Progress Report

Günther Rosner NuPECC, Copenhagen, 15/6/12 1

Page 2: Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.

FAIR @ Darmstadt

Günther Rosner NuPECC, Copenhagen, 15/6/12 2

Page 3: Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.

3

Facility for Antiproton & Ion Research

Günther Rosner NuPECC, Copenhagen, 15/6/12

Dense Bulk Plasmas (Ion-beam bunch compression& petawatt-laser)

Materials Science & Radiation Biology (Ion & antiproton beams) Accelerator Physics

UNILAC

SIS18 SIS100/300p-Linac

HESR

CR &RESR

NESR

Cryring

Rare-IsotopeProduction Target

Anti-ProtonProduction Target

100 m

QCD-Phase Diagram(HI beams 2 to 45 GeV/u)

Hadron Physics (Stored and cooled14 GeV/c anti-protons)

Nuclear Structure & Astrophysics(Rare-isotope beams)

Fundamental Symmetries& Ultra-High EM Fields(Antiprotons & highly stripped ions)

Page 4: Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.

Civil Construction

Günther Rosner NuPECC, Copenhagen, 15/6/12 4

Page 5: Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.

CC Planning Activities02 / 12 03 / 12 04 / 12 05 / 12

Checking/Approval of CC Phase 3 & Cost Calculations

Inclusion of requirements of fire department /building inspection

Statics / Layout Drawings (CC Phase 5)

Technical Execution Planning (CC Phase 5)

Announcement Logistics

Günther Rosner NuPECC, Copenhagen, 15/6/12 5

Page 6: Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.

LicensingIII /11 IV /11 I /12 II / 12 III /12

Building Application

Afforestation Appl.

Water rights Appl.

Environmental Compatibilty

Water Rights Appl.(ground water management)

31.08.11

19.01.12

21./23.11

12.02.12 07.03.12

02.02.12

Günther Rosner NuPECC, Copenhagen, 15/6/12 6

Page 7: Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.

Preparatory Work02 /12 03 /12 04 /12 05 /12

Stripping of Topsoil(area tree felling)

Site Roads(Messeler Parkstr.)

Site Roads(southern traffic link)

Site Roads(northern traffic link)

Alternative routing pedestrian

Günther Rosner NuPECC, Copenhagen, 15/6/12 7

Page 8: Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.

Aerial View

Günther Rosner NuPECC, Copenhagen, 15/6/12 8

Page 9: Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.

9

Fast accelerationHigh gradient, variable frequency

Ferrite & MA loaded cavities

Compact & cost effective acceleratorsFast cycling superconducting magnets

dB/dt ~ 4T/s

Precision beamsElectron & stochastic cooling

XHV @ high beam intensitiesExtremely high vacuum ~10-13 mbar

Accelerator Challenges

Günther Rosner NuPECC, Copenhagen, 15/6/12

Page 10: Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.

10

Compact & cost effectiveFast cycling superconducting magnets

dB/dt ~ 4T/s

Accelerators• 113 SIS100 dipoles

ordered from Babcock Noell in Jan. 2012 (German in-kind contribution)

• Many other parts of SIS100 and CR in preparation.

• HESR ready to be submitted for tender.

• IKRB meeting at FAIR on 28/3/12

• MAC meeting at FZ Jülich on 2/4/12

Günther Rosner NuPECC, Copenhagen, 15/6/12

Page 11: Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.

11

FAIR Experiments

Günther Rosner NuPECC, Copenhagen, 15/6/12

CBM

PANDANuSTAR

Super-FRS

APPA

Page 12: Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.

NuPECC, Copenhagen, 15/6/12 12

Experiments• Collaborations finish R&D phase

• Collaborations submit complete sets of TDRs to FAIR

• FAIR establishes Expert Committee Experiments, ECE– TDR Review Panels: ECE members (+ external experts)

• FAIR organises/monitors the co-ordination of experiments with– Civil construction & setup of accelerators/storage rings

• Collaborations identify critical pathways regarding– Timelines, milestones & deliverables

• Collaborations submit risk management plans– To be assessed by FAIR & integrated into Risk Reports to AFC and Council

• Funding Issues– FAIR establishes Resources Review Boards for each Collaboration

consisting of all Research Councils participating in the experiment(s)

• Funding Agencies, Collaborations and FAIR negotiate Construction MoUs

Günther Rosner

Page 13: Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.

OrgChart

Günther Rosner NuPECC, Copenhagen, 15/6/12 13

Page 14: Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.

NuPECC, Copenhagen, 15/6/12 14

Timeline

Günther Rosner

20122011 2013 201620152014

6

Building permits

Site preparation

Civil construction contracts

Building of accelerator & detector components

Completion of civil construction work

Installation & commissioning of accelerators and detectors

Start Data taking

7 108

2017 2018 2019

12

6

7

8

9

11

12

10

119

Page 15: Progress Report Günther RosnerNuPECC, Copenhagen, 15/6/121.

Thank you very much

Günther Rosner NuPECC, Copenhagen, 15/6/12 15