FR-HSR-0040-11-01-00 Knowledge Corridor Restore Vermonter Project Tim Doherty, MassDOT Cherron Riddick will enable Amtrak's Vermonter train to again travel the historic 50-mile MA, and Northfield, MA. The Project will utilize a $75 million Federal Railroad Administration (FRA) grant from the American Recovery and Reinvestment Act to undertake rail improvements in the Pioneer Valley in Western Massachusetts. The Project also includes bicycle/pedestrian improvements in the City Nnrth"rr'nt<1n, MA with the construction of an underpass that runs under the rail line. An additional benefit of the rail line rehabilitation will be improved freight for customers along the line and within western Massachusetts. The improvements to the Knowledge Corridor will occur on the Connecticut River mainline of the Pan Am Southern (PAS) railroad, a joint venture between Pan Am Railways and Norfolk Southern. MassDOT, through its Rail and Transit Division, has designated the Massachusetts Bay Transportation Authority's (MBTA) Design and Construction Department to oversee the implementation of the Project through final design and construction and has entered into a Construction Agreement with Pan Am Southern, LLC to construct the Project. -KNOWLEDGE CORRIDOR STATION AND UNDERPASS- 100% Design completed and distributed for review and comments. PS&E documents expected by 1/31/14. MBTA will issue a single construction contract for these elements of work. -KNOWLEDGE CORRIDOR PAN AM -Continue to receive new track materials@ South Deerfield Yard. Salvage contractor hired by PAS and mobilized for retrieval. Grade crossings track work north of Greenfield completed pending signal procurement. Grade crossing signal packages are on the street for bids. Balance of signal package designs ongoing. Project Progress 0% 20% 40% 60% 80% A B c D E F G :\' Planned .. • Actual % .. i panels for turnouts at CPR-38, CPR-16, & CPR-9. 100% 120% 4500 4000 3500 3000 2500 2000 1500 1000 500 0 0 0 0 iii c:; 0 -;; 0 0 0 0 I>A6<:<:nnT- Provide additional funding for the project. Continue with procurement of bridge repair contract. - Advertise & Procure Stations and Underpass. Continue material procurement. URS - Continue Program and Construction Management. Cumulative Financial Trends --- - July August _._ Estimated - Actual Sept Oct ... - Nov Dec
Transcript
Page 1: Progress Report for FRA - 4Q2013

FR-HSR-0040-11-01-00

Knowledge Corridor Restore Vermonter Project

Tim Doherty, MassDOT

Cherron Riddick

will enable Amtrak's Vermonter train to again travel the historic 50-mile MA, and Northfield , MA. The Project will utilize a $75 million Federal Railroad Administration (FRA) grant from the American Recovery and Reinvestment Act

to undertake rail improvements in the Pioneer Valley in Western Massachusetts. The Project also includes bicycle/pedestrian improvements in the City Nnrth"rr'nt<1n , MA with the construction of an underpass that runs under the rail line. An additional benefit of the rail line rehabilitation will be improved freight

for customers along the line and within western Massachusetts.

The improvements to the Knowledge Corridor will occur on the Connecticut River mainline of the Pan Am Southern (PAS) railroad, a joint venture between Pan Am Railways and Norfolk Southern. MassDOT, through its Rail and Transit Division, has designated the Massachusetts Bay Transportation Authority's (MBTA) Design and Construction Department to oversee the implementation of the Project through final design and construction and has entered into a Construction Agreement with Pan Am Southern, LLC to construct the Project.

-KNOWLEDGE CORRIDOR STATION AND UNDERPASS- 100% Design completed and distributed for review and comments. PS&E documents expected by 1/31/14. MBTA will issue a single construction contract for these elements of work. -KNOWLEDGE CORRIDOR PAN AM -Continue to receive new track materials@ South Deerfield Yard. Salvage contractor hired by PAS and mobilized for retrieval. Grade crossings track work north of Greenfield completed pending signal procurement. Grade crossing signal packages are on the street for bids. Balance of signal package designs ongoing .

Project Progress

0% 20% 40% 60% 80%

A

B

c

D

E

F

G

:\' Planned .. • Actual % ..

i panels for turnouts at CPR-38, CPR-16, & CPR-9.

100% 120%

4500

4000

3500

3000

2500

2000

1500

1000

500

0

0

0

0 iii

c:; 0

-;; 0

0

0

0

I>A6<:<:nnT- Provide additional funding for the project. Continue with procurement of bridge repair contract. - Advertise & Procure Stations and Underpass. Continue material procurement.

URS - Continue Program and Construction Management.

Cumulative Financial Trends

----

July August

_._Estimated

- Actual

Sept Oct

... -

Nov Dec

Recommended