ProgresssincelastPresenta.on11/05/2016
• MoUdiscussioncon.nueswithALICE/ITS– LANL“ExpressofInterest”submiJedinearlyOctoberandreviewedby
ALICE– AssociateMembershipexpectedaNerALICECollabora.onBoard
Mee.ngnextweek(11/11)– Luciao/ALICEworkingonCost&ScheduleofsPHENIX“MoU”– WaltandMingvisitALICEnextweek
• MoUandprocurementsofR&Dteststandetc.
• Con.nuebuildingcollabora.on– Morenewmembers
• AseparateMIEideabeingexplored– Asmallgroupmee.ng10/21– VisitMIT/Bates10/27– Aneartermplandeveloped
11/4/16 [email protected] 1
PossibleAddi.onalCollabora.ons• CzechGroup(PHENIX,FVTX)– Expressedinterest-M.Finger/MikeFinger– possibleengineeringandstudentsupport– Amee.ngw/MingandWaltschedulednextweekatCERN,Nov.10-15
• ChinaCentralNormalUniv.(CCNU,ALICE/ITS5thlayer)– Expressedinterestandpossiblecollabora.ononsPHENIXMAPStracker-NuXu
– CesarvisitedCCNUITS/MAPSlabs– ManygoodstudentsalreadyatALICE/CERN– Couldhelponassemblyandtes.ngetc.
11/4/16 [email protected] 2
ASeparateMIEProposalforthesPHENIXMAPSInnerTracker?
• ThisideaofaseparateMIEhasbeenbroughtupanddiscussedatseveralmee.ngsrecently
• sPHENIXcollabora.onproposed“costreduced”baselineconfigura.ons,(I)&(II).– S.llwai.ngfordecisions/inputsfromALD– Inbothscenarios,weneedMAPS!
• MAPSisconsideredbyBNLALDtohavethebestchancetogetaddi.onalfundforsPHENIX:– Withstrongconsor.umofoutsideins.tu.ons(LANL+MIT+LBNL?+
UT..),thusthereisastrongpush/desirefromALD/sPHENIXprojectofficetogetaseparateMIEforMAPS
11/4/16 [email protected] 3
ChallengesofanewMIE• WhatdoweknowfromDOE?
– FromwhatALDdescribed,DOE(JehanneandTim)thoughtthiswasagoodideabutitistooearlytosaymorethanthat.
– NotveryclearDOEwillbereadytoprovide$$forthis,andalsothe.melinegiventhe2-yearFederalBudgetCycleevenif“missionneed”approved---earliestMIEfundFY20
• TheseparateMAPSMIE.melineneedstobe.edtotheALICE/ITSproduc.onandalsothesPHENIXschedules– ALICE/ITSproduc.onendssummer2018– TheearlyfundingopportunityfromnormalMIE~10/2019,aspecial
casemustbemadetomeettheALICE/ITSproduc.onschedule
• Poten.alhighimpactsonthesPHENIX-ALICE“MoU”– Resources,labspaceandmanpower– Schedules
11/4/16 [email protected] 4
ProjectTaskandTimeline
Det.Install.@BNL
ReadoutR&DMech.design@LANL/ALICE
Mech.Integr.&Prototype@BNL/LANL
Produc.on
KeyR&D
FY2017 FY2018 FY2019 FY2020 FY2021FY2016
CD-111/1
CD-2/38/1
CD-011/1
ReadyforBeam6/1
MoUw/ALICE:12/2016Toproducestaves,framesandFEMs
Det.Assembly&Test@BNL
MAPSProd.&QA@ALICE
StaveProd.&Test@CERN;
FEMProd.@US
+2% +50%
FromSep.2016TrackerReview
11/4/16
FY20:MIEFundavailable?
Weneed$$heretostart!
Someintermediatesolu.onsneededtofillthegap!
HadaSmallGroupMee.ngon10/21/2016
11/4/16 [email protected] 6
Ed,DaveM,GuntherandMing1.HighlevelsPHENIX-ALICE“Agreement”:
“ThedocumentthatweintendtohavebothCERNandDOEsignagreeingtocooperateonMAPSdevelopmentforsPHENIX,willnotbeaMemorandumofUnderstanding,butratheran
agreementtocollaborate,anagreementtoprovideresources,orsomethingsimilar.“fromEd.2.ALDplanstoworkonsPHENIX-ALICEAgreementwithDOEandsPHENIXmanagement,willingtogotoCERNfornego.a.onetc.3.>$2MMIEasanindividualfederalbudgetitem,therecouldbesomeflexibili.es,wetrytoworkoutMAPSplanfirstthendealwiththislater4.Developapre-proposal(adraNby12/15/2016sPHENIXcollabora.onmee.ng),--iden.fythe.melineofM&SfundandmanpowerneedstomatchALCIE/ITSandsPHENIXschedules--->star.ngfromCost&Scheduledocumentswealreadyhave5.Togetallinterestedpar1esinvolvedinthepre-proposalwri1ng6.Guntherwilltrytoarrangeamee.ngwithMITfolkson27thtodiscussMAPSinvolvement
sPHENIX/MAPSMIEDiscussion(Cont.)
• sPHENIX/MAPSdiscussionatMIT,10/27/16,manyaJended– Gunther,BolekW.,Yen-JieL,BobR.,RichardM.,BolekW.,– BatesEngineersJasonBesuille,JamesKelsey.– DaveM.,JohnH,Eddialedin– CesarandMing
• DiscussedMIT’sinterestandresponsibility– Majortaskstolead
• Mechanicalsystemintegra.on• Assemblyandsystemtest
– MITPhysicsandBatesEngineeringGroup• excellentmatchtothecapabili.es
– Resourceand.meline• EngineersandTechs• Studentsandpostdocs
11/4/16 [email protected] 7
ANearTermPlan• ConsideraseparateMIEproposalforMAPS– Feasibility,startcommunica.onwithDOE– Haveapre-proposalsoon,firstdraNbyDec15
• Iden.fytasks,resourcesand.meline• FirstfulldocbyJan2017,tobereadyfordiscussionswithDOE
• Inviteallinterestedpar.estojointhepre-proposalwri.ng– AdraN:~15pages– UpdateResource,CostandSchedules– MorediscussionatDec.collabora.onmee.ng
11/4/16 [email protected] 8
Note:aTypicalMIETimeline• SubmiJedandreviewedinFY17,establishDOE“missionneed”
• FederalbudgetrequestbyDOEinFeb2018,
• FundavailableFY20forconstruc.on
• Earlyconstruc.onfundneededbymid2018– ProduceMAPSchipsandstavesfollowingALICE/ITSproduc.onatCERN
– About$1M,externalfundingopportuni.es?
11/4/16 [email protected] 9