+ All Categories

Project

Date post: 24-Oct-2014
Category:
Upload: rbangaram1
View: 121 times
Download: 13 times
Share this document with a friend
Popular Tags:
18
MVR College of Engineering & Technology, Paritala LIST OF PROJECTS S NO Roll Number Name of the student Branch Class Name of the organisation Duration of the Project Project Type 1 L9EE2261 A. AJAY KUMAR EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project 2 L9EE2262 CH. YOGAIAH EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project 3 L9EE2264 K. CHAITANYA TATIKONDA EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project 4 L9EE2265 L. MOHAN RAO EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project 5 L9EE2267 V. TRILOKA NADH EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project 6 Y8EE2201 A GANESH AMARENDRA EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project 7 Y8EE2203 BADARLA NARESH EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project 8 Y8EE2205 CHALASANI ROJA EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project 9 Y8EE2212 DURGASI TEJA EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project 10 Y8EE2213 GSRINIVASARAO EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project 11 Y8EE2218 KADIYALA LAKSHMI SIRISHA EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project 12 Y8EE2220 KANDULA LAKSHMI DURGA EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project 13 Y8EE2223 KJYOTHI PRAKASH EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project 14 Y8EE2225 K VIJAYA LAKSHMI EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project 15 Y8EE2226 KOVURU SARATH BABU EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project 16 Y8EE2227 K SANTHOSH VIJAY KUMAR EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project 17 Y8EE2235 PARVATANENI SRAVYA EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project 18 Y8EE2237 P DURGA MAHESH EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project 19 Y8EE2241 PRUDHIVI VEERA GANESH EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project 20 Y8EE2245 S DURGA RAM PRASAD EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project 21 Y8EE2246 SEKHAR BABU PANDEPU EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project 22 Y10BU141059 P.Venu Gopala Swami MBA II/II INCAP Capacitors Ltd., Nidamanuru 2 Months 245 Y10BU141019 V. Jagan Mohan Srinivas MBA II/II INCAP Capacitors Ltd., Nidamanuru 2 Months 23 Y9CS2201 SANTOSHI ANUPAMA . A. N. L CSE III/IV (Microsoft) Everonn Education Ltd. 3 Months Mini Project
Transcript
Page 1: Project

MVR College of Engineering & Technology, Paritala

LIST OF PROJECTS

S

NO Roll Number Name of the student Branch Class Name of the organisation

Duration of the

Project Project Type

1 L9EE2261 A. AJAY KUMAR EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project

2 L9EE2262 CH. YOGAIAH EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project

3 L9EE2264 K. CHAITANYA TATIKONDA EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project

4 L9EE2265 L. MOHAN RAO EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project

5 L9EE2267 V. TRILOKA NADH EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project

6 Y8EE2201 A GANESH AMARENDRA EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project

7 Y8EE2203 BADARLA NARESH EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project

8 Y8EE2205 CHALASANI ROJA EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project

9 Y8EE2212 DURGASI TEJA EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project

10 Y8EE2213 GSRINIVASARAO EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project

11 Y8EE2218 KADIYALA LAKSHMI SIRISHA EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project

12 Y8EE2220 KANDULA LAKSHMI DURGA EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project

13 Y8EE2223 KJYOTHI PRAKASH EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project

14 Y8EE2225 K VIJAYA LAKSHMI EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project

15 Y8EE2226 KOVURU SARATH BABU EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project

16 Y8EE2227 K SANTHOSH VIJAY KUMAR EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project

17 Y8EE2235 PARVATANENI SRAVYA EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project

18 Y8EE2237 P DURGA MAHESH EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project

19 Y8EE2241 PRUDHIVI VEERA GANESH EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project

20 Y8EE2245 S DURGA RAM PRASAD EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project

21 Y8EE2246 SEKHAR BABU PANDEPU EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project

22 Y10BU141059 P.Venu Gopala Swami MBA II/II INCAP Capacitors Ltd., Nidamanuru 2 Months ������

245 Y10BU141019 V. Jagan Mohan Srinivas MBA II/II INCAP Capacitors Ltd., Nidamanuru 2 Months ������

23 Y9CS2201 SANTOSHI ANUPAMA . A. N. L CSE III/IV (Microsoft) Everonn Education Ltd. 3 Months Mini Project

Page 2: Project

24 Y9CS3047 TAGORE. K CSE III/IV (Microsoft) Everonn Education Ltd. 3 Months Mini Project

25 108H1A0550 BHAVANI. T CSE II/IV (Microsoft) Everonn Education Ltd. 3 Months Mini Project

26 Y9CS2207 SAI KUMAR. CH CSE III/IV (Microsoft) Everonn Education Ltd. 3 Months Mini Project

27 108H1A0532 RAMYA. M CSE II/IV (Microsoft) Everonn Education Ltd. 3 Months Mini Project

28 108H1A0557 SOUNDARYA . Y CSE II/IV (Microsoft) Everonn Education Ltd. 3 Months Mini Project

29 108H1A0527 SAI GURU SRINIVAS. K CSE II/IV (Microsoft) Everonn Education Ltd. 3 Months Mini Project

30 108H1A0547 SAI RAM. T CSE II/IV (Microsoft) Everonn Education Ltd. 3 Months Mini Project

31 108H1A0549 KALPANA. T CSE II/IV (Microsoft) Everonn Education Ltd. 3 Months Mini Project

32 Y9CS2235 VENKATA NAGA VAMSI KIRAN. K CSE III/IV (Microsoft) Everonn Education Ltd. 3 Months Mini Project

33 L10CS2261 HARI KRISHNA. CH CSE III/IV (Microsoft) Everonn Education Ltd. 3 Months Mini Project

34 Y9CS2213 VENKATA DURGA PRASAD. J CSE III/IV (Microsoft) Everonn Education Ltd. 3 Months Mini Project

35 Y9CS2220 GOPI CHAND. M CSE III/IV (Microsoft) Everonn Education Ltd. 3 Months Mini Project

36 108H1A0526 SURYA TEJA. K CSE II/IV (Microsoft) Everonn Education Ltd. 3 Months Mini Project

37 108H1A0534 VAMSI KRISHNA. M CSE II/IV (Microsoft) Everonn Education Ltd. 3 Months Mini Project

38 108H1A0548 SRI HARSHA .T CSE II/IV (Microsoft) Everonn Education Ltd. 3 Months Mini Project

39 118H5A0502 KARTHEEK KUMAR. K CSE II/IV (Microsoft) Everonn Education Ltd. 3 Months Mini Project

40 108H1A0538 JAYA CHOWDARY. P CSE II/IV (Microsoft) Everonn Education Ltd. 3 Months Mini Project

41 108H1A0525 LAKSHMAN .K CSE II/IV (Microsoft) Everonn Education Ltd. 3 Months Mini Project

