PROGRESS: motors control
•STATUS• SW interface finalized and agreed between CCC, Totem DCS,
FESA server and LabVIEW/PXI.
• All Use Cases and associated requirements implemented and tested in lab setup (bld. 187)
• Fixing of issues identified during integration tests on lab setup ongoing weeks 38 and 39.
• NEXT STEPS• Deployment at point 5 of release candidate sw. (FESA server
+ LabVIEW/PXI SW) week 39. • Commissioning checklist (besides Use Cases scenario) to be
prepared by TOTEM team.
• Motorization sw. commissioning starting week 40. Deadline
for completion: mid-October.
PROGRESS:
HW, TOTEM General and tools
• Production PCs memory upgrade 1G 4G• Automatic generation of HW tree to monitor the HW• Rewritten FSM tree explorer: JCOP component has too
many bugs• Piotr’s tool to check the DCS HW status
RP Si detectors
• Updated HW overview diagram: add pump• RADMON integration (HW and SW)• New subpanels for motors and RADMON
FSM tree explorer
DCS HW status panel
RP Si det pump
ELMB boxes
• RP boxes ready:• tested in 555• installed and tested in IP5
• T2 boxes ready• tested in 555
• T1 boxes designed
PROGRESS:
T1
• requirements collected by Janos (~40%) • names and PBS• pinout table : HV and LV need confirmation, no sensors
yet• summary table
T2
• HV and LV components integrated in IP5 and used for commissioning
• next:• sensor integration (problems with pinout table)• custom panels
3 months ago
today
TOTEM DCS status --> referees
•BigBrother is operational in IP5
• RP Si: extensive functionality with some custom panels• T2: basic functionality with JCOP panels only• T1: on the way• interface with RP motor control tested in the lab
•fully CMS compatible
•with archiving
• is being used for commissioning of RP Si and T2
• ongoing development according to the plan ?
MP
16SEP
2009
-3 months
-6 months
userfeedback
TEAM newsTOTEM General and RP
• Fernando LUCAS RODRIGUEZ now a user; fellowship committee in November
• Ivan ATANASSOV confirmed for 2010• Federico RAVOTTI (20%) fellow until Feb 2010 (extension?)
T2
• Sami STOECKELL (6m) left in July; waiting for replacement
T1• Janos SZIKLAI (50%) works from Budapest
Technical support• Antoine THYS (a fraction of 20%) confirmed for 2010
Coordination• Paolo PALAZZI (50%) retires in February 2010
TEAM situation
• the current workforce is inadequate
• in 2010 it may get much worse
• this is a critical situation
TOTEM CRBigBrother screens
TOTEM Control Room
• TOTEM-only control area
• guests of CMS in a room of a barrack at IP5
• Furniture, lights, telephone OK (well, almost..)
• Network to be extended
• A/C needs fixing
• Separate access group being defined
• installation is a few weeks late
• small fixes need considerable time
• I had an accident and have been away
TOTEM Control Room
• Tempo layout from the entrance door, clockwise:• interlock panel
• DSS: 1 PC 1 screen
• CCC, beam etc: 1 PC 1 screen
• DCS: 2 PCs 6 screens, in the left corner
• DAQ: 3 PCs 3 screens, in the right corner
• RPs: 1 PC 1 screen, 1 desk facing the rack room
• T1: 1 PC 1 screen, 1 desk on the right from the entrance door
• T2: 1 PC 1 screen, 1 desk on the right from the entrance door
• Equipment:• available now: 5 PCs, 8 screens
• on order: 2 PCs, 3 screens
• being considered: 1 or 2 large status screens, …
>>> Meeting of the relevant people this Thu or FRI
?