Programme for Prevention, Preparedness and Response to Floods in the Western Balkans and Turkey – IPA FLOODS Grant Contract ECHO/SUB/2014/692292 18th Floods Working-Group Madrid – 23 October 2015 1
Transcript

Programme for Prevention, Preparedness and Response to Floods in the Western Balkans and Turkey – IPA FLOODS

Grant Contract ECHO/SUB/2014/692292

18th Floods Working-Group

Madrid – 23 October 2015

1

Programme synospis: scope, target groups, etc.

Scope (L1&L2) : Increase Flood Risk Management capacities in the Beneficiaries at national, regional and EU levels

Beneficiaries: AL, BH, CRO (only L1), FYROM, MNE, SRB, KSV under UNSCR 1244/99, TUR

2

1. Programme synopsis: components/expected results

Lot 1:

- A1) Capacity building for flood preparedness/response: multi-national CP Modules for Flood Rescue using Boats (FRB), SOPs, border-crossing/HNS protocols, training/exercise for staff of CP Modules

- A2) Capacity building for approximation to/implementation of EU Floods Directive (EUFD): capacity-building on EUFD, guidelines and road-map for future action in Flood Risk Management

Lot 2:

- A1) Capacity building for flood preparedness/response: multi-national CP Modules for High Capacity Pumping (HCP) and Flood Containment (FC), SOPs, border-crossing/HNS protocols, training/exercise for staff of CP Modules

3

Component 2: Capacity building on EUFD

OVERALL OBJECTIVE

Capacity building and provision of support for the approximation to the EU Floods directive and the implementation of an integrated approach to flood risk

management encompassing prevention, preparedness and response in line with the Council conclusions on Integrated Flood Management

4

Main actions

1. Need assessment, gap analysis and survey of existing data and map on flood risk. (WP 2.1) 1. multi-stakeholders mapping, 2. Completed and on-going main initiatives 3. Status of implementation of Floods Directive in beneficiaries 4. survey of existing data and maps of flood risks

2. Guidelines, good practices and recommendations (WP2.3) 1. Uptake of existing guidance documents and analysis of MSs GPs 2. Beneficiaries specific and regional recommendations

5

Component 2: Capacity building EUFD

Main actions

3. Needs-based capacity building programme (WP 2.2)

1. First presentation of Draft Guidelines and GPs – Back to Back to 2nd AG meeting -November- December 2014

2. Regional Flood Directive Workshop (Back to Back with SG – February 2015)

3. training on the job under the formula of “learning by doing” based on the recommendations

4. support the implementation of the Flood Risk Information System.

6

Component 2: Capacity building EUFD

Main actions

4. Flood Risk Information System for Preliminary Risk Assessment (WP 2.2) 1. Web-GIS for sharing data and maps on Risk Assessment 2. Support the creation of a flood catalogue (ICPD - FloodCat)

5. Roadmap for future actions (WP 2.3) 1. focus on the entire flood risk management cycle 2. Focus on aspects with a multi-beneficiary dimension

7

Component 2: Capacity building EUFD

8

Work Plan

Component 2: Capacity building EUFD

9

STATUS OF IPA FLOODS

• Connection with other Projects and initiatives • COWI-IPF Present Situation of Flood Management in the Western

Balkans (WB Floods)

• Working Group Flood DG ENV

• Working Group on Disaster Loss Data

• International Sava River Basin Commission and Drin Core Group

• Establish Flood Directive Advisory board in the

beneficiaries

10

Inception Phase

Multi-stakeholder platforms

11

1st Advisory Group on Status of implementation of FD in beneficiaries

Beneficiary Number of

institutions

Participants to

1st AG

Albania 5 11

Bosnia & Herzegovina 8 10

Croatia 4 11

FYROM 8 7

Kosovo* 6 8

Montenegro 5 10

Serbia 8 10

Turkey 6 17

TOT 50 91

• Consultation with Beneficiaries trough the FD-AG

• Content of the assessments • Legal and institutional Framework • Preliminary Risk Assessment, Historical data on Floods,

methodologies • Hazard and Risk Mapping, methodologies • Flood Risk Management Planning

• The assessment has been considered to be comprehensive by SG

12

Assessment of the Status of Implementation of EU FD

13

Beneficiary

Albania Law no. 111/ 2012 on “The Integrated Management of Water Resources” Decision no. 4, 17.2.2015 of National Water Council (in line with FD requirements)

