E L E C T R I C A L P R O F I L E Satnam Engineers & Fabricators Pvt. Ltd. (SEFPL) is a small business providing engineering services in the field of Electrical, Mechanical, Architectural, and Civil & Power Plants. Beginning with the award of Architectural and Engineering contract with US Embassy, New Delhi. SEFPL has grown to a current staff of 12 persons in less than 8 years. A principal focus of our growth has been application of state of the art system to the industry. Many of SEFPL versatile professional staff has successfully designed the power distribution system & illumination of the major Govt. Projects of India, like 1500MW Hydro Electric underground power plant of NJPC (Nathpa, Jhakri Power Corporation) Himachal Pradesh. Auditorium Complex of NIMANS, Bangalore, Switchyards from 11KV to 400KV, Railway traction, Hospitals etc. SEFPL track record as a fast growing, forward thinking, and high-tech company is largely due to its corporate strategy to keep abreast of the latest technology. Our business objective is to provide best value to our clients based on performance quality & cost.
Transcript
Page 1: PROFILE RAGHAV CONSULTANTS - 123seminarsonly.com · 7. 6MW Power Plant of Bhiwani Textile Mills. 8. ... 13. 4MW Power Plant of Auro Textiles, Baddi. 14. 4MW Power Plant of Nahar Spinning

E L E C T R I C A L P R O F I L E Satnam Engineers & Fabricators Pvt. Ltd. (SEFPL) is a small business providing engineering

services in the field of Electrical, Mechanical, Architectural, and Civil & Power Plants.

Beginning with the award of Architectural and Engineering contract with US Embassy, New

Delhi. SEFPL has grown to a current staff of 12 persons in less than 8 years. A principal focus of

our growth has been application of state of the art system to the industry. Many of SEFPL

versatile professional staff has successfully designed the power distribution system &

illumination of the major Govt. Projects of India, like 1500MW Hydro Electric underground

power plant of NJPC (Nathpa, Jhakri Power Corporation) Himachal Pradesh. Auditorium

Complex of NIMANS, Bangalore, Switchyards from 11KV to 400KV, Railway traction,

Hospitals etc.

SEFPL track record as a fast growing, forward thinking, and high-tech company is largely due

to its corporate strategy to keep abreast of the latest technology. Our business objective is to

provide best value to our clients based on performance quality & cost.

Page 2: PROFILE RAGHAV CONSULTANTS - 123seminarsonly.com · 7. 6MW Power Plant of Bhiwani Textile Mills. 8. ... 13. 4MW Power Plant of Auro Textiles, Baddi. 14. 4MW Power Plant of Nahar Spinning

About Us SEFPL have been supporting US Embassy in their various up gradations Projects, Hospital Services Consultancy Corporation (India) Ltd and Wartsila India Ltd. on a regular basis. SEFPL not only uses its indispensable computer tools in execution of technical detail engineering, but also offers expertise in tendering, bid evaluation, negotiation with vendors, inspection & quality control, installation at site, testing & commissioning of systems & subsystems. Facilities & Infrastructure All employees operating at remote sites are connected via internet. SEFPL have tieups with various contractors which can take up construction works at various sites independently. Certification & Clearances SEFPL performs on a number of government and private contracts. It possesses relevant registration, Chartered Engineers Certification with the Government. To further facilitate our forward thinking strategy, SEFPL provides all employees with state of the art system, a user account on our LAN and electronic mail account. All employees are connected via local area network. Remote employees are serviced by utilizing the internet. Company Performance In the past years the company has been in existence, SEFPL has shown substantial growth in revenue, thanks mainly to the diversity and versatility of its staff. Driven by a vision to excel, challenged by the rigors of competiveness of the market, and impaired by the innovative spirit of its employees, SEFPL has carved a niche as a company that performs and delivers superior outputs. IT is this dedication to quality, the Best value engineering to the client that sustained our eight years of growth. As a result of successfully performing on several government and private contracts, over the years, SEFPL has acquired expertise in performing computer based detailed engineering. SEFPL performs on firm fixed price contracts. Organization & Administrative Infrastructure SEFPL was founded and is headed by Mr. Harvinder Singh Sandhu, whose vision is to maintain SEFPL’s place at the forefront in the Industrial projects. A Proponent of the doctrine that there is no better way to succeed than by delivering quality and best value products to the clients. Mr. Harvinder Singh Sandhu directs a team of dedicated engineers who share this vision and philosophy. SEFPL Expertise SEFPL has design & Engineering capabilities to design & engineer Power Plants, captive as well as IPP, based on heavy fuel sets with export of electrical power at EHT Voltages. We design the total illumination requirements right from traffic road lights, playgrounds to auditoriums, 5 star hotels, hospitals and power plants, large commercial buildings, Industrial setup with and without hazardous areas. The illumination is designed based and software driven. We design the cable routings of very complex nature for hydroelectric underground power plants like 1500 MW Nathpa Jhakri at Himachal, Larji Hydro Electric 150 MW, Outdoor switchyards from 11KV to 400KV.

