DELHI METRO
Subject : Project Appraisal
Faculty:Prof. M.Zakaria
BY: Subhank Modi
SS11/13 SPABF
1/26
04/07/2023
DELHI METRO
• The Delhi Metro is a rapid transit system serving Delhi, Gurgaon, Noida and Ghaziabad in the National Capital Region of India.
• Delhi Metro is being built and operated by the Delhi Metro Rail Corporation Limited (DMRC).
• Began operation: 24 December 2002.
2/26
04/07/2023
Market Demand Analysis
• Delhi, the capital city of India, is one of the fastest growing cities in the world with a population of 13 million .
• The road length(1340km) is not at par with the phenomenal growth in the number of vehicles on these roads in Delhi.
3/26
04/07/2023
Market Demand Analysis
• With gradual horizontal expansion of the city, the average trip length of buses has gone up to 13 km and the increased congestion on roads has made the corresponding journey time of about one hour.
• Delhi has now become the fourth most polluted city in the world.
4/26
04/07/2023
Break down of demand
5/26
04/07/2023
MARKET DEMAND ANALYSIS (PRICE)
• RITES (1995b) considered four rates per trip: Rs 3, 4, 5, 6 at April 1995 prices and the fare sensitivity of ridership.
• The main source of revenue of the MRTS system is the fare box collection, which is a product of the total passenger ridership on the MRTS and the fare charged.
• The financial model consisting of Rs. 5 per passenger trip and an annual fare increase of 7.5 per cent was considered optimal by RITES.
6/26
04/07/2023
Market Demand Analysis
Govt Policy:• Planning for the metro started in 1984, when
the Delhi Development Authority and the Urban Arts Commission came up with a proposal for developing a multi-modal transport system for the city.
• The Government of India and the Government of Delhi jointly set up the Delhi Metro Rail Corporation (DMRC) in 1995.
7/26
04/07/2023
PRICES• Tourist Card:• For unlimited travel over short periods. There are two kinds of
cards - 1 day and 3 day.• - Value of 1-Day Card: Rs 100• - Value of 3-Day Card: Rs 250• - Refundable Deposit: Rs 50/- payable at purchase (refundable on
return of card) • Token:• - Single-Journey Token: For one way journey• - Value will depend on the destination. Valid only on the day of
purchase.• - Minimum Fare Rs. 8/- and Maximum Fare Rs. 30/-
8/26
04/07/2023 9
Method of Distribution• How to use your Token:• - Hold your token close to the
machine for the gates to open.• - At exit, drop a Single-Journey
token into the machine. • How to use your Smart Card/
Tourist Card:• - For entry to the station, please
exhibit your travel card at the entry gate for the flap to open.
• - For exit please exhibit your travel card at the exit gates for the flap to open and to do an exit from the station.
9/26
04/07/2023
Government Policy• The DM had been provided with the following concessions by GOI to
make the project viable, namely a) The cost of land equivalent to Rs. 2180 million has been provided as
an interest free subordinate loan by GOI/GNCTD to be repaid by the DM.
(b) The risk associated with the exchange rate fluctuations is borne by government in case of foreign debt,
(c) The DM is exempted from payment of income tax, capital gains tax, property tax and customs duty on imports,
(d) The DM is permitted to generate resources through property development over a period of 6-20 years and
(e) No dividend is paid on GOI share of equity till the senior debt is repaid fully by the twentieth year.
10/26
04/07/2023 11
TECHNICAL ANALYSIS
7772 56341 6406311/26
04/07/2023 12
Distribution of Total costs
Engineer-ing
Works; 31327
Electrical Works; 6970
Signalling and
Telecom-munication;
4504
Rolling Stock; 10999
Land; 3339
General Es-tablishment and Consul-
tancy Charges,
5101Contingencies;
1823
Total Cost
Engineering WorksElectrical WorksSignalling and TelecommunicationRolling StockLandGeneral establishment and Consultancy ChargesContingencies
12/26
04/07/2023
TECHNICAL ANALYSIS
• The Delhi Metro (DM) planned in four phases is part of the MRTS.
• As of August 27, 2011, the whole of Phase-I and Phase-II are complete, with the network comprising six lines with 142 metro stations and a total length of 189.7 km (117.9 mi)
• Phases III (112 km) and IV (108.5 km) are planned to be completed by 2015 and 2021 respectively, with the network spanning 413 km (257 mi) by then.[
13/26
04/07/2023 14
14/26
04/07/2023 15/26
04/07/2023 16
PHASE 1
Corridor Length (Km)
Under Ground Corridor
13.17
Elevated Corridor
47.43
Grade Rail Corridor
4.5
The 1st Phase consists of 3 corridors divided in to 9 sections
Total Length 65.10 km
16/26
04/07/2023
PHASE 2The 1st Phase consists of 3 corridors divided in to 12 sections
Corridor Length (Km)
Under Ground Corridor
8.93
Elevated Corridor
42.24
Grade Rail Corridor
1.85
Total Length 53.02 km
17/26
04/07/2023
FINANCIAL ANALYSIS
18/26
04/07/2023 19/26
04/07/2023 20/26
04/07/2023
Net Present Value
• An estimate of NPEB of the Metro using the first approach and an 8 percent rate of discount is Rs. 432387.5 million while the estimate using the second approach and a 10 percent rate of discount is Rs. 232050.7 million.
• The estimates of the economic internal rate of return (IRR) corresponding to the first and second approaches are 23.86 and 23.88 percent, respectively.
21/26
04/07/2023
SOCIAL COST BENEFIT ANALYSIS
• The social cost-benefit analysis of the Metro requires the identification of benefits and the economic agents affected by it. The incremental changes in the incomes of various economic agents:
• passengers, transporters, public and government and unskilled labour due to the Metro could be estimated by considering the Delhi economy with and without the Metro.
22/26
04/07/202323/26
04/07/2023 24/2624/26
04/07/2023
SOCIAL COST BENEFIT ANALYSIS
• Savings in Foreign Exchange due to reduced Fuel Consumption
• Reduction in Pollution • Savings in Time for all passengers using Metro and Roads • Savings in Accidents • Savings in Vehicle Operating Cost (VOC) due to
decongestion for residual traffic • Savings in Capital and Operating cost of diverted vehicles • Savings in the cost of Road Infrastructure