+ All Categories
Home > Documents > profile of hariharan foundations pvt. ltd.

profile of hariharan foundations pvt. ltd.

Date post: 30-Mar-2016
Category:
Upload: hariharan-foundations
View: 220 times
Download: 2 times
Share this document with a friend
Description:
profile pdf, hariharan foundations pvt. ltd.
Popular Tags:
41
BUILDING VISIONS HARIHARAN FOUNDATIONS (P) LTD. CIVIL ENGINEERS | CONTRACTORS
Transcript
Page 1: profile of hariharan foundations pvt. ltd.

BUILDINGVISIONS

HARIHARAN FOUNDATIONS (P) LTD.CIVIL ENGINEERS | CONTRACTORS

Page 2: profile of hariharan foundations pvt. ltd.

Hariharan Foundations began as a modest Civil Engineering Contracting Firm in 2001. Today, the Company is at the forefront of industrial and commercial construction in Tamil Nadu. With several hallmark projects already to its credit, the Company has developed projects for multinational corporations like Toshiba, Renault Nissan, Winwind Energy, Nokia, Schwing Stetter India, Foxconn to name a few.Specializing in the development of industrial and residential projects along with high-rise and commercial buildings, HariharanFoundations is committed to quality, safety and excellence in building your vision.

Page 3: profile of hariharan foundations pvt. ltd.

The Company is known for:

• Fast Track Project completion.

• Undertaking turnkey jobs from concept to completion.

• Great track record with well known Multi National Corporations as well as Indian Concerns.

• Repeat orders from clients.

•Value Engineering practicesresulting in maximum value for the amount invested in a Project.

• Strict quality adherence.

• Best safety practices.

• Very low attrition rate resulting in strong employer employee bonds.

Page 4: profile of hariharan foundations pvt. ltd.

Hariharan Foundations is committed to providing complete customer satisfaction. The Company sets the bar high in terms of quality and efficiency and is dedicated to continuously improving the standards of quality in all spheres.

The Company follows a detailed Quality Policy that is supported by an effective Quality Control Department. The company is equipped with the latest systems and ensures high standards by adhering to specifications and delivering projects on time along with following safety rules, statutory and regulatory requirements. The company also uses state of the art construction technology and follows ethical business practices, while fostering a spirit of teamworkwithin the organization.

qualitypolicy

sales

humanresources

Period 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12

Rs. in millions 500 750 1150 1000 1080 1900

Period 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12

No. of Employees 110 140 150 208 225 253

Page 5: profile of hariharan foundations pvt. ltd.

Toshiba JSW Turbine & Generator Private LimitedBlade Shop, Admin Building & Canteen, TPSC were the architects and the project was managed by TCE.Construction Area : 2,31,500 Sq. Ft.

Page 6: profile of hariharan foundations pvt. ltd.

Galaxy Educational Health & Charitable TrustMBA Institute designed to best standards by Bharath Associates.

Construction area: 1,00,100 Sq. Ft.

Page 7: profile of hariharan foundations pvt. ltd.

Rockworth Systems Furniture India Pvt. Ltd.Construction of Factory Facility, Admin Building, Road at Sricity, Tada, Andhra Pradesh, designed by CRN architects. Construction Area : 1,38,000 Sq. Ft.

completprojectscompleted

projectsVirgo Valves & Controls LimitedConstruction of Factory Building for Manufacturing of Valves, designed by ShetGiri Associates. Construction Area : 1,50,000 Sq. Ft.

Page 8: profile of hariharan foundations pvt. ltd.

Tacle Automotive India Private LimitedConstruction of Production Facility at SIPCOT Industrial Park, Oragadam, Chennai, designed and managed by Jayam Consultants (P) Ltd, Chennai. Construction Area : 61,340 Sq. Ft.complet

projectscompletedprojects

Page 9: profile of hariharan foundations pvt. ltd.

completprojectscompleted

projectsWinwind Power Energy Private Limited

This project involved the construction of Wind Turbine Assembly and Blade

Manufacturing Facilities and Mould Blocks & Raw material stores,

covering 11,00,000 Sq. Ft. It was completed in 2009 after 12 months of

construction. Super Flat Floors, conforming to FM3 TR34 standards was the hallmark of this work. It also

houses a state of the art Pyramidal corporate office. M/s.VICI Engineers

were the consultants

Page 10: profile of hariharan foundations pvt. ltd.