42 108H1A0501 ABHISHEK. J CSE II/IV (Microsoft) Everonn Education Ltd. 3 Months Mini Project

43 Y9CS2224 PRASANTH KUMAR. N CSE III/IV (Microsoft) Everonn Education Ltd. 3 Months Mini Project

44 Y9CS2233 KANAKA DURGA. T CSE III/IV (Microsoft) Everonn Education Ltd. 3 Months Mini Project

45 Y9CS2218 PUJITHA. K CSE III/IV (Microsoft) Everonn Education Ltd. 3 Months Mini Project

46 Y9CS2231 SINDHUJA .G CSE III/IV (Microsoft) Everonn Education Ltd. 3 Months Mini Project

47 108H1E0015 SWAPNA .K MBA II/II A.P.H.M.E.L (kondapalli) 2 Months Main

48 108H1E0043 RAFEE .SK MBA II/II A.P.H.M.E.L (kondapalli) 2 Months Main

49 108H1E0046 VENKATESWARARAO.U MBA II/II A.P.H.M.E.L (kondapalli) 2 Months Main

50 108H1E0048 SIRISHA .V MBA II/II A.P.H.M.E.L (kondapalli) 2 Months Main

51 Y10BU141052 S.V. Narasimha Rao MBA II/II Agri Gold Food Division 2 Months ������

53 Y8EC2215 J VENKATA ANUSHA ECE IV/IV AIR, Vijayawada 1 month Mini Project

Page 3: Project

54 Y8EC2216 JONNALA GADDA SWETHA ECE IV/IV AIR, Vijayawada 1 month Mini Project

55 Y8EC2217 K. NAVYA ECE IV/IV AIR, Vijayawada 1 month Mini Project

56 Y8EC2219 K VENKATESWARA RAO ECE IV/IV AIR, Vijayawada 1 month Mini Project

57 Y8EC2220 KASTURI VENKATAKRISHNA ECE IV/IV AIR, Vijayawada 1 month Mini Project

58 Y8EC2221 KATRAVATH SRINIVAS ECE IV/IV AIR, Vijayawada 1 month Mini Project

59 Y8EC2224 KONAKANCHI USHA KIRAN ECE IV/IV AIR, Vijayawada 1 month Mini Project

60 Y8EC2226 M S RAMAKRISHNA ECE IV/IV AIR, Vijayawada 1 month Mini Project

61 Y8EC2230 MANNAM NILIMA ECE IV/IV AIR, Vijayawada 1 month Mini Project

62 Y8EC2231 MANTADA GIRISH KUMAR ECE IV/IV AIR, Vijayawada 1 month Mini Project

63 Y8EC2232 MERUGU SRI NAVYA ECE IV/IV AIR, Vijayawada 1 month Mini Project

64 Y8EC2236 N V SRIVALLI AMRUTHA ECE IV/IV AIR, Vijayawada 1 month Mini Project

65 Y8EC2237 N VINAY KUMAR REDDY ECE IV/IV AIR, Vijayawada 1 month Mini Project

66 Y8EC2238 PALAGANI JOTHSNA DEVI ECE IV/IV AIR, Vijayawada 1 month Mini Project

67 Y8EC2244 RAYALA HARINARAYANA ECE IV/IV AIR, Vijayawada 1 month Mini Project

68 Y8EC2245 S O VARA PRASAD ECE IV/IV AIR, Vijayawada 1 month Mini Project

69 Y8EC2247 SATULURI MURALI ECE IV/IV AIR, Vijayawada 1 month Mini Project

70 Y8EC2248 SEELAM LAKSHMANA ECE IV/IV AIR, Vijayawada 1 month Mini Project

71 Y8EC2249 SEETHALA SAI JANARDHAN ECE IV/IV AIR, Vijayawada 1 month Mini Project

72 Y8EC2252 TALLAM SIRISHA ECE IV/IV AIR, Vijayawada 1 month Mini Project

52 108H1E0003 JAGADEESH REDDY .B MBA II/II AIRTEL 2 Months Main

73 Y10BU141024 K. Nageswara Rao MBA II/II APHMEL, kondapalli 2 Months ������

74 108H1E0045 VINODPRABHAKAR.T MBA II/II Aurabindo Pharama, Hyderabad 2 Months Main