Bosnia & Herzegovina Water law of fBiH and RS in line with EU FD Water law of BD in design phase Action Plan for Flood Protection and River Management for BiH 2014-2017

Croatia Water Act, in line with WFD and FD

FYROM Law on Water, FD is in phase of Transposition of EU FD requirements

Kosovo* The Law on Waters 04/L-147 Law no. 02 / L-068 for protection against natural and other disasters- Partially transpose FD

Montenegro Amendments to the Law on Waters (in line with FD), submitted to Parliament

Serbia Law on Water, in line with WFD and contains FD transposition

Turkey Draft regulation on Flood Management and Flood Management Plan (in line with EU FD)

Assessment: Legal framework

14

Assessment: Preliminary Risk Assessment

Beneficiary

Albania Database on historical Flood (GDCE) based on UNISDR methodology

Bosnia & Herzegovina APSFR identified in FiBH and RS , NO BD, different methodologies

Croatia APSFR identified

FYROM Data are present in different institutions

Kosovo* Database on historical Flood (GDCE) based on UNISDR methodology

Montenegro Data are present in different institutions

Serbia APSFR identified

Turkey APSFR identified in Basin of National Projects

15

Beneficiary

Albania On project base and carried by different institutions (Hydromet service, Ministry of Agriculture, GDC

Bosnia & Herzegovina In progress for the entire territory

Croatia Completed

FYROM On project base and carried by different institutions

Kosovo* On project base (MoE)

Montenegro Data are in different institutions

Serbia HM in some rivers

Turkey HM & RM in basin of National Projects

Assessment: Hazard and Risk Mapping

16

Beneficiary

Albania No systematic preparation of FRMP Contingency plan for flood management at National and local level

Bosnia & Herzegovina In progress

Croatia Completed at National level

FYROM Action plan for development

Kosovo* No systematic preparation of FRMP FRMP for a pilot basin

Montenegro No systematic preparation of FRMP Contingency plan for flood management at National local level

Serbia At early stage and coordinated with the International Commission for the Protection of the Danube River (ICPDR)

Turkey FRMP in basins of National project

Assessment: FRMP

• Elaborated by IPA Floods team in consultation with beneficiaries (2nd AG)

• Content of the recommendations • Legal and institutional Framework • Unit of Management with Focus on International River Basin • Preliminary Risk Assessment • Hazard and Risk Mapping, methodologies • Flood Risk Management Planning • Data Management and Sharing

17

Reccomendations to Beneficiaries

1. Address mainly: Preliminary Risk Assessment and Hazard and Risk

Mapping

2. Uptake of existing guidance documents 1. IPA Twinning Croatia and Turkey 2. International handbooks and guidelines on H&R mapping

3. Guidance complemented with MSs practices

1. Croatia, Germany, Italy, Slovenia and Sweden 2. Any other countries?

4. International rivers basin experience

• Rhine • Sava

18

Guidelines and Good Practices

Presentation of Draft

Guidelines at 2nd AG meeting

• Web-GIS for sharing data and Maps on Flood Risks

• Flood Cat: A technological platform for reporting historical Floods under Flood Directive

Flood Risk Information System

Flood Cat

• Operational Multi-stakeholders on-line platform

for recording flood events and associated

damages

• Compliant with Guidance for Reporting under

FD

• Compliant with EU-minimum standards for

loss Loss data

• INSPIRE->?

Flood Cat

Secure access

Flood Cat

Main Functionalities

Data Verification/validation

Data Visualization

Data query/Search

Basic Analysis

Flood Cat

EUDPC

FLOOD REPORTING DB

Server Web

Catasto Eventi On Line

Auth ServerEEA

ReportNET

AutoritàCompetenti

INSERISCONOVALIDANO

VISUALIZZANO

Dati EsistentiRaccolti da Autorità

Competenti

Imp

ort

Imp

ort

Imp

ort

Imp

ort

XML Events Report

Data and Information flow: from regional CP centres to EU

Search for past events (Area and Time Range)

Area

Time range

Search for specific event (Area and Time Range)

Description of phenomenos

Description of damages

28

Questions, suggestions or comments?

THANKS