PRODUCTION PLANNINGIntroduction
ActivitiesProcessOutcome
8/13/2019 productionplanning-110409060343-phpapp02
http://slidepdf.com/reader/full/productionplanning-110409060343-phpapp02 2/20
Start of Production Planning• Forecasting Decision: Based on Sales Estimates.• Management Decision : Based on Demand
Estimates, product design, etc.•
Engineering Decision : Based on manufacturingdesign, process design, materials required, etc.• Capacity Decision : Based on existing resources of
plant, machinery, tools, Planning the facility, etc.•
Financial Decision : Based on funds, profitability.• Resource availability :Employee workflow,
availability of skilled labour, etc.
8/13/2019 productionplanning-110409060343-phpapp02
http://slidepdf.com/reader/full/productionplanning-110409060343-phpapp02 3/20
ACTIVITIES OF PRODUCTION PLANNING
Materials Machines Men
Planning, Routing, Scheduling, Dispatching
Sales Order orStock to order
8/13/2019 productionplanning-110409060343-phpapp02
http://slidepdf.com/reader/full/productionplanning-110409060343-phpapp02 4/20
OBJECTIVES
• Maximise utilisation of materials andhuman resources
• Minimise costs• Timely supply of finished goods•
Effective control of productionprocess
8/13/2019 productionplanning-110409060343-phpapp02
http://slidepdf.com/reader/full/productionplanning-110409060343-phpapp02 5/20
PROCESS OF PRODUCTION PLANNING
• Materials Planning
• Operations Planning
• Cost Planning
8/13/2019 productionplanning-110409060343-phpapp02
http://slidepdf.com/reader/full/productionplanning-110409060343-phpapp02 6/20
MATERIALS PLANNINGMaster
Production Schedule Bill of
Materials Material
Requirements Planning System
Inventory Status
Planned Order & Other Reports
Item Master Purchasing
Data
8/13/2019 productionplanning-110409060343-phpapp02
http://slidepdf.com/reader/full/productionplanning-110409060343-phpapp02 7/20
Bill of Materials
• Bill of Materials – Parent-child diagram thatshows what goes into what.
Frame Assy
Wheel Assy
Wheel Tires
Hubs &Rims
Spokes
Frame
Bike
Components
8/13/2019 productionplanning-110409060343-phpapp02
http://slidepdf.com/reader/full/productionplanning-110409060343-phpapp02 8/20
BOM (contd.)
Used to make sure enough parts are availablethroughout production plan.Each part has Lead Time and ordering process.One BOM for every end product to arrive atcost per product.
Types of BOMSingle Level BOM – One level downIndented BOM – More than one level
8/13/2019 productionplanning-110409060343-phpapp02
http://slidepdf.com/reader/full/productionplanning-110409060343-phpapp02 9/20
Inventory Classifications
Inventory
Processstage
DemandType
Number& Value Other
Raw MaterialWIP Finished
Goods
IndependentDependent
A ItemsB ItemsC Items
MaintenanceDependentOperating
8/13/2019 productionplanning-110409060343-phpapp02
http://slidepdf.com/reader/full/productionplanning-110409060343-phpapp02 10/20
Output of Materials Planning
• Planned Production report• Planned Purchases report•
Master Schedule report• Sales Forecasts Listing• Materials Handling report
8/13/2019 productionplanning-110409060343-phpapp02
http://slidepdf.com/reader/full/productionplanning-110409060343-phpapp02 11/20
OPERATIONS PLANNING
MasterProductionSchedule
ForecastMedium term
Long termShort term
Sales OrderCapacity
Constraints
Production Plan
Lead TimeProduct :
What
Time:When
Quantity:
HowMuch
8/13/2019 productionplanning-110409060343-phpapp02
http://slidepdf.com/reader/full/productionplanning-110409060343-phpapp02 12/20
How it is done
EngineeringDiagram
StandardProcessSheet
Route Sheet
CostTime
Labour
PERTCPM
OperationsPlanning
8/13/2019 productionplanning-110409060343-phpapp02
http://slidepdf.com/reader/full/productionplanning-110409060343-phpapp02 13/20
8/13/2019 productionplanning-110409060343-phpapp02
http://slidepdf.com/reader/full/productionplanning-110409060343-phpapp02 14/20
COST PLANNINGCost
MATERIALS LABOUROTHER EXPENSES
DIRECTDIRECTINDIRECT INDIRECTDIRECT INDIRECT
OVERHEADS
FOH AOH SOH DOH
DirectDi
8/13/2019 productionplanning-110409060343-phpapp02
http://slidepdf.com/reader/full/productionplanning-110409060343-phpapp02 15/20
Examples of Indirect material
• At factory level – lubricants, oil, consumables,etc.
• At office level – Printing & stationery, Brooms,Dusters, etc.
• At selling & distribution level – Packingmaterials, printing & stationery, etc.
8/13/2019 productionplanning-110409060343-phpapp02
http://slidepdf.com/reader/full/productionplanning-110409060343-phpapp02 16/20
Examples of Indirect labour
• At factory level – foremen’s salary, worksmanager’s salary, gate keeper’s salary,etc.
• At office level – Accountant’s salary, GM’s
salary, Manager’s salary, etc. • At selling and distribution level – salesmen
salaries, Logistics manager salary, etc.
8/13/2019 productionplanning-110409060343-phpapp02
http://slidepdf.com/reader/full/productionplanning-110409060343-phpapp02 17/20
Examples of other expenses
• At factory level – factory rent, factoryinsurance, lighting, etc.
• At office level – office rent, office insurance,office lighting, etc.
• At sales & distribution level – advertising,show room expenses like rent, insurance, etc.
8/13/2019 productionplanning-110409060343-phpapp02
http://slidepdf.com/reader/full/productionplanning-110409060343-phpapp02 18/20
Output of Cost Planning
• Know the value addition at each stage ofproduction.
• Break up of material, production andoverhead costs. Know the direct / indirectcosts.
• Know the cheapest production line.•
Analyse the profitability of make / buydecision.• Know the reason for rise in costs.
OUTCOME OF PRODUCTION
8/13/2019 productionplanning-110409060343-phpapp02
http://slidepdf.com/reader/full/productionplanning-110409060343-phpapp02 19/20
OUTCOME OF PRODUCTIONPLANNING
• Production Data• Inspection Data• Pay roll Data• Cost Data
8/13/2019 productionplanning-110409060343-phpapp02
http://slidepdf.com/reader/full/productionplanning-110409060343-phpapp02 20/20
ERP inProduction Planning
MRP by period report
MRP by date report
Planned orders report
Purchase requirements
Cost reports
MRPPrograms
Master ProductionScheduleBOM
Lead Times
(Item Master File )
(Bill-of-Material )
Inventory Data
Purchasing data CostData