8
Production Curve in Brazil | Production of Oil and LNG 2013-2017 BMP: Production Curve Maintained 2013 Roncador III (P-55) Iracema Norte (Cid. Itaguaí) Florim Júpiter Norte Pq. Baleias (P-58) Baleia Azul (Cid. Anchieta) Sapinhoá Pilot (Cid. São Paulo) Baúna (Cid. Itajaí) Lula NE Pilot (Cid. Paraty) Papa-Terra (P-63) Iracema Sul (Cid. Mangaratiba) Roncador IV (P-62) Sapinhoá Norte (Cid. Ilhabela) Lula Alto Lula Central Lula Sul (P-66) Franco 1 (P-74) Carioca Lula Norte (P-67) Franco SW (P-75) Bonito Franco Leste Espadarte III Papa-Terra (P-61) 2.0 ±2% 2.0 2.0 Million bpd 25 new production units will start-up between 2013-17 or 38 new production units will start-up between 2013-20 Lula Ext. Sul (P-68) Lula Oeste (P-69) Franco Sul (P-76) Tartaruga Verde e Mestiça Parque dos Doces Maromba Iara Horst (P-70) Franco NW (P-77) Entorno de Iara (P-73) NE de Tupi (P-72) Iara NW (P-71) Sul Pq. Baleias Espadarte I Deep Waters Sergipe Carcará Production units in operation
Transcript
Page 1: Production Curve in Brazil | Production of Oil and LNG

Production Curve in Brazil | Production of Oil and LNG2013-2017 BMP: Production Curve Maintained

2013

• Roncador III

(P-55)• Iracema

Norte

(Cid. Itaguaí)

• Florim• Júpiter

• Norte Pq.

Baleias (P-58)

� Baleia Azul

(Cid. Anchieta)

� Sapinhoá Pilot

(Cid. São Paulo)

� Baúna

(Cid. Itajaí)

• Lula NE Pilot

(Cid. Paraty)

• Papa-Terra

(P-63)

• Iracema Sul

(Cid.

Mangaratiba)

• Roncador IV

(P-62)

• Sapinhoá

Norte

(Cid. Ilhabela)

• Lula Alto

• Lula Central

• Lula Sul

(P-66)

• Franco 1

(P-74)

• Carioca

• Lula Norte

(P-67)

• Franco SW

(P-75)

• Bonito

• Franco Leste

• Espadarte III

• Papa-Terra

(P-61)

2.0 ±2%2.02.0

Mill

ion b

pd

25 new production units will start-up between 2013-17 or

38 new production units will start-up between 2013-20

• Lula Ext. Sul

(P-68)

• Lula Oeste

(P-69)

• Franco Sul

(P-76)

•Tartaruga Verde

e Mestiça

• Parque dos

Doces

• Maromba

• Iara Horst

(P-70)

• Franco NW

(P-77)

• Entorno de

Iara (P-73)

• NE de Tupi

(P-72)

• Iara NW

(P-71)

• Sul Pq. Baleias

• Espadarte I

• Deep Waters

Sergipe

• Carcará

� Production units in operation

Page 2: Production Curve in Brazil | Production of Oil and LNG

Supply History

Page 3: Production Curve in Brazil | Production of Oil and LNG

1950 1960

Contracting of goods and

services abroad.

1970 1980

Substitution of importing, similarity

law, nationalization, “reverse

engineering”, local market protection,

contracts in Brazil.

2002

1990 2000

2003

Opening of the market to importing,

globalization, international bids.

Focus on competitiveness. R&D in

Brazil and abroad.

Focus on the Brazilian industry.

Increase of the Local Content in the

goods and services contracting

(competitiveness and technological adherence).

Most of the equipment

and materials

are acquired from abroad

Substitution of imported

equipment and materialsOpening of the

Brazilian market for

importing

History

Page 4: Production Curve in Brazil | Production of Oil and LNG

What is Pre Salt?

Page 5: Production Curve in Brazil | Production of Oil and LNG

Corcovado

Hill

What Is Pre-salt?

Page 6: Production Curve in Brazil | Production of Oil and LNG

Drilling and Completion

�Construction of high angle wells,

deviated into the salt zone

� Well integrity

� Penetration rate in the microbial

carbonate reservoir

� New alloys to reduce costs of well

materials

PRE-SALT

SOME TECHNOLOGICAL CHALLENGES

What Is Pre-salt?

Page 7: Production Curve in Brazil | Production of Oil and LNG

What Is Pre-salt?

Reservoir

�Reservoir characterization

�Rock fluid interaction

�EOR

PRE-SALT

SOME TECHNOLOGICAL CHALLENGES

Page 8: Production Curve in Brazil | Production of Oil and LNG

What Is Pre-salt?

Subsea

�Flexible risers for water depth

of 2,200m (7,218 ft)

� Flow assurance

� Scaling control

PRE-SALT

SOME TECHNOLOGICAL CHALLENGES


Recommended