+ All Categories
Home > Documents > Project : Consultancy Services for Design, Project ...seatecgroup.com/images/SEATEC...

Project : Consultancy Services for Design, Project ...seatecgroup.com/images/SEATEC...

Date post: 14-Aug-2019
Category:
Upload: hoangtram
View: 215 times
Download: 0 times
Share this document with a friend
16
Transcript
Page 1: Project : Consultancy Services for Design, Project ...seatecgroup.com/images/SEATEC download/Industries.pdf · main consultant) to provide the technical advice, detailed design and
Page 2: Project : Consultancy Services for Design, Project ...seatecgroup.com/images/SEATEC download/Industries.pdf · main consultant) to provide the technical advice, detailed design and

281 S

oi P

anit A

nan

7, Pr

idi B

anom

yong 4

2, Sukh

um

vit

71, Ban

gko

k 10110, Th

aila

nd

Tel

: (

662)

713 3

888;

Fax:

(6

62)

713 3

889

E-m

ail: d

ynam

ic3@

ksc.

th.c

om;

sea

tec@

seat

ecgro

up.c

om;

Hom

epag

e: w

ww

.sea

tecg

roup.c

om

Pro

ject

:

Con

sult

an

cy

Serv

ices

for

Desi

gn

, P

roje

ct

Man

ag

em

en

t an

d

Con

stru

ctio

n S

up

erv

isio

n o

f Eth

an

ol P

lan

t

Loca

tion

:

Lop

Bu

ri P

rovin

ce, Th

ailan

d

Ow

ner

: S

ap

Th

ip C

o.,

Ltd

.

Pro

ject

Cost

: Th

ai B

aht

523 M

illio

n (

appro

x. U

SD

14.7

mill

.)

Tim

e S

ched

ule

: S

epte

mber

2006 –

Nov

ember

2007

Desc

rip

tion

: Th

e pro

ject

cov

ers

area

90 h

a (o

r ap

pro

xim

atel

y 500 r

ai)

loca

tes

at L

op

Buri P

rovi

nce

, Thai

land.

Dyn

amic

Engin

eering C

onsu

ltan

ts C

o.,

Ltd.

(DEC)

of S

EATEC G

roup w

as a

ssig

ned

to

pro

vide

serv

ices

until b

egin

oper

atio

n.

Mai

n a

ssig

nm

ent

consi

sted

of

Mas

ter

Plan

; D

etai

led D

esig

n f

or 2

eth

anol

pla

nts

, fa

cilit

ies

and in

fras

truct

ure

; Pr

ojec

t M

anag

emen

t th

at in

cluded

Bid

din

g

Proc

ess,

as

sist

in

Con

stru

ctio

n

per

mit;

Super

visi

on

and

Man

agem

ent

for

Con

stru

ctio

n a

nd m

achin

e in

stal

lation

. W

orks

incl

udin

g:

• Site

Prep

arat

ion a

nd 2

60,0

00 c

u.m

. pon

d e

xcav

atio

n;

• Raw

mat

eria

l are

a pre

par

atio

n;

• Con

stru

ctio

n o

f Eth

anol

Pla

nt

1 a

nd E

than

ol P

lant

2;

• Con

stru

ctio

n o

f Tan

k Fa

rm;

• Build

ing o

f Bio

-Gas

& 2

nd .

Tre

atm

ent

syst

em;

• Roa

d, m

ater

ial a

rea;

Raw

mat

eria

l war

ehou

se;

• Pu

mpin

g s

yste

m fro

m r

iver

; •

Build

ing for

boi

ler

syst

em in

stal

lation

; •

Offic

e build

ing, ca

nte

en, an

d w

eighting e

quip

men

t •

Ele

ctrica

l sys

tem

, lig

hting, lig

htn

ing;

• D

rain

age

syst

em;

• W

aste

wat

er t

reat

men

t sy

stem

; •

Wat

er s

upply

sys

tem

; •

Sta

ff h

ousi

ng a

nd e

tc.

Page 3: Project : Consultancy Services for Design, Project ...seatecgroup.com/images/SEATEC download/Industries.pdf · main consultant) to provide the technical advice, detailed design and

281

Soi P

anit

Ana

n 7,

Prid

i Ban

omyo

ng 4

2, S

ukhu

mvi

t 71,

Ban

gkok

101

10, T

haila

nd

Tel:

(662

) 713

388

8; F

ax:

(662

) 713

388

9 E-

mai

l: dy

nam

ic3@

ksc.

th.c

om;

seat

ec@

seat

ecgr

oup.

com

; Hom

epag

e: w

ww

.seat

ecgr

oup.

com

Ow

ner

: Si

am F

ood

Prod

uct P

ublic

Com

pany

Lim

ited

Loc

atio

n :

Sara

buri

Pro

vinc

e, T

haila

nd.

Proj

ect C

ost

: B

aht 3

0 m

illio

n (a

ppro

x U

S$ 0

.75

mill

ion)

Pr

ojec

t Per

iod:

A

pr 2

004-

Jul

200

5 D

escr

iptio

n :

Saim

Foo

d Pr

oduc

t Pl

c. e

stabl

ished

the

sw

eet

corn

fac

tory

loc

ated

at

Wan

g M

uang

D

istrc

t, Sa

rabu

ri Pr

ovin

ce.

Dyn

amic

En

gine

erin

g C

onsu

ltant

s C

o.,

Ltd.

(D

EC)

was

ass

igne

d to

pro

vide

the

con

sulti

ng

arch

itect

ural

an

d en

gine

erin

g se

rvic

es

for

deta

iled

desig

n an

d co

nstru

ctio

n su

perv

ision

for c

onstr

uctio

n of

the

fact

ory

on a

rea

of 8

8 ra

i, M

uang

lek-

Wan

g M

uang

Hig

hway

Km

. 19

, Ta

mbo

n Sa

lang

pan,

Wan

g M

uang

, Sa

rabu

ri Pr

ovin

ce.

