Chapter 5 ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED DEVELOPMENT OF KUANTAN MARITIME HUB AT MUKIM SUNGAI KARANG, KUANTAN, PAHANG DARUL MAKMUR Chemsain Konsultant Sdn Bhd CK/EV703/7021/16 EIA C5-1 Revision No.: 1 Revision Date: Nov 2017 Project Description 5.1 Project Concept MEB intends to reclaim the proposed Project site and develop a maritime hub in Kuantan. The proposed KMH is planned for a much bigger shipyard and fabrication yard with associated maritime industrial park as well as institution, business and residential parks to support and be self-sufficient where necessary. The proposed KMH will also have a dedicated navigation channel to access to the proposed shipyard and fabrication yard. The proposed development components are as presented in Table 5.1.1. Development planning for Phases 2 and 3 will only be determined by future market requirement and tentatively it is earmarked for industrial parks. Table 5.1.1: Breakdown of Project Development Development Phase (refer Figure 1.3.1) Type of Development Approximate Acreage (acre) Phase 1 Shipyard 120 Fabrication Yard 200 Training Institution 30 Maritime Industrial Park 100 Business and Residential Park 50 Total for Phase 1 500 Phase 2 Future Development (Industrial Park) 365 Phase 3 Future Development (Industrial Park) 115 Total for 3 phases 980 5.2 Project Layout and Components The details on proposed Project layout for Phase 1 development which covers an area of 500 acres with the list of components are presented as Figure 5.2.1, Figure 5.2.2, Figure 5.2.3 and Figure 5.2.4. The proposed dedicated navigation channel is shown on Figure 5.2.5. Chapter 5
Transcript
Page 1: Project Description · Chemsain Konsultant Sdn Bhd CK/EV703/7021/16 EIA C5-1 Revision No.: 1 Revision Date: Nov 2017 Project Description 5.1 Project Concept MEB intends to reclaim

Chapter 5

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED DEVELOPMENT OF KUANTAN MARITIME HUB AT MUKIM SUNGAI KARANG, KUANTAN, PAHANG DARUL MAKMUR

Chemsain Konsultant Sdn Bhd CK/EV703/7021/16 EIA

C5-1 Revision No.: 1

Revision Date: Nov 2017

Project Description

5.1 Project Concept

MEB intends to reclaim the proposed Project site and develop a maritime hub in Kuantan. The

proposed KMH is planned for a much bigger shipyard and fabrication yard with associated maritime

industrial park as well as institution, business and residential parks to support and be self-sufficient

where necessary. The proposed KMH will also have a dedicated navigation channel to access to the

proposed shipyard and fabrication yard. The proposed development components are as presented in

Table 5.1.1. Development planning for Phases 2 and 3 will only be determined by future market

requirement and tentatively it is earmarked for industrial parks.

Table 5.1.1: Breakdown of Project Development

Development Phase (refer Figure 1.3.1)

Type of Development Approximate Acreage (acre)

Phase 1 Shipyard 120

Fabrication Yard 200

Training Institution 30

Maritime Industrial Park 100

Business and Residential Park 50

Total for Phase 1 500

Phase 2 Future Development (Industrial Park) 365

Phase 3 Future Development (Industrial Park) 115

Total for 3 phases 980

5.2 Project Layout and Components

The details on proposed Project layout for Phase 1 development which covers an area of 500 acres

with the list of components are presented as Figure 5.2.1, Figure 5.2.2, Figure 5.2.3 and Figure

5.2.4. The proposed dedicated navigation channel is shown on Figure 5.2.5.

Chapter

5

Page 2: Project Description · Chemsain Konsultant Sdn Bhd CK/EV703/7021/16 EIA C5-1 Revision No.: 1 Revision Date: Nov 2017 Project Description 5.1 Project Concept MEB intends to reclaim

#1

#3

#2

#1

#3

#2

#4

#5

FUTU

RE

DEC

OM

MISSIO

NIN

G

AR

EA

EXTEN

SION

15

17

14

22

1414

16

19

18

20

25

4

26

1

2

5

10

11

12

28

13

13

13

23

3

6

8

13

9

7

13

33

34

33

36

35

24

37

38

4041

39 30

27

21 29

31

32

33

CHEMSAIN KONSULTANT SDN. BHD.

OVERALL PROJECT

LAYOUT

FUTURE

AREA

FUTURE

AREA

SHIPYARD

FABRICATION

YARD

TECHNICAL TRAINING INSTITUTE /

MARITIME INDUSTRIAL PARK /

BUSINESS & RESIDENTIAL PARK

SHIPYARD

FABRICATION YARD

MARITIME INDUSTRIAL PARK

ROAD

JUNCTION

2

ROAD

JUNCTION

3

DISCHARGE

POINT 3

ROAD

JUNCTION

1

DISCHARGE

POINT 2

DISCHARGