Project Bank Accounts Phase 1 - Government Contracts August 2018 Information Session for Head Contractors and Consultants
Transcript
Page 1: Project Bank Accounts...Overview of Project Bank Accounts Department of Housing and Public Works 2 • Project Bank Accounts (Chapter 2) commenced on 1 March 2018 • For each project/contract

Project Bank AccountsPhase 1 - Government Contracts

August 2018

Information Session for Head Contractors and Consultants

Page 2: Project Bank Accounts...Overview of Project Bank Accounts Department of Housing and Public Works 2 • Project Bank Accounts (Chapter 2) commenced on 1 March 2018 • For each project/contract

A fairer industry

Department of Housing and Public Works 1

Building Industry Fairness (Security of Payment) Act 2017

Expected Timeline of Reforms

17 Nov 2017 Strengthening QBCC’s powers

1 March 2018 Project Bank Accounts on government projects $1-10M

17 Dec 2018 Progress payments, Adjudication process and Subcontractors’ charges provisions

1 January 2019 Minimum Financial Requirements regulation

Later 2019 Project Bank Accounts - all building projects over $1M

2020 ? Project Bank Accounts - extend to all subcontractors

Page 3: Project Bank Accounts...Overview of Project Bank Accounts Department of Housing and Public Works 2 • Project Bank Accounts (Chapter 2) commenced on 1 March 2018 • For each project/contract

Overview of Project Bank Accounts

Department of Housing and Public Works 2

• Project Bank Accounts (Chapter 2) commenced on 1 March 2018

• For each project/contract a new unique PBA is set up

• Three separate 'trust’ accounts for receiving and making progress payments

• Holds ‘cash’ retention and disputed amounts until ready to be paid out

• Head Contractor is responsible for the management of the PBA

• Both Head Contractor and subcontractors are paid only from the PBA

Head Contractors can be Consultants, Project Managers, Managing Consultants, Architects, Engineers, Planners or Inspectors.

Page 4: Project Bank Accounts...Overview of Project Bank Accounts Department of Housing and Public Works 2 • Project Bank Accounts (Chapter 2) commenced on 1 March 2018 • For each project/contract

How a PBA Works

Department of Housing and Public Works 3

Principal

PBAHead

Contractor

SC 3 SC 2 SC 1SC 1

retentions

SC 3 Disputed

funds

SC 2 retentions

Page 5: Project Bank Accounts...Overview of Project Bank Accounts Department of Housing and Public Works 2 • Project Bank Accounts (Chapter 2) commenced on 1 March 2018 • For each project/contract

Overview of Project Bank Accounts

Department of Housing and Public Works 4

• Same payment process and timeframes apply

• Head contractor still manages subcontractor performance and can withhold payments when obligations have not been met

• Head contractors and subcontractors have same legal rights

Page 6: Project Bank Accounts...Overview of Project Bank Accounts Department of Housing and Public Works 2 • Project Bank Accounts (Chapter 2) commenced on 1 March 2018 • For each project/contract

A fairer industry

Department of Housing and Public Works 5

Presentation Overview

Module 1: When is a PBA required

Module 2: Post-Contract Award

Module 3: Payment Process

Module 4: Project Completion and Other Matters

Page 7: Project Bank Accounts...Overview of Project Bank Accounts Department of Housing and Public Works 2 • Project Bank Accounts (Chapter 2) commenced on 1 March 2018 • For each project/contract

Department of Housing and Public Works 6

Module 1: When is a PBA required?

Which contracts will require a PBA?

• PBA criteria and exemptions

• Which ‘building work’ captured

• Contract variations and amendments

Page 8: Project Bank Accounts...Overview of Project Bank Accounts Department of Housing and Public Works 2 • Project Bank Accounts (Chapter 2) commenced on 1 March 2018 • For each project/contract

PBA Criteria – Contracts requiring a PBA

Department of Housing and Public Works 7

Not all projects will require a PBA

During Phase 1 (from 1 March 2018):

✓State Government is the principal (or a statutory authority who has opted-in)

✓Contract price is $1M to $10M (incl. GST)

✓More than 50% of the contract price is for 'building work'

✓At least one subcontractor

Not required if less than 90 days from start date to practical completion (S23(8))

Page 9: Project Bank Accounts...Overview of Project Bank Accounts Department of Housing and Public Works 2 • Project Bank Accounts (Chapter 2) commenced on 1 March 2018 • For each project/contract

PBA Criteria – Contracts requiring a PBA

Department of Housing and Public Works 8

What about future phases?