75 L10CE2265 S.K.MASTAN CIVIL III/IV BANU CONSTRUCTIONS 1MONTH Main Project

76 Y8IT2222 N.Swathi IT IV/IV BDPS,Vijayawada

26/12/12-

26/03/12 Main Project

77 Y8IT2209 G.Prathyusha IT IV/IV BDPS,Vijayawada

26/12/12-

26/03/12 Main Project

78 Y8IT2212 P.Himavanth Varma IT IV/IV BDPS,Vijayawada

26/12/12-

26/03/12 Main Project

79 Y8IT2215 K.Saichand IT IV/IV BDPS,Vijayawada

26/12/12-

26/03/12 Main Project

Page 4: Project

80 Y8EC2207 B JOHN KALYAN ECE IV/IV

Bharat Electronics Ltd.,

Machilipatnam 3 months Main Project

81 Y8EC2215 J VENKATA ANUSHA ECE IV/IV

Bharat Electronics Ltd.,

Machilipatnam 3 months Main Project

82 Y8EC2219 K VENKATESWARA RAO ECE IV/IV

Bharat Electronics Ltd.,

Machilipatnam 3 months Main Project

83 Y8EC2224 KONAKANCHI USHA KIRAN ECE IV/IV

Bharat Electronics Ltd.,

Machilipatnam 3 months Main Project

84 Y8EC2231 MANTADA GIRISH KUMAR ECE IV/IV

Bharat Electronics Ltd.,

Machilipatnam 3 months Main Project

85 Y9CE2225 MAREEDU VARA PRASAD CIVIL III/IV BHARGAV CONSTRUCTIONS 1MONTH Main Project

86 L9EE2262 CH. YOGAIAH EEE IV/IV BHEL, Hyderabad

THREE

MONTHS Major Project

87 L9EE2263 K. NAGU EEE IV/IV BHEL, Hyderabad

THREE

MONTHS Major Project

88 Y8EE2206 CH DURGA RAJA KARTHIK EEE IV/IV BHEL, Hyderabad

THREE

MONTHS Major Project

89 Y8EE2210 D SAI SANDHYA CHOWDARY EEE IV/IV BHEL, Hyderabad

THREE

MONTHS Major Project

90 Y8EE2214 GOVADA RAVINDRA BABU EEE IV/IV BHEL, Hyderabad

THREE

MONTHS Major Project

91 Y8EE2218 KADIYALA LAKSHMI SIRISHA EEE IV/IV BHEL, Hyderabad

THREE

MONTHS Major Project

92 Y8EE2219 KAMISETTI SUSMITHA EEE IV/IV BHEL, Hyderabad

THREE

MONTHS Major Project

93 Y8EE2222 KODALI JAYA CHANDRA EEE IV/IV BHEL, Hyderabad

THREE

MONTHS Major Project

94 Y8EE2223 KJYOTHI PRAKASH EEE IV/IV BHEL, Hyderabad

THREE

MONTHS Major Project

95 Y8EE2230 MANIKONDA LOKESH EEE IV/IV BHEL, Hyderabad

THREE

MONTHS Major Project

96 Y8EE2234 PALA RANGAPRASAD EEE IV/IV BHEL, Hyderabad

THREE

MONTHS Major Project

97 Y8EE2235 PARVATANENI SRAVYA EEE IV/IV BHEL, Hyderabad

THREE

MONTHS Major Project

Page 5: Project

98 Y8EE2249 T JAGADISH EEE IV/IV BHEL, Hyderabad

THREE

MONTHS Major Project

99 Y8EE2253 UBBALA MURALI KRISHNA EEE IV/IV BHEL, Hyderabad

THREE

MONTHS Major Project

100 108H1E0005 NARASIMHAM.B MBA II/II Big Bazar 2 Months Main

101 Y9CE2206 BOBBA. KRISHNA CHAITANYA CIVIL III/IV BSNL, Vijayawada 1MONTH Main Project

102 Y9CE2208 BUSANABOINA. NAGA MURALI CIVIL III/IV BSNL, Vijayawada 1MONTH Main Project

103 Y9CE2218 JETTY CHINNA RAMASWAMY CIVIL III/IV BSNL, Vijayawada 1MONTH Main Project

104 Y9CE2219 KATRAGADDA. LALITESWAR CIVIL III/IV BSNL, Vijayawada 1MONTH Main Project

105 Y9CE2223 KRISTAVARAPU. TEROHA CIVIL III/IV BSNL, Vijayawada 1MONTH Main Project

106 Y9CE2227 MOHAMMED. HYDER CIVIL III/IV BSNL, Vijayawada 1MONTH Main Project

107 Y9CE2232 PENUGURTHI. RAVINDRA NAGU CIVIL III/IV BSNL, Vijayawada 1MONTH Main Project

108 Y9CE2236 RAVI SARAT CHANDRA CIVIL III/IV BSNL, Vijayawada 1MONTH Main Project

109 Y9CE2237 SINGAM. SAI SRAVAN CIVIL III/IV BSNL, Vijayawada 1MONTH Main Project

110 Y9CE2238 SURAPANENI. SAMANTH CIVIL III/IV BSNL, Vijayawada 1MONTH Main Project

111 Y9CE2244 YEEDI. BALAJI CIVIL III/IV BSNL, Vijayawada 1MONTH Main Project

112 Y9CE2245 YEMINENI LAKSHMI PRASANA CIVIL III/IV BSNL, Vijayawada 1MONTH Main Project

113 L10CE2261 K.RATNA KUMAR CIVIL III/IV BSNL, Vijayawada 1MONTH Main Project

114 L10CE2266 K.GOWTHAM CIVIL III/IV BSNL, Vijayawada 1MONTH Main Project

115 Y8EC2201 ACHANTA SARAN TEJUS ECE IV/IV BSNL, Vijayawada 1 month Mini Project

116 Y8EC2203 BAJARU RAVIBABU ECE IV/IV BSNL, Vijayawada 1 month Mini Project

117 Y8EC2204 BANDLAMUDI LAKSHMANUDU ECE IV/IV BSNL, Vijayawada 1 month Mini Project

118 Y8EC2205 B LEELA NAGA SRAVANTHI ECE IV/IV BSNL, Vijayawada 1 month Mini Project

119 Y8EC2206 BOBBADI VANAJA ECE IV/IV BSNL, Vijayawada 1 month Mini Project

120 Y8EC2207 B JOHN KALYAN ECE IV/IV BSNL, Vijayawada 1 month Mini Project

121 Y8EC2208 CHANDRABATLA SANDEEP ECE IV/IV BSNL, Vijayawada 1 month Mini Project

122 Y8EC2209 CHINTALA HARIKRISHNA ECE IV/IV BSNL, Vijayawada 1 month Mini Project

123 Y8EC2210 DEVARALA LAVANYA ECE IV/IV BSNL, Vijayawada 1 month Mini Project

124 Y8EC2211 DONEPUDI VENKATESH ECE IV/IV BSNL, Vijayawada 1 month Mini Project

125 Y8EC2212 GONUGUNTLA SUREKHA ECE IV/IV BSNL, Vijayawada 1 month Mini Project

Page 6: Project

126 Y8EC2214 HEMA RAJU GORUMUCHU ECE IV/IV BSNL, Vijayawada 1 month Mini Project

127 Y8EC2239 P VENKATA PRASAD ECE IV/IV BSNL, Vijayawada 1 month Mini Project

128 Y8EC2240 P S SRINIVASA REDDY ECE IV/IV BSNL, Vijayawada 1 month Mini Project

129 Y8EC2253 UNDAVALLI SURENDRA BABU ECE IV/IV BSNL, Vijayawada 1 month Mini Project

130 Y8EC2254 VADDEMPUDI KASAYYA ECE IV/IV BSNL, Vijayawada 1 month Mini Project

131 Y8EC2255 V PRADEEP KUMAR ECE IV/IV BSNL, Vijayawada 1 month Mini Project

132 Y8EC2256 VATTIKUTI GOWTHAMI ECE IV/IV BSNL, Vijayawada 1 month Mini Project

133 Y8EC2257 VEERLA RAVEENDRA ECE IV/IV BSNL, Vijayawada 1 month Mini Project

134 Y8EC2258 V SIVANJANEYULU ECE IV/IV BSNL, Vijayawada 1 month Mini Project

135 L9EC2261 A. BALAJI ECE IV/IV BSNL, Vijayawada 1 month Mini Project

136 L9EC2262 K.T.V.DASRADHA ECE IV/IV BSNL, Vijayawada 1 month Mini Project

137 L9EC2264 M. NAGA RAJU NAIK ECE IV/IV BSNL, Vijayawada 1 month Mini Project

138 L9EC2265 P.R. BHAVANA ECE IV/IV BSNL, Vijayawada 1 month Mini Project

139 108H1A0101 ALLAM KUMAR RAJA CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

140 108H1A0102 ANNAM PRASANTHI CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

141 108H1A0103 B VENKATA SASI KUMAR CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

142 108H1A0106 BEVARA HEMA MADHURI CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

143 108H1A0108 BHUKYA RAVI DURGA CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

144 108H1A0109 BOLLAVARAPU RAVI CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

145 108H1A0110 CHERUKUMALLI GOWTHAM CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

