2
BEC Group of Companies c/o 18 Boon Lay Way TradeHub 21 Singapore 609966 Tel: +(65) 6778 6858 Website: www.be-con.com Email: [email protected] Cert No: QS - 2009 - 14 Member of the IAF MLA for QMS CASE STUDY PROJECT CHIMNEY DESIGN AND BUILD Project Participants Detail of work by BEC BEC was involved in the Design & Build of the chimney, including piling, pilecap, slipform, heavy lifting of roof, floors and flues, installation of internal rack and pinion hoist, AWL’s, internal lighting, lightning conductor and earthing works. Challenges The remote location of this stack required importing all materials and equipment for the construction Owner Client Formosa Heavy Industries Corporation Chimney EPC Contractor TOLEDO POWER TOLEDO POWER PLANT #10-159 to 162 Fax: +(65) 6690 9259 Toledo Power Project Cebu Energy Development Corporation Cebu Energy Development Corporation was constructing a 3 300T/H Coal Fired Boiler Power Plant located in Toledo City, Cebu. Formosa Heavy Industries Corporation was its main EPC contractor. Cebu Energy Development Corporation (CEDC) is a 246MW Clean Coal-Fired Power Plant located in Toledo City, Cebu. This CEDC Plant provides affordable energy and improves the power system reliability of the island. Similar to its twin power plant in Iloilo City, CEDC utilizes the latest boiler technology to set the beginning of a cleaner transitional technology. Balanced Engineering & Construction Pte Ltd Lining System SCR-Ten 2
Transcript
Page 1: Project CHIMNEY DESIGN AND BUILD Participants › pdf › PastProject-CaseStudy › New BEC...Email: sales@be-con.com Cert No: QS - 2009 - 14 Member of the IAF MLA for QMS CASE STUDY

BEC Group of Companiesc/o 18 Boon Lay Way

TradeHub 21Singapore 609966

Tel: +(65) 6778 6858

Website: www.be-con.comEmail: [email protected]

Cert No: QS - 2009 - 14

Member of the IAF MLA for QMS

CASE STUDY

PROJECT

CHIMNEY DESIGN AND BUILDProjectParticipants

Detail of work by BECBEC was involved in the Design & Build of the chimney, including piling, pilecap, slipform, heavy lifting of roof, floors and flues, installation of internal rack and pinion hoist, AWL’s, internal lighting, lightning conductor and earthing works.

Challenges• The remote location of this stack required importing all materials and equipment for the construction

Owner

Client

Formosa Heavy Industries Corporation

Chimney EPC Contractor

TOLEDO POWER

TOLE

DO

PO

WE

R P

LAN

T

#10-159 to 162 Fax: +(65) 6690 9259

Toledo Power Project

Cebu Energy Development Corporation

Cebu Energy Development Corporation was constructing a 3 300T/H Coal Fired Boiler Power Plant located in Toledo City, Cebu. Formosa Heavy Industries Corporation was its mainEPC contractor.

Cebu Energy Development Corporation (CEDC) is a 246MW Clean Coal-Fired Power Plant located in Toledo City,Cebu. This CEDC Plant provides affordable energy and improves the power system reliability of the island. Similar to itstwin power plant in Iloilo City, CEDC utilizes the latest boiler technology to set the beginning of a cleaner transitionaltechnology.

Balanced Engineering & Construction Pte Ltd

Lining System

SCR-Ten 2

Page 2: Project CHIMNEY DESIGN AND BUILD Participants › pdf › PastProject-CaseStudy › New BEC...Email: sales@be-con.com Cert No: QS - 2009 - 14 Member of the IAF MLA for QMS CASE STUDY

stack elevation

100m

3

2.8m

Chimney data:

Height

No. of internal steel flues

No. of internal platforms

Diameter of internal flues

External concrete diameter

Piles

Toledo

3

17.2m

79nos

Prebored precast concrete

Pile cap

500 diameter

2.8mUnit trusses connected to main ring

Internal liner

Manufacturing liner cans Slipforming in progress


Recommended