David AbramsonNovember 21, 2002
Progress Report (November 14 - 20, 2002)
• “Rev. B” board submitted for fabrication.• Receiver board alignment tolerance
measurements completed.• Transmitter board alignment tolerance
attempted.– Problem with VCSEL identification– Possibly smoked VCSEL by applying too much
bias current– Lifted a pad on the board when switching parts
Progress: HFE 4080-321 TO-46
David AbramsonNovember 21, 2002
Planned Work (November 21 – 27, 2002)
• Build Rev. B boards• Test Rev. B boards with
connectorized parts• Start alignment testing for
Rev. B boards
Planned work:
David AbramsonNovember 21, 2002
Gantt Chart
David AbramsonNovember 21, 2002
RX Alignment Eye Diagrams
Best Eye
X axis extreme
Y axis extreme
David AbramsonNovember 21, 2002
RX Alignment Results
Alignment Detection Graph
-400
-300
-200
-100
0
100
200
300
400
-200 -100 0 100 200 300 400