+ All Categories
Home > Documents > Production improvements

Production improvements

Date post: 30-Jun-2015
Category:
Upload: 07weeksjor
View: 80 times
Download: 0 times
Share this document with a friend
1
Production I have elapsed the set time for opening sequence. So I have decided to cut down some bits of my opening sequence. My opening sequence was supposed to only last for 2 minutes but it goes on for 2 minutes 36 In shots like these my titles fill up too much of the shot. So therefore I could change the font size so the text doesn’t dominate the I increased the volume of my track and I reduced the
Transcript

Production

I have elapsed the set time for opening sequence. So I have decided to cut down some bits of my opening sequence. My opening sequence was supposed to only last for 2 minutes but it goes on for 2 minutes 36 seconds.

In shots like these my titles fill up too much of the shot. So therefore I could change the font size so the text doesn’t dominate the action in the opening sequence.

I increased the volume of my track and I reduced the volume of the other sound. This meant that the track was too loud and you could barely hear the diegetic sound, which gave it more of a music video feel. So I changed it.

Recommended