1 GSA Progressive Collapse Design Guidelines Applied to Concrete Moment-Resisting Frame Buildings David N. Bilow, P.E., S.E. and Mahmoud E. Kamara, PhD Portland Cement Association Tri-Service Infrastructure Systems Conference & Exposition St. Louis, MO - August 2005
Transcript
Page 1: Progressive Collapse 23

8/13/2019 Progressive Collapse 23

http://slidepdf.com/reader/full/progressive-collapse-23 1/31

1

GSA Progressive Collapse Design

Guidelines Applied to

Concrete Moment-ResistingFrame Buildings

David N. Bilow, P.E., S.E. andMahmoud E. Kamara, PhDPortland Cement Association

Tri-Service Infrastructure SystemsConference & ExpositionSt. Louis, MO - August 2005

Page 2: Progressive Collapse 23

8/13/2019 Progressive Collapse 23

http://slidepdf.com/reader/full/progressive-collapse-23 2/31

2

TopicsTopics

DefinitionDefinition

Comparison of DOD & GSA requirementsComparison of DOD & GSA requirements

Purpose of PCA studyPurpose of PCA study

Study procedureStudy procedureResultsResults

Page 3: Progressive Collapse 23

8/13/2019 Progressive Collapse 23

http://slidepdf.com/reader/full/progressive-collapse-23 3/31

3

Ronan PointRonan Point(1968)(1968)

 Explosion on 18Explosion on 18thth

floorfloor Wall panel blownWall panel blown

outout

 22 floors collapse22 floors collapse

Page 4: Progressive Collapse 23

8/13/2019 Progressive Collapse 23

http://slidepdf.com/reader/full/progressive-collapse-23 4/31

4

Ronan PointRonan Point

Page 5: Progressive Collapse 23

8/13/2019 Progressive Collapse 23

http://slidepdf.com/reader/full/progressive-collapse-23 5/31

5

PreventPrevent

ProgressiveProgressiveCollapseCollapse

 Explosion at groundExplosion at ground

floorfloor

 Local damage onlyLocal damage only

Page 6: Progressive Collapse 23

8/13/2019 Progressive Collapse 23

http://slidepdf.com/reader/full/progressive-collapse-23 6/31

6

GSA and DOD Criteria Comparison

Middle of long side,

middle of short side, &

corner column, at eachfloor one at a time

Middle of long side,

middle of short side, &

corner column, atground level only

Column

Removal

Req’d for Low LOP w/o

vertical tie, Medium LOP,

& High LOP

Required for 

nonexempt

 Alternate Path

 Analysis

Vertical and/or horizontaltie forces, and ductilityRedundancy, ductility& continuityTieRequirements

Very Low, Low, Medium,and High

Exempt or nonexemptLevel of Protection

(LOP)

DODGSARequirement

Page 7: Progressive Collapse 23

8/13/2019 Progressive Collapse 23

http://slidepdf.com/reader/full/progressive-collapse-23 7/31

7

Comparison

Linear static, nonlinear static,

or nonlinear dynamic

Linear static

preferred

Method of 

 Analysis

1.0DL + 0.5LLRecommendedUpward Loads onFloor Slabs

1.2DL + 0.5LL + 0.2WDL + 0.25LLLoads forDynamic Analysis

2.0(1.2DL + 0.5LL) + 0.2W Adjacent bays & floor above

1.2 DL + 0.5LL for rest of structure

2(DL +0.25LL)all bays andfloors

Loads forStatic Analysis

DODGSARequirement

Page 8: Progressive Collapse 23

8/13/2019 Progressive Collapse 23

http://slidepdf.com/reader/full/progressive-collapse-23 8/31

8

Comparison

Exterior: 1500 ft2

or 15%Interior: 3000 ft

2or 30%

Exterior: 1800 ft2

Interior: 3600 ft2

Maximum Extent of Floor Collapse

 Allow plastic hinges & moment redistribution

DCR  6 2.0 fortypical structures

 Acceptance Criteria

  specified in ACI 3181Strength ReductionFactor, 

1.251.25Material StrengthIncrease Factor

DODGSARequirement

Page 9: Progressive Collapse 23

8/13/2019 Progressive Collapse 23

http://slidepdf.com/reader/full/progressive-collapse-23 9/31

9

PCA Study ObjectivesPCA Study Objectives

1. Determine how to apply the GSA progressive collapse guidelines.

2. Determine additional reinforcement

needed to meet requirements forreinforced concrete frame buildings.

