Sigma Engineering FZE.,
P.O. Box No. 42178, Hamriyah Free Zone Phase – II,
Sharjah, U.A.E.
Ph: 06-7464641 Fax: 06-7464642 email: [email protected] www.sigmaengg.com
INDEX
Sr. CONTENTS
01. Introduction
02. Mission Statement
03. Quality Statement
04. Safety System
05. Range of Services
06. Organization Chart
07. Projects Involved
08. Quality Assurance Plan
09. Quality Control Reports
10. Release Note
11. Fabrication Procedure
12. Painting Procedure
13. Erection Procedure
14. Valid Trade License
15. Route Map
16. Photos
Ph: 06-7464641 Fax: 06-7464642 email: [email protected] www.sigmaengg.com
Introduction
SIGMA Engineering has bee active in UAE since long time,
providing fabrication and site construction activities comprising
of structural fabrication, plate work, mechanical erection,
blasting and painting works for the-projects such as
Infrastructure, Cement, Power, Oil and Gas Sectors, Industrial
Plants, multi- storied buildings and large commercial buildings.
SIGMA Engineering fabrication and Machine Shop are located in
Hamriyah Free Zone (HFZA) Sharjah, U.A.E. The company
managed by team of highly experienced professionals in the
filed, undertakes detail engineering/shop drawings for
tanks/vessels and structures / cladding. SIGMA has adequate
skilled technicians, qualified and experienced engineers and
supervisory staff with proven track record of executing
sophisticated projects.
Supply, Fabrication, Surface Treatment and Installation of
Steel Structures and Equipments:
SIGMA has fabricated and erected large volume of steel
structures, equipment, pipe work and plate work (Carbon Steel,
Alloy Steel and S.S Steel) for various industries viz. cement,
Power, Petrochemicals/ Chemicals, Food Processing industry, etc.
Blasting, Paintings, and Coating Services:
SIGMA has in-house facility for blasting and painting of
fabricated items and also carries out if required, filed painting of
Ph: 06-7464641 Fax: 06-7464642 email: [email protected] www.sigmaengg.com
fabricated items and also caries out if required, field painting
work at the erection site.
Machine Shop facilities and Machine works
A fully equipped machine shop for precision machining, heavy
and light machining work for oil field equipment, marine and auto
works. Highly skilled operators and supervisory staff for Turning,
Boring, Shaping, Milling, Threading, Key way cutting,
Manufacturing of pipeline flanges, Anchor bolts, Connecting rods
and many such precision machining jobs undertaken.
SIGMA Engineering is committed to:
The Pursuit of Excellence.
Total Customer satisfaction.
Delivery as per agreed completion schedule.
Most economical price by controlling our overheads.
SIGMA Engineering is not just another Fabrication and erection
company; it is a whole new kind of professionally managed
engineering company. The kind that never promises anymore
than it can deliver and never delivers less than it has promised.
We are all engineers. People, who measure every opportunity,
weigh every risk and calculate every outcome. Not just to add
quality to your work but multiply it. And that's what makes the
real difference.
Ph: 06-7464641 Fax: 06-7464642 email: [email protected] www.sigmaengg.com
Mission Statement Diligently pursue the development and consistent delivery of
quality product to our clients. Deliver the product and service
faster smarter and better than the completion, exercise
exemplary corporate citizenship to the community and create an
environment in which we promote and reward employee
contribution, As a fabrication and erection, entity, our mission is
to achieve superior long term company financial value
Core Values Statement
We believe our business is built upon a commitment to team
work and to these Core Value
Absolute Customer Satisfaction.
Honesty 8c Integrity in all aspects of business.
An Unrelenting pursuit of Excellence.
A safe working environment.
Respect & Concern for each employee
Community Involvement
Ph: 06-7464641 Fax: 06-7464642 email: [email protected] www.sigmaengg.com
Quality Policy of SIGMA Engineering.
