4
Steel wiring and beam on 1st floor
Transcript
  • Steel wiring and beam on 1st floor

  • Concrete flooring on 1st Floor

  • Progress steel wiring for beam and floor 2nd floor(back view)(back view)

  • Progress steel wiring for beam and floor 2nd floor(front view)(front view)