Production Log 10/09/2012- Today the group assigned each other the job roles within the production teams. In task 1 we discussed what each person is doing and what their job will entail. 11/09/2012- Today we discussed when we were going to film within a production meeting. We also booked out some equipment. 13/09/2012- I have set up two projects on Adobe Premiere Pro, one in a standard setting and one in HD. This is so I have the option to film the film in the different settings. 17/09/2012-27/09/2012- Filmed ‘The Book’ footage and moved to a folder so we can use the footage to edit the film together. Editing has begun. We have found that we will struggle to record sound. 01/10/2012-02/10/2012- Editing continues and more shots are added.
Transcript
Page 1: Production log

Production Log

10/09/2012- Today the group assigned each other the job roles within the production teams. In task 1 we discussed what each person is doing and what their job will entail.

11/09/2012-

Today we discussed when we were going to film within a production meeting. We also booked out some equipment.

13/09/2012- I have set up two projects on Adobe Premiere Pro, one in a standard setting and one in HD. This is so I have the option to film the film in the different settings.

17/09/2012-27/09/2012- Filmed ‘The Book’ footage and moved to a folder so we can use the footage to edit the film together. Editing has begun. We have found that we will struggle to record sound.

01/10/2012-02/10/2012- Editing continues and more shots are added.

04/10/2012-I have used after effects to edit the colour of some clips to distinguish the shots of the monsters point of view from other shots. Editing is nearly complete.

08/10/2012- Rough edit is complete and is now uploaded to YouTube.

Page 2: Production log

09/10/2012- I have noted some improvements in which I can improve on in my final edit.

11/10/2012- I have written some notes down, in which I will use to improve my short film.

15/10/2012- 18/10/2012- As a group we have discussed what shots should be taken and when. Equipment has been taken out.

21/10/2012- Camera equipment has been taken home and shots have been redone.

22/10/2012-23/10/2012- More shots have been retaken.

25/10/2012- Work has been added to blog.

06/11/2012- Footage has been added to the project. The Final edit has begun.

08/11/12- 15/11/2012- All new footage has been added and the final edit is nearly complete.

19/11/12- 26/11/2012- Video clips have been added to After Effects so that effects can be added such as cc lens.

01/12/12- 10/11/2012- We have been provided with some soundtracks and effect that we can add to our film. I have edited the sound to fit with the final edit. Title sequence and credits have been made in After Effects and then added to the project.

11/12/12- As the final edit is complete I am going over all of the work so that it is all in order. A voice over for our review of the film is being organised.

13/12/12- Evaluation is in process.

18/12/12- Evaluation has been finished and all of the assignment has been finished.