It is the policy of the SIGMA Engineering to provide best
professional service and satisfaction to the customer as
regards the quality of products manufactured and the
construction services rendered.
The existing systems are being further enhanced by
persistent and dedicated efforts by implementing and
maintaining the quality system to the requirements of
ISO 9001: 2000 to ensure continuous improvement in
every functional area and achieve a leading position in the
manufacturing of products and all services by the company.
The products and services shall be delivered to an
agreed completion schedule and at the competitive and
most economical price to the customer.
Ph: 06-7464641 Fax: 06-7464642 email: [email protected] www.sigmaengg.com
Range of Services
1. Light and Heavy Structural Steel Work
Industrial Fabrication. Warehouses. Cranes. Crossovers. Staircases, ladders, Walkways and Hand Rails.
2. Light and Heavy Plate Fabrication Work
Ducts and Chutes. Bins and Hoppers. Bag Filter Casings. Conveyors. Bucket Elevators. Storage Tanks. Media Filters. Pressure Vessels.
3. Pipeline Line Fabrication and Erection Work
Carbon steel pipelines for oil, gas chemicals, steam, air and
water lines.
Stainless-steel pipelines for water treatment and chemical
plants.
Alloys steel pipelines for steam and oil.
Fabrication of large diameter pipelines for sewerage and
water line.
4. Surface Treatment, Painting and Galvanizing
Grit blasting of structural steel and plate work as NACE
&
SSPC Standards.
All types of epoxy painting, Enamel painting with
Ph: 06-7464641 Fax: 06-7464642 email: [email protected] www.sigmaengg.com
airless
spray system.
Galvanizing (facilities available with associate
company)
Ph: 06-7464641 Fax: 06-7464642 email: [email protected] www.sigmaengg.com
Safety Policy A safety and environment philosophy is normally developed for
the project. It is formulated to ensure that hazards, which affect
the safety of the personnel, the integrity of the facilities and
conversation of the environment, are properly and adequately
considered .In doing so, all are introduced onto the execution of
the work to ensure the retention of good and well proven
engineering practices thought.
Probable hazards are established by comprehensive analysis. The
appropriate safety and environment systems and procedure are
then incorporated into the project.
The Principal Objectives are:
To provide a safe working environment for personnel
To minimize the potential of hazardous occurrence.
To avoid exposure to the potential hazards.
To contain or minimize the effect of hazards.
To provide the means of escape from the hazards.
To provide environment protection.
Ph: 06-7464641 Fax: 06-7464642 email: [email protected] www.sigmaengg.com
Safety manual Guidelines
The main provision of the safety manual that Site Manager will
distribute, after Owners approval to all field personnel are
summarized in the following subsections:
Personal protection equipment
Fire prevention
Mobile equipment and rigging practices
Excavation and form practices
Ladders and scaffolding safety
Transportation safety
Radiography
Work permits.
Housekeeping
Emergency situation
Reporting of accidents
Procedure to obtain first aid / assistance for injuries.
Ph: 06-7464641 Fax: 06-7464642 email: [email protected] www.sigmaengg.com
1.
Date:………………….
Inspection Report(Dimensional/Visual)
Project:
Client:
Report No:
Date:
Page:
Item / Part Description Drawing No:Sl. No.
Item / markIdentification (Block No)
Edge Pre / Fit-up Check sigma
DimensionsCheck
Sigma/TPI
Weld VisualCheck
Sigma/TPI
Final Check
Sigma TPI/Client
Remarks: Refer the enclosed Sketches / Drawings for Actual Dimensions. All critical (as-built) dimensions and noted in brackets ( )Inspection Result: Dimensional & Visual Acceptable. Released for Blasting & Painting Dimensions & Weld Visual acceptance Criteria :
Sigma Q/C: Client:
Date : Date:
Ph: 06-7464641 Fax: 06-7464642 email: [email protected] www.sigmaengg.com
SIGMA ENGINEERING FZEP.O.Box No: 42178Hamriyah free zoneSharjah UAE
Date:………………….
