+ All Categories
Home > Documents > PROECT - LoopNet

PROECT - LoopNet

Date post: 17-Jan-2022
Category:
Upload: others
View: 5 times
Download: 0 times
Share this document with a friend
21
PROJECT HIGHLIGHTS KELLY YODER 408.615.3427 [email protected] LIC #01821117 ERIK HALLGRIMSON 408.615.3435 [email protected] LIC #01274540 STEVE HORTON 408.615.3412 [email protected] LIC #01127340 JEFF CUSHMAN 408.572.4122 [email protected] LIC #01308259 ±46K SF TO ±415K SF AVAILABLE BE FRONT & CENTER
Transcript
Page 1: PROECT - LoopNet

PROJECTHIGHLIGHTS

KELLY [email protected] #01821117

ERIK [email protected] #01274540

STEVE [email protected] #01127340

JEFF [email protected] #01308259

±46K SF TO ±415K SF AVAILABLE

BE FRONT & CENTER

Page 2: PROECT - LoopNet

300±99,870 SF

3 Stories

350±96,310 SF

3 Stories

100±46,070 SF

2 Stories

250±76,410 SF

2 Stories

200±96,640 SF

3 Stories

HOLGER WAY

N. FIRST STREET

HEADQUART

ERS

DRIVE

237

• ±46,070 TO ±415,230 SF AVAILABLE• NEW MARKET READY INTERIORS & EXTERIORS• CLASS A STEEL FRAME BUILDINGS • CONNECTED CAMPUS OPPORTUNITY• FLEXIBLE & EFFICIENT FLOOR PLATES• ±3.75/1,000 SF PARKING RATIO

• NEW OUTDOOR AMENITY AREAS• SIGNAGE PROGRAM• EXCELLENT HIGHWAY 237 EXPOSURE• PROMINENT BUILDING TOP SIGNAGE• ADJACENT TO @FIRST RETAIL, HOTELS &

RESTAURANTS

PROJECTHIGHLIGHTS

Page 3: PROECT - LoopNet

YOUR NAME IN LIGHTS!NEW SIGNAGE PROGRAM - SIGN HEIGHT: 60 FT.

Page 4: PROECT - LoopNet

ZANK

ER R

D

N 1ST STLAFAYETTE ST

E TASMAN DR

W TASMAN DR

MONTAGUE EXPY

237

880

IN GOOD COMPANYCORPORATE MAP

GRE AT AM

ERICA PKWY

Page 5: PROECT - LoopNet

350 HOLGER NEWLY RENOVATED INSIDE & OUT!

PRIVATE TENANT LOUNGE FULLY BUILT-OUT OPEN/CREATIVE OFFICE SPACE

OUTDOOR AMENITY AREA INCLUDED

Page 6: PROECT - LoopNet

hea

dq

ua

rter

s dr.

HIGHWAY 237

holger wy.

Za

nker

rd.

350 300 250 200

100

HOLGER WAY

237

350

UP

UP

FIRST FLOOR: ±32,102 SF

HYPOTHETICAL FLOOR PLAN

• 126 CUBICLES• 8 OFFICES• 1 BOARD ROOM• 7 CONFERENCE ROOMS• 1 TRAINING ROOM• 1 LOUNGE• 1 FITNESS AREA• SHOWERS• OUTDOOR AMENITY AREA• GRADE LEVEL LOADING POTENTIAL• 2,500 AMPS AT 277/480 VOLTS

350 HOLGER WAY | ±96,310 SF

CONF.

CONF.

CONF.CONF.

CONF.LOBBY

BOARD ROOM CONF.OFF.

OFF.

OFF.

OFF.OFF.

OFF.OFF.

OFF.

LOUNGE

FITNESS

SHIPPING/RECEIVING

CONF.

Page 7: PROECT - LoopNet

hea

dq

ua

rter

s dr.

HIGHWAY 237

holger wy.

Za

nker

rd.

350 300 250 200

100

HOLGER WAY

237

350

TRUE35G-LD

COOLER

TRUE35G-LD

COOLER

CONF.

CONF.

CONF.

CONF.

STOR.

MOTHER

BREAK

ROOM

JAN.