Winwind Power Energy Private LimitedConstruction of

Wind Energy Turbine - Asia's Biggest Facility to International Standards ,

Vici Engineers were the architects.Construction Area: 11,00,000 Sq. Ft.

Winwind Corporate OfficePyramidal Corporate Office To International Standards,Vici Engineers were the architects.Construction Area: 32,000 Sq. Ft.

mpletprojectscompleted

projects

Page 11: profile of hariharan foundations pvt. ltd.

Unipres India Pvt. Ltd.Construction of Production Facility and Press Shop at SIPCOT Industrial Park, Oragadam, Chennai for biggest ancillary of Nissan designed by CRN architects and managed by Fujita Corporation & Taamaesek Engineering Consortium.Construction Area : 3,50,000 Sq. Ft.

Page 12: profile of hariharan foundations pvt. ltd.

Renault Nissan Automotive India Private LimitedCorporate Office for Renault Nissan Automotive Pvt Ltd at Orgadam, Chennai designed by CRN Architects and managed by Toyo Engineering. Construction Area : 90,000 Sq. Ft.

mpletprojectscompleted

projects

Kobelco, JapanFacility for Japanese excavators co. is

being executed as subcontractor for Shimizu, Japan, designed by

Aswathanarayana & Eswara and managed by Shimizu, Japan.

Construction Area: 1,07,700 Sq. Ft.

Page 13: profile of hariharan foundations pvt. ltd.

completprojectscompleted

projectsNokia Siemens Networks Private LimitedThis project was constructed over a period of six months.Completed in 2008, the facility covers 3,22,850 Sq. Ft.It has super flat floors conforming to FM3 TR34 standards and a anti-static floor. This work was executed as a sub-contractor for Lemcon, Finland.

Sanmina SCI-TechnologyIndia Private Limited

This industrial facility covers3,22,850 Sq. Ft. The project was

completed in 2009 in the brief span of 6 months. It has super flat floors

conforming to FM3 TR34 standards and a anti-static floor. M/s. CRN were

the consultants.

Page 14: profile of hariharan foundations pvt. ltd.

A. S. Cargo Movers Private LimitedThe warehouse was built in 2008 in 6 months covering 3,22,830 Sq. Ft.M/s.Virendra Kumar Giridhar &Associates were the consultants. mplet

projectscompletedprojects

Page 15: profile of hariharan foundations pvt. ltd.

completprojectscompleted

projectsWintek TechnologiesIndia Private LimitedThis industrial facility covers 2,15,250 Sq. Ft. The project was completed in 2008 in the brief span of 6 months. It was done as a subcontractor for Leighton Contractors India Pvt. Ltd.

Foxconn India Developers Private Limited

This industrial facility covers 6,00,000 Sq. Ft. and has a

Pipe Rack – 6 km long. The construction was completed in

2008 and was built in 10 months. M/s.Aswathanarayana & Eswara

were the consultants.

Page 16: profile of hariharan foundations pvt. ltd.

Perlos Telecommunication & Electronic Components IndiaPvt. Ltd. This construction was completedin 2007. The building covers an area of 2,15,250 Sq. Ft. Super flat floors conforming to FM3 TR34 standards were the hallmark of this facility. M/s.CRN were the consultants.

completprojectscompleted

projects

Salcomp ManufacturingIndia Private Limited

This construction was completedin 2007. The building covers an

area of 1,29,150 Sq. Ft. Super flatfloors conforming to FM3 TR34

standards was the hallmark of this facility. This work was executed as

a sub-contractor for Leighton Contractors India Pvt. Ltd.

Page 17: profile of hariharan foundations pvt. ltd.

completprojectscompleted

projectsUCAL Fuel Systems, Maraimalai NagarThe construction of this Die cost facility was finished in 2007. The building covers a plan area of1,07,650 Sq. Ft., with epoxy floors and PEB Roof from Tata Blue Scope Steel Limited. It also houses the corporate office. M/s.Naksha were the consultants.

Flextronics TechnologiesIndia Private Limited

This 6,02,650 Sq. Ft. factory building was built in 2006. The project was

completed in six months. Super Flat Floor conforming to FM3 TR34 standards is the hallmark of the

Project. The work was executed as a sub-contractor for Leighton Contractors India Pvt. Ltd.