Weld Inspection Report
Project: Job/Tag No: WIR No:Order No: Item No:Location:Weld
NoDrawing
NoFit up Weld
ProcedureDate
WeldedLength of Weld
NDT RemarksRT DP
For Sigma (Q.C) For Client / TPI
Ph: 06-7464641 Fax: 06-7464642 email: [email protected] www.sigmaengg.com
SIGMA ENGINEERING FZEP.O.Box No: 42178Hamriyah Free Zone Phase IISharjah UAE
Date:………………….
Paint Inspection Report
Client :Project :Job No :
Location :
Reference:
Report No:
Date:Layer Batch No App. Method Colour Inspection
Equipment UsedIdentificatio
n/Inv. NO
1st Base Hydrometer
Hardener
Steel Temp. Gauge
2nd BaseHardene
rSurface Measure
3rd BaseHardene
rWet film thick. Gauge
4th BaseHardene
rDry film thick .Gauge
Surface Preparation Surface Profile Abrasive :
Required Actual Required Actual Grade:
Type:
Blasting Painting / Coating
Layer 1st 2nd 3rd 4th
DateType of PaintWet film thicknessTotal Ave. dft micronTime temp. checkDry bulb oCWet bulb oCSteel temp oCHumidity %Dew point oCWeather condition: Paint Manufacturer:
Mem No.
Inspector : Approved By:
Ph: 06-7464641 Fax: 06-7464642 email: [email protected] www.sigmaengg.com
SIGMA ENGINEERING FZEP.O.Box No: 42178Hamriyah Free Zone Phase IISharjah UAE
Date : Date :
Date:………………….
Release Certificate Cert. No:Date :Page :
Project :Client :Client’s W.O. / P.O. No. :Sigma Contract No :The following items are accepted and released for : Dispatch / Erection Sl. No. Drawing No Rev. Part / Item No Qty. Remarks Sign
All relevant inspection / verification activities has been completed as follows :Sl. No. Discipline Yes N/A Initials Remark
s 1 Material certificates reviewed / accepted2 Fit – up joint preparation checked3 Dimensional conformance verified4 Final Visual satisfactory 5 NDT competed & Accepted6 Surface preparation / Painting completed
& Accepted7 Identification / Marking completed8 QA/AC documents reviewed & Accepted
Authorized by : Sigma Q.C.
Name :
Client:
Name:
Ph: 06-7464641 Fax: 06-7464642 email: [email protected] www.sigmaengg.com
SIGMA ENGINEERING FZEP.O.Box No: 42178Hamriyah Free Zone Phase IISharjah UAE
Fabrication Procedure
The purpose of this procedure is to describe the elements of
techniques involved to fabricate particular item. The same to be
implemented for pipeline, ducting or any other type of items
either with similar or dissimilar materials.
The procedure covers the requirements governing the selection
of required grades and sections .The same time it covers the
activities as below:
Shop Drawings preparation.
Material Mill certificates submitted and approval.
Receiving the material.
Providing proper supports and packing for the
material.
Identification of material with available mill
certificates.
Traceability of material with approved drawings and
available specifications.
Marking of material (Measurements Layout and
developments process)
Welding process as per given procedure.
Surface preparation (Blasting Galvanizing and Protective
coating) .
Loading on Truck.
Shop Drawings preparation and approval
After receiving the general arrangement drawings and
specifications and standard from the client the shop drawings
will be provided in accordance with the standards referred in the
provided specifications. All the joints details splicing
orientations, weld fillets, dimensions are taken cafe .The shop
Ph: 06-7464641 Fax: 06-7464642 email: [email protected] www.sigmaengg.com
drawings made in ,such a fashion that the fabrication technicians
can easily read the drawings to improve the qualify of
production.