It co

nsist

s of

(1)

Fac

tory

bui

ldin

g w

hich

in

clud

ed P

rodu

ctio

n A

rea,

Unl

oadi

ng A

rea,

Em

pty

Can

, C

ool

Roo

m,

Park

ing

Med

ia,

War

ehou

se,

Load

ing

Stat

ion;

(2

) A

dmin

istra

tion

Bui

ldin

g w

hich

inc

lude

d O

ffice

& O

A,

Can

teen

& M

eetin

g R

oom

, N

ursin

g, L

ab &

Loc

ker;

(3)

Serv

ices

bui

ldin

g w

hich

incl

uded

Cat

wal

k,

mai

nten

ance

sho

p, M

echa

nica

l Bui

ldin

g, W

aste

Wat

er T

reat

men

t Pla

nt,

Boi

ler,

Fire

pum

p, C

hille

r, C

oolin

g to

wer

, Ta

nk F

arm

, gu

ard

hous

e, F

lag

Pole

; (4

) En

tranc

e R

oad

& S

ervi

ce R

oad

with

lig

htin

g an

d dr

aina

ge

syste

m, a

nd w

ater

sup

ply;

(5)

Tru

ck a

nd T

raile

r pa

rkin

g, T

ruck

sca

le,

Raw

wat

er p

ond

40 ra

i and

1,5

20 m

. Fen

ce; (

6) R

esid

ent a

nd R

ecre

atio

n A

rea

for G

uest,

Man

agem

ent,

and

Staf

fs (7

) Ele

ctric

al sy

stem

:- Li

ghtin

g,

Pow

er, S

tand

-by

Gen

erat

or, G

roun

ding

, Fire

Man

agem

ent s

yste

m,

and

Tele

phon

e sy

stem

s; (5

) M

echa

nica

l Sy

stem

, Sa

nita

ry a

nd P

lum

bing

sy

stem

Page 4: Project : Consultancy Services for Design, Project ...seatecgroup.com/images/SEATEC download/Industries.pdf · main consultant) to provide the technical advice, detailed design and

281

Soi P

anit

Ana

n 7,

Prid

i Ban

omyo

ng 4

2, S

ukhu

mvi

t 71,

Ban

gkok

101

10, T

haila

nd

Tel:

(662

) 713

388

8; F

ax:

(662

) 713

388

9 E-

mai

l: dy

nam

ic3@

ksc.

th.c

om;

seat

ec@

seat

ecgr

oup.

com

; Hom

epag

e: w

ww

.seat

ecgr

oup.

com

O

wne

r :

Tha

i Kra

ft Pa

per

Indu

stry

Co.

, Ltd

. L

ocat

ion

: K

anch

ana

Bur

i Pro

vinc

e, T

haila

nd.

Proj

ect C

ost

: A

ppro

x. B

aht 1

,000

mill

ion

Proj

ect P

erio

d:

Janu

ary

1995

-Jan

uary

199

7 D

escr

iptio

n :

Thai

Kra

ft Pa

per

Indu

stry

Co.

, Ltd

. a s

ubsid

iary

of

Siam

Cem

ent P

ublic

C

o., L

td. w

as p

lann

ing

to e

xpan

d its

pap

er m

ill i

n th

e ar

ea o

f 11

3 ra

i at

W

angs

ala

Subd

istric

t, Th

amua

ng D

istric

t, K

anch

anab

uri P

rovi

nce

with

its

prod

uctio

n ca

paci

ty o

f 30

0,00

0 to

n/ye

ar.

SEA

TEC

Gro

up b

y D

ynam

ic

Engi

neer

ing

Con

sulta

nts

Co.

, Ltd

. (D

EC)

was

app

oint

ed t

o un

derta

ke t

he

Des

ign,

Pro

ject

Man

agem

ent a

nd C

onstr

uctio

n Su

perv

ision

wor

ks.

Thai

Kra

ft Pa

per I

ndus

try C

o., L

td.

requ

ired

the

Prod

uctio

n pr

oces

s as

fast

as p

ossib

le t

hen

Fast

Trac

k co

nstru

ctio

n m

etho

d w

as i

ntro

duce

d to

thi

s pr

ojec

t. Th

is fa

ctor

y is

high

est

prod

uctio

n of

Kra

ft pa

per

at t

hat

time.

Mai

n ra

w

mat

eria

l is

from

loc

al r

ecyc

le p

aper

with

som

e im

port

amou

nt a

s lo

cal

recy

cle

pape

r is n

ot e

noug

h an

d ad

ding

with

pul

p pa

per.

Prod

uctio

n ca

paci

ty

of e

ach

mac

hine

is 5

00 to

n pe

r day

. Con

struc

tion

was

sta

rt on

beg

inni

ng o

f 19

95 a

nd p

rodu

ctio

n ca

n sta

rt ab

out e

nd o

f 199

6.

Page 5: Project : Consultancy Services for Design, Project ...seatecgroup.com/images/SEATEC download/Industries.pdf · main consultant) to provide the technical advice, detailed design and

281

Soi P

anit

Ana

n 7,

Prid

i Ban

omyo

ng 4

2, S

ukhu

mvi

t 71,

Ban

gkok

101

10, T

haila

nd

Tel:

(662

) 713

388

8; F

ax:

(662

) 713

388

9 E-

mai

l: dy

nam

ic3@

ksc.

th.c

om;

seat

ec@

seat

ecgr

oup.

com

; Hom

epag

e: w

ww

.seat

ecgr

oup.

com

O

wne

r :

Adv

ance

Agr

o Pu

blic

Co.

, Ltd

. L

ocat

ion

: Sr

i Mah

a Ph

ot, P

rach

in B

uri P

rovi

nce,

Tha

iland

. Pr

ojec

t Cos

t :

App

rox.

Bah

t 1,0

00 m

illio

n Pr

ojec

t Per

iod:

N

ovem

ber

1993

– O

ctob

er 1

996

Des

crip

tion

: A

dvan

ce A

gro

Publ

ic C

o., L

td. (

AA

) the

pul

p an

d pa

per m

anuf

actu

rer h

as

expa

nded

its

prod

uctio

n fa

cilit

ies

at th

eir p

rem

ises a

t Si M

aha

Phot

dist

rict,

Prac

hin

Bur

i pr

ovin

ce.

The

esti

mat

ed p

rodu

ctio

n ca

paci

ty w

as 2

00,0

00

ton/

year

. SEA

TEC

Gro

up b

y D

ynam

ic E

ngin

eerin

g C

onsu

ltant

s C

o., L

td.

(DEC

) w

as a

ppoi

nted

by

Adv

ance

Agr

o Pu

blic

Co.

, Ltd

. to

unde

rtake

the

deta

iled

desig

n an

d su

perv

ision

of c

onstr

uctio

n w

orks

. A

dvan

ce A

gro

Pulp

and

Pap

er M

ill is

one

of t

he la

rge

mill

, req

uire

s lo

t of

larg

e m

achi

nes

incl

udin

g bo

iler

and

pow

er p

lant

. O

rder

, sh

ipm

ent

and

insta

llatio

n pr

oces

s of

the

se m

achi

nes

take

tim

e an

d co

st. P

rodu

ctio

n pr

oces

s is

requ

ired

as fa

st as

pos

sible

then

Fas

t Tra

ck c

onstr

uctio

n m

etho

d w

as in

trodu

ced

to th

is pr

ojec

t. Th

is pr

ojec

t has

bot

h Pu

lp M

ill a

nd P

aper

M

ill w

ithin

the

sam

e ar

ea.