PBAs Phase 2 (later in 2019)

✓All private sector and public sector projects

✓Contract price is $1M or more (incl. GST)

✓ Including private sector residential construction

PBAs Phase 3 (TBC – after implementation of Phase 2)

✓ All subcontractors (second tier/sub-sub contractors)

Page 10: Project Bank Accounts...Overview of Project Bank Accounts Department of Housing and Public Works 2 • Project Bank Accounts (Chapter 2) commenced on 1 March 2018 • For each project/contract

Determining ‘building work’

Department of Housing and Public Works 9

What is ‘Building Work’? (s8)

• Erection, construction, renovation of a building

• Any site works; and provision of lighting, heating, plumbing/drainage, scaffolding and air-conditioning

• Preparation of plans and specifications (including by architects, engineers and surveyors)

• Contract administration for the building work

• Fire protection work, building inspections, investigations and certifications

Page 11: Project Bank Accounts...Overview of Project Bank Accounts Department of Housing and Public Works 2 • Project Bank Accounts (Chapter 2) commenced on 1 March 2018 • For each project/contract

Determining ‘building work’

Department of Housing and Public Works 10

What is NOT ‘building work’?

• Civil, engineering and infrastructure projects such as bridges, roads and tunnels

• Public transport infrastructure including busways and railways; and authorised activity for a resource authority (Regs s4)

• 'Residential' construction work (s16) – Except 3 or more 'living units' procured by DHPW

• Maintenance work (s17)

Refer to Guidelines for Head Contractors and the BIF Act for more detail

Page 12: Project Bank Accounts...Overview of Project Bank Accounts Department of Housing and Public Works 2 • Project Bank Accounts (Chapter 2) commenced on 1 March 2018 • For each project/contract

Department of Housing and Public Works 11

Attachment 1 in Guidelines

‘Decision Tree’ –

Is a PBA required?

Page 13: Project Bank Accounts...Overview of Project Bank Accounts Department of Housing and Public Works 2 • Project Bank Accounts (Chapter 2) commenced on 1 March 2018 • For each project/contract

‘Subcontractors’ vs ‘Suppliers’

Department of Housing and Public Works 12

Subcontractor = Subconsultant

Subcontractor is any party to a subcontract required to carry out subcontracted work

Subcontractors are 'beneficiaries' of the PBA and MUST be paid from the PBA

Suppliers are NOT 'beneficiaries' of the PBA and MUST NOT be paid from the PBA.

Some ‘Suppliers’ are ‘Subcontractors’ under the BIF Act (refer definition at S11)

Page 14: Project Bank Accounts...Overview of Project Bank Accounts Department of Housing and Public Works 2 • Project Bank Accounts (Chapter 2) commenced on 1 March 2018 • For each project/contract

Contract variation or amendment

Department of Housing and Public Works 13

• A variation or amendment may cause a PBA to be required even if it wasn't required at the start of the project

e.g. Contract price increase (by 30% or more) or unexpected subcontractor engaged

• No PBA required if less than 90 days remaining to practical completion from date of variation

• A variation or amendment cannot cause a PBA to no longer be required if it had been required at the start of the project.

• Compliance with PBA requirements and payments commence from the point of establishment (i.e. not retrospective)

Page 15: Project Bank Accounts...Overview of Project Bank Accounts Department of Housing and Public Works 2 • Project Bank Accounts (Chapter 2) commenced on 1 March 2018 • For each project/contract

Pre-tender Considerations

Department of Housing and Public Works 14

• Process for lodging a tender for project with project bank accounts is the same as normal.

• Standard contract documents updated to reflect PBA requirements.

• Some different and additional contractual obligations not in the Act (Refer to Special Conditions of Contract and Annexure).

• ‘Returnable Tender Schedule’ (new form) must be returned with tender documentation if project within scope of work that might require a PBA

• Tenderers need to determine if a PBA is likely to be required and fully understand the work and costs required to administer PBAs

• Administration costs and overheads may be included in tender price

Page 16: Project Bank Accounts...Overview of Project Bank Accounts Department of Housing and Public Works 2 • Project Bank Accounts (Chapter 2) commenced on 1 March 2018 • For each project/contract

Department of Housing and Public Works 15

Module 2Post-Contract Award

What do you need to do after entering a contract?

• Establishing the PBA Accounts

• Principals viewing access

• Engaging subcontractors

Page 17: Project Bank Accounts...Overview of Project Bank Accounts Department of Housing and Public Works 2 • Project Bank Accounts (Chapter 2) commenced on 1 March 2018 • For each project/contract

Setting up the PBA (ss 23-26)

Department of Housing and Public Works 16

✓ By the date Specified in the contract (20 Business Days after the Acceptance of Tender); or otherwise 20 business days after entering first subcontract.

✓ Open three, separate accounts at a bank that has an office in Qld (s23) and MUST have word ‘trust’ in the name (s25):▪ General 'Trust’ Account

▪ Retention 'Trust’ Account

▪ Disputed Funds 'Trust’ Account

For example: XYZ Hospital General Trust, XYZ Hospital Retention Trust, and XYZ Hospital Disputed Funds Trust

✓Request the bank provide electronic viewing access for the Principal’s employees or agents (s24)

✓Written notice to the Principal within 10 business days advising the accounts’ opening (s26)

Page 18: Project Bank Accounts...Overview of Project Bank Accounts Department of Housing and Public Works 2 • Project Bank Accounts (Chapter 2) commenced on 1 March 2018 • For each project/contract

Setting up the PBA

Department of Housing and Public Works 17

✓ Any bank with an office or branch in Qld✓ Must be able to upload payment instructions✓ Must be able to provide electronic viewing access for third

parties (i.e. principals officers) for duration of contract and DLP

✓ Viewing access must include:▪ All deposits and withdrawals▪ Payment instruction information▪ Account payment reports

✓ Interest earned to HC – withdrawn once every 12 months and on closure of PBA

PBA can take time to set up. See your bank as soon as possible to ensure the PBA is set up within the required timeframe – and in time to receive the first progress payments.

Guidelines for Banking Institutions

Page 19: Project Bank Accounts...Overview of Project Bank Accounts Department of Housing and Public Works 2 • Project Bank Accounts (Chapter 2) commenced on 1 March 2018 • For each project/contract

Engaging Subcontractors

Department of Housing and Public Works 18

Before entering into subcontract:

✓Approval from Superintendent to subcontract

✓S49 Notice of PBA to advise subcontractors that a PBA will be used

After entering into subcontract:

✓S50 Notice of Subcontracts advising Principal of subcontractors banking information

Page 20: Project Bank Accounts...Overview of Project Bank Accounts Department of Housing and Public Works 2 • Project Bank Accounts (Chapter 2) commenced on 1 March 2018 • For each project/contract

Engaging Subcontractors

Department of Housing and Public Works 19

What is a Related Entity?

• members of the same family (spouse, parent or grandparent, child or grandchild, brother, sister, nephew or niece either by birth or marriage)

• majority shareholder, director or secretary of the corporation or its related body corporate, or has an interest of 50 percent or more in the corporation

• related bodies corporate

After entering into subcontract with Related Entity:

✓S21 Notice of Related Entity to the QBCC and Principal

Related Entities

Page 21: Project Bank Accounts...Overview of Project Bank Accounts Department of Housing and Public Works 2 • Project Bank Accounts (Chapter 2) commenced on 1 March 2018 • For each project/contract

Department of Housing and Public Works 20

Attachment 2 in Guidelines

PBA Establishment Flowchart

Page 22: Project Bank Accounts...Overview of Project Bank Accounts Department of Housing and Public Works 2 • Project Bank Accounts (Chapter 2) commenced on 1 March 2018 • For each project/contract

Department of Housing and Public Works 21

Module 3Payments using the PBA

• The payment process – getting paid by the Principal and paying subcontractors

• Making payments – payment instructions and required notices

Page 23: Project Bank Accounts...Overview of Project Bank Accounts Department of Housing and Public Works 2 • Project Bank Accounts (Chapter 2) commenced on 1 March 2018 • For each project/contract