M/s.CRN were the consultants.

Page 18: profile of hariharan foundations pvt. ltd.

Rayala Techno ParkThis 8 storied I.T. Building was completed in 2006 and took 6 months for construction. It is an I.T. Building of International Standards. The size of the building is 2,15,250 Sq. Ft. M/s. KSM Consultants Pvt. Ltd were the consultants.

mpletprojectscompleted

projects

Schwing Stetter India Pvt LtdPhase III

This turnkey project involved the design and building of a Concrete

Equipment Manufacturing Facility. It houses roof at 21m RCC columns

and EOT cranes. The facility was completed from concept to

completion including Mechanical & Electrical works in 6 months in 2006.

M/s. Bharath & Associates werethe designers.

Construction Area: 2,25,000 Sq. Ft.

Page 19: profile of hariharan foundations pvt. ltd.

completprojectscompleted

projectsSchwing Stetter India Pvt Ltd Phase IIThis turnkey project involved the design and building including Mechanical & Electrical services of a Concrete Equipment Manufacturing Facility. Bonus was received for early completion. It was built in 6 months in 2004. M/s. Natraj & Venkat Associates were the designers.Construction Area: 2,81,950 Sq. Ft.

Nokia FacilitiesThis involved the construction of

Nokia’s main building of the mobile unit along with other structures.

The project took was completed in6 months in 2005. It was done as

a subcontractor for LeightonContractors India Pvt. Ltd.

M/s. Aswathanarayana & Eswara were the consultants.

Construction Area: 3,44,400 Sq. Ft.

Page 20: profile of hariharan foundations pvt. ltd.

Cauvery Palm Oil LimitedIn 2003, the company completed construction of this Palm Oil Factory. The project took 6 months to finish. It involved the construction of 32,300 Sq. Ft. EPS tanks and metal sheet roofing. The project was designed byJayam Consultants.

mpletprojectscompleted

projects

Ceebros Property DevelopmentPvt. Ltd.

This multi storied I.T. complex was constructed in 2004 and took 6

months for construction. It is an I.T. building of International standards. It

is a 1,07,650 Sq. Ft. building,comprising of 5 floors. M/s.Jeevan

Associates were the consultants.

Page 21: profile of hariharan foundations pvt. ltd.

completprojectscompleted

projectsSakthi Arutkoodam Meditation Hall, SelaiyurThe hall was completed in 2002 and took 5 months of construction.The structure is a coffer slab gridfor a free span of 30 m at 6 mfrom ground level.

Kryolan CosmeticsThe factory was constructed as per

European GMP standards in a span of 6 months. The building in

Maraimalainagar is truly world class. M/s.R.Basker, Architect were

the consultants.

Page 22: profile of hariharan foundations pvt. ltd.

completprojectscompleted

projects

Other completedprojectsSheenlac Paint Corporation

Factory Building - Paint Factory, designed and

managed by Kannimar Consultants, Chennai.

Flooring Area: 8,21,400 Sq, Ft.

Foxconn – Irungattukottai

This involved the renovation of the already existing

facilities. The project was completed in 5 months in

the year 2006.

Astron - BPO

This multi storied B.P.O was constructed in 2005

and took 6 months for construction. The area of the

building is 80,700 Sq. Ft.

Orchid Chemicals & Pharmaceuticals

The project involved the expansion of the power

plant, which was completed in a period of 3 months.

Sanmar Alloy Castings Limited

Construction in this project required adding to the

pre-existing facilities. It was completed in 2003, in 7

months time.

Moksha Show Room

This high quality commercial building took 4 months

to complete. It was finished in 2003.

Tata Consultancy Services

This commercial office was set up in 2004. It took 6

months to construct.

Temple work at Kumbakonam

This unique project involved the construction of the

temple tank at Kumbakonam. It was completed in

2005, in 6 months time.

Andavan Arts & Science College, Srirangam

This college building was built in 2002, in the span of

4 months.

Grobest Feeds Corporation, Gummidipoondi

The project involved construction of a shrimp feed

plant. It was finished in 2001 after 5 months of

construction.