Page 3: PROFILE RAGHAV CONSULTANTS - 123seminarsonly.com · 7. 6MW Power Plant of Bhiwani Textile Mills. 8. ... 13. 4MW Power Plant of Auro Textiles, Baddi. 14. 4MW Power Plant of Nahar Spinning

We have designed for lighting and cabling for several fuel oils handling Depots of Bharat Petroleum. It consists mainly of Hazardous area working. We are well versed with designs under Hazardous Areas. We have worked for Methane Gas handling, Acronitryle, Dowtherm and other hazardous areas. We have capability to design the communication system with intercom facility. The computer networking is done almost in all projects. We have designed the fire alarm systems of both addressable and non-addressable in most of our projects. For large areas having lesser movement of man and machine we usually recommend to use the intelligent lighting systems to economize of illumination expenditure and enhance the lamp life. The system also led to knowledge of movement art all places of work by operator interface. Such systems were installed at 1500MW Hydroelectric Power Plant at Jkhakri which controls about 7500 lamps of Sodium Vapor and Florescent. Earthing is provided at all projects and is recommended as per calculation and design based. We provide total turnkey solutions to the client on design to build concept. We formulate specifications of all equipments, items, draft tender documents with bill of quantities, and provide quality control services, overseas implementation as we had done for Ocap Chassis Parts Pvt. Ltd, a 15 crore, 100% EOU Project at Bhiwadi, Rajasthan, India. Similar types of job is undertaken at American Embassy, Chanakyapuri, New Delhi (Order value Rs. 4.75 crores without duties/taxes). Brief Description of Scope of Work Design of electrical distribution system, lay outing of equipments, cable routings, earthing layouts, lighting layouts, earthing calculations, and fault level calculations, illumination designs. Structural designs for associated building with seismic calculations. Ventilation designs & requirements. Air conditioning of control rooms etc. Getting approvals of all working designs for Dept. of Foreign Building Operation, U. S. Govt., Washington. 1. Transformers Replacement & Upgrade, U. S. Embassy, Delhi. 2. 8 x 365 KVA DG Sets installation, U. S. Embassy, Delhi. 3. Transformer Replacement & Upgrade, U. S. Consulate, Chennai. 4. 2 x 600 KVA DG Sets Replacement, U. S. Consulate, Chennai. 5. Upgradation of Power distribution at USIS, Mumbai, U. S. Consulate, Mumbai. 6. Electrical Upgrade, Washington House, Mumbai, U. S. Consulate, Mumbai. 7. 16 Nos. Solar Water Heaters installation, Washington House, U. S. Consulate, Mumbai. 8. 2 x 165 KVA UPS installation & distribution, U. S. Embassy, Delhi. 9. 2 x 35 KVA UPS installation & distribution, U. S. Embassy, Delhi. Electrical/Mechanical upgrade system of American Embassy, New Delhi. - Complete renovation of existing 11 KV distribution replacement of transformers, all cabling,

all distribution boards, all LT distribution panels with Auto changeovers. - Complete renovations of Air Conditioning systems. Converting all split pack AC’s to chilled

water Fan Coil Units (140 Nos. ) and Air handling Units (11 Nos.). This was an energy saving project.

Page 4: PROFILE RAGHAV CONSULTANTS - 123seminarsonly.com · 7. 6MW Power Plant of Bhiwani Textile Mills. 8. ... 13. 4MW Power Plant of Auro Textiles, Baddi. 14. 4MW Power Plant of Nahar Spinning

- All FCU and AHU were hooked up to the Building Management systems with sensors in every room to modulate and control the usage of Air Conditioning and optimization of fuel in the chillers.

INDUSTRIAL PROJECT 1. Ocap Chassis Parts Pvt. Ltd., Bhiwadi, - 100% EOU, Italian Company manufacturing

Auto parts. Complete turnkey architecture & engineering work right from land purchase up to commissioning of the Plant. The job included preparation of tender drawings for structural, Architectural, Plumbing, Ventilation, Drawings, roads, boundary walls, Landscaping, illumination, substation, power distribution, generation. Allotment of work orders, daily progress monitoring, daily reporting to principals in Italy, Quality Control, Bill checking.

2. Vardhman Acrylics Ltd., Bharuch. Complete Electrical distribution system design along with generation, instrumentation.

3. Entee Textiles, Ludhiana. Completing Power Generation, Distribution, illumination, Instrumentation Engg.

4. Conveyor Systems – Oswal Fertilizers, Paradeep Port. -Through Cegelec Ltd.

5. Flex Industries Ltd., Noida. Study of power generation & distribution and utilization of power. -Through Dimension Engg.

6. Misurata Free Zone, Libya. Power distribution and utilization of Power. -Through Span Consultants.

HOTELS 1. Hyall Regency, Goa

Complete Electrification, Outside illuminations, inside illumination. Power distribution etc. with as building drawings. -Through Aargee Consultants.

2. Picadally Hotel, Janakpuri, Delhi. -Through Aargee Consultants.

COMMERCIAL BUILDING 1. Commercial Complex at B-3

Alpha Commercial Belt, Greater Noida. Complete electrification design of multi storied commercial complex. -Through Space Designers.

Page 5: PROFILE RAGHAV CONSULTANTS - 123seminarsonly.com · 7. 6MW Power Plant of Bhiwani Textile Mills. 8. ... 13. 4MW Power Plant of Auro Textiles, Baddi. 14. 4MW Power Plant of Nahar Spinning

2. Commercial Complex at B-1

Alpha Commercial Belt, Greater Noida. Complete electrification design of multi storied commercial complex. -Through Space Designers.

3. International Exposition Mart & Trade Fair Exhibition Centre, Greater Noida.

Design and layouting of illumination for the complete project along with distribution of power. Design & layouting of LT power distribution for all utilities, ground Earth grid etc. -Through Ahluwalia Contract (I) Ltd.

4. Senior Mall, Faridabad.

- Through Pieco International BOARD ROOM & AUDITORIUMS Conference Centre & Auditorium Complex, Nimhans, Bangalore. Complete Electrification, including stage lighting, Dimming Systems, Communication Systems, data & fire alarm system, Power generation & distribution, 11 KV substation. Preparation of complete tender documents. -Through HSCC. EXTERNAL ELECTRIFICATION 1. Gurgaon Technological Part, Gurgaon.

Power Distribution (11 KV & 433 V) for the industrial hub being set up at Gurgaon including street lighting. - Through Dimension Engg. Consultants (P) Ltd.

2. Garden Villa, (DLF Universal Ltd. ), Gurgaon. Power Distribution from 11 KV substation to each of 32 villa along with street lighting. -Through Dimension Engg. Consultants (P) Ltd.

POWER GENERATION & DISTRIBUTION Large Sized Gensets, Heavy fuel operated. Detailed Engineering, Equipment Layouts, Illumination, Cable routings, Earthing, Lighting, Fault Level calculation, Relay settings & Coordination etc. 1. 4MW Power Plant of Bhilwara Spinners Ltd.,at Bhilwara. 2. 8 MW Power Plant of Rajasthan SPG. & Weaving Mills at Banswara. 3. 8 MW Power Plant at Gulabpura. 4. 8MW Power Plant at Maral Overseas Ltd. at Maral. 5. 4MW Power Plant at HEG Limited at Rishabdev. 6. 12 MW Power Plant at Arti Steels Ltd. 7. 6MW Power Plant of Bhiwani Textile Mills.

Page 6: PROFILE RAGHAV CONSULTANTS - 123seminarsonly.com · 7. 6MW Power Plant of Bhiwani Textile Mills. 8. ... 13. 4MW Power Plant of Auro Textiles, Baddi. 14. 4MW Power Plant of Nahar Spinning

8. 12MW Power Plant of West Coast Paper Mills. 9. 12MW Power Plant of Star Paper Mills Ltd. 10. 36MW Power Plant of Electricity Dept. Govt. of Manipur. 11. 8MW Power Plant of Mahavir Spinning Mills Ltd 12. 8MW Power Plant of Nahar Industries Ltd. 13. 4MW Power Plant of Auro Textiles, Baddi. 14. 4MW Power Plant of Nahar Spinning Mills Ltd. 15. 4MW Power Plant of Birla Textiles Mills, Baddi. 16. 6MW Power Plant of Modi Spinning Mills, Modinagar. 17. 6MW 3rd Unit Power Plant of Flex Industries Ltd., Noida (Phase I) 18. 6MW 4th Unit Power Plant of Flex Industries Ltd., Noida (Phase II) 19. 2.05 MW Power Plant of FCL, Malanpur. 20. 2.05 MW Power Plant of FIL, Malanpur. 21. Feasibility study of requirement of Power (through heavy fuel) for areas –

Gangtok/Gyalshing/Namchi/Changn/Thegu/Mangan

TURBINE BASED PROJECT Alok Textiles Ltd. MW TG Set with boilers – Through BSES Noida. - Detailed engineering for illumination of Boiler House, Coal storage yard, DM water plant,

Control room. - Detailed engineering for illumination of Turbine house. - Detailed engineering for Cable tray layouts. - Detailed engineering for Cable scheduling for Power and Control schemes, instrumentation,

Scada system. - Detailed engineering for Ground earth mat systems. - Preparation of complete BOQ. - Preparation of Cable bunching schedules. 1. Nathpa Jhakri Hydro Electric Project

1500 MW Hydro Electric Project – Through Ahluwalia Contracts (I) Ltd. - Detailed Engineering for illumination of Main Access Tunnels, various Adits, Busduct

Tunnels, Adits for machine hall crown, Transformer hall crown, Desilting Adits, Ventilation Tunnels, various galleries for dam, all floors of Machine hall, Battery rooms, Control Bays etc. at Nathpa and Jhakri.

Page 7: PROFILE RAGHAV CONSULTANTS - 123seminarsonly.com · 7. 6MW Power Plant of Bhiwani Textile Mills. 8. ... 13. 4MW Power Plant of Auro Textiles, Baddi. 14. 4MW Power Plant of Nahar Spinning

- Detailing for illumination of Surge shaft, Butterfly valve hall, Pot head yard, GIS –I and GIS

– II. - Detailing for illumination of all access roads to various services buildings – approx. 50 kms

of Road lighting. - Planning of various Emergency Lighting system, DG backup as well as Battery back up in

the Power plant building. - Planning of Intelligent Lighting system for the complete Power plant for energy saving up to

70%. - Planning for LT Power distribution inside the Power Plant building, Pot head yards, dam site,

desilting areas and various Adits. - Preparation of Cable schedules, Cable tray layouts, Cable bunching schedules. - Preparation of complete BOQ. - Monitoring the progress at site and modifications taken up in detailed engineering as per site

conditions due to other services. 2. Study of installation & distribution of Power 2.7 MW Gas Turbine at GAIL, Vijaypur –

Through Rolls Royce Ltd, Gurgaon. - Study of installation of 3rd unit of 2.7 MW Gas Turbine. Preparation of scope of work and

complete Bill of materials required for installation. - Study of distributions of Power 6.6 KV for the ultimate usage of 2.7 MW 6.6 KV of Power

for GAIL’s various utilities. 3. 3x42 MW Hydro Electric Power Plant at Largi (HP). - Detailed Engineering for Complete illumination of Power Plant and Dam, Pot head yard etc. - Preparation of Complete Bill of materials. - Tendering of complete illumination package. 4. Indra Sagar Hydro Electric Power at Khandwa (M.P) - Preparation of Complete Bill of materials. - Tendering of complete illumination package. 5. Detailed engineering for HT / LT Power Distribution for the 250 MW Turbin Unit No.