AA

has

his

own

Euca

lypt

us p

lant

atio

n.

Euca

lypt

us p

lant

is

the

mat

eria

l fo

r Pu

lp M

ill a

nd p

ulp

outp

ut i

s fe

d to

Pa

per

Mill

to

prod

uce

the

roll

pape

r. C

apac

ity o

f 2

pulp

fac

torie

s ca

n pr

oduc

e 60

0 to

n pe

r da

y. P

aper

mill

has

two

mac

hine

s, ea

ch c

an p

rodu

ce

700

ton

per

day

of w

ritin

g pa

per

(whi

te p

aper

) hi

ghes

t pr

oduc

tion

in

Thai

land

and

reg

ion.

Pili

ng w

ork

start

on b

egin

ning

of

1994

and

pap

er

prod

uctio

n ca

n sta

rt on

mid

of 1

996.

Page 6: Project : Consultancy Services for Design, Project ...seatecgroup.com/images/SEATEC download/Industries.pdf · main consultant) to provide the technical advice, detailed design and

281

Soi P

anit

Ana

n 7,

Prid

i Ban

omyo

ng 4

2, S

ukhu

mvi

t 71,

Ban

gkok

101

10, T

haila

nd

Tel:

(662

) 713

388

8; F

ax:

(662

) 713

388

9 E-

mai

l: dy

nam

ic3@

ksc.

th.c

om;

seat

ec@

seat

ecgr

oup.

com

; Hom

epag

e: w

ww

.seat

ecgr

oup.

com

C

lient

/Ow

ner

: B

angk

ok S

teel

Indu

stry

Pub

lic C

o., L

td.

Loc

atio

n :

Nak

hon

Rat

chas

ima

Prov

ince

, Tha

iland

Pr

ojec

t Cos

t :

US$

90

mill

ion

Des

crip

tion

: B

angk

ok S

teel

Rol

ling

Mill

loc

ated

at

Nak

hon

Rat

chas

ima

Prov

ince

, N

orth

east

of T

haila

nd,

tota

l ar

ea o

f 48

,000

m2 .

The

serv

ices

inc

lude

d de

taile

d de

sign

and

cons

truct

ion

supe

rvisi

on a

nd b

udge

t co

ntro

l of

the

pr

ojec

t. Th

e R

ollin

g M

ill h

as a

pro

duct

ion

capa

city

of

500,

000

tons

of

steel

bar

s an

d w

ire r

ods

per

year

. The

fac

tory

is

built

on

steel

tru

sses

su

ppor

ted

on h

eavy

rein

forc

ed c

oncr

ete

foun

datio

n. Th

e es

timat

ed c

ost o

f th

e pr

ojec

t is B

aht 1

,800

mill

ion.

The

scop

e of

the

serv

ice

incl

ude

the

follo

win

g w

orks

: -

Det

aile

d de

sign

and

supe

rvisi

on o

f co

nstru

ctio

n of

arc

hite

ctur

al,

civi

l, str

uctu

ral a

nd u

tility

syste

m w

orks

; -

Tend

er a

nd c

ontra

ct d

ocum

ent p

repa

ratio

n;

- Sp

ecifi

catio

n an

d B

OQ

pre

para

tion;

-

Con

st es

timat

ion;

-

Mon

itorin

g of

con

struc

tion

sche

dule

; -

Exec

utin

g fo

r all

cons

truct

ion

perm

it an

d pl

ant o

pera

tion

perm

it.

Page 7: Project : Consultancy Services for Design, Project ...seatecgroup.com/images/SEATEC download/Industries.pdf · main consultant) to provide the technical advice, detailed design and

281

Soi P

anit

Ana

n 7,

Prid

i Ban

omyo

ng 4

2, S

ukhu

mvi

t 71,

Ban

gkok

101

10, T

haila

nd

Tel:

(662

) 713

388

8; F

ax:

(662

) 713

388

9 E-

mai

l: dy

nam

ic3@

ksc.

th.c

om;

seat

ec@

seat

ecgr

oup.

com

; Hom

epag

e: w

ww

.seat

ecgr

oup.

com

Clie

nt/O

wne

r :

GM

OPE

L

Loc

atio

n :

Ray

ong

Prov

ince

, Tha

iland

Pr

ojec

t Cos

t :

App

rox.

US

$ 42

0 M

illio

n D

escr

iptio

n :

Tech

nica

l A

dvic

e, D

etai

led

Des

ign

and

Con

struc

tion

Supe

rvisi

on o

f G

M-O

PEL

Car

Pla

nt a

nd P

aint

Sho

p, A

dam

Ope

l AG

Pro

ject

. Thi

s is

an

auto

mob

ile a

ssem

bly

plan

t of

GM

-Ope

l th

at i

s lo

cate

d at

Eas

tern

In

dustr

ial E

state

at P

luak

daen

g D

istric

t, R

ayon

g Pr

ovin

ce in

the

area

of

298

rai

s. Th

e pl

ant

has

a ca

paci

ty o

f pr

oduc

ing

75,0

00 v

ehic

les

per

annu

m in

Sta

ge 1

and

150,

000

vehi

cles

in S

tage

2. D

ynam

ic E

ngin

eerin

g C

onsu

ltant

s C

o., L

td. (

DEC

) of

SEA

TEC

Gro

up w

as a

ppoi

nted

by

Ove

A

rup

& P

artn

ers

Inte

rnat

iona

l (m

ain

cons

ulta

nt) t

o pr

ovid

e th

e te

chni

cal

advi

ce, d

etai

led

desig

n an

d co

nstru

ctio

n su

perv

ision

of t

his

proj

ect.

The

pain

t sho

p bu

ildin

g ha

s fo

otpr

int o

f 276

.0 m

x 3

6.0

m a

nd h

eigh

t of 3

0.0

m.

It ha

s a c

oncr

ete

floor

are

a of

app

roxi

mat

ed 2

6,40

0 m

2 and

steel

floo

r of

app

rox.

4,5

00 m

2 . Th

e sp

ray

boot

h co

vers

an

area

of 1

,360

m2 .

Tota

l ste

el i

n co

mpo

site

cons

truct

ion

appr

oxim

ated

4,2

50 to

ns.