146 108H1A0111 CH V SURYA MANOHAR CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

147 108H1A0112 CHUNDURI VIJAYA KRISHNA CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

148 108H1A0114 D MURALI KRISHNAM RAJU CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

149 108H1A0115 GARRE VINESH SAI SARATH CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

150 108H1A0116 GOGINENI PAVAN CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

151 108H1A0121 JONNALAGADDA SOWJANYA CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

152 108H1A0122 KAKARLA NAGA PRIYANKA CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

153 108H1A0123 KAREDLA.PAVAN KUMAR CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

154 108H1A0128 KURAKULA MADHAVARAO CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

Page 7: Project

155 108H1A0129 MADALA.PHANI TEJA CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

156 108H1A0130 MADASU VINAYKUMAR CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

157 108H1A0131 MADDALA PHANEENDRA CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

158 108H1A0133 NALLAGARLA GOPI NATH CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

159 108H1A0134 NALLAMOTHU PRASAD RAO CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

160 108H1A0135 N ARAVIND PRABHAKAR CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

161 108H1A0136 N RAVEENDRA REDDY CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

162 108H1A0138 PALLI MANOHAR CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

163 108H1A0139 PAMARTHI VINODKUMAR CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

164 108H1A0141 PONDUGALA JAGADEESH CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

165 108H1A0143 P RAJESH CHOWDARY CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

166 108H1A0144 RAMANA TANUJA CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

167 108H1A0145 R.BALASUBRAMANYAM CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

168 108H1A0146 SARIKONDA SAI VARMA CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

169 108H1A0147 SEETHALA BHAVYA CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

170 108H1A0148 SETTIPALLI RAM SURYA CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

171 108H1A0149 SINGAMSETTY HARISH CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

172 108H1A0150 T VEERA MANI KANTA CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

173 108H1A0151 TARAKA.SHANKAR CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

174 108H1A0152 T HEMANTH KUMAR CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

175 108H1A0153 TULLURU BABU CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

176 108H1A0154 VEERUBHOTLA.SESHA.SAI CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

177 108H1A0155 VOGGU NAREN KUMAR CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

178 108H1A0156 YARLAGADDA SUMA CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

179 118H5A0101 MONDI.DURGA RAO CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

180 118H5A0102 THOTA.BALAJI CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