Ph: 06-7464641 Fax: 06-7464642 email: [email protected] www.sigmaengg.com
Grinding Process:
Grinding shall be applied to remove spatter, overlap, slap, gear
etc. of welding beads and ensure quality of product appearance.
Assembly Identification:
After fabrication before releasing for surface preparation the
total assembly will be identified by hard punch at certain place
specified by the client.
Surface Preparation
1. Blasting to S.A2.5
2. Galvanizing as per BS 729-1971 (1986)
3. Mordant wash and 3 coat epoxy 200microns
Delivery Method
Before material dispatches the following discipline are taken:
Material certificates reviewed and accepted
Fit up joint preparations.
Dimensional conformance verified
Final visual inspection satisfactory
NDT completed and accepted.
Surface preparation/painting completed and accepted
Identification/ marking completed
Items cross checked with release certificates
The above statements covers all the activities for steel
fabrication .Any future changes required in above statements to
be in formed before starting the fabrication.
Ph: 06-7464641 Fax: 06-7464642 email: [email protected] www.sigmaengg.com
Material Mill Certificates submittal and approval:
The certificates are reviewed as per our requirements. The
certificates which are matching your our requirements will be
submitted to the client for the approval. To avoid usage of non-
equivalent materials.
Material Receiving:
While receiving the material all the sections are visually
inspected to avoid pitted, rusted, laminated are bent materials.
Material Placing;
All the material is placed in a reasonably leveled area on the
supports, which is suitable to fabricate.
Identification of Material:All the received raw materials are dimensionally identified to
required sizes. All heat numbers and grades are verified
according to approved mill certificates. The Q.C personal will
generate in-word material document for clients review and to
avoid unspecified material usage.
Traceability of materialThe raw materials which are under fabrication will be marked
for traceability with the permanent mental marker on the left
over materials. This will avoid the miss-usages of specified
grades at the time of using the left over materials.
Marking: The raw material marking is the important activity in the
fabrication. This activity done by a technician who can read
the drawing .While marking the cutting plans will be provided
to the technicians to avoid the wastage of raw materials.
Ph: 06-7464641 Fax: 06-7464642 email: [email protected] www.sigmaengg.com
The standard measuring instruments are used for marking to
get the dimensions with in the tolerances .The cutting
allowances will be taken care at the time of marking. All the
markings, developments, layouts will be verified and inspected
by the Q.C. personnel. The dimensions are verified by the Q.C.
personnel to maintain the tolerances
Cutting Activities:
The raw materials are mild steel or carbon steel the oxy-
acetylene process will be used. While cutting tolerances will be
taken care.
Edge Preparation:
To prepare the edges, approved drawings are verified, to find the
weld methods. Based on the weld method, edge preparation will
be carried out All the preparation are monitored by the Q.C.
Personal, before the fit up process proceeds.
Fit- up process:
Before starting the fit up all items are verified with approved
drawings by the technician to avoid the dimensional errors all
the edges are checked as per given weld methods. The fit-up will
be made by the help of clamps and special tools.
Welding Process:
Welding process is very important process in the mechanical
fabrication and construction activity. All welding processes are
confirmed and qualified before starting the job. The welder has
to be qualified on the required welding process before any
fabrication can be started. For Mild Steel and Carbon Steel the
low hydrogen E-7018 electrodes will be used. All the lot and
batch certificates for these electrodes will be submitted to the
Ph: 06-7464641 Fax: 06-7464642 email: [email protected] www.sigmaengg.com
client, prior using the materials as per the attached quality
assurance plan. All the fillet & butt welds will be verified by the
Q.C personnel.
Ph: 06-7464641 Fax: 06-7464642 email: [email protected] www.sigmaengg.com
CORROSION PROTECTIVE COATING PROCEDURE
1. Scope
This procedure covers the requirements governing the selection and application of the
coating system to be used on the exterior surfaces of
manufactured products including structural steel, crane rails,
piping and equipment for onshore or coastal locations and
internal coating of such equipment when required.