7 & 8 - Tau Devi Lal Thermal Power Station, Panipat - Through Reliance Energy Delhi. - Detailed engineering for cable tray layouts, Cable routings, Cable scheduling, Bunching

schedules. - Detailed engineering for Termination schedules, Control schemes.

6. 2X300MW Thermal Power Project, Yamuna Nagar, of Haryana Power Generation

Corporation. - Through Reliance Energy Ltd. Noida. 7. Illumination/electrification of 220 meter Rcc chimney for Jindal Steel and Power Ltd.

Raigarh. - Through AP Jain & Associates

Page 8: PROFILE RAGHAV CONSULTANTS - 123seminarsonly.com · 7. 6MW Power Plant of Bhiwani Textile Mills. 8. ... 13. 4MW Power Plant of Auro Textiles, Baddi. 14. 4MW Power Plant of Nahar Spinning

BIOGAS PROJECTS 2.7 MW Power Plant fueled from waste biogas of Som Distilleries, Bhopal. - Complete detailed engineering, Consisting of all Equipment layout, building layouts,

electrical 33 KV switchyard for export of power to MPEB., Piping layouts for Fuel, water, air etc.

- Complete supervision of erection & commissioning; relay testing, coordination, Manpower selection, recruitment.

SWITHCYARD 1. 66kV, 40 MVA switchyard of Prakash Industries Ltd., Bharuch. - Detailed structural design of switchyard, selection of equipments, transformers, breakers,

control cable scheduling, illumination, control room layout, 11 KV distribution. 2. 132/25KV, 60MVA, Single phase switch yard for Mumbai Railway Vikas Corporation

Ltd at Bandra, Mumbai. - Through AREVA T&D Ltd, Noida. 3. 132/25KV, 40MVA, Single Phase switchyard for Mumbai Railway Vikas Corporation

Ltd at Mahalaxmi, Mumbai. - Through AREVA T&D Ltd, Noida. 4. 132/33KV Switchyard of PGCIL at Shiekhpura, Bihar. - Through AREVA T&D Ltd, Noida.

Page 9: PROFILE RAGHAV CONSULTANTS - 123seminarsonly.com · 7. 6MW Power Plant of Bhiwani Textile Mills. 8. ... 13. 4MW Power Plant of Auro Textiles, Baddi. 14. 4MW Power Plant of Nahar Spinning

5. 132/33 KV Switchyard of PGCIL at Nawada, Bihar. - Through AREVA T&D Ltd, Noida.

6. 132/33KV Switchyard of PGCIL at Bihar Shariff, Bihar. - Through AREVA T&D Ltd, Noida.

7. 132/33KV Switchyard of PGCIL at Baripahari, Bihar. - Through AREVA T&D Ltd, Noida.

Page 10: PROFILE RAGHAV CONSULTANTS - 123seminarsonly.com · 7. 6MW Power Plant of Bhiwani Textile Mills. 8. ... 13. 4MW Power Plant of Auro Textiles, Baddi. 14. 4MW Power Plant of Nahar Spinning

8. 132/33KV Switchyard of PGCIL at Jahanabad, Bihar. - Through AREVA T&D Ltd, Noida.