181 118H5A0103 V.VAMSIDHAR CIVIL II/IV CADD EXPERTS 1MONTH Mini Project

182 Y8CS2225 K.Chandana CSE IV/IV Career IT,Hyderabad

26/12/12-

26/03/12 Main Project

Page 8: Project

183 Y8CS2218 G.B.Sirisha CSE IV/IV Career IT,Hyderabad

26/12/12-

26/03/12 Main Project

184 Y8CS2252 V.Triloka Raja CSE IV/IV Career IT,Hyderabad

26/12/12-

26/03/12 Main Project

185 Y8CS2217 G.Satya Narayana CSE IV/IV Career IT,Hyderabad

26/12/12-

26/03/12 Main Project

186 Y10BU141012 M. Gouri Sarvani MBA II/II Chandra shipping & Trading Services 2 Months ������

187 Y8IT2218 K.Ram Kiran IT IV/IV CMTES,Vijayawada

26/12/12 -

26/03/12 Main Project

188 Y8IT2201 A.Krishna Veni IT IV/IV CMTES,Vijayawada

26/12/12 -

26/03/12 Main Project

189 Y8IT2202 A. Dinesh IT IV/IV CMTES,Vijayawada

26/12/12-

26/03/12 Main Project

190 Y8IT2206 B.Pavan Kumar IT IV/IV CMTES,Vijayawada

26/12/12 -

26/03/12 Main Project

191 Y8IT2220 K.Sasi Kiran IT IV/IV CMTES,Vijayawada

26/12/12-

26/03/12 Main Project

192 Y8IT2227 S.Srinu IT IV/IV CMTES,Vijayawada

26/12/12-

26/03/12 Main Project

193 Y8IT2219 K.Solomon Raju IT IV/IV CMTES,Vijayawada

26/12/12-

26/03/12 Main Project

194 Y8IT2221 N.Narasimhulu IT IV/IV CMTES,Vijayawada

26/12/12-

26/03/12 Main Project

195 Y10BU141005 A. Bhagya Lakshmi MBA II/II Corporation Bank 2 Months ������

196 Y10BU141006 B. Chandu MBA II/II Corporation Bank 2 Months ������

197 Y10BU141013 G. Hari Priya MBA II/II Corporation Bank 2 Months ������

198 Y10BU141031 E. Marry Lilly Garce MBA II/II Corporation Bank 2 Months ������

199 Y10BU141035 P. Naveen MBA II/II Corporation Bank 2 Months ������

200 Y10BU141036 D. Pallavi MBA II/II Corporation Bank 2 Months ������

201 Y9CE2230 NALLAMOTHU. SOWMYA SRI CIVIL III/IV DBT 1MONTH Main Project

202 108H1E0027 SUBRAMANYAM.PVPR

MBA II/II

Delta Sugars Ltd, Hanuman

Junction 2 Months Main

203 Y9CE2220 KILLI. CHIRANJEEVI RAO CIVIL III/IV DR CONSTRUCTIONS 1MONTH Main Project

Page 9: Project

204 L9EE2266 K. SRINIVAS EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project

205 Y8EE2202 A GOPALAKRISHNA EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM ONE MONTH Mini Project

206 Y8EE2201 A GANESH AMARENDRA EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM

THREE

MONTHS Major Project

207 Y8EE2202 A GOPALAKRISHNA EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM

THREE

MONTHS Major Project

208 Y8EE2203 BADARLA NARESH EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM

THREE

MONTHS Major Project

209 Y8EE2207 CHIRALA NAGARAJU EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM

THREE

MONTHS Major Project

210 Y8EE2208 DIMMITI GOPI CHAND EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM

THREE

MONTHS Major Project

211 Y8EE2211 D VISHNU VARDHAN REDDY EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM

THREE

MONTHS Major Project

212 Y8EE2213 GSRINIVASARAO EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM

THREE

MONTHS Major Project

213 Y8EE2215 GUDISEVA SURIBABU EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM

THREE

MONTHS Major Project

214 Y8EE2216 GUNDARAPU ARUNSAI EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM

THREE

MONTHS Major Project

215 Y8EE2217 G MADHUSUDAN RAO EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM

THREE

MONTHS Major Project

216 Y8EE2227 K SANTHOSH VIJAY KUMAR EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM

THREE

MONTHS Major Project

217 Y8EE2229 MALAGI DURGA RAO EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM

THREE

MONTHS Major Project

218 Y8EE2246 SEKHAR BABU PANDEPU EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM

THREE

MONTHS Major Project

219 Y8EE2255 Y VENKATESWARA RAO EEE IV/IV Dr.NTTPS, IBHRAHIMPATNAM

THREE

MONTHS Major Project

220 Y10BU141023 K. Naga Sudha MBA II/II Dr.NTTPS, IBHRAHIMPATNAM 2 Months ������

221 Y8EC2210 DEVARALA LAVANYA ECE IV/IV ECIL, Hyderabad 3 months Main Project

222 Y8EC2217 K. NAVYA ECE IV/IV ECIL, Hyderabad 3 months Main Project

223 Y8EC2221 KATRAVATH SRINIVAS ECE IV/IV ECIL, Hyderabad 3 months Main Project

Page 10: Project

224 Y8EC2232 MERUGU SRI NAVYA ECE IV/IV ECIL, Hyderabad 3 months Main Project