Individual equipment specifications and/or drawings, when
furnished, shall be used with these procedures. If conflict exists,
the individual specification and/or drawing shall govern, unless
subjected to client's veto.
2. General
a. Reference to (SSPC) Steel Structures Painting Council.
b. Machined and threaded surfaces shall be protected
wife a
temporary rust preventative or by protection tape.
c. Any deviation from this procedure shall be approved
in
writing by client's representative.
d. The foreman or supervisor is acquainting with the
requirements of this procedure. They have a copy of
the
procedure at the job site at all times, Dry film
thickness
gauge and are inspecting all work as it progresses.
He
shall have a temperature gauge and relative
humidify
gauge to assure that conditions are within the
specified limits
Ph: 06-7464641 Fax: 06-7464642 email: [email protected] www.sigmaengg.com
3. Surface Preparation
1. Carbon Steel Surfaces.
a. All rough welds, bums, weld splatter, laminations all
other sharp surface and projections are ground
smooth prior to further surface preparation. Any
grinding done after shot blasting, shall be cleaned to
obtain proper anchor pattern.
Ph: 06-7464641 Fax: 06-7464642 email: [email protected] www.sigmaengg.com
b. All bolt holes shall be drilled and smoothed before blast cleaning.
c. All surface to be coated shall be blast cleaned to "No. 10
Near White Metal Blast Cleaning" as per steel structures.
Painting Council (SSPC) surface preparation specification
SP-10T or as per client specifications.
d. All the Blasted materials sent to Galvanizing process. The
galvanizing process carried out as per BS 729 Standard.
e. Any oil, grease, dust or foreign matter deposited on the
surface after the surface preparation is completed shall be
removed prior to painting. In the event rusting occurs after
completion of surface preparation, the surfaces shall again be
cleaned in accordance with the specified method.
f. Cleaning shall be discontinued each day in sufficient time to
permit the surface cleaned to be primed before the end of the
working day.
g. Dry blast cleaning operations shall not be conducted on
surfaces that will be wet after blasting and before painting, if
relative humidity is greater than 80 percent, permission to blast
shall be obtained from company representative.
h. Extreme care shall be exercised to prevent damage when
blasting near, machined surfaces and factory coated items.
These surfaces shall be adequately protected.4. Coating Procedure:-
I. Coating System
a. The type, brand number of coats, color and thickness shall be as
outlined in specification issued by coating manufacturer's and
the product technical data sheets shall form part of this
procedure, and shall be strictly adhered to.
b. Primers and finish coats for any particular system shall be from
the same manufacturer to ensure compatibility. Unless the
paint manufacturer issues written compatibility statement.
c. Manufacturers instruction, including safety precautions are a
Ph: 06-7464641 Fax: 06-7464642 email: [email protected] www.sigmaengg.com
part of these specifications in case of conflict the Sigma
Engineering LL.C management shall be contacted.
g. Spray application shall be in accordance with the following.
i) The equipment used shall be suitable for the
intended purpose, shall be capable of property
atomizing the paint to be applied, and shall be
equipped with suitable pressure regulators and
gauges. The air caps, nozzles and needles shall be
those recommended by the manufacturer of the
equipment for the material being sprayed.
ii) Paint shall be applied in a uniform layer, with
overlapping at the edge o the sprayed pattern. The
spray pattern shall be adjusted. so that the paint is
deposited uniformly. During application, the gun shall
be held perpendicular to the surface and at a distance,
winch will ensure that a wet layer of paint is deposited
on the surface. The trigger of the gun shall be released
at the end of each stroke.
iii) Only areas inaccessible to the spray gun shall be
painted by brush if not accessible by brush, daubers or
sheepskin shall he used. Brushes shall be used to work
paint into cracks, crevices and blind spots, which are
not adequately painted by spray.
h. The areas where to prohibit coating deposition shall be
rnask6d. If these surfaces arc coated, the component shall
be cleaned and restored to its original condition.
i. Wet paint shaft be protected against contamination from dust:
or other foreign matter.