Page 23: profile of hariharan foundations pvt. ltd.

currentprojects

L & T – Ship BuildingUnder took the construction Civil & Structural works for Shipyard, Port & Container Freight Station – Office Admin Building, QA, Fire, Dispensary, SEZ, Security, Main Entry Gate & Side Facilities. Flooring Area: 4,00,000 Sq. Ft.

Page 24: profile of hariharan foundations pvt. ltd.

currentprojects

currentprojects

currentproject

Page 25: profile of hariharan foundations pvt. ltd.

currentprojects

currentprojects

currentproject

L & T – Ship BuildingUnder took the construction Civil & Structural works for Shipyard, Port & Container Freight Station – Office Admin Building, QA, Fire, Dispensary, SEZ, Security, Main Entry Gate & Side Facilities. Flooring Area: 4,00,000 Sq. Ft.

L&T Ship Building - Admin Building

Page 26: profile of hariharan foundations pvt. ltd.

currentprojects

currentprojects

currentproject

L&T Ship Building - Workshop

L&T Ship Building - Warehouse

Page 27: profile of hariharan foundations pvt. ltd.

currentprojects

currentprojects

currentproject

Shimizu- Kobelco CranesIt is an admin building for manufacturing cranes.Construction Area: 86,100 Sq. Ft.

Page 28: profile of hariharan foundations pvt. ltd.

currentprojects

currentprojectscurrent

project

Yorozu JBM Automotive TN Pvt. Limited

Constructed press pit- 1500 T, press pit- 800

T- 2 nos. roads & external development.

Construction Area: 2,15,200 Sq. Ft.

Page 29: profile of hariharan foundations pvt. ltd.

currentprojects

currentprojects

currentproject

Virgo Engineers Limited

Construction for Foundry Facility.

Construction Area: 70,000 Sq. Ft.

National CollegeConstruction of Educational Institute.Construction Area: 1,20,000 Sq. Ft.

Page 30: profile of hariharan foundations pvt. ltd.

currentprojectscurrent

projects

Other currentprojects

Cosma International India - Subcontract from Reward Construction (P) Limited - (Nissan Ancillary)Industrial Facilities including Press Pit.Construction area: 2,00,000 Sq. Ft.

Renault Nissan- Press PitConstructing of Industrial Facilities (Press Pit), work at Body Shop, Paint Shop, Trim & Chasis.Construction area: 1,29,120 Sq. Ft.

Sanmina SCI- Technology India Private Limited

Deployed for the construction of Semi-Conductor Facility.

Construction area: 1,10,000 Sq. Ft.

Page 31: profile of hariharan foundations pvt. ltd.

themilestones

The Systems present in the company got validated through an ISO audit and the company obtained its ISO certification

(ISO 9001:2008) from BVCI in OCTOBER 2009.

Award from Builders Association for excellence inIndustrial Construction.

Page 32: profile of hariharan foundations pvt. ltd.

themilestones

themilestones

Page 33: profile of hariharan foundations pvt. ltd.

themilestones

themilestones

Page 34: profile of hariharan foundations pvt. ltd.

themilestones

themilestones

Page 35: profile of hariharan foundations pvt. ltd.

themilestones

themilestones

Page 36: profile of hariharan foundations pvt. ltd.

the team

Hariharan Foundations has a well-structured organizational set up for efficient management and overall functioning. Considerable authority is vested with executives from the upper management to ensure quick decision-making for faster progress. Under the guidance of Mr.H. Ravishankar, Managing Director, the Company has earned the reputation for being one of the best in terms of quick construction, qualityand safety.The Company also gives great importance to Health and Safety Executive issues.These parameters are overseen by qualified and experienced Safety Managers and Engineers. A full-fledged, proactive Quality Assurance/ Quality Controlset-up is the strength of the Company, enabling it to make architectural visions a reality.