225 Y8EC2243 R V D JAHNAVI CHEETHIRALA ECE IV/IV EFFTRONICS, Vijayawada 1 month Mini Project

226 Y10BU141007' Ch. Rajesh MBA II/II G.S. Alloy's Castings Ltd 2 Months ������

227 Y10BU141009 D. Anjaneyulu MBA II/II G.S. Alloy's Castings Ltd 2 Months ������

228 Y10BU141032 M. Srikanth MBA II/II G.S. Alloy's Castings Ltd 2 Months ������

229 Y10BU141060 Ch. Vinay Babu MBA II/II G.S. Alloy's Castings Ltd 2 Months ������

230 108H1E0021 NARAYANA .M MBA II/II G.S. Alloy's Castings Ltd 2 Months Main

231 108H1E0028 SESHA RAO.PV MBA II/II G.S. Alloy's Castings Ltd 2 Months Main

232 108H1E0039 SUBBA REDDY.S MBA II/II G.S. Alloy's Castings Ltd 2 Months Main

236 Y10BU141045 D. Sai Venkata Naga Praveen MBA II/II G.S. Alloy's Castings Ltd 2 Months ������

233 Y10BU141002 A.Jaya Lakshmi MBA II/II Gandhi Co-operative Bank 2 Months ������

234 108H1E0032 PICHESWARARAO.G MBA II/II Genting Lanco Power Pvt Ltd 2 Months Main

235 108H1E0041 IBRAHIM.SK MBA II/II Genting Lanco Power Pvt Ltd 2 Months Main

237 108H1E0018 ASHOK .M MBA II/II HDFC Bank 2 Months Main

238 108H1E0044 SIVAKRISHNA REDDY MBA II/II Hero Honda Motors, Vijayawada 2 Months Main

239 Y10BU141004 B. Srinu Babu MBA II/II HETERO Drugs, Hyderabad 2 Months ������

240 Y10BU141034 B. Naga Rani MBA II/II HETERO Drugs, Hyderabad 2 Months ������

241 108H1E0050 VENKATARATHNAM .B MBA II/II HETERO Drugs, Hyderabad 2 Months Main

242 Y10BU141015 I. Narasimha Rao MBA II/II

Hindustan Coco-Cola Beverages Ltd.,

Atmakur 2 Months ������

243 Y10BU141027 Kotha Konda Kunal MBA II/II HPCL, BPCL, Mangalagiri 2 Months ������

244 108H1E0014 RAVINDRA.K MBA II/II Iddupulapadu cotton mill 2 Months Main

246 Y10BU141014 M. Harsha vardhini MBA II/II India Info Line 2 Months ������

247 Y10BU141017 J.Venkata Prasanna Divya MBA II/II India Info Line 2 Months ������

248 108H1E0040 KISHORE.S MBA II/II India Infoline 2 Months Main

324 Y10BU141028 L.K.D.V. Satyanarayana MBA II/II Indian Railways SCR Zone 2 Months ������

249 Y9CE2217 JABBA. HIMA TEJA SREE CIVIL III/IV IVRCL 1MONTH Main Project

250 108H1E0047 RENUKA .V MBA II/II Jocil (dokiparru) 2 Months Main

251 108H1E0002 VENKATA RAVITEJA .A MBA II/II K.C.P Sugars 2 Months Main

252 108H1E0026 SRINIVASA RAO .PV MBA II/II K.C.P Sugars 2 Months Main

Page 11: Project

253 108H1E0029 DEEPIKA .P MBA II/II K.C.P Sugars 2 Months Main

254 108H1E0030 SWETHA .P MBA II/II K.C.P Sugars 2 Months Main

255 108H1E0031 SRIRAMKAMAL .P MBA II/II K.C.P Sugars 2 Months Main

256 108H1E0037 NAGEWARARAO .MS MBA II/II K.C.P Sugars 2 Months Main

258 Y10BU141029' M. Naga Madhuri MBA II/II K.C.P Sugars 2 Months ������

259 Y10BU141033 Ch. N. Krishna Prasad MBA II/II K.C.P Sugars 2 Months ������

257 108H1E0001 MANIKANTA. A MBA II/II Karvy. Pvt . Ltd 2 Months Main

260 Y10BU141037 P. Rajesh MBA II/II KCP Sugars Co-Operative LTd 2 Months ������

261 Y10BU141058 D. Venkateswara Rao MBA II/II KCP Sugars Co-Operative LTd 2 Months ������

262 108H1E0013 HARATHBABU.K MBA II/II kesoram Cement 2 Months Main

263 108H1E0023 VENU .M MBA II/II kesoram Cement 2 Months Main

264 Y10BU141021 J. Suresh MBA II/II Kirbey Buildings & Systems 2 Months ������

265 Y9CE2201 ABBABATHULA. HARIKA CIVIL III/IV KK DESIGNS 1MONTH Main Project

266 Y9CE2202 ALURU HARISH BABU CIVIL III/IV KK DESIGNS 1MONTH Main Project

267 Y9CE2203 AMARA TEJASWI CIVIL III/IV KK DESIGNS 1MONTH Main Project

268 Y9CE2210

CHERUKUMALLI ASHOK

KUMAR CIVIL III/IV KK DESIGNS 1MONTH Main Project

269 Y9CE2212 CHETLURI. BAJI CIVIL III/IV KK DESIGNS 1MONTH Main Project

270 Y9CE2216 GARIMELLA GANESH CIVIL III/IV KK DESIGNS 1MONTH Main Project

271 Y9CE2224 MANDAPAKA. SAI SRIVANI CIVIL III/IV KK DESIGNS 1MONTH Main Project

272 Y9CE2235 RAMYA. LINGALA CIVIL III/IV KK DESIGNS 1MONTH Main Project

273 Y9CE2241 VASA. N. V. M. SURENDRANATH CIVIL III/IV KK DESIGNS 1MONTH Main Project

274 Y9CE2243 VEMULAKONDA. V. S. ESWAR CIVIL III/IV KK DESIGNS 1MONTH Main Project

275 L10CE2264 K.N.SUDHEER BABU CIVIL III/IV KK DESIGNS 1MONTH Main Project

276 Y10BU141051 T. Babu MBA II/II Kusalava International Ltd 2 Months ������

277 108H1E0052 PRAVEENKUMAR .Y.V.R MBA II/II Kusalava International Ltd. 2 Months Main