5. Drying of Coated Surfaces
1. No coat shall be applied until the preceding coat has
dried. The material shall be considered (fry for re-coating
Ph: 06-7464641 Fax: 06-7464642 email: [email protected] www.sigmaengg.com
when other coat can be applied without the development
of any film irregularities such as a lifting or loss of
adhesion to undercoats, and the drying time of the applied
coat does not exceed the maximum specified for it as a
first coat.
Ph: 06-7464641 Fax: 06-7464642 email: [email protected] www.sigmaengg.com
6. Application of the Recommended Paints.
I. Primer Coat
The primer coat to be applied according to the manufacturer’s data
sheets and recommendation, immediately applied upon the blasted area to
obtain recommended DFT with airless or conventional spray machine.
While spraying wet film thickness to be checked and maintained as per
the paint manufacturers specification. Before painting, the humidity and
dew point to be checked. Mixing to be done, as per the manufacturer
specification, drying and over coating times shall be as per manufacturers
technical data sheet.
II. 2 nd Coat
The intermediate coat to be applied according to the manufacturers
data sheets and recommendation upon the primed surface to obtain
recommended DFT "with airless spray machine. While spraying, wet
film thickness to be checked and maintained the requirements. Mixing
to be done as per the manufacturers specification, drying and over coaling
times shall be as per manufacturers technical data sheet.
III. Final Coat
The final coat to be applied up on the intermediate coat to obtained
recommended DFT and RAL color with airless spray and wet film to be
checked to maintain requirements.
7. Inspection
I AH work and materials applied under tins specification shall be subject
To Inspection.
II AH parts of the work shall be readily accessible to client's inspection.
Ph: 06-7464641 Fax: 06-7464642 email: [email protected] www.sigmaengg.com
8. Approvals
I. Each activity of the following shall be obtained
before proceeding the each subsequent phase:
a. Location of work
b. Equipment
c. Surface preparation
d. First coat
e. Coating thickness shall be determined by a
micro test thickness gauge or comparable
instrument.
9. Q.C. Form
I. The following Q.C: Form shall be applicable to this
procedure:
a. Paint Inspection Report
Ph: 06-7464641 Fax: 06-7464642 email: [email protected] www.sigmaengg.com
Erection Method Statement
The purpose of this procedure is to describe the elements of
techniques involved in the industrial erection either structural
steel, pipe lines, equipment erection etc.
This procedure covers activities below;
Receiving the fabricated materials
Placing the materials
Preparation of equipment placing area
Lifting tools safety measures
Erection
Alignment, bolt tightening
Touchup Painting -
Receiving the fabricated materials
Receiving the fabricated materials and identifying the receiving
materials with delivery
note, to ensure the mentioned quantity in the delivery Note.
Placing the materials:
The receiving materials placed at reasonably leveled area on
wooden packing near to the erection area. To avoid the re-
handling activity.
Ph: 06-7464641 Fax: 06-7464642 email: [email protected] www.sigmaengg.com
Preparation of equipment placing area.
The concrete foundation or slab should be in a level, other wise
the structural steel will be given suitable shim plates to obtained
the required level.
Lifting tools safety measures
Proper lifting tools to be used for the erection activity. All the
tools used for this should be calibrated. This activity will be
headed by a experience site engineer.
Erection
Before lifting Pipe Supports, Gantry Beams, the site
measurements will be taken and cross checked the drawing
dimensions. The material will be lifted with proper tools, to suit
the site conditions and placed in position. The suitable bolts
are used according to the drawing for tightening of materials.
Alignment bolt tightening.
The erected materials aligned according to the drawing and
ensure the dimensions. And bolt tightening will be done to
required torque as per provided specifications.
