
7-year life cycle includes an End of Life (EOL) period which is typically 18 months.
● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)
R-Series A77E
BE960 Basic
2023, Q2
2018 Q1 2 3 4
R-Series SoC
ARM
2012 2013 2014 2015 2016 2017 Q1 2 3 4 Q1 2 3 4 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 4 before
Freescale i.MX6 FS700
Qseven
2027 Q1 2 3
..............
Computer-On-Module
The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.
7-year life cycle includes an End of Life (EOL) period which is typically 18 months.
● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)
Intel Desktop Chipset
2012 2013 2014 2015 2016 2017 2018 2019
Q1 2 3 4 Q1 2 3 4 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 before
PIC-H61 PICMG 1.3
H61
Embedded SBCs
The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.
7-year life cycle includes an End of Life (EOL) period which is typically 18 months.
● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)
Intel Atom Processor
before 2014 2015 2016 2017 2018 2019
Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 2020
Q1 4 2 3
Atom E3800 Series/ Celeron
BT253 4”
BT551/BT553 3.5”
BW551 3.5”
2022 Q1 2 3
2021 Q1 2 3 4 4
Pentium/Celeron N3000 Series
The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.
7-year life cycle includes an End of Life (EOL) period which is typically 18 months.
● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)
Embedded SBCs
BW051 2.5” Pico-ITX
Intel Atom Processor
before
Atom D2550/ N2800/ N2600
CD952-2xDE21 3.5”
2013, Q3
CD951-C2550 3.5”
2012, Q4
CD951-C2800 3.5”
2012, Q4
CD951-C2600 3.5”
2012, Q4
CD952-2xDE20 3.5”
2013, Q3
2014 2015 2016 2017 2018 2019 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4
2020 Q1 4 2 3
2022 Q1 2 3
2021 Q1 2 3 4 4
The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.
7-year life cycle includes an End of Life (EOL) period which is typically 18 months.
● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)
Embedded SBCs
Intel ULT Processor
before
ULT
HU551 3.5”
HU553 3.5”
2014 2015 2016 2017 2018 2019 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4
2020 Q1 4 2 3
The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.
7-year life cycle includes an End of Life (EOL) period which is typically 18 months.
● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)
Embedded SBCs
SU551 3.5”
2022 Q1 2 3
2021 Q1 2 3 4 4
SU251/253 4”
2012 2013 2014 2015 2016 2017 2018 Q1 2 3 4 Q1 2 3 4 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 after before
G-Series A50M
OT951-D 3.5”
2021, Q1
2020, Q2
AMD Chipset
The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.
7-year life cycle includes an End of Life (EOL) period which is typically 18 months.
● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)
Embedded SBCs
Milestone Model
End of Sale Date1 Last Shipment Date2 End of RMA Service Date3
G4S601-B Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G4V600-S Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G5G101-B Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G5G100-P Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G5G100-L10C Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G5M101-B Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G5M900-B10 Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G5M900-B06C Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G5M350-P Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G5M300-P Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
GIC68-B/-N Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G4V100-P Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G7V600-B Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G7V300-P Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G5G330-P Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G4S600-B Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G4S300-B Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G4V620-B Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
Milestone Model
End of Sale Date1 Last Shipment Date2 End of RMA Service Date3
G4V300-D Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
GCB60-BX Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G4V621-B Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G7S620-N Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G7V330-B Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G4E620-B Oct. 31, 2010 Jun. 30, 2011 Jun. 30, 2013
G7V100-B Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G7V100-N Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G7S600-B Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G7S300-B Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G5M151-B Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G5M151-B10C Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G5M151-B06C Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G5M151-B06 Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G5M150-N10C Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G5M150-N10 Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G5M150-N06C Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G5M150-N Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
