Progress Report
Günther Rosner NuPECC, Copenhagen, 15/6/12 1
FAIR @ Darmstadt
Günther Rosner NuPECC, Copenhagen, 15/6/12 2
3
Facility for Antiproton & Ion Research
Günther Rosner NuPECC, Copenhagen, 15/6/12
Dense Bulk Plasmas (Ion-beam bunch compression& petawatt-laser)
Materials Science & Radiation Biology (Ion & antiproton beams) Accelerator Physics
UNILAC
SIS18 SIS100/300p-Linac
HESR
CR &RESR
NESR
Cryring
Rare-IsotopeProduction Target
Anti-ProtonProduction Target
100 m
QCD-Phase Diagram(HI beams 2 to 45 GeV/u)
Hadron Physics (Stored and cooled14 GeV/c anti-protons)
Nuclear Structure & Astrophysics(Rare-isotope beams)
Fundamental Symmetries& Ultra-High EM Fields(Antiprotons & highly stripped ions)
Civil Construction
Günther Rosner NuPECC, Copenhagen, 15/6/12 4
CC Planning Activities02 / 12 03 / 12 04 / 12 05 / 12
Checking/Approval of CC Phase 3 & Cost Calculations
Inclusion of requirements of fire department /building inspection
Statics / Layout Drawings (CC Phase 5)
Technical Execution Planning (CC Phase 5)
Announcement Logistics
Günther Rosner NuPECC, Copenhagen, 15/6/12 5
LicensingIII /11 IV /11 I /12 II / 12 III /12
Building Application
Afforestation Appl.
Water rights Appl.
Environmental Compatibilty
Water Rights Appl.(ground water management)
31.08.11
19.01.12
21./23.11
12.02.12 07.03.12
02.02.12
Günther Rosner NuPECC, Copenhagen, 15/6/12 6
Preparatory Work02 /12 03 /12 04 /12 05 /12
Stripping of Topsoil(area tree felling)
Site Roads(Messeler Parkstr.)
Site Roads(southern traffic link)
Site Roads(northern traffic link)
Alternative routing pedestrian
Günther Rosner NuPECC, Copenhagen, 15/6/12 7
Aerial View
Günther Rosner NuPECC, Copenhagen, 15/6/12 8
9
Fast accelerationHigh gradient, variable frequency
Ferrite & MA loaded cavities
Compact & cost effective acceleratorsFast cycling superconducting magnets
dB/dt ~ 4T/s
Precision beamsElectron & stochastic cooling
XHV @ high beam intensitiesExtremely high vacuum ~10-13 mbar
Accelerator Challenges
Günther Rosner NuPECC, Copenhagen, 15/6/12
10
Compact & cost effectiveFast cycling superconducting magnets
dB/dt ~ 4T/s
Accelerators• 113 SIS100 dipoles
ordered from Babcock Noell in Jan. 2012 (German in-kind contribution)
• Many other parts of SIS100 and CR in preparation.
• HESR ready to be submitted for tender.
• IKRB meeting at FAIR on 28/3/12
• MAC meeting at FZ Jülich on 2/4/12
Günther Rosner NuPECC, Copenhagen, 15/6/12
11
FAIR Experiments
Günther Rosner NuPECC, Copenhagen, 15/6/12
CBM
PANDANuSTAR
Super-FRS
APPA
NuPECC, Copenhagen, 15/6/12 12
Experiments• Collaborations finish R&D phase
• Collaborations submit complete sets of TDRs to FAIR
• FAIR establishes Expert Committee Experiments, ECE– TDR Review Panels: ECE members (+ external experts)
• FAIR organises/monitors the co-ordination of experiments with– Civil construction & setup of accelerators/storage rings
• Collaborations identify critical pathways regarding– Timelines, milestones & deliverables
• Collaborations submit risk management plans– To be assessed by FAIR & integrated into Risk Reports to AFC and Council
• Funding Issues– FAIR establishes Resources Review Boards for each Collaboration
consisting of all Research Councils participating in the experiment(s)
• Funding Agencies, Collaborations and FAIR negotiate Construction MoUs
Günther Rosner
OrgChart
Günther Rosner NuPECC, Copenhagen, 15/6/12 13
NuPECC, Copenhagen, 15/6/12 14
Timeline
Günther Rosner
20122011 2013 201620152014
6
Building permits
Site preparation
Civil construction contracts
Building of accelerator & detector components
Completion of civil construction work
Installation & commissioning of accelerators and detectors
Start Data taking
7 108
2017 2018 2019
12
6
7
8
9
11
12
10
119
Thank you very much
Günther Rosner NuPECC, Copenhagen, 15/6/12 15