PWO-Released Report Date PWO Nr s Item-Nr Qty
Transcript
Page 1: Production Monitoring Table

PWO-Released Report

Date PWO Nr s Item-Nr Qty

Page 2: Production Monitoring Table
Page 3: Production Monitoring Table

SO-Nr RemarkStatus (Open/In-Progress/Closed)

Page 4: Production Monitoring Table
Page 5: Production Monitoring Table

Update

Page 6: Production Monitoring Table
Page 7: Production Monitoring Table

WO Monitoring

PWO Nr. Item Nr. Qty

POR-123456/1 AT03-RBG0700-XX-XX 20 7-Mar-11

POR-123456/2 AT03-RBG0700-XX-XX 20 8-Mar-11

POR-123456/3 AT03-RBG0700-XX-XX 20 9-Mar-11

POR-123456/4 AT03-RBG0700-XX-XX 20 10-Mar-11

POR-123456/5 AT03-RBG0700-XX-XX 20 11-Mar-11

POR-123456/6 AT03-RBG0700-XX-XX 20 12-Mar-11

POR-123456/7 AT03-RBG0700-XX-XX 20 13-Mar-11

POR-123456/8 AT03-RBG0700-XX-XX 20 14-Mar-11

POR-123456/9 AT03-RBG0700-XX-XX 20 15-Mar-11

Date Releaseed

Page 8: Production Monitoring Table

Line Checker Patrol Record

Date Time Stage/Step Output Scrap Rework PORData Entry

Time

Page 9: Production Monitoring Table

Remark

Page 10: Production Monitoring Table

WIP & RawMat Monitoring Table

Date: WIP Location :

Part Nr Shf-Pagi Shf-Sore Shf-Malam

Page 11: Production Monitoring Table

Shf-Malam

Page 12: Production Monitoring Table

PWO - Production Work Order

Item Nr. AT03-RBG0700-XX-XXDescription RBG Avanza with parking sensorDate Release 11-Mar-11 Finish Schedule:

No. Process Date Finish Quality Status Transfer by

1 BMD-Blow Moulding 12-Mar-11

2 WHS-Wiring Harnes 12-Mar-11

3 12-Mar-11

4 Triming 12-Mar-11

5 Assembly 12-Mar-11

6 Final Inspection 12-Mar-11

Schedule to Finish

Stamping & Powder Coating

Page 13: Production Monitoring Table

PWO-Nr.

POR-123456/1

Qty : 20

Finish Schedule: 11-Mar-11

Received by Remark Lead Time

1

1

1

1

1

1

Page 14: Production Monitoring Table

Sub-Assy Order

W/C Wiring Harness

Part Nr. WH-atbkkdkd

Description Wiring Harness for Avanza

PWO Nr. POR-123456/1

Qty

Schedule

Date Finish

Parent Delivery Date

Transfered by

Received by

Page 15: Production Monitoring Table

Sub-Assy Order

Wiring Harness

PWO Nr. Part Nr Qty

Page 16: Production Monitoring Table

Sub-Assy Order

Stamping and Powder Coating

Schedule to Run PWO Nr. Part Nr

Page 17: Production Monitoring Table

Qty Schedule to Run

Page 18: Production Monitoring Table

PW-Order Gantt Chart

PWO Nr. Item-Nr QtyWork Center: Work Center:

POR-123456/1 20 7-Mar-11 7-Mar-11

POR-123456/2 20 8-Mar-11 8-Mar-11

POR-123456/3 20 9-Mar-11 9-Mar-11

POR-123456/4 20 10-Mar-11 10-Mar-11

POR-123456/5 20 11-Mar-11 11-Mar-11

POR-123456/6 20 12-Mar-11 12-Mar-11

POR-123456/7 20 13-Mar-11 13-Mar-11

POR-123456/8 20 14-Mar-11 14-Mar-11

POR-123456/9 20 15-Mar-11 15-Mar-11

Date Releaseed

Delivery Plan

Page 19: Production Monitoring Table
Page 20: Production Monitoring Table

Work Center: Work Center:

Page 21: Production Monitoring Table

Recommended