EOL Models | Boards
Milestone Model
End of Sale Date1 Last Shipment Date2 End of RMA Service Date3
G5M100-N Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
GIC68-D Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G4V509-P Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G4V506-P Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G4S306-C Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G4M300-M12 Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G4M100-MS12 Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G4H875-N Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G4H875-C Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G4G100-N Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G4E606-P Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G4E620-N Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
G4E600-D Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
ST2K-E Dec. 31, 2009 Mar. 31, 2010 Mar. 31, 2013
GIE65-D Sep. 30, 2008 Dec. 31, 2008 Dec. 31, 2011
G370IM-24 Sep. 30, 2008 Dec. 31, 2008 Dec. 31, 2011
G4C600-D Sep. 30, 2008 Dec. 31, 2008 Dec. 31, 2011
G4C600-DG Sep. 30, 2008 Dec. 31, 2008 Dec. 31, 2011
Milestone Model
End of Sale Date1 Last Shipment Date2 End of RMA Service Date3
CT930-B Feb. 01, 2011 Aug. 01, 2011 Aug. 31, 2013
CT950-B10 Feb. 01, 2011 Aug. 01, 2011 Aug. 31, 2013
BP900 Feb. 01, 2011 Aug. 01, 2011 Aug. 31, 2013
GIC68-P Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
PT331-DRM Sep. 15, 2011 Mar. 15, 2012 Mar. 15, 2014
LR101-B16D Aug. 10, 2012 Feb. 10, 2013 Feb. 10, 2015
LR101-B16M Aug. 10, 2012 Feb. 10, 2013 Feb. 10, 2015
LR101-B16S Aug. 10, 2012 Feb. 10, 2013 Feb. 10, 2015
G7B630-N Sep. 02, 2012 Mar. 02, 2013 Mar. 02, 2015
G7B630-NR Sep. 02, 2012 Mar. 02, 2013 Mar. 02, 2015
G7L330-B Jan. 02, 2013 Jan. 02, 2013 Jan. 02, 2015
G7L331-B Jan. 02, 2013 Jan. 02, 2013 Jan. 02, 2015
G7L331-L Jan. 02, 2013 Jan. 02, 2013 Jan. 02, 2015
G7L332-L Jan. 02, 2013 Jan. 02, 2013 Jan. 02, 2015
G7L830-B Jan. 02, 2013 Jan. 02, 2013 Jan. 02, 2015
CT132-BR Jan. 03, 2013 Apr. 03, 2013 Apr. 03, 2015
AR100-DR Jan. 03, 2013 Apr. 03, 2013 Apr. 03, 2015
G7B336-P Jan. 03, 2013 Apr. 03, 2013 Apr. 03, 2015
EOL Models | Boards
Milestone Model
End of Sale Date1 Last Shipment Date2
End of RMA Service Date3
EL331-RM Jan. 03, 2013 Apr. 03, 2013 Apr. 03, 2015
CA230-BF Jan. 03, 2013 Apr. 03, 2013 Apr. 03, 2015
G7L630-B Jan. 11, 2013 Jan. 11, 2014 Jan. 11, 2016
ADD7009 Sep. 12, 2013 Dec. 12.2013 Dec. 12.2015
SR960-N Sep. 21, 2013 Dec. 21.2013 Dec. 21.2015
G7B330-B Dec. 21, 2013 Mar. 21, 2014 Mar. 21, 2016
G7B330-BR Dec. 21, 2013 Mar. 21, 2014 Mar. 21, 2016
ML936-B11C/B16C Jan. 16, 2014 Apr. 16, 2014 Apr. 16, 2016
ML936-B11T/B13T Jan. 16, 2014 Apr. 16, 2014 Apr. 16, 2016
CA100-D Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018
CA101-D Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018
CA331-NR Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018
CA331-N Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018
CA331-P Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018
CA900-B Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018
NP100-N16C Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018
NP101-D16C Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018
G5C100-N Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018
G5C100-NR Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018
Milestone Model
End of Sale Date1 Last Shipment Date2
End of RMA Service Date3
G5C100-B Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018
G5C100-N10C Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018
G5C630-DR Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018
G5C900-B Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018
LT330-B Apr. 28, 2014 Apr. 27, 2015 Apr. 27, 2017
LT600-DR Apr. 28, 2014 Apr. 27, 2015 Apr. 27, 2017
LT600-D Apr. 28, 2014 Apr. 27, 2015 Apr. 27, 2017
LT600-T Apr. 28, 2014 Apr. 27, 2015 Apr. 27, 2017
NP1208-C84 Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018
NP102-N16C Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018
NP900-B16C Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018
NP905-B16C Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018
NP951-B16C Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018
EL332-IP Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018
G5G330-P Apr. 28, 2014 Apr. 27, 2015 Apr. 27, 2017
PD-7010 Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018
BL100-N Aug. 7 2014 Feb. 9 2016 Feb. 9 2018
BL100-NE Aug. 7 2014 Feb. 9 2016 Feb. 9 2018
BL100-P Aug. 7 2014 Feb. 9 2016 Feb. 9 2018
EOL Models | Boards
1. End of Sale Date: The last Date to order the product and that the product is no longer for sale after this Date. 2. Last Shipment Date: The last-possible ship Date that can be requested from DFI and/or its branch offices. Actual ship Date is dependent on the lead time. 3. End of RMA Service Date: DFI continues updates to the products until this Date. The RMA service will still be available depending on the DFI’s RMA policy. 4. The EOL list is updated every 25th of the month.