278 108H1E0022 ANANTHA LAKSHMI.M MBA II/II Kusalava Motors 2 Months Main

279 108H1E0042 JANIBABA.SK MBA II/II L.G. Electronics 2 Months Main

281 108H1E0004 SRIPATHI RAO .B MBA II/II Lanco Infra Tech 2 Months Main

Page 12: Project

280 Y10BU141039 P. Kanthi MBA II/II LANCO Kondapalli 2 Months ������

282 Y10BU141003 Annapoorna . B MBA II/II LANCO Kondapalli 2 Months ������

283 Y10BU141054 E.V.Narayana Reddy MBA II/II LANCO- Kondapalli 2 Months ������

284 Y10BU141057 V. Srinivasa Rao MBA II/II LANCO- Kondapalli 2 Months ������

285 Y10BU141030 M. Ram Babu MBA II/II Lanco power, kondapalli 2 Months ������

286 Y10BU141041' M. Ramu MBA II/II LG Electronics 2 Months ������

287 108H1E0019 BHADRAKALI .M MBA II/II Madras Cements 2 Months Main

288 Y10BU141044 Ch. Siva Nageswara Rao MBA II/II Maturi plastics 2 Months ������

289 Y10BU141026 T. Kishore MBA II/II MILK PROJECT 2 Months ������

290 Y9CE2228

MUDIGONDA. VENKATA

KISHORE CIVIL III/IV MILLENORUM 1MONTH Main Project

291 108H1E0020 AVINASH.M MBA II/II Model Dairy 2 Months Main

292 108H1E0007 KAPIL PHANI .CH

MBA II/II

Narla Thatarao Thermal Power

Station 2 Months Main

293 108H1E0011 NAGA DEEPIKA.G

MBA II/II

Narla Thatarao Thermal Power

Station 2 Months Main

294 108H1E0017 SARANYA .M

MBA II/II

Narla Thatarao Thermal Power

Station 2 Months Main

295 108H1E0035 RAMAKRISHNA. P MBA II/II Natco Pharma Limited 2 Months Main

296 Y8CS2213 Ch.Rajya Lakshmi CSE IV/IV NIIT,Vijayawad

26/12/12-

26/03/12 Main Project

297 Y8CS2251 N.Vijaya Lakshmi CSE IV/IV NIIT,Vijayawad

26/12/12-

26/03/12 Main Project

298 Y8CS2237 P.Giridhar CSE IV/IV NIIT,Vijayawad

26/12/12-

26/03/12 Main Project

299 Y8CS2249 V.Trinath CSE IV/IV NIIT,Vijayawad

26/12/12-

26/03/12 Main Project

300 Y8CS2215 D.Naga Poojitha CSE IV/IV NIIT,Vijayawad

26/12/12-

26/03/12 Main Project

301 Y8CS2236 N.V.SabariNath CSE IV/IV NIIT,Vijayawad

26/12/12-

26/03/12 Main Project

302 Y8CS2206 B.Sandeep CSE IV/IV NIIT,Vijayawad

26/12/12-

26/03/12 Main Project

Page 13: Project

303 Y8CS2254 Y.Salini CSE IV/IV NIIT,Vijayawad

26/12/12-

26/03/12 Main Project

304 Y8CS2214 Ch.Hima Sri CSE IV/IV NIIT,Vijayawad

26/12/12-

26/03/12 Main Project

305 Y8CS2253 V.Sai Kiran CSE IV/IV NIIT,Vijayawad

26/12/12-

26/03/12 Main Project

306 Y8CS2226 K.Veerendra CSE IV/IV NIIT,Vijayawad

26/12/12-

26/03/12 Main Project

307 Y8CS2244 P.Meenakshi CSE IV/IV NIIT,Vijayawad

26/12/12-

26/03/12 Main Project

308 Y8CS2241 P.Mounika CSE IV/IV NIIT,Vijayawad

26/12/12-

26/03/12 Main Project

309 Y8CS2231 M.Vikram Kumar CSE IV/IV NIIT,Vijayawad

26/12/12-

26/03/12 Main Project

310 Y8EC2205 B LEELA NAGA SRAVANTHI ECE IV/IV Nokia Siemens Networks, Chennai 3 months Main Project

311 Y8EE2207 CHIRALA NAGARAJU EEE IV/IV POWER GRID, NUNNA ONE MONTH Mini Project

312 Y8EE2216 GUNDARAPU ARUNSAI EEE IV/IV POWER GRID, NUNNA 15 DAYS Mini Project

313 Y8EE2217 G MADHUSUDAN RAO EEE IV/IV POWER GRID, NUNNA 15 DAYS Mini Project

314 Y8EE2251 T V PRAVEEN KUMAR EEE IV/IV POWER GRID, NUNNA 15 DAYS Mini Project

315 Y8EE2255 Y VENKATESWARA RAO EEE IV/IV POWER GRID, NUNNA 15 DAYS Mini Project

316 108H1E0016 Madhavi. S MBA II/II Prakasha Spector Pvt Ltd 2 Months Main

317 Y8EE2208 DIMMITI GOPI CHAND EEE IV/IV PRSAD INDUSTRIES ONE MONTH Mini Project

318 Y8EE2214 GOVADA RAVINDRA BABU EEE IV/IV PRSAD INDUSTRIES ONE MONTH Mini Project

319 Y8EE2215 GUDISEVA SURIBABU EEE IV/IV PRSAD INDUSTRIES ONE MONTH Mini Project

320 Y8EE2230 MANIKONDA LOKESH EEE IV/IV PRSAD INDUSTRIES 15 DAYS Mini Project

321 Y8EE2234 PALA RANGAPRASAD EEE IV/IV PRSAD INDUSTRIES 15 DAYS Mini Project

322 Y8EE2249 T JAGADISH EEE IV/IV PRSAD INDUSTRIES ONE MONTH Mini Project

323 Y10BU141020 J. Jaya Dev MBA II/II Railway Wagan Workshop 2 Months ������

327 Y8IT2208 Ch.Venkata Reddy IT IV/IV

Regional Research Labs,

Vijayawada

26/12/12-

26/03/12 Main Project

328 Y8IT2235 T.Madhuri IT IV/IV

Regional Research Labs,

Vijayawada

26/12/12-

26/03/12 Main Project

329 Y8IT2237 V.Praveen IT IV/IV Regional Research Labs, 26/12/12- Main Project

Page 14: Project

Vijayawada 26/03/12

330 Y8IT2216 K.Sandeep IT IV/IV

Regional Research Labs,

Vijayawada

26/12/12-

26/03/12 Main Project

331 Y8IT2203 S.Siva Ram IT IV/IV

Regional Research Labs,

Vijayawada

26/12/12-

26/03/12 Main Project

332 Y8IT2229 S. Harish IT IV/IV

Regional Research Labs,

Vijayawada

26/12/12-

26/03/12 Main Project

333 Y8IT2236 T.Ravi Kanth IT IV/IV

Regional Research Labs,

Vijayawada

26/12/12-

26/03/12 Main Project

334 Y8IT2225 P.Bhanu Prakash IT IV/IV

Regional Research Labs,

Vijayawada

26/12/12-

26/03/12 Main Project

325 Y10BU141008 Ch. Gayathri MBA II/II Reliance Mutual Funds 2 Months ������

326 108H1E0038 PEDHAGURAVAIH .S MBA II/II Reliance Mutual Funds 2 Months Main

335 108H1E0051 ANUSHCHOWDARY .Y MBA II/II Sarvaraya Sugars 2 Months Main

336 Y10BU141046 G. Solomon Avinash MBA II/II Sri Krishna Jute Mills 2 Months ������

337 Y10BU141010' Durga Prasad. B MBA II/II Sri ram Trancs Finance & Co Ltd 2 Months ������

338 Y10BU141055 K. Venkata Ramana MBA II/II Sri Ram Transpfort & Finance Co Ltd 2 Months ������

339 Y8IT2224 N.Urmila IT IV/IV SSIT,Vijayawada-10

26/12/12-

26/03/12 Main Project

340 Y8IT2230 S.GopiRatnaKumari IT IV/IV SSIT,Vijayawada-10

26/12/12-

26/03/12 Main Project

341 Y8IT2233 T.Vineela IT IV/IV SSIT,Vijayawada-10

26/12/12-

26/03/12 Main Project

342 Y8IT2210 G.Ramana IT IV/IV SSIT,Vijayawada-10

26/12/12-

26/03/12 Main Project

343 Y9CE2204

ATUKURI. NAGA VENKATA

DHEERAJ CIVIL III/IV

Sewage Treatment Plant, VMC,

Vijayawada 1MONTH Main Project

344 Y9CE2231 PALAKOLLU SRINIVAS

CIVIL III/IV

Sewage Treatment Plant, VMC,

Vijayawada 1MONTH Main Project

345 Y9CE2233 PULAPA MOHANA RAO

CIVIL III/IV

Sewage Treatment Plant, VMC,

Vijayawada 1MONTH Main Project

346 Y9CE2242

VEMIREDDY.