CONF.

CONF.

CONF.CONF.CONF.

OFF.

OFF.

STOR.

IDF

OFF.

OFF.

SECOND FLOOR: ±32,102 SF

HYPOTHETICAL FLOOR PLAN

• 238 CUBICLES• 32 BENCH-STYLE WORKSTATIONS• 4 OFFICES• 9 CONFERENCE ROOMS• BREAK ROOM

350 HOLGER WAY | ±96,310 SF

Page 8: PROECT - LoopNet

hea

dq

ua

rter

s dr.

HIGHWAY 237

holger wy.

Za

nker

rd.

350 300 250 200

100

HOLGER WAY

237

350

TRUE35G-LD

COOLER

TRUE35G-LD

COOLER

CONF.

CONF.

CONF.CONF.

OFF.

OFF.

OFF.

OFF.

OFF.

OFF.

OFF.

OFF.

OFF.

CONF.

CONF.

CONF.

CABLING

BREAKROOM

CPY.

ELEC.

JAN

CONF. CONF.

THIRD FLOOR: ±32,105 SF

HYPOTHETICAL FLOOR PLAN

• 213 CUBICLES• 32 BENCH-STYLE WORKSTATIONS• 9 OFFICES• 9 CONFERENCE ROOMS• BREAK ROOM

350 HOLGER WAY | ±96,310 SF

Page 9: PROECT - LoopNet

hea

dq

ua

rter

s dr.

HIGHWAY 237

holger wy.

Za

nker

rd.

350 300 250 200

100

HOLGER WAY

237

300

UP

TRUE35G-LD

COOLER

TRUE35G-LD

COOLER

TRUE35G-LD

COOLER

TRUE35G-LD

COOLER

FIRST FLOOR: ±33,290 SF

HYPOTHETICAL FLOOR PLAN

300 HOLGER WAY | ±99,870 SF

SHIPPING/RECEIVING

ELEC.

FITNESSCENTER

LOBBYCONF.

CONF.

OFF.

OFF.

OFF.

SHWR.

AMENITY AREA

BREAK RM.

• OPEN OFFICE, CONFERENCE ROOMS & PRIVATE OFFICES

• BREAK ROOM/AMENITY AREA• DEDICATED AIR TO LABS & SERVER ROOMS• FITNESS CENTER & SHOWERS• SHIPPING & RECEIVING WITH DOCK LEVEL

LOADING• 5,000 AMPS AT 277/480 VOLTS• 200KW BACKUP GENERATOR• 15 FOOT CLEAR HEIGHT

Page 10: PROECT - LoopNet

hea

dq

ua

rter

s dr.

HIGHWAY 237

holger wy.

Za

nker

rd.

350 300 250 200

100

HOLGER WAY

237

300

SECOND FLOOR: ±33,290 SF

HYPOTHETICAL FLOOR PLAN

300 HOLGER WAY | ±99,870 SF

UP DN

DN UP

CONF. CONF.

OFF.OFF.

• OPEN OFFICE, CONFERENCE ROOMS & PRIVATE OFFICES

• 15 FOOT CLEAR HEIGHT

Page 11: PROECT - LoopNet

hea

dq

ua

rter

s dr.

HIGHWAY 237

holger wy.

Za

nker

rd.

350 300 250 200

100

HOLGER WAY

237

300

THIRD FLOOR: ±33,290 SF

HYPOTHETICAL FLOOR PLAN

300 HOLGER WAY | ±99,870 SF

DN

DN

CONF. CONF.

OFF.OFF.

• OPEN OFFICE, CONFERENCE ROOMS & PRIVATE OFFICES

• 16 FOOT CLEAR HEIGHT

Page 12: PROECT - LoopNet

hea

dq

ua

rter

s dr.

HIGHWAY 237

holger wy.

Za

nker

rd.

350 300 250 200

100

HOLGER WAY

237

250

TRUE35G-LD

COOLER

TRUE35G-LD

COOLER

FIRST FLOOR: ±38,205 SF

HYPOTHETICAL FLOOR PLAN

250 HOLGER WAY | ±76,410 SF

BREAK RM.