Payments from and into trust account

Department of Housing and Public Works 22

Page 24: Project Bank Accounts...Overview of Project Bank Accounts Department of Housing and Public Works 2 • Project Bank Accounts (Chapter 2) commenced on 1 March 2018 • For each project/contract

Payment Process

Department of Housing and Public Works 23

Payment Claim

•Head contractor gives payment claim to Principal

Payment Schedule

•Principal will certify work completed

• Issues a payment schedule

Payment into PBA

•Principal pays (electronic transfer) scheduled amount into the PBA

Payment Claim

• Subcontractor gives payment claim to Head Contractor

Payment Schedule

• Head Contractor will certify work completed

• Issue a payment schedule (or pay in full)

Payment Instruction

• Head Contractor pays subcontractors (incl. Retention and Disputed amounts) and pay themselves

Payment Instruction Information

• Copy of Payment Instruction Information provided to Principal and Subcontractors

Page 25: Project Bank Accounts...Overview of Project Bank Accounts Department of Housing and Public Works 2 • Project Bank Accounts (Chapter 2) commenced on 1 March 2018 • For each project/contract

Making Payments

Department of Housing and Public Works 24

All payments and withdrawals from the PBA accounts MUST be made using a Payment Instruction

A Payment Instruction is:

• direction to the bank to pay Subcontractors and the Head Contractor from the PBA accounts. Known as ABA or Cemtext files.

• allow for batch transactions to be generated and executed at the same time.

• generated using most accounting software packages and other online/banking applications.

What is a Payment Instruction?

Page 26: Project Bank Accounts...Overview of Project Bank Accounts Department of Housing and Public Works 2 • Project Bank Accounts (Chapter 2) commenced on 1 March 2018 • For each project/contract

Making Payments

Department of Housing and Public Works 25

After uploading a Payment Instruction a copy of the information must be given to Principals and Subcontractors

Payment Instruction Information is:

• Copy of certain information from a payment instruction

• Provided in any written format to Principal (within 3 business days) and Subcontractor (as soon as practicable)

• Must include the following information:

What is the Payment Instruction Information?

To the Principal To the Subcontractor

✓ Name of payee✓ Name of account✓ Name of Bank✓ Bank account details✓ Amount paid✓ Date Paid

✓ Name of account✓ Name of Bank✓ Bank account details✓ Amount paid✓ Date Paid

Page 27: Project Bank Accounts...Overview of Project Bank Accounts Department of Housing and Public Works 2 • Project Bank Accounts (Chapter 2) commenced on 1 March 2018 • For each project/contract

Accounts of the PBA

Department of Housing and Public Works 26

• Cash retention amounts for subcontractors must be held in the retention trust account for the PBA.

• Must be transferred into retention account using a payment instruction (usually at the same time the progress payment paid to the subcontractor)

• Must be able to identify in the account who each retention amount is being held for.

• In event of variation requiring a PBA, must transfer any retentions withheld before the PBA was established.

• Can only be withdrawn from retention account:

▪ Pay the subcontractor in accordance with subcontract

▪ Pay to head contractor for correction of defects or to secure performance of subcontract

Retention Trust Account

Page 28: Project Bank Accounts...Overview of Project Bank Accounts Department of Housing and Public Works 2 • Project Bank Accounts (Chapter 2) commenced on 1 March 2018 • For each project/contract

Accounts of the PBA

Department of Housing and Public Works 27

▪ 'Payment Dispute' occurs when

▪ 'Disputed amount' difference between the scheduled/claimed amount and the amount actually paid.

▪ Must be paid at the time of payment to the subcontractor or on the due date and must be ‘identifiable’ in the account.

▪ Must provide written notice to subcontractor of amount paid into PBA and reasons why

▪ Must remain in the disputed funds account until dispute resolution process has been decided or 60 days after notice given to Subcontractor.