Touchup
Paint touch will be done for mechanical and transit damages
after alignment. As per paint manufacturers / data sheet
recommendations
Ph: 06-7464641 Fax: 06-7464642 email: [email protected] www.sigmaengg.com
QUALITY SUPERVISOR
PRODUCTION ENGINEER
PROCUCTION ENGINEER
FABRICATION SUPERVISIOR
BLASTING SUPERVISIOR
FORMANFORMAN
FABRICATOR
FITTERS, RIGGERS, HELPERS WELDERS
BLASTERS, PAINTERS, HELPERS
ACCOUNTANT MARKETING EXECUTIVES
P.R.OCUSTOMS /
TRANSPORTT
ASSISTANT
SECURITY
Ph: 06-7464641 Fax: 06-7464642 email: [email protected] www.sigmaengg.com
GENERAL MANAGER
QUALITY ENGINEER PRODUCTION MANAGERCOMMERCIAL MANAGER /
ADMINISTRATOR
ORGANIZATION CHART
SIGMA ENGINEERING FZEP.O.Box No: 42178Hamriyah Free Zone Phase IISharjah UAE
QUALITY ASSURANCE PLAN(Inspection & test Plan )
Sigma QAP:Sheet : 1/5
Scope Date Rev Prepared By Reviewed By Approved By Remarks
Signature & Stamp Signature & Stamp Signature & Stamp
Abbreviations;H – HoldR – ReviewM – Monitor
Ph: 06-7464641 Fax: 06-7464642 email: [email protected] www.sigmaengg.com
SIGMA ENGINEERING FZEP.O.Box No: 42178Hamriyah Free Zone Phase IISharjah UAE
QUALITY ASSURANCE PLAN(Inspection & test Plan )
Sigma QAP:Sheet : 2/5
Project: Sigma job No:
Element Description /Control activity
ReferenceDocuments
Acceptance Criteria
Verification personnel
Form of record / Verify.Doc
Sigma Inspection Authority
Client’s TPI
Raw material Dimensional conformity and Visual check
Approved fabrication Drawings / Parts List
Dimensions conforming to parts list
Sigma Q.C. Personnel
Incoming Goods Inspection /report
H
Steel Plates, Structural sections and Pipes
Verification of Mill Test Certificates for the specification & Grade
Approved Fabrication drawings & parts List
Specification / Grade Conforming to Drawing
Client’s Q.C. Personnel
Mill Test Certificates
H
Welding Procedure & welder qualification records
Verification of sigma’s qualified welding procedure specifications and procedure qualification records (WPS & PQR) for compatibility & compliance of Essential Variables.
Approved fabrication drawings & ASME Sec. IX
Compliance to ASME Sec. IX
Sigma’s Q.C. Engineer & client’s QC personnel
Copies of WPS & PQR
R
Ph: 06-7464641 Fax: 06-7464642 email: [email protected] www.sigmaengg.com
SIGMA ENGINEERING FZEP.O.Box No: 42178Hamriyah Free Zone Phase IISharjah UAE
QUALITY ASSURANCE PLAN(Inspection & test Plan )
Sigma QAP:Sheet : 3/5
Project: Sigma job No:
Element Description /Control Activity
ReferenceDocuments
Acceptance Criteria
Verification personnel
Form of record / Verify.Doc
Sigma Inspection Authority
Client’s TPI
Welding Consumables SMAW Electrodes (low Hydrogen Type
Verification of AWS Classification & Batch / Lot No. Conformity
Applicable WPS & Electrode Batch / lot Test Certificates
AWS classification Bach / Lot No. conforming to test certificates
Sigma Q.C. Personnel
Electrode batch/ Lot Test Certificates
H
In – progress inspection A) Cutting & Edge Preparation
Monitoring of cutting dimensions and weld bevel edge preparations Conformity
Applicable Fabrication Drawing
Dimensions Conforming to drawing & Specification
Sigma, Work supervisor &AC Personnel
Inspection Report (Dimensional & Visual)
M
B) Fit –up Dimensions
Fit- up / alignment check & Critical / major Dimensions conformity at fit – up stage
Applicable fabrication Drawings
Applicable drawings & Clients Doc.
Sigma’s Q.C. personnel
Inspection Report (Dimensional & Visual)
H
Ph: 06-7464641 Fax: 06-7464642 email: [email protected] www.sigmaengg.com
SIGMA ENGINEERING FZEP.O.Box No: 42178Hamriyah Free Zone Phase IISharjah UAE
QUALITY ASSURANCE PLAN(Inspection & test Plan )
Sigma QAP:Sheet : 5/5
Project: Sigma job No:
Element Description /Control Activity
ReferenceDocuments
Acceptance Criteria
Verification personnel
Form of record / Verify.Doc
Sigma Inspection Authority
Client’s TPI
Dry Film thickness (DFT) check after coat of shop painting with Elcometer Digital DFT gauge
Paint Manufacture Data sheet
Minimum average DFT Conforming to Clients
Sigma TPI/Client’s Q.C. Personnel
Blasting & Painting report
M
Shipping release
Verification of identification tags / marks and final visual check
Review & verification of all quality control records
Approved fabrication drawings & Clients Doc.
SIGMA Quality assurance plan
Unique Identification
Availability of all complete quality records as per QAP
Sigma TPI/Client’s Q.C. Personnel
Sigma TPI/Client’s Q.C. Personnel
Sigma Release Certificate
Sigma Release Certificate
H
Ph: 06-7464641 Fax: 06-7464642 email: [email protected] www.sigmaengg.com
Our Involvement in Various Project
Description Project Consultant / ClientMaterial Handling System Hoppers & Bucket Elevators Sharjah Cement
Material Handling System Stacker & Reclaimer Al-Qasim Cement, Saudi
Structural Steel Works Camping Facility ADNOC
Structural Steel WorksInfrastructure Development Al-Qaffy
IslandHalcrow / Dutco Balfour Beatty
Structural Steel WorksAl-Yasat Ali Island Infrastrcture
DevelementHalcrow / Ducto Balfour Beatty
Structural Steel WorksCentral Cooling Processing Plant 1,2,3 & 4 Jumeirah Lake Towers
Dutco Balfour Beatty
Structural Steel & Piping District Cooling Processing Plant, Palm Trunk
Dutco Balfour Beatty
Structural Steel WorksPantoon Piling Pipes & Structural Steel, Lagoons Dubai
Dutco Balfour Beatty
Structural Steel WorksPantoon Bridge, Sudan Petro
ChemicalsAl-Swiss
Structural Steel WorksRTA Infra Structure Development
5.5 BridgeParsons / Dutco Balfour Beatty
Material Handling SystemFabrication of Ducts & Chuts for
Gulf CementGulf Cement
TanksMedia Vessels for Water Treatment Plant
Celar Water
DuctingDuplex Steel Fabrication for Soudi Desalination Plant
Swedon
Material Handling System for Fujairah Port
Material Transport Conveyors and Modification Ship Loader
Kropp, Fujairah Port
Casting & Structural Steel Modification ESP to Bag FilterBHA, Germany / Union
Cements
Pipe Fabrication & Coatings Coatings for Rig Pipes, Siril Oil Base Total Fina
Plate Work Silo Fabrication for Cements Factory, Siril Cement Products, Ras-Al-
Khaimah
CoatingsCoatings for Tanks form Hamiriyah
Free Zone –IAlaska
Structural Steel Fabrication & Painting
Structural steel works for Disalination, Dubai
Aqwa / Tornado
Tank formDiesel, Petrol and aviation fuel tanks for Gaffy Island
E.O / Dutco Balfour Beatty