9. 132/33KV Switchyard of PGCIL at Patna, Bihar. - Through AREVA T&D Ltd. Noida. 10. 132/33KV Switchyard of PGCIL at Wazirganj, Bihar. - Through Areva T & D 11. 132/33KV Switchyard of PGCIL at Jamui, Bihar. - Through Areva T & D 12. 132/33KV Switchyard of PGCIL at Karpi, Bihar. - Through Areva T & D 13. 33/11KV Switchyard of DHBVNL at Khuiyan Malkana, Sirsa, Haryana. - Through WS Industries. 14. 33/11KV Switchyard of DHBVNL at Kagdana, Sirsa, Haryana. - Through WS Industries 15. 33/11KV Switchyard of DHBVNL at Desu Jodha, Sirsa, Haryana. - Through WS Industries. 16. 33/11KV Switchyard of DHBVNL at Risalia Khera, Sirsa, Haryana. - Through WS Industries. 17. 33/11KV Switchyard of DHBVNL at Jamal, Sirsa, Haryana. - Through WS Industries. 18. 33/11KV Switchyard of DHBVNL at Moda Khera, Hissar, Haryana. - Through WS Industries.

Page 11: PROFILE RAGHAV CONSULTANTS - 123seminarsonly.com · 7. 6MW Power Plant of Bhiwani Textile Mills. 8. ... 13. 4MW Power Plant of Auro Textiles, Baddi. 14. 4MW Power Plant of Nahar Spinning

19. 33/11KV Switchyard of DHBVNL at Hazrakalan, Hissar, Haryana. - Through WS Industries. 20. 33/11KV Switchyard of DHBVNL at Shobapur, Narnaul, Haryana. - Through WS Industries. 21. 33/11KV Switchyard of DHBVNL at Alampur, Bhiwani, Haryana. - Through WS Industries. 22. 33/11KV Switchyard of DHBVNL at Baralu, Bhiwani, Haryana. - Through WS Industries. 23. 33/11KV Switchyard of DHBVNL at Hassan, Bhiwani, Haryana. - Through WS Industries. 24. 33/11KV Switchyard of DHBVNL at Bapora, Bhiwani, Haryana. - Through WS Industries. 25. 400/220/132/33KV switchyard of HVPNL at Kirori (Hissar) - Through Areva T & D

26. 400KV switchyard of PGCIL at Raipur. - Through Areva T & D 27. 400KV switchyard of PGCIL at Rourkela. - Through Areva T & D

Page 12: PROFILE RAGHAV CONSULTANTS - 123seminarsonly.com · 7. 6MW Power Plant of Bhiwani Textile Mills. 8. ... 13. 4MW Power Plant of Auro Textiles, Baddi. 14. 4MW Power Plant of Nahar Spinning

28. 400KV switchyard of PGCIL at Ranchi. - Through Areva T & D

29. 400KV switchyard of PGCIL at Raigarh. - Through Areva T & D 30. 400KV switchyard of NTPC at Farakka. - Through Areva T & D 31. 400KV switchyard of NTPC at Korba. - Through Areva T & D 32. 400KV switchyard of NTPC at Dadri. - Through Areva T & D 33. 66/11KV GIS Substation of HVPNL at Gurgaon(sector 51,43) - Through Areva T & D 34. 220/132/33KV Gss Swicthyard of RRVPNL at Jaipur. - Through Areva T & D 35. 33/11KV indoor substations (12 Nos) of Kenya Power & Lighting Corp. Ltd - Through Areva T & D 36. 400 KV switchyard for 1320MW Thermal Power plant of Adani Power Ltd. - Through Areva T & D 37. 132KV/11 KV switchyard of Dalmia Cement Ltd. - Through Areva T & D

Page 13: PROFILE RAGHAV CONSULTANTS - 123seminarsonly.com · 7. 6MW Power Plant of Bhiwani Textile Mills. 8. ... 13. 4MW Power Plant of Auro Textiles, Baddi. 14. 4MW Power Plant of Nahar Spinning

38. 132KV switchyard of HPCL Mittal Pipelines Ltd. - Through Areva L & T 39. 33/11KV Switchyard of DHBVNL at Guruwara, Rewari, Haryana. - Through WS Industries. 40. 33/11KV Switchyard of DHBVNL at Kaluwas, Rewari, Haryana. - Through WS Industries. 41. 33/11KV Switchyard of DHBVNL at Sector-10, Rewari, Haryana. - Through WS Industries. OVERSEAS PROJECT 1. 24 MW Power Plant at Fujiara Cement Works, Dubai. - Power Generation & distribution, illumination, cable routing, earthing, synchronization with

Grid.