Disputed Funds Trust Account

Page 29: Project Bank Accounts...Overview of Project Bank Accounts Department of Housing and Public Works 2 • Project Bank Accounts (Chapter 2) commenced on 1 March 2018 • For each project/contract

Making payments

Department of Housing and Public Works 28

▪ Payments and deposits into the PBA must be made by electronic transfer (not cheque/cash deposits)

▪ No payments for other purposes may be deposited into the PBA

▪ ALL Subcontractors MUST be paid only from the PBA

▪ All payments, withdrawals and transfers from the PBA accounts (including to pay yourself) MUST be made using 'payment instruction'

▪ If there are insufficient funds available in PBA when an amount is due to a SC, the HC must 'top-up' the general account

▪ Head Contractor must pay amounts liable to pay Subcontractors before paying themselves ( i.e. cannot pay itself if insufficient funds left to pay amounts ‘due’ to subcontractors)

Things to remember when using the PBA

Page 30: Project Bank Accounts...Overview of Project Bank Accounts Department of Housing and Public Works 2 • Project Bank Accounts (Chapter 2) commenced on 1 March 2018 • For each project/contract

Making payments

Department of Housing and Public Works 29

• May delegate any of its powers under the Act using the S42 Delegation Form, and provide a copy to the Principal and each subcontractor

• Must keep written records of all transactions involving the PBA for minimum 7 years

Things to remember when using the PBA

Page 31: Project Bank Accounts...Overview of Project Bank Accounts Department of Housing and Public Works 2 • Project Bank Accounts (Chapter 2) commenced on 1 March 2018 • For each project/contract

Department of Housing and Public Works 30

Module 4Project completion and other matters

• When a PBA can be closed

• Contract termination, insolvency and bankruptcy

• Role of Regulator (QBCC)

Page 32: Project Bank Accounts...Overview of Project Bank Accounts Department of Housing and Public Works 2 • Project Bank Accounts (Chapter 2) commenced on 1 March 2018 • For each project/contract

Closing the PBA

Department of Housing and Public Works 31

The PBA may be ‘dissolved’ when:

▪ there are no longer any Subcontractor beneficiaries for the project bank accounts, OR

▪ the only remaining work is maintenance (not including work for which retention amount is withheld).

▪ Provide written notice of ▪ intent to close at least 5 business days before closing the account

with copy of balance report for each account.

▪ confirming closure within 10 business days after account/s have been closed (s26)

▪ With final payment claim or at time Final Certificate issued (if remaining balances in PBA accounts): Retention Balance Report and Disputed Funds Balance Report

Page 33: Project Bank Accounts...Overview of Project Bank Accounts Department of Housing and Public Works 2 • Project Bank Accounts (Chapter 2) commenced on 1 March 2018 • For each project/contract

Contract termination, insolvency and bankruptcy

Department of Housing and Public Works 32

▪ Funds in the PBA trust accounts protected from claims from Head Contractors’ creditors and debtors

▪ Principal may step in as 'trustee' of the PBA

▪ Principal as Trustee may pay beneficiaries amounts owing or held in trust on their behalf

▪ Head Contractor remains liable for any act or failure under the Act as trustee

Page 34: Project Bank Accounts...Overview of Project Bank Accounts Department of Housing and Public Works 2 • Project Bank Accounts (Chapter 2) commenced on 1 March 2018 • For each project/contract

Role of the Regulator

Department of Housing and Public Works 33

▪ QBCC has strengthened powers to monitor PBA compliance, investigate PBA discrepancies and payment concerns raised by Subcontractors.

▪ The QBCC’s jurisdiction is no longer limited to active building sites.

▪ Significant penalties for non-compliance up to 500 penalty units and imprisonment.

Queensland Building and Construction Commission (QBCC)

Page 35: Project Bank Accounts...Overview of Project Bank Accounts Department of Housing and Public Works 2 • Project Bank Accounts (Chapter 2) commenced on 1 March 2018 • For each project/contract

Department of Housing and Public Works 34

Attachment 3 in Guidelines

PBA Checklist

Page 36: Project Bank Accounts...Overview of Project Bank Accounts Department of Housing and Public Works 2 • Project Bank Accounts (Chapter 2) commenced on 1 March 2018 • For each project/contract

More information

Department of Housing and Public Works 35

▪ Guidelines for Head Contractors available on the HPW Website.

▪ A Head Contractor may also wish to seek independent legal advice regarding compliance.

▪ All copies of Forms and Notices available on the QBCC and HPW websites.