Roo

fing

and

sidin

g ar

e in

sula

ted

pane

ls of

130

mm

thic

knes

s. Th

e w

hole

bui

ldin

g is

dustp

roof

and

sili

cone

fre

e. Th

e su

pers

truct

ure

skel

eton

is

mad

e of

str

uctu

ral

steel

whi

le b

ore

pile

s us

ed f

or t

he f

ound

atio

ns (

Sep

1996

Mar

200

0).

Page 8: Project : Consultancy Services for Design, Project ...seatecgroup.com/images/SEATEC download/Industries.pdf · main consultant) to provide the technical advice, detailed design and

281

Soi P

anit

Ana

n 7,

Prid

i Ban

omyo

ng 4

2, S

ukhu

mvi

t 71,

Ban

gkok

101

10, T

haila

nd

Tel:

(662

) 713

388

8; F

ax:

(662

) 713

388

9 E-

mai

l: dy

nam

ic3@

ksc.

th.c

om;

seat

ec@

seat

ecgr

oup.

com

; Hom

epag

e: w

ww

.seat

ecgr

oup.

com

C

lient

/Ow

ner

: (a

) Eas

tern

Pow

er a

nd E

lect

ric

Co.

, Ltd

. (E

PEC

) (b

) AB

B P

ower

Gen

erat

ion

Sdn.

Bhd

. L

ocat

ion

: Sa

mut

Pra

karn

Pro

vinc

e, T

haila

nd

Proj

ect C

ost

: A

ppro

x. U

S $

20 M

illio

n D

escr

iptio

n :

The

Easte

rn P

ower

and

Ele

ctric

al C

o., L

td. (

EPEC

) at B

ang

Bo,

Sam

ut

Prak

arn

Prov

ince

, is

cons

ider

ing

deve

lopm

ent

of a

nat

ural

gas

fire

d co

mbi

ned

cycl

e ge

nera

ting

at B

ang

Bo

in r

espo

nse

to E

GA

T’s

requ

est

for

IPP

Proj

ect.

The

pow

er p

lant

is

350

MW

cap

acity

whi

ch u

sing

natu

ral g

as a

nd d

iese

l oil

as fu

el.

a)

The

Env

iron

men

tal

Impa

ct A

sses

smen

t (E

IA)

wer

e fo

und

that

ai

r, no

ise a

nd w

aste

wat

er im

pact

wer

e m

inim

ize.

The

ope

ratio

n of

po

wer

pla

nt i

s no

t ef

fect

on

ecol

ogy

and

soci

al a

spec

ts. T

he

mig

ratio

n m

easu

re a

nd m

onito

ring

prog

ram

wer

e pr

opos

ed f

or th

e po

wer

pla

nt d

urin

g co

nstru

ctio

n an

d op

erat

ion.

(A

ug. 1

995

– Ja

n.

1997

) b)

G

eote

chni

cal E

ngin

eeri

ng D

esig

n an

d C

onst

ruct

ion

Supe

rvisi

on

of A

cces

s R

oad

and

Site

Pre

para

tion

for

Com

bine

d C

ycle

350

M

W P

ower

Pla

nt o

f EP

EC a

t Ban

g B

o, S

amut

Pra

karn

Pro

vinc

e.

For

Site

Pre

para

tion

wor

ks, t

he t

echn

ique

of

Geo

tecx

tile-

Bam

boo

Mat

tress

as

a gr

ound

im

prov

emen

t m

etho

d ha

s be

en e

mpl

oyed

to

build

a p

latfo

rm f

or e

mba

nkm

ent

and

pilin

g w

orks

for

the

Pow

er

Plan

t. Fo

r Acc

ess R

oad

and

all s

ervi

ce ro

ads f

or th

e po

wer

pla

nt th

e gr

ound

im

prov

emen

t us

ing

Men

ard’

s A

dvan

ced

Con

solid

atio

n by

V

acuu

m T

echn

ique

com

bine

d w

ith C

ontro

lled

Mod

ules

Cem

ent

Col

umns

(C

MC

) ha

s be

en e

mpl

oyed

with

out h

igh

surc

harg

ing

for

prel

oadi

ng so

ils. A

t the

end

of 6

mot

hs th

e gr

ound

was

impr

oved

by

arou

nd 1

.8m

con

solid

ated

set

tlem

ent,

i.e.

87%

pre

-con

solid

atio

n w

as a

chie

ved.

(Jun

e 19

98 –

Nov

embe

r 199

9)

Page 9: Project : Consultancy Services for Design, Project ...seatecgroup.com/images/SEATEC download/Industries.pdf · main consultant) to provide the technical advice, detailed design and

281

Soi P

anit

Ana

n 7,

Prid

i Ban

omyo

ng 4

2, S

ukhu

mvi

t 71,

Ban

gkok

101

10, T

haila

nd

Tel:

(662

) 713

388

8; F

ax:

(662

) 713

388

9 E-

mai

l: dy

nam

ic3@

ksc.

th.c

om;

seat

ec@

seat

ecgr

oup.

com

; Hom

epag

e: w

ww

.seat

ecgr

oup.

com

C

lient

/Ow

ner :

M

.D.X

. Pub

lic C

o., L

td.

Loc

atio

n :

Cha

choe

ngsa

o Pr

ovin

ce, T

haila

nd

Proj

ect C

ost

: U

S$ 8

0 m

illio

n D

escr

iptio

n :

The

Gat

eway

City

Ind

ustri

al E

state

Pro

ject

is a

maj

or in

dustr

ial c

ompl

ex

unde

r the

dev

elop

men

t by

MD

X P

ublic

Co.,

Ltd

. With

the

supp

ort o

f IEA

T.

The

proj

ect

loca

ted

at K

m #

20 o

n H

ighw

ay n

o.33

1 (C

hach

oeng

sao-

Satta

hip)

, H

uasa

mro

ng S

ub-d

istric

t, Pl

angy

ao D

istric

, co

ver

an a

rea

of

6,90

0 ra

i div

ided

into

five

zon

es a

s G

ener

al In

dustr

ial E

state

(GIE

), Ex

port

Proc

essin

g Zo

ne (E

PZ),

Res

iden

tial

and

Com

mer

cial

Are

as,

utili

ties

and

othe

rs. S

ite d

evel

opm

ent w

orks

in th

e ap

prox

imat

ed a

rea

of 2

,500

rai,

Land

D

evel

opm

ent,

drai

nage

syste

m a

nd re

late

d fa

cilit

ies i

n th

e ar

ea o

f 3,9

00 ra

i. So

uthe

ast A

sia T

echn

olog

y C

o., L

td. (

SEA

TEC

) was

app

oint

ed b

y M

DX

pu

blic

Co.

Ltd.

to u

nder

take

the

des

ign

and

supe

rvisi

on o

f co

nstru

ctio

n w

orks

in

clud

ed

IEA

T O

ffice

bu

ildin

g,

Clu

b H

ouse

an

d R

esta

uran

t bu

ildin

g, C

usto

m O

ffice

Bui

ldin

g, F

ire F

ight

ing

Stat

ion,

Sho

p ho

use,

W

areh

ouse

, R

esid

entia

l ho

uses

an

d co

ndom

iniu

ms,

and

Com

mer

cial

bu

ildin

gs, u

tiliti

es a

nd o

ther

s. Th

e co

nstru

ctio

n ap

prox

imat

ely

cost

2,00

0 M

B. (

Nov

. 198

9 –

Dec

. 199

5).

Page 10: Project : Consultancy Services for Design, Project ...seatecgroup.com/images/SEATEC download/Industries.pdf · main consultant) to provide the technical advice, detailed design and

281

Soi P

anit

Ana

n 7,

Prid

i Ban

omyo

ng 4

2, S

ukhu

mvi

t 71,

Ban

gkok

101

10, T

haila

nd

Tel:

(662

) 713

388

8; F

ax:

(662

) 713

388

9 E-

mai

l: dy

nam

ic3@

ksc.

th.c

om;

seat

ec@

seat

ecgr

oup.

com

; Hom

epag

e: w

ww

.seat

ecgr

oup.

com

Clie

nt/O

wne

r :

Tha

i In

dust

rial

E

stat

e C

orpo

ratio

n L

td.,

The

In

dust

rial

E

stat

e A

utho

rity

of T

haila

nd (I

EA

T) a

nd B

oard

of I

nves

tmen

t

Loc

atio

n :

Ayu

ttha

ya P

rovi

nce,

Tha

iland

Pr

ojec

t Cos

t :

- D

escr

iptio

n :

Hi-T

ech

Indu

stria

l Es

tate

is

deve

lope

d by

Tha

i In

dust

rial

Esta

te C

orp.

Lt

d. i

n jo

int

coop

erat

ion

with

Ind

ustri

al E

stat

e A

utho

rity

of T

haila

nd

(IEA

T) a

nd B

oard

of

Inve

stm

ent

(BO

I),

Thai

land

. H

i-Tec

h In

dust

rial

Esta

te i

s si

tuat

ed a

t th

e 59

kilo

met

er m

arke

r on

the

Asi

a hi

ghw

ay i

n B

ang-

Pa-I

n D

istri

ct, A

yutth

aya

Prov

ince

. Pha

se o

ne o

f the

pro

ject

cov

ers

860

acre

s (3

44 h

ecta

res)

whi

ch i

s di

vide

d in

to 3

zon

es:

(1)

Expo

rt Pr

oces

sing

Zon

e (w

ith C

usto

m’s

Han

dlin

g) 3

15 a

cres

; (2

) G

ener

al

Indu

stria

l Zon

e 31

5 ac

res;

and

(3) S

ervi

ces

Res

iden

tial,

Com

mer

cial

and

U

tility

zon

es 2

30 a

cres

. Th

e Es

tate

hou

ses

all n

eces

sary

infr

astru

ctur

al

para

met

ers

and

faci

litie

s, se

rvic

es a

nd c

omm

unity

util

ities

. To

cope

with

al

l the

est

ate’

s di

spos

al n

eeds

a w

aste

wat

er tr

eatm

ent p

lant

is d

esig

ned

with

cap

acity

of 1

6,80

0 cu

.m./d

ay to

serv

e th

e in

dust

rial,

com

mer

cial

and

re

side

ntia

l zo

nes

of t

he E

stat

e.

The

syst

em i

s an

ext

ende

d ac

tivat

ed

slud

ge p

roce

ss.

The

was

tew

ater

trea

tmen

t sys

tem

of t

he e

stat

e co

mpr

ised

of

pum

p su

mp,

grit

rem

oval

cha

mbe

r, pa

rsha

ll flu

me,

equ

aliz

atio

n ta

nk,

aera

tion

tank

, sed

imen

tatio

n ta

nk, c

hlor

inat

ion

tank

, slu

dge

sum

p, s

ludg

e th

icke

ner,

slud

ge s

tora

ge ta

nk a

nd s

ludg

e dr

ying

bed

. The

eff

luen

t mee

ts

the

IEA

T st

anda

rds

befo

re d

isch

argi

ng i

nto

the

envi

ronm

ent.

The

two

sour

ces

of w

ater

for

the

esta

te a

re C

hao

Phra

ya r

iver

and

gro

und

wat

er

thro

ugh

deep

wel

ls.

The

wat

er s

uppl

y sy

stem

of t

he e

stat

e is

des

igne

d to

m

eet t

he to

tal d

eman

d of

20,

855

m3 /d

ay. T

he e

stat

e ha

s di

spos

al s

yste

m

for n

on-h

azar

dous

was

te a

s ha

zard

ous

was

te p

rodu

cing

indu

strie

s ar

e no

t al

low

ed t

o op

erat

e in

the

est

ate.

H

owev

er,

if ha

zard

ous

was

tes

are

prod

uced

, th

ey s

hall

be d

ispo

sed

off

thro

ugh

licen

sed

agen

cies

in

a m

anne

r app

rove

d by

the

gove

rnm

ent.

The

sol

id w

aste

dis

posa

l sys

tem

is

desi

gned

to m

eet t

he d

eman

d of

92

m3 /d

ay (2

8 t/d

ay) a

nd 2

inci

nera

tors

, on

e in

EPZ

and

ano

ther

in G

IZ, a

re in

stal

led

to h

andl

e 19

.0 t/

day

of n

on-

recy

clab

le, a

nd c

ombu

stib

le so

lids.

Page 11: Project : Consultancy Services for Design, Project ...seatecgroup.com/images/SEATEC download/Industries.pdf · main consultant) to provide the technical advice, detailed design and

281

Soi P

anit

Ana

n 7,

Prid

i Ban

omyo

ng 4

2, S

ukhu

mvi

t 71,

Ban

gkok

101

10, T

haila

nd

Tel:

(662

) 713

388

8; F

ax:

(662

) 713

388

9 E-

mai

l: dy

nam

ic3@

ksc.

th.c

om;

seat

ec@

seat

ecgr

oup.

com

; Hom

epag

e: w

ww

.seat

ecgr

oup.

com

C

lient

/Ow

ner

: T

he In

dust

rial

Est

ate

Aut

hori

ty o

f Tha

iland

(IE

AT

).