AMENITYAREA

SHIPPING/RECEIVING

LOBBYCONF.

• OPEN OFFICE, CONFERENCE & PRIVATE OFFICES• DEDICATED AIR TO LABS & SERVER ROOMS• BREAK ROOM/AMENITY AREA• SHIPPING/RECEIVING & DOCK LEVEL LOADING• 2,000 AMPS AT 277/480 VOLTS• 17 FOOT CLEAR HEIGHT

Page 13: PROECT - LoopNet

hea

dq

ua

rter

s dr.

HIGHWAY 237

holger wy.

Za

nker

rd.

350 300 250 200

100

HOLGER WAY

237

250

DN.

DN.

SECOND FLOOR: ±38,205 SF

HYPOTHETICAL FLOOR PLAN

• OPEN OFFICE, CONFERENCE & PRIVATE OFFICES• COFFEE BAR• 15 FOOT CLEAR HEIGHT

250 HOLGER WAY | ±76,410 SF

COFFEE BAR

CONF.

OFF. OFF.OFF. OFF.OFF. OFF.

OFF. OFF.OFF. OFF. OFF.

Page 14: PROECT - LoopNet

hea

dq

ua

rter

s dr.

HIGHWAY 237

holger wy.

Za

nker

rd.

350 300 250 200

100

200

HOLGER WAY

237

UP

UP

TRUE35G-LD

COOLER

TRUE35G-LD

COOLER

TRUE35G-LD

COOLER

TRUE35G-LD

COOLER

FIRST FLOOR: ±32,212 SF

HYPOTHETICAL FLOOR PLAN

200 HOLGER WAY | ±96,640 SF

FITNESSCENTER

LAB

OUTDOORAMENITY

AREA

AMENITYSPACE

CONF.

KITCHEN

BOARD RM.

LOUNGE

LOBBY

• OPEN OFFICE & CONFERENCE ROOMS• DEDICATED AIR TO LABS & SERVER ROOMS• 5,000 AMPS / 277 / 480 VOLTS• FITNESS CENTER, SHOWERS• INDOOR/OUTDOOR AMENITY AREA• LOUNGE/KITCHEN• BOARD ROOM• POTENTIAL FOR GRADE LEVEL LOADING

SHWR.

Page 15: PROECT - LoopNet

hea

dq

ua

rter

s dr.

HIGHWAY 237

holger wy.

Za

nker

rd.

350 300 250 200

100

200

HOLGER WAY

237

SECOND FLOOR: ±32,213 SF

HYPOTHETICAL FLOOR PLAN

200 HOLGER WAY | ±96,640 SF

UP

UP

DN.

DN

COFFEE BAR

• OPEN OFFICE• COFFEE BAR

Page 16: PROECT - LoopNet

hea

dq

ua

rter

s dr.

HIGHWAY 237

holger wy.

Za

nker

rd.

350 300 250 200

100

200

HOLGER WAY

237

THIRD FLOOR: ±32,215 SF

HYPOTHETICAL FLOOR PLAN

200 HOLGER WAY | ±96,640 SF

DN

DN

COFFEE BAR

• OPEN OFFICE• COFFEE BAR

Page 17: PROECT - LoopNet

hea

dq

ua

rter

s dr.

HIGHWAY 237

holger wy.

Za

nker

rd.

350 300 250 200

100

100

HEADQUARTERS DRIVE

FIRST FLOOR: ±23,035 SF

EXISTING FLOOR PLAN

• OPEN OFFICE & CONFERENCE ROOMS• TRAINING ROOM• DEDICATED AIR TO LABS & SERVER ROOMS• SHOWERS• DOCK LEVEL LOADING (POTENTIAL FOR MORE)• 1,200 AMPS AT 277/480 VOLTS• 16 FOOT CLEAR HEIGHT

100 HEADQUARTERS DRIVE | ±46,070 SF

OPENOFFICE

OPENOFFICE

SERVER OFFICE

TRAININGROOM

CONF.

CONF.

CONF.

CONF.

CONF.

CONF. CONF.

CONF.LOBBY

CONF.

ELEC.LAB

DL

LAB

SHWR.

SHWR.