VENKATAKRISHNA REDDY CIVIL III/IV

Sewage Treatment Plant, VMC,

Vijayawada 1MONTH Main Project

347 L10CE2262 D.KUMARA SWAMI CIVIL III/IV Sewage Treatment Plant, VMC, 1MONTH Main Project

Page 15: Project

Vijayawada

348 L10CE2263 P.ANIL KUMAR CIVIL III/IV

Sewage Treatment Plant, VMC,

Vijayawada 1MONTH Main Project

349 Y10BU141022 K. Naga Srinivasa Rao MBA II/II Tata AIG Insurance 2 Months ������

350 108H1E0009 KONDAL RAO .G MBA II/II Tata Telecommunications 2 Months Main

351 Y10BU141056 A. Vamsi Krishna MBA II/II

The Krishna Dist Milk Product

mutually aided 2 Months ������

352 Y10BU141001 A. Venkateswara Rao MBA II/II

The Krishna Dist Milk Product

mutually aided Co-Op Union Ltd. 2 Months ������

353 Y10BU141038 K. Poornima MBA II/II

The Krishna Dist Milk Product

mutually aided Co-Op Union Ltd. 2 Months ������

354 Y10BU141040 V. Ramesh MBA II/II

The Krishna Dist Milk Product

mutually aided Co-Op Union Ltd. 2 Months ������

355 108H1E0010 VINEELA .G

MBA II/II

The Krishna Dst. Milk Producers

Mutually Aided Co-Op Union Ltd. 2 Months Main

356 108H1E0033 DURGA PRASAD .P

MBA II/II

The Krishna Dst. Milk Producers

Mutually Aided Co-Op Union Ltd. 2 Months Main

357 Y10BU141049 M. Suresh MBA II/II TTK Prestige Ltd 2 Months ������

358 Y10BU141047 D. Sri Haarika MBA II/II Unit Trust of India 2 Months ������

359 Y10BU141016 J.N.V.D. Alekya Surya MBA II/II UTI Mutual Funds 2 Months ������

360 Y10BU141025' J. Kiran Kumar MBA II/II UTI Mutual Funds 2 Months ������

361 Y10BU141043 G. Ravi Teja MBA II/II UTI Mutual Funds 2 Months ������

362 108H1E0025 RAMAKRISHNA .N MBA II/II Varun Motors Pvt.Ltd 2 Months Main

363 108H1E0034 RAGHAVENDRA.K MBA II/II Varun Motors Pvt.Ltd 2 Months Main

364 Y9CE2213 DANDU. SAIMOUNISHA CIVIL III/IV Vijayawada Municipal Corporation 1MONTH Main Project

365 Y9CE2214 DHANIKONDA. SWAPNA CIVIL III/IV Vijayawada Municipal Corporation 1MONTH Main Project

366 Y9CE2221 KOLLEPARA P R K SAI KUMAR CIVIL III/IV Vijayawada Municipal Corporation 1MONTH Main Project

367 Y9CE2222 KORRAPATI MANOJ CIVIL III/IV Vijayawada Municipal Corporation 1MONTH Main Project

410 Y9CE2215 EMANI. MAHESH BABU CIVIL III/IV Vijayawada Municipal Corporation 1MONTH Main Project

411 Y9CE2226 MEDARAMETLA. SAI KRISHNA CIVIL III/IV Vijayawada Municipal Corporation 1MONTH Main Project

412 Y9CE2240 VADDI. LATHA SREE CIVIL III/IV Vijayawada Municipal Corporation 1MONTH Main Project

Page 16: Project

368 Y9CE2211 CHERUKURI. HEMA SINDHUSHA CIVIL III/IV Vijayawada Municipal Corporation, 1MONTH Main Project

369 Y8CS2238 P.Mounika CSE IV/IV Vision Computers, Vijayawada

26/12/12-

26/03/12 Main Project

370 Y8CS2222 K.Siva Krishna CSE IV/IV Vision Computers, Vijayawada

26/12/12-

26/03/12 Main Project

371 Y8CS2239 P.Naveen Kumar CSE IV/IV Vision Computers, Vijayawada

26/12/12-

26/03/12 Main Project

372 Y8CS2208 B.Rajesh CSE IV/IV Vision Computers, Vijayawada

26/12/12-

26/03/12 Main Project

373 Y8CS2233 M.SrinivasReddy CSE IV/IV Vision Computers, Vijayawada

26/12/12-

26/03/12 Main Project

374 Y8CS2201 A.kishore CSE IV/IV Vision Computers, Vijayawada

26/12/12-

26/03/12 Main Project

375 Y8CS2203 Y.Anjan Kumar CSE IV/IV Vision Computers, Vijayawada

26/12/12-

26/03/12 Main Project

376 Y8CS2216 D.Sai Kiran CSE IV/IV Vision Computers, Vijayawada

26/12/12-

26/03/12 Main Project

377 Y8EE2204 BITRA SATISH KUMAR EEE IV/IV Vizag Steel Plant, Vishakapatnam 15 DAYS Mini Project

378 Y8EE2206 CH DURGA RAJA KARTHIK EEE IV/IV Vizag Steel Plant, Vishakapatnam 15 DAYS Mini Project

379 Y8EE2209 D. K MAHALAKSHMI NAIDU EEE IV/IV Vizag Steel Plant, Vishakapatnam 15 DAYS Mini Project

380 Y8EE2222 KODALI JAYA CHANDRA EEE IV/IV Vizag Steel Plant, Vishakapatnam 15 DAYS Mini Project

381 Y8EE2224 KOPPISETTI MOHAN KUMAR EEE IV/IV Vizag Steel Plant, Vishakapatnam 15 DAYS Mini Project

382 Y8EE2236 PASUPULETI RAMAKRISHNA EEE IV/IV Vizag Steel Plant, Vishakapatnam 15 DAYS Mini Project

383 Y8EE2240 P NAGENDRAPRASAD EEE IV/IV Vizag Steel Plant, Vishakapatnam 15 DAYS Mini Project

384 Y8EE2252 T.M V SATYA PHANI KUMAR EEE IV/IV Vizag Steel Plant, Vishakapatnam 15 DAYS Mini Project

385 Y8EE2253 UBBALA MURALI KRISHNA EEE IV/IV Vizag Steel Plant, Vishakapatnam 15 DAYS Mini Project

386 L9EE2261 A. AJAY KUMAR EEE IV/IV Vizag Steel Plant, Vishakapatnam

THREE

MONTHS Major Project

387 L9EE2264 K. CHAITANYA TATIKONDA EEE IV/IV Vizag Steel Plant, Vishakapatnam

THREE

MONTHS Major Project

388 L9EE2265 L. MOHAN RAO EEE IV/IV Vizag Steel Plant, Vishakapatnam

THREE

MONTHS Major Project

389 L9EE2266 K. SRINIVAS EEE IV/IV Vizag Steel Plant, Vishakapatnam

THREE

MONTHS Major Project

Page 17: Project

390 L9EE2267 V. TRILOKA NADH EEE IV/IV Vizag Steel Plant, Vishakapatnam

THREE

MONTHS Major Project

391 Y8EE2204 BITRA SATISH KUMAR EEE IV/IV Vizag Steel Plant, Vishakapatnam

THREE

MONTHS Major Project

392 Y8EE2205 CHALASANI ROJA EEE IV/IV Vizag Steel Plant, Vishakapatnam

THREE

MONTHS Major Project

393 Y8EE2209 D. K MAHALAKSHMI NAIDU EEE IV/IV Vizag Steel Plant, Vishakapatnam

THREE

MONTHS Major Project

394 Y8EE2212 DURGASI TEJA EEE IV/IV Vizag Steel Plant, Vishakapatnam

THREE

MONTHS Major Project

395 Y8EE2220 KANDULA LAKSHMI DURGA EEE IV/IV Vizag Steel Plant, Vishakapatnam

THREE

MONTHS Major Project

396 Y8EE2224 KOPPISETTI MOHAN KUMAR EEE IV/IV Vizag Steel Plant, Vishakapatnam

THREE

MONTHS Major Project

397 Y8EE2225 K VIJAYA LAKSHMI EEE IV/IV Vizag Steel Plant, Vishakapatnam

THREE

MONTHS Major Project

398 Y8EE2226 KOVURU SARATH BABU EEE IV/IV Vizag Steel Plant, Vishakapatnam

THREE

MONTHS Major Project

399 Y8EE2236 PASUPULETI RAMAKRISHNA EEE IV/IV Vizag Steel Plant, Vishakapatnam

THREE

MONTHS Major Project

400 Y8EE2237 P DURGA MAHESH EEE IV/IV Vizag Steel Plant, Vishakapatnam

THREE

MONTHS Major Project

401 Y8EE2240 P NAGENDRAPRASAD EEE IV/IV Vizag Steel Plant, Vishakapatnam

THREE

MONTHS Major Project

402 Y8EE2241 PRUDHIVI VEERA GANESH EEE IV/IV Vizag Steel Plant, Vishakapatnam

THREE

MONTHS Major Project

403 Y8EE2245 S DURGA RAM PRASAD EEE IV/IV Vizag Steel Plant, Vishakapatnam

THREE

MONTHS Major Project

404 Y8EE2251 T V PRAVEEN KUMAR EEE IV/IV Vizag Steel Plant, Vishakapatnam

THREE

MONTHS Major Project

405 Y8EE2252 T.M V SATYA PHANI KUMAR EEE IV/IV Vizag Steel Plant, Vishakapatnam

THREE

MONTHS Major Project

406 Y8EE2256 YELLEPEDDY ANKITH KUMAR EEE IV/IV Vizag Steel Plant, Vishakapatnam

THREE

MONTHS Major Project

407 Y9CE2205 BANOTHU JAGADESH KUMAR CIVIL III/IV Vizag Steel Plant, Vishakapatnam 1MONTH Main Project

Page 18: Project

408 Y9CE2207 BUSANABOINA. ANIL KUMAR CIVIL III/IV Vizag Steel Plant, Vishakapatnam 1MONTH Main Project

409 Y9CE2229 MURARI. SIVA RAO CIVIL III/IV Vizag Steel Plant, Vishakapatnam 1MONTH Main Project

413 Y10BU141011 K.Gopi MBA II/II Wagan Workshop, Guntupalli 2 Months ������

414 Y10BU141042 S. Ravi Kumar MBA II/II Zuari cement ltd, Vijayawada 2 Months ������

415 Y10BU141048 Ch. Srikanth MBA II/II Zuari cement ltd, Vijayawada 2 Months ������

416 108H1E0008 VENU GOPAL .CH MBA II/II Zuari cement ltd, Vijayawada 2 Months Main


Recommended