Milestone Model
End of Sale Date1 Last Shipment Date2
End of RMA Service Date3
BL100-PE Aug. 7 2014 Feb. 9 2016 Feb. 9 2018
BL330-B Aug. 7 2014 Feb. 9 2016 Feb. 9 2018
BL330-BR Aug. 7 2014 Feb. 9 2016 Feb. 9 2018
BL600-DR Aug. 7 2014 Feb. 9 2016 Feb. 9 2018
BL600-D Aug. 7 2014 Feb. 9 2016 Feb. 9 2018
BL630-DR Aug. 7 2014 Feb. 9 2016 Feb. 9 2018
BL630-D Aug. 7 2014 Feb. 9 2016 Feb. 9 2018
EL109-N Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018
EL339-B Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018
EL620-C Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018
ML905-B11C Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018
ML905-B16C Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018
BL631-D Aug. 7 2014 Feb. 9 2016 Feb. 9 2018
NP101-B16C Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018
G7B630-B Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018
SR100-N Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018
SR100-L20C Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018
Milestone Model
End of Sale Date1 Last Shipment Date2
End of RMA Service Date3
CT132-B Jan. 3, 2013 Apr. 3, 2013 Apr. 3, 2015
EL330-DR Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018
EL630-NR Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018
SR330-L Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018
SR330-N Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018
PT631-IPM Jul. 20, 2015 Dec. 20, 2016 Dec. 20, 2017
LR100 Series Dec. 31, 2015 Jun. 1, 2017 Jun. 1, 2019
LR102 Series Dec. 31, 2015 Jun. 1, 2017 Jun. 1, 2019
LR905 Series Dec. 31, 2015 Jun. 1, 2017 Jun. 1, 2019
LR200-D Dec. 31, 2015 Jun. 1, 2017 Jun. 1, 2019
CM960-B Jan 8, 2016 Mar 30, 2016 Jun 30, 2016
HR902-B/BL Jan 8, 2016 Mar 30, 2016 Jun 30, 2016
ML905 Jan 8, 2016 Mar 30, 2016 Jun 30, 2016
QB700 Jan 8, 2016 Mar 30, 2016 Jun 30, 2016
QB701 Jan 8, 2016 Mar 30, 2016 Jun 30, 2016
QB702 Jan 8, 2016 Mar 30, 2016 Jun 30, 2016
EOL Models | Boards
Milestone Model
End of Sale Date1 Last Shipment Date2 End of RMA Service Date3
LAT720-D Aug. 06, 2013 Oct. 06, 2013 Oct. 06, 2015
LS3440 Aug. 10, 2012 Feb. 10, 2013 Feb. 10, 2015
LCG300 Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013
LAT700 Jan. 30, 2008 Sep. 30, 2008 Dec. 31, 2011
ADD7017 May. 31, 2008 Aug. 31, 2008 Aug. 31, 2011
ADD7307 Jan. 03, 2013 Apr. 03, 2013 Apr. 03, 2015
EXT-ECX2 Jan. 16, 2014 Apr. 16, 2014 Apr. 16, 2016
LAN81C May 14, 2012 Nov. 14, 2013 Nov. 14, 2014
LEA6x6 Series Sep. 25, 2015 Sep. 25, 2016 Sep. 25, 2018
1. End of Sale Date: The last Date to order the product and that the product is no longer for sale after this Date. 2. Last Shipment Date: The last-possible ship Date that can be requested from DFI and/or its branch offices. Actual ship Date is dependent on the lead time. 3. End of RMA Service Date: DFI continues updates to the products until this Date. The RMA service will still be available depending on the DFI’s RMA policy. 4. The EOL list is updated every 25th of the month.
EOL Models | Graphic Cards/ Peripherals
DFI’s Long Product Life Support
DFI is dedicated to providing long life manufacturing support for the embedded market.
DFI’s product availability commitment for all embedded products is 7 years as defined by:
7-year life cycle spans from DFI product launch to last shipments
7-year life cycle includes an End of Life (EOL) period which is typically 18 months
- Product EOL notifications typically issued between 66-72 months of
production followed by
• 6 month last time order period followed by
• 6 month last time ship period
The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.