Page 10: Progressive Collapse 23

8/13/2019 Progressive Collapse 23

http://slidepdf.com/reader/full/progressive-collapse-23 10/31

10

ReferencesReferences

 General Services AdministrationGeneral Services Administration

Progressive CollapseProgressive Collapse

 Analysis and Design Guidelines for Analysis and Design Guidelines for

New Federal Office Buildings andNew Federal Office Buildings andMajor Modernization ProjectsMajor Modernization Projects

June 2003June 2003

 2000 International Building Code2000 International Building Code

 ACI 318 ACI 318--99 Building Code Requirements for99 Building Code Requirements for

Structural ConcreteStructural Concrete

Page 11: Progressive Collapse 23

8/13/2019 Progressive Collapse 23

http://slidepdf.com/reader/full/progressive-collapse-23 11/31

11

Study Procedure

1. Design 3 building structures for live,

dead, wind, and seismic loads2. Instantaneously remove selected firstfloor columns

3. Calculate the alternate path loads perGSA criteria

4. Apply the GSA loads to the structure5. Determine moments and forces

6. Determine ultimate unfactored membercapacity

7. Calculate Demand Capacity Ratios

8. Calculate additional reinforcement

Page 12: Progressive Collapse 23

8/13/2019 Progressive Collapse 23

http://slidepdf.com/reader/full/progressive-collapse-23 12/31

12

Building PlanBuilding Plan

Number of stories: 12

Bay size in each direction: 24’ 

Typical story height: 12’ 

First story height: 15’ 

Page 13: Progressive Collapse 23

8/13/2019 Progressive Collapse 23

http://slidepdf.com/reader/full/progressive-collapse-23 13/31

13

LoadsLoads

Floor Live Load = 50 psf Floor Live Load = 50 psf 

Superimposed Dead Load = 30 psf Superimposed Dead Load = 30 psf 

Dead LoadDead Load

Wind Load for 70 MPHWind Load for 70 MPHSeismic LoadSeismic Load -- 3 Locations3 Locations

Page 14: Progressive Collapse 23

8/13/2019 Progressive Collapse 23

http://slidepdf.com/reader/full/progressive-collapse-23 14/31

14

Three Reinforced Cast-in-Place Concrete

Moment Frame Buildings

Special momentframe

.61gD

Intermediate

moment frame

.094gC

Ordinary momentframe

.024g A 

Type of DetailingShort Period Acceleration

SeismicDesign Class

Page 15: Progressive Collapse 23

8/13/2019 Progressive Collapse 23

http://slidepdf.com/reader/full/progressive-collapse-23 15/31

15

Load Combinations

Normal Loading

U = 1.4D + 1.7L U = 0.75(1.4D + 1.7L+ 1.7W)

U = 0.75(1.4D +1.7L +1.1 E)

Page 16: Progressive Collapse 23

8/13/2019 Progressive Collapse 23

http://slidepdf.com/reader/full/progressive-collapse-23 16/31

16

 Analysis and Design Analysis and Design Select preliminary member sizesSelect preliminary member sizes

 Model in 3 dimensionsModel in 3 dimensions

 Static linear elastic analysisStatic linear elastic analysis

 Beam and column reinforcement calculatedBeam and column reinforcement calculated

 ETABS software version 8.11ETABS software version 8.11

Page 17: Progressive Collapse 23

8/13/2019 Progressive Collapse 23

http://slidepdf.com/reader/full/progressive-collapse-23 17/31

17

Remove 1Remove 1stst Story ColumnsStory Columns

Interior columnremoved for

parking and publicspace

Page 18: Progressive Collapse 23

8/13/2019 Progressive Collapse 23

http://slidepdf.com/reader/full/progressive-collapse-23 18/31

18

 Alternate Load Path Analysis Alternate Load Path Analysis

Four new models of each of 3 buildingsFour new models of each of 3 buildingsFirst story columns removedFirst story columns removed

Progressive Collapse Alternate Load Path

Gravity Load = 2(DL+0.25LL)

Determine forces and moments (ETABS)Determine forces and moments (ETABS)

Page 19: Progressive Collapse 23

8/13/2019 Progressive Collapse 23

http://slidepdf.com/reader/full/progressive-collapse-23 19/31

19

Bending Moments

 After Removing Long

Side Center Column

 After Removing

Corner Column

 X    X 

Page 20: Progressive Collapse 23

8/13/2019 Progressive Collapse 23

http://slidepdf.com/reader/full/progressive-collapse-23 20/31

20

Shear ForcesShear Forces

 After Removing LongSide Center Column

 X 

Page 21: Progressive Collapse 23

8/13/2019 Progressive Collapse 23

http://slidepdf.com/reader/full/progressive-collapse-23 21/31

21

Calculate Demand Capacity Ratios

DCR = QUD/QCE

QUD:  Acting force from alternate load path

QCE:   Ultimate unfactored component

capacity with strength increased 25%Limits:DCR < 2.0 for typical structures

DCR < 1.5 for atypical structures

NEHRP Guidelines for Seismic Rehabilitation of NEHRP Guidelines for Seismic Rehabilitation of 

BuildingsBuildings-- FEMA 1997FEMA 1997

Page 22: Progressive Collapse 23

8/13/2019 Progressive Collapse 23

http://slidepdf.com/reader/full/progressive-collapse-23 22/31

22

Remove 1Remove 1stst Story ColumnsStory Columns

Page 23: Progressive Collapse 23

8/13/2019 Progressive Collapse 23

http://slidepdf.com/reader/full/progressive-collapse-23 23/31

23

DC Rs Flexure - Co rner C olumn Eliminated - B 1

0 2

1

2

3

4

5

6

7

8

9

10

11

12

      S      t     o     r

     y

D C R

SDC D

SDC C

SDC A

Study ResultsStudy Results

Page 24: Progressive Collapse 23

8/13/2019 Progressive Collapse 23

http://slidepdf.com/reader/full/progressive-collapse-23 24/31

24

DCRs Flexure - Long Side Column Eliminated -

B2

0 2

123

45678

9101112

      S      t     o     r     y

DCR

SDC D

SDC C

SDC A

ResultsResults

Page 25: Progressive Collapse 23

8/13/2019 Progressive Collapse 23

http://slidepdf.com/reader/full/progressive-collapse-23 25/31

25

DCRs Flexure - Long Side Column Eliminated -

B27

0.00 2.00

1

234

56

78

91011

12

      S      t     o     r     y

DCR

SDC D

SDC C

SDC A

ResultsResults

Page 26: Progressive Collapse 23

8/13/2019 Progressive Collapse 23

http://slidepdf.com/reader/full/progressive-collapse-23 26/31

26

DCR for Shear in BeamsDCR for Shear in Beams

1.041.041.461.4611

1.011.011.391.3933

.94.941.321.3255

.86.861.231.2377

.81.811.191.1999

.79.791.171.171111B27B27B2B2StoryStory

Page 27: Progressive Collapse 23

8/13/2019 Progressive Collapse 23

http://slidepdf.com/reader/full/progressive-collapse-23 27/31

27

Remove 1Remove 1stst Story ColumnsStory Columns

Page 28: Progressive Collapse 23

8/13/2019 Progressive Collapse 23

http://slidepdf.com/reader/full/progressive-collapse-23 28/31

28

DCR for 1DCR for 1stst

Story ColumnsStory Columns

.44.44.65.65.84.84C12C12

.59.59.76.761.021.02C11C11

.73.73.88.881.231.23C10C10

XXXXXXC9C9

SeismicSeismicClass DClass DSeismicSeismic

Class CClass CSeismicSeismicClass A Class A ColumnColumn

Page 29: Progressive Collapse 23

8/13/2019 Progressive Collapse 23

http://slidepdf.com/reader/full/progressive-collapse-23 29/31

29

Summary of Results

235 of 456

55 of 456

 All

 All

 All

Number

 Add Rebar> 2.0Beams, Class A  Add Rebar> 2.0Beams, Class C

None< 2.0Beams, Class D

None< 2.0Columns

None< 2.0Shear

 ActionDCR ValueItem

 Additional rebar for “A” Structures

Cost = $12,000

Page 30: Progressive Collapse 23

8/13/2019 Progressive Collapse 23

http://slidepdf.com/reader/full/progressive-collapse-23 30/31

30

 Applying the GSA criteria to preventprogressive collapse for concrete

buildings can be accomplished by thestructural engineer using readily

available software and for little additional

construction cost.

ConclusionConclusion

Page 31: Progressive Collapse 23

8/13/2019 Progressive Collapse 23

http://slidepdf.com/reader/full/progressive-collapse-23 31/31

31

Contact InformationContact InformationDavid N. Bilow, P.E., S.E.David N. Bilow, P.E., S.E.

Portland Cement AssociationPortland Cement Association

[email protected]@cement.org

847847--972972--90649064847847--972972--9065 Fax9065 Fax

5420 Old Orchard Road5420 Old Orchard Road

Skokie, IL 60077Skokie, IL 60077