Page 18: PROECT - LoopNet

hea

dq

ua

rter

s dr.

HIGHWAY 237

holger wy.

Za

nker

rd.

350 300 250 200

100

100

HEADQUARTERS DRIVE

OPENOFFICE

OPENOFFICE

LOBBY

LUNCHROOM

OPENOFFICE

CONF.

CONF.

CONF.

CONF.

CONF.

CONF.

CONF.

CONF.

CONF.

CONF.CONF.

SECOND FLOOR: ±23,035 SF

EXISTING FLOOR PLAN

• OPEN OFFICE & CONFERENCE ROOMS• LUNCH ROOM• 15 FOOT CLEAR HEIGHT

100 HEADQUARTERS DRIVE | ±46,070 SF

Page 19: PROECT - LoopNet

AMENITY MAP

FOOD HOTELS SHOPPING BANKS1.

2.

3.

4.

5. 6.

7. 1. 11. 1.

2.

3.

1.2.3.2.

12.

3.13.

4.14.

5.

15.

6.

16.17.18.

19.7.

8.

9.

10.

The Coffee Bean & Tea LeafChipotleChick-fil-ASweet TomatoesFive GuysPanera BreadRok Steakhouse

SubwayRound Table PizzaLa CatalanaSendo SushiExtreme PitaMina’s KoreanTandoori Bites

Levi’s StadiumBourbon SteakPho KangCarl’s Jr.Butter & ZeusDona MariaBistro SiamMikayla’s CaféTogo’sRed RobinJamba JuicePeet’s CoffeeChipotleYoyo SushiJersey Mike’s

Hobee’sPremier PizzaChina TasteSubwayFalafel’s N MoreStarbucks

StarbucksMacaroni GrillMichael’sOn the BorderBlack AngusHome Town BuffettBanana LeafMcDonald’sTaco BellDishDash Grill

SafewayYan Can Asian BistroCold StoneThe Prolific OvenPiatti’sSmashburgerStarbucksMazbaan BarFantasia Coffee

Hyatt HouseCourtyard SJ

Hilton Garden Inn TargetCVSSupercutsNail SpaDental SpaBest BuyMichael’sRossPetsmartWalmartDollar Tree

Chase BankWells FargoBank of AmericaWells Fargo

Courtyard MarriottStaybridge Suites

Hyatt HouseExtended Stay America

Extended Stay AmericaAloft Santa Clara

Crowne Plaza

Homewood Suites-Hilton

Hampton Inn

Hyatt Regency

Larkspur LandingTowne Place by MarriottBest Western Plus/Brookside InnSheraton San JoseSonesta Silicon Valley

Hilton Santa Clara

Avatar Hotel

Santa Clara Marriott

Hyatt House

E TASMAN DR

GREAT MALL PKWYZAN

KER

RD

LAFAYETTE ST

MONTAGUE EXPY

237

880

1

2

3

5

6

7

4

1

2

3

11

3

2

2

3

4

6

7

89

10

11

1213

17

19

1415

16

5

18

GREAT AMERICA PKW

Y

Page 20: PROECT - LoopNet

TRANSPORTATION MAP

MILPITAS STATIONOPENING 2019

LIGHT RAIL STOPS

237

880

ACE TRAINSANTA CLARA/

GREAT AMERICASTATION

TASMANSTATION

FLEX SHUTTLESTOP

680

13 MINUTE DRIVE FROM DISTRICT 237 TO MILPITAS BART STATIONFLEX SHUTTLE STOP AT 300 HOLGER WAY - WITH SERVICE TO LIGHT RAIL, BART & ACE TRAIN STATION15 MINUTES ON LIGHT RAIL FROM TASMAN STATION TO MILPITAS BART16 MINUTES ON LIGHT RAIL FROM TASMAN STATION TO ACE TRAIN

ZANK

ER R

D

LAFAYETTE ST

MONTAGUE EXPY

Page 21: PROECT - LoopNet

CONTACTKELLY [email protected] #01821117

ERIK [email protected] #01274540

STEVE [email protected] #01127340

JEFF [email protected] #01308259

±46K SF TO ±415K SF AVAILABLE


Recommended