Loc

atio

n

: C

honb

uri P

rovi

nce,

Tha

iland

Pr

ojec

t Cos

t :

US$

20

mill

ion

Des

crip

tion

: Th

e In

dust

rial E

stat

e A

utho

rity

of T

haila

nd (I

EAT)

had

a p

lan

to d

evel

op

the

mod

ern

Map

Tap

hut I

ndus

trial

Com

plex

ove

r an

area

of a

bout

20,

000

rai

(3,2

00 h

ecta

re)

in R

ayon

g pr

ovin

ce.

This

are

a w

as a

sel

f co

ntai

ned

indu

stria

l est

ate

for b

asic

indu

strie

s an

d th

eir d

owns

tream

indu

strie

s. T

he

deve

lopm

ent

of M

ap T

a Ph

ut I

ndus

trial

Est

ate

was

am

ong

the

othe

r pr

ojec

ts i

n th

e Ea

ster

n Se

aboa

rd D

evel

opm

ent

Prog

ram

. T

he M

ap T

a Ph

ut I

ndus

trial

Est

ate

will

con

tain

the

follo

win

g ba

sic

indu

strie

s; n

atur

al

gas

sepa

ratio

n pl

ant,

petro

chem

ical

ind

ustry

, sh

ip r

epai

r an

d bu

ildin

g ya

rds,

ferti

lizin

g pl

ant,

glas

s in

dust

ry,

stee

l in

dust

ries,

and

man

y do

wns

tream

ind

ustri

es.

The

deve

lopm

ent

of M

ap T

a Ph

ut E

stat

e w

as

plan

ned

into

two

stag

es.

The

Firs

t Sta

ge w

as to

dev

elop

an

area

of 1

,220

ra

i (1

95 h

ecta

re)

for

serv

ing

the

basi

c in

dust

rial,

fact

ory,

com

plet

ed i

n 19

87.

The

des

ign

wor

ks i

n th

e Fi

rst

Stag

e de

velo

pmen

t in

clud

ed a

ll in

fras

truct

ure

such

as

road

way

s, w

ater

sup

ply

and

trans

mis

sion

sys

tem

, dr

aina

ge, h

igh

tens

ion

trans

mis

sion

line

s, su

bsta

tions

, im

prov

emen

t of t

he

river

s an

d st

ream

s in

the

vici

nity

are

a, e

tc.

This

was

com

plet

ed in

199

2.

Sout

heas

t A

sia

Tech

nolo

gy C

o.,

Ltd.

(SE

ATE

C)

in a

ssoc

iatio

n w

ith a

Ja

pane

se a

nd o

ther

two

loca

l con

sulti

ng e

ngin

eerin

g fir

ms

wer

e ap

poin

ted

by IE

AT

to u

nder

take

the

desi

gn a

nd c

onst

ruct

ion

supe

rvis

ion

of th

e Fi

rst

Stag

e an

d Se

cond

Sta

ge D

evel

opm

ent

of t

he M

ap T

a Ph

ut I

ndus

trial

C

ompl

ex

and

Urb

an

Are

a,

incl

udin

g en

viro

nmen

tal

stud

ies

and

inve

stig

atio

n, p

repa

ring

land

use

pla

n an

d si

te l

ayou

ts,

cond

uct

field

in

vest

igat

ion,

en

viro

nmen

tal

impa

ct

asse

ssm

ent,

and

adm

inis

tratio

n bu

ildin

g, c

usto

m h

ouse

, can

teen

and

exh

ibiti

on b

uild

ing,

sta

ff r

esid

ence

, w

areh

ouse

, sta

ndar

d fa

ctor

ies,

cont

rol b

uild

ings

and

bas

ic in

fras

truct

ure.

Page 12: Project : Consultancy Services for Design, Project ...seatecgroup.com/images/SEATEC download/Industries.pdf · main consultant) to provide the technical advice, detailed design and

281

Soi P

anit

Ana

n 7,

Prid

i Ban

omyo

ng 4

2, S

ukhu

mvi

t 71,

Ban

gkok

101

10, T

haila

nd

Tel:

(662

) 713

388

8; F

ax:

(662

) 713

388

9 E-

mai

l: dy

nam

ic3@

ksc.

th.c

om;

seat

ec@

seat

ecgr

oup.

com

; Hom

epag

e: w

ww

.seat

ecgr

oup.

com

C

lient

/Ow

ner :

T

he In

dust

rial

Est

ate

Aut

hori

ty o

f Tha

iland

(IE

AT

).

L

ocat

ion

: C

honb

uri P

rovi

nce,

Tha

iland

Pr

ojec

t Cos

t :

US$

20

mill

ion

Des

crip

tion

: Th

e Ea

ster

n Se

aboa

rd D

evel

opm

ent P

lan

(ESD

P), i

nitia

ted

in 1

981,

was

de

sign

ed t

o de

cent

raliz

e de

velo

pmen

t ac

tiviti

es f

rom

Ban

gkok

and

to

build

the

coun

try’s

new

eco

nom

ic b

ase

capa

ble

of v

ying

eff

ectiv

ely

with

th

e w

orld

mar

ket.

Map

Ta

Phut

Indu

stria

l Est

ate

Dev

elop

men

t was

par

t of

ESD

P. T

he In

dust

rial E

stat

e A

utho

rity

of T

haila

nd d

evel

oped

Map

Ta

Phut

Indu

stria

l Est

ate

and

Urb

an A

rea

in tw

o st

ages

ove

r an

area

of 3

,200

ha

in R

ayon

g pr

ovin

ce.

The

sout

hern

blo

ck o

f the

Est

ate

was

dev

elop

ed

for

heav

y in

dust

ries,

e.g.

up

and

dow

n-st

ream

hyd

roca

rbon

and

ste

el

indu

strie

s. T

he n

orth

ern

bloc

k w

as d

evel

oped

as a

n ur

ban

area

to su

ppor

t th

e in

dust

rial d

evel

opm

ent.

Pha

se I

and

pha

se I

I w

ere

impl

emen

ted

in

1987

and

199

2, r

espe

ctiv

ely.

