Project Cost Redistribution (PCR) Pablo Valin CITS/PCR Coordinator Professional Services Office
Transcript
Page 1: Project Cost Redistribution (PCR) Pablo Valin CITS/PCR Coordinator Professional Services Office (305) 470-5285.

Project Cost Redistribution(PCR)

Pablo Valin

CITS/PCR Coordinator

Professional Services Office

(305) 470-5285

Page 2: Project Cost Redistribution (PCR) Pablo Valin CITS/PCR Coordinator Professional Services Office (305) 470-5285.

The project cost initiative involves the improvement of project cost reporting by capturing detailed project information for the purpose of providing better data for decisions, managing resources and forecasting at the project and program levels. It is mandated by Tallahassee.

INTRODUCTION

Page 3: Project Cost Redistribution (PCR) Pablo Valin CITS/PCR Coordinator Professional Services Office (305) 470-5285.

Project Cost Redistribution (PCR) files are required on phase 22, 32, 62 & 72 Professional Services District Wide and General Engineering contracts.

Files MUST be successfully submitted by the Consultant BEFORE the Department’s Project Manager will approve the invoice.

REQUIREMENTS

Page 4: Project Cost Redistribution (PCR) Pablo Valin CITS/PCR Coordinator Professional Services Office (305) 470-5285.

Method of Compensation (MOC)

PCR requirements can be found in section 3.1 of the MOC, noted in the footer of the MOC and flagged in CITS.

Page 5: Project Cost Redistribution (PCR) Pablo Valin CITS/PCR Coordinator Professional Services Office (305) 470-5285.

PROJECT COSTING INITIATIVE

http

://w

ww

.dot

.sta

te.f

l.us/

proc

urem

ent/

Inde

x.sh

tm

Page 6: Project Cost Redistribution (PCR) Pablo Valin CITS/PCR Coordinator Professional Services Office (305) 470-5285.

EXCEL SPREADSHEET

http

://w

ww

.dot

.sta

te.f

l.us/

proc

urem

ent/

Pro

ject

Cos

tingI

nitia

tive.

shtm

Page 7: Project Cost Redistribution (PCR) Pablo Valin CITS/PCR Coordinator Professional Services Office (305) 470-5285.

• Enter ‘From Project Id’. Do not enter spaces or dashes, spreadsheet will format automatically with dashes when you move to another field!

• Number should be a valid FM # which is included in the contract in CITS. To view all Valid ‘From Project IDs’ Log into CITS, go to your contract, and select projects.

Page 8: Project Cost Redistribution (PCR) Pablo Valin CITS/PCR Coordinator Professional Services Office (305) 470-5285.

• Enter valid ‘To Project Id’ (This number must be provided to you by your FDOT Project Manager.)

• Do not enter spaces/dashes, spreadsheet automatically formats with dashes after you move to the next field!

‘From Project id’ is

formatted automatically.

Page 9: Project Cost Redistribution (PCR) Pablo Valin CITS/PCR Coordinator Professional Services Office (305) 470-5285.

• Close the file and you are now ready to send an email to [email protected] sure to attach this file.

• NOTE: If your signature block contains a logo that is an image file, be sure to delete this as the system will assume you have submitted two attachments, thus making an invalid transfer.

Page 10: Project Cost Redistribution (PCR) Pablo Valin CITS/PCR Coordinator Professional Services Office (305) 470-5285.

To email id

[email protected]

s

Subject LineFDOT PCR FILE

C8443584Attachment

C8443584.txt (7

kb)

Send email. If there are any errors, you will receive a response back from ‘[email protected]’ with an error description.

Page 11: Project Cost Redistribution (PCR) Pablo Valin CITS/PCR Coordinator Professional Services Office (305) 470-5285.

DO’s• E-mail PCR files to [email protected] • Submit the PCR file concurrently with every Invoice.• Submit only one attachment per e-mail. (PCR files

may include multiple projects redistribution).• Copy your Project Manager for their review of project

number redistribution. Department Project Managers have been instructed NOT to approve invoices without a successful PCR file.

• Always ask your Project Manager for the “To Project Id” information.

• Be proactive and download the latest “Missing or Failed PCR Report” from our website.

Page 12: Project Cost Redistribution (PCR) Pablo Valin CITS/PCR Coordinator Professional Services Office (305) 470-5285.

DON’Ts• Do not assume that your “To Project Id” is the

District Wide Project Id. Always ask your Project Manager for this information.

• Do not enter spaces/dashes while entering information in the Spreadsheet. The Spreadsheet will automatically format it.

• Do not include spaces between end of file name attachment and “.TXT” extension.

• Do not leave any blank rows before creating the file in the Spreadsheet.

• Do not include any images within e-mail body (including any graphical logos in your e-mail signature).

Page 13: Project Cost Redistribution (PCR) Pablo Valin CITS/PCR Coordinator Professional Services Office (305) 470-5285.

MISSING/FAILED FILES REPORT

http

://w

ww

.dot

.sta

te.f

l.us/

proc

urem

ent/

Pro

ject

Cos

tingI

nitia

tive.

shtm

Page 14: Project Cost Redistribution (PCR) Pablo Valin CITS/PCR Coordinator Professional Services Office (305) 470-5285.

MISSING/FAILED FILES REPORT

Download the latest “Missing or Failed PCR Files Report (updated once/twice a week).

Page 15: Project Cost Redistribution (PCR) Pablo Valin CITS/PCR Coordinator Professional Services Office (305) 470-5285.

Save the file first on your computer. DO NOT attempt to open it (will not open).

MISSING/FAILED FILES REPORT

Page 16: Project Cost Redistribution (PCR) Pablo Valin CITS/PCR Coordinator Professional Services Office (305) 470-5285.

MISSING/FAILED FILES REPORT

Excel file will open displaying all PCR files that are missing or failed on contracts where the invoice has been submitted.

Page 17: Project Cost Redistribution (PCR) Pablo Valin CITS/PCR Coordinator Professional Services Office (305) 470-5285.

If you would like to review the status of your PCR file BEFORE you submit your invoice, please log in to CITS, click on the contract of interest, click on ‘Invoices’, then click ‘View all Invoices’, the last column you should see in the table is titled ‘Distribution Status’. After you submit a Distribution file, you can periodically check this column to see the status of your submittal.

ADDITIONAL INFORMATION

Page 18: Project Cost Redistribution (PCR) Pablo Valin CITS/PCR Coordinator Professional Services Office (305) 470-5285.

ADDITIONAL INFORMATION

Distribution Status

Page 19: Project Cost Redistribution (PCR) Pablo Valin CITS/PCR Coordinator Professional Services Office (305) 470-5285.

DISTRIBUTION STATUS

QUESTION: What does this status mean?

Page 20: Project Cost Redistribution (PCR) Pablo Valin CITS/PCR Coordinator Professional Services Office (305) 470-5285.

PCR COORDINATORS BY DISTRICT

Page 21: Project Cost Redistribution (PCR) Pablo Valin CITS/PCR Coordinator Professional Services Office (305) 470-5285.

Presentation available at: ftp://ftp.dot.state.fl.us/lts/d6/

Located under:

Professional Services

PCR Presentation


Recommended