DIRECTORS

G.M. FINANCEADMIN & SYS. IMPLEMENTATION

A.G.M.PROJECTS

G.M.PROCUREMENT &

SITE ADMINISTRATION

ADMINISTRATION

ADMIN. ASSISTANT SR. ACCOUNTS EXE

ACCOUNTS ASSISTANTS

QUANTITY SURVEYORS

Q.A. ASSISTANT

SITE ENGINEERSITE ENGINEERSITE ENGINEERSITE ENGINEERSITE ENGINEER

SURVEYOR SURVEYOR

ENGINEERS - QA/QCPROJECT ENGINEERSPROJECT ENGINEERS

ACCOUNT MANAGER PROJECT MANAGERS TENDER/PURCHASE PURCHASE MANAGERS

A.G.M.BATCHING PLANT

PLANT OPERATORS

SAFETY MANAGERS

SITE ADMINISTRATION

STORES

ACCOUNTS

SAFETYOFFICERS

SAFETYOFFICERS

TENDER/PURCHASEASSISTANT

Page 37: profile of hariharan foundations pvt. ltd.

the safety policyIts dedication toward the occupational health and safety of the employees and environmental preservation has led the Company to establish a sound Safety Policy. Hariharan Foundations works hard to

• Eliminate, minimize and control adverse environmental impacts, occupational health and safety risks at all levels and functions.

• Improve working environment by taking proactive measures for the health and safety of our employees, contractors and visitors

• Comply with all relevant legal and other requirements.

• Instill good environment, health and safety practicesin the minds the employees and strengthen theirinvolvement is such issues

• Conserve resources and minimize generation of inevitable wastes.

• Spread awareness about the importance ofenvironmental, health and safety managementamong stockholders, suppliers, visitors and clients.

Page 38: profile of hariharan foundations pvt. ltd.

the ready mix concrete

Drawing from its expertise in construction, Hariharan Foundations

has now entered the concrete industry with the production of its own

brand of ready mix concrete. The company now has 3 fully opera-

tional commercial Batching Plants. The plants are located at

1) Oragadam – Tamilnadu

2) Sricity – Tada – Andhra Pradesh

3) Kattupalli – Ennore - Tamilnadu

The plant is completely computerized and can generate specific

mixes to suit the customer’s requirements.

About 1,50,000 cum of concrete is produced every year in the

company.

The Company’s services assure customized mixes that suit the

client’s needs best, swift delivery that is supported by an

uninterrupted supply and excellent placement methods. We also

ensure the delivery of the correct quantity of the mix for complete

customer satisfaction.

divisionOragadam Tamilnadu

Sricity Tada, Andhra Pradesh

Page 39: profile of hariharan foundations pvt. ltd.

The Company has invested in a 1 MW windmill

at Uthumalai, Tirunelveli District. The Windmill is

expected to generate 2.4 Million units of power

every year for the next 20 years.

power production

Page 40: profile of hariharan foundations pvt. ltd.

support infrastructureconstructionMajor Plant & MachineryBMP – Site Plants – 18m3 Per HourBMP – Commercial Plants – 30m3 Per HourConcrete PumpsBackhoes2 Ton RollersDynapac Ride on TrowelsDynapac Walk behind Ride on Power TrowelsVacuum PumpsChain DozersVibratory RollersBoom PlacersReady Mix TrucksScreed VibratorsCement Storage SilosReversible Drum Mixer Machines RM800Tough RidersWeigh Bridges - 100 Tons

DG Sets15 KVA Kirloskar Green20 KVA Kirloskar Green30 KVA Kirloskar Green62 KVA Kirloskar Green125 KVA Kirloskar Green25 KVA 82.5 KVA Kirloskar Green

Minor Plant & MachineryVibrators, Rammers, Pumps Tower CranesMobile HoistsElectrical HoistsStaircase Towers Plate CompactorsRod Bending Machines Rod Shearing MachinesMini LiftsCube Testing Machines Baby Mixer Machines Cube MouldsThermo Stat Ovens Slump Cone with Tamping Rods

Scaffolding & ShutteringCuplock Scaffolding Roof SystemAPS-ScaffoldingAPS-Roof SystemL & T Materials – Wall Form Work

Survey EquipmentsLaser Instrument SetsAuto Level Instrument SetsSurvey Instrument Sets (Total Station)Optical Leveling InstrumentsDLE – 70 (Range Finder)

Page 41: profile of hariharan foundations pvt. ltd.

“Chandra Vilas”, No.19/9 8th street, Dr. Radhakrishnan salai, Mylapore, Chennai 600 004.Ph: 044 42698181/82, 28474982, 32986943. Fax: 28474981

email: [email protected]

HARIHARAN FOUNDATIONS (P) LTD.CIVIL ENGINEERS | CONTRACTORS

Feb

ruar

y 20

12


Recommended