The

dev

elop

men

t pl

anni

ng w

as d

one

for

Phas

e II

I an

d IV

and

for

New

Are

a un

der

this

pro

ject

. Th

e ch

angi

ng

urba

n sc

enar

io a

nd ri

sing

dem

and

for i

nclu

sion

of m

ore

land

, ini

tiate

d th

e la

nd a

ppro

pria

tion

know

n as

New

Are

a. A

com

preh

ensi

ve M

aste

r Pl

an

for

deve

lopm

ent

of:

tota

l 18

5 ha

of

land

in

Phas

e II

I fo

r he

avy

Petro

chem

ical

ind

ustri

es;

325

ha o

f la

nd i

n Ph

ase

IV f

or h

igh-

tech

, el

ectri

cal

and

light

in

dust

ries

and

for

conv

entio

n/ex

hibi

tion

area

, bu

sine

ss p

ark

and

rese

arch

and

dev

elop

men

t cen

ters

; and

122

1 ha

in N

ew

Are

a fo

r up

-stre

am,

mid

-stre

am

and

dow

n-st

ream

pe

troch

emic

al

indu

strie

s, bu

ffer

and

supp

ortin

g in

dust

ries,

was

pre

pare

d.

Page 13: Project : Consultancy Services for Design, Project ...seatecgroup.com/images/SEATEC download/Industries.pdf · main consultant) to provide the technical advice, detailed design and

281

Soi P

anit

Ana

n 7,

Prid

i Ban

omyo

ng 4

2, S

ukhu

mvi

t 71,

Ban

gkok

101

10, T

haila

nd

Tel:

(662

) 713

388

8; F

ax:

(662

) 713

388

9 E-

mai

l: dy

nam

ic3@

ksc.

th.c

om;

seat

ec@

seat

ecgr

oup.

com

; Hom

epag

e: w

ww

.seat

ecgr

oup.

com

Clie

nt/O

wne

r :

Ray

ong

Indu

stri

al L

and

Co.

, Ltd

.

Loc

atio

n :

Ray

ong

Prov

ince

, Tha

iland

Pr

ojec

t Cos

t :

App

rox.

US$

22

mill

ion

Des

crip

tion

: R

ayon

g In

dust

rial L

and

Co.

, Ltd

. was

a s

ubsi

diar

y of

Sia

m C

emen

t Co.

, Lt

d. w

ishe

d to

dev

elop

an

indu

stria

l est

ate

to s

erve

the

fact

orie

s of

Sia

m

Cem

ent G

roup

and

oth

ers

in th

e ar

ea o

f 3,0

00 ra

is in

Baa

n K

hai D

istri

ct,

Ray

ong

Prov

ince

. Sou

thea

st A

sia

Tech

nolo

gy C

o., L

td. (

SEA

TEC

) w

as

appo

inte

d by

Ray

ong

Indu

stria

l Lan

d C

o., L

td. t

o un

derta

ke th

e su

rvey

, de

sign

, su

perv

isio

n of

con

stru

ctio

n w

orks

and

env

ironm

enta

l im

pact

st

udy.

Sco

pe o

f wor

ks w

ere

as fo

llow

s:

1.

To

pogr

aphi

c Su

rvey

2.

B

ound

ary

Line

3.

A

dmin

istra

tion

and

Off

ice

Bui

ldin

g 4.

R

oad

leng

th 9

.7 k

m. a

nd d

rain

age

syst

em

5.

Wat

er tr

eatm

ent a

nd w

ater

supp

ly sy

stem

s 6.

R

eser

voir

for c

apac

ity o

f 120

,000

m3

7.

Ret

entio

n Po

nd fo

r cap

acity

of 1

20,0

00 m

3 8.

El

ectri

cal S

yste

m

9.

Sew

age

treat

men

t sys

tem

10

. Was

te w

ater

trea

tmen

t pla

nt

11. E

nviro

nmen

tal I

mpa

ct A

sses

smen

t Stu

dy

Page 14: Project : Consultancy Services for Design, Project ...seatecgroup.com/images/SEATEC download/Industries.pdf · main consultant) to provide the technical advice, detailed design and

281

Soi P

anit

Ana

n 7,

Prid

i Ban

omyo

ng 4

2, S

ukhu

mvi

t 71,

Ban

gkok

101

10, T

haila

nd

Tel:

(662

) 713

388

8; F

ax:

(662

) 713

388

9 E-

mai

l: dy

nam

ic3@

ksc.

th.c

om;

seat

ec@

seat

ecgr

oup.

com

; Hom

epag

e: w

ww

.seat

ecgr

oup.

com

C

lient

/Ow

ner

: T

haik

oei I

nter

natio

nal C

o., L

td.

Loc

atio

n :

Jiad

ing

Dist

rict

, Sha

ngha

i, C

hina

Pr

ojec

t Cos

t :

US$

1,4

31.6

mill

ion

Des

crip

tion

: Th

e In

dust

rial

Esta

te w

as d

evel

oped

on

a 30

sq.

km. p

arte

d of

lan

d in

Ji

adin

g di

stric

t 32

km

. Aw

ay f

rom

Sha

ngha

i. I

t w

as d

evel

oped

by

a jo

int

vent

ure

com

pany

AM

ATA

con

sist

ing

of B

angp

akon

g In

dust

rial

Park

& C

o., L

td.,

CP

grou

p of

Tha

iland

and

a lo

cal p

artn

er.

This

Est

ate

was

dev

elop

ed o

n th

e na

tiona

l sca

le a

nd m

et th

e an

ticip

ated

dem

ands

in

basi

c in

fras

truct

ure

and

indu

stria

l pr

oduc

tion

from

di

rect

fo

reig

n in

vest

men

t in

Shan

ghai

reg

ion.

Th

e pr

ojec

t was

to b

e de

velo

ped

in 5

ph

ases

ove

r a

perio

d of

15

year

s w

ith a

tot

al c

ost

of U

S$ 1

,431

.6

mill

ion.

Thai

koei

In

tern

atio

nal

Co.

, Lt

d.

was

en

truste

d to

un

derta

ke

the

Feas

ibili

ty S

tudy

of

the

proj

ect.

Tha

ikoe

i In

tern

atio

nal

Co.

, Lt

d.

appo

inte

d So

uthe

ast

Asia

Tec

hnol

ogy

Co.

, Ltd

. (SE

ATE

C)

to p

erfo

rm

the

feas

ibili

ty o

f th

is im

porta

nt p

roje

ct.

(199

4-19

95).

The

serv

ices

in

clud

ed:

1.

Stud

y of

pas

t an

d pr

esen

t sit

uatio

n of

ind

ustri

al d

evel

opm

ent

in

Shan

ghai

; pre

cast

of fu

ture

indu

stria

l dem

and.

2.

A

naly

sis o

f the

pro

ject

site

. 3.

Se

tting

of d

evel

opm

ent f

ram

ewor

k.

4.

Form

ulat

ion

of d

evel

opm

ent p

lan.

5.

Ph

ysic

al p

lan

form

ulat

ion

phas

e w

ise.