2. R. O drinking water facility, Dubai. - Power distribution for all auxiliary equipments. HOSPITALS Design of Substation, Design of illumination, data, Fire alarm, communication system, their distribution, making complete Bill of material, costings, complete tender specifications etc. 1. Drug De-addiction Centre for AIIMS at Ghaziabad - Through HSCC.

2. Institute Rotary Cancer Hospital, AIIMS, Delhi - Through HSCC.

3. Institute of Cytology & Preventive Oncology Research Cum Clinical complex, Noida. - Through HSCC. 4. Cooperative Medical College, Kochi. - Through HSCC.

5. Model Bikram Referral Centre, Patna. - Through HSCC.

6. Orissa Health System Development Project, Cuttack. - Through HSCC. 7. Drug De-addiction Centre for AIIMS, Delhi. - Through HSCC. 8. Orissa Health System Development Project, Danagadi.

Page 14: PROFILE RAGHAV CONSULTANTS - 123seminarsonly.com · 7. 6MW Power Plant of Bhiwani Textile Mills. 8. ... 13. 4MW Power Plant of Auro Textiles, Baddi. 14. 4MW Power Plant of Nahar Spinning

- Through HSCC.

9. Max Clinic - Panchsheel Park - Through Aargee Consultants. 10. Max Clinic – Maharani Bagh. - Through Aargee Consultants. 11. PGI Chandigarh – only as built drawings. - Through Aargee Consultants.

12. Orissa Health System Development Project, Indupur, Orissa. - Through HSCC.

13. Orissa Health System Development Project, Niali, Orissa. - Through HSCC.

14. Fortis Specialty Centre, Noida - Through Ahluwalia Contracts (I) Ltd. 15. Escort Hospital, Jaipur (Partly) - Through Ahluwalia Contracts (I) Ltd.

16. Sahara Medical Institute Ltd., Lucknow, Sahara Hospitals - Through Pieco

17. Trauma Center, PGIMS, Rohtak. - Through HSCC Ltd.

18. Cancer Block, Northern Railway Hospital, Delhi. - Through HSCC Ltd. HOUSING 1. Housing for North Eastern Indra Gandhi Regional Institute of Health & Medical

Science. - Through HSCC. 2. National Institute of Biologicals, Noida essential staff housing. - Through HSCC. MISCELLANEOUS PROJECTS 1. MGRM software centre at SDA, New Delhi. 2. Global Technologies (Software), Gurgaon. 3. International Public School, Gurgaon. 4. Fruit Pack House, Nasik. - Through Prime Hortiagro Projects Ltd. Delhi.

Page 15: PROFILE RAGHAV CONSULTANTS - 123seminarsonly.com · 7. 6MW Power Plant of Bhiwani Textile Mills. 8. ... 13. 4MW Power Plant of Auro Textiles, Baddi. 14. 4MW Power Plant of Nahar Spinning

MAJOR PROJECTS HANDLED WHILE IN EMPLOYMENT 1. Polyester Filament Yarn Project at J. K. Synthetics Ltd., Kota. 2. Tyre Cord Project at J. K. Tyre cord, Kota. 3. Staple Fibre Project at J. K. Staple & Tows, Kota. 4. Acrylic Fiber Project at J. K. Acrylics, Kota. 5. 132 KV, 20 MVA Switchyard at Kota. 6. 16 MW Power Plant at Kota. 7. 11/433 V Substations, 6 MVA – 4 Nos. at Kota. 8. 100 Tons coal fired Boilers. 9. Polyester Film Project at Flowmore Polyesters Ltd., Kashipur. 10. 2.4 MW Static UPS System at Kota. 11. Acrylic Fiber Project at Pasupati Acrylons Ltd., Thakurdwara (Moradabad). 12. 5 MW direct condensing steam Turbine, Coal/Rice husk fired at Thakurdwara. 13. 132 KV, 25 MVA Switchyard at Parasrampuria International, Pitampura. 14. Polyester Filament yarn project at Parasrampuria Synthetics Ltd., Bhiwadi. 15. 18 MW Power Plant at Bhiwadi. 16. 1450 KVA Rotary UPS at Bhiwadi.