6.

Envi

ronm

enta

l con

sider

atio

ns.

7.

Impl

emen

tatio

n sc

hedu

le.

8.

Cos

t esti

mat

e, re

venu

e es

timat

e an

d fin

anci

al a

naly

sis

Page 15: Project : Consultancy Services for Design, Project ...seatecgroup.com/images/SEATEC download/Industries.pdf · main consultant) to provide the technical advice, detailed design and

281

Soi P

anit

Ana

n 7,

Prid

i Ban

omyo

ng 4

2, S

ukhu

mvi

t 71,

Ban

gkok

101

10, T

haila

nd

Tel:

(662

) 713

388

8; F

ax:

(662

) 713

388

9 E-

mai

l: dy

nam

ic3@

ksc.

th.c

om;

seat

ec@

seat

ecgr

oup.

com

; Hom

epag

e: w

ww

.seat

ecgr

oup.

com

Clie

nt/O

wne

r :

The

Indu

stri

al E

stat

e A

utho

rity

of T

haila

nd (I

EA

T)

L

ocat

ion

:

Cho

nbur

i Pro

vinc

e, T

haila

nd

Proj

ect C

ost

: U

S$ 1

04 m

illio

n D

escr

iptio

n :

The

Indu

stria

l Est

ate

Aut

horit

y of

Tha

iland

(IEA

T) h

ad a

pla

n to

dev

elop

th

e La

em C

haba

ng I

ndus

trial

Com

plex

, whi

ch is

a p

roje

ct in

the

east

ern

seab

oard

dev

elop

men

t pro

gram

me,

ove

r an

are

a of

abo

ut 5

44 h

ecta

re f

or

full

deve

lopm

ent

adjo

inin

g th

e ar

ea o

f La

em C

haba

ng P

ort

in S

rirac

ha

Dis

trict

, Cho

nbur

i Pro

vinc

e.

The

Indu

stria

l com

plex

con

sist

s of

Gen

eral

In

dust

rial

Esta

te (

GIE

), Ex

port

Proc

essi

ng Z

one

(EPZ

), bu

sine

ss a

nd

com

mer

cial

are

as.

In a

dditi

on, a

n ar

ea o

f ab

out 9

28 h

ecta

re a

djac

ent t

o th

e In

dust

rial C

ompl

ex h

as a

lso

been

pre

pare

d fo

r de

velo

pmen

t of

a ne

w

tow

n. S

outh

east

Asi

a Te

chno

logy

Co.

, Ltd

. (SE

ATE

C) i

n as

soci

atio

n w

ith

two

Japa

nese

and

oth

er f

our

loca

l en

gine

erin

g co

nsul

ting

firm

s w

ere

appo

inte

d by

the

IEA

T to

con

duct

the

det

aile

d de

sign

and

con

stru

ctio

n su

perv

isio

n of

the

proj

ect,

whi

ch in

clud

ed p

repa

ring

land

use

pla

n an

d si

te

layo

uts,

cond

uct f

ield

inve

stig

atio

n, e

nviro

nmen

tal i

mpa

ct a

sses

smen

t, an

d ad

min

istra

tion

build

ing,

cus

tom

hou

se,

cant

een

and

exhi

bitio

n bu

ildin

g,

staf

f re

side

nce,

war

ehou

se, s

tand

ard

fact

orie

s, co

ntro

l bui

ldin

gs (

tota

l 60

build

ings

) and

bas

ic in

fras

truct

ure.

Page 16: Project : Consultancy Services for Design, Project ...seatecgroup.com/images/SEATEC download/Industries.pdf · main consultant) to provide the technical advice, detailed design and

281

Soi P

anit

Ana

n 7,

Prid

i Ban

omyo

ng 4

2, S

ukhu

mvi

t 71,

Ban

gkok

101

10, T

haila

nd

Tel:

(662

) 713

388

8; F

ax:

(662

) 713

388

9 E-

mai

l: dy

nam

ic3@

ksc.

th.c

om;

seat

ec@

seat

ecgr

oup.

com

; Hom

epag

e: w

ww

.seat

ecgr

oup.

com

C

lient

/Ow

ner

: B

oonr

awd

Asia

Co.,

Ltd

. L

ocat

ion

: K

hon

Kae

n Pr

ovin

ce, T

haila

nd

Proj

ect C

ost

: -

Des

crip

tion

: SE

ATE

C w

as r

ende

r th

e en

gine

erin

g co

nsul

ting

serv

ices

to

Boo

nraw

d A

sia C

o., L

td. f

or B

.B. I

ndus

trial

Par

k Pr

ojec

t in

the

area

of 1

,028

rais

at

Kho

n K

aen

Prov

ince

on

deta

iled

engi

neer

ing

desig

n an

d stu

dy o

n th

e En

viro

nmen

tal

Impa

ct A

sses

smen

t. (1

996-

1997

) Th

e Sc

ope

of w

ork

incl

uded

: 1.

M

aste

r Pla

nnin

g, T

opog

raph

ic su

rvey

2.

B

uild

ings

: 60

units

com

mer

cial

bui

ldin

gs, 5

0 un

its m

ini-f

acto

ries a

nd

offic

e bu

ildin

gs

3.

Roa

d W

ork

and

Dra

inag

e Sy

stem

; Mai

n ro

ad o

f 2,

460

met

ers

long

an

d Fe

eder

road

of 2

,739

met

ers l

ong.

4.

W

aste

C

olle

ctio

n an

d Tr

eatm

ent

Syste

m.

Exte

nded

A

erat

ion

Act

ivat

ed S

ludg

e ca

paci

ty o

f 6,

000

m3 /d

ay. S

olid

Was

te D

ispos

al,

Inci

nera

tor o

f 500

kg/

hr. 2

uni

ts. S

anita

ry L

andf

ill.

5.

Elec

trica

l Sys

tem

of 1

15 K

V/3

80 V

olt (

3 ph

ase)

and

Sub

statio

ns

6.

Fire

Pro

tect

ion

Syste

m.

7.

Tele

com

mun

icat

ion

Syste

m.

The

EIA

stud

y in

clud

ed:

a.

Esta

blis

hmen

t of a

n in

form

atio

n ba

se p

lann

ing

b.

Def

initi

on a

nd c

hara

cter

izat

ion

of in

dust

rial p

ollu

tion

cont

rol

c.

Soci

oeco

nom

ic a

naly

sis

d.

Envi

ronm

enta

l gui

delin

es fo

r fut

ure

indu

stria

l dev

elop

men

t e.

Fo

rmul

atio

n of

the

Act

ion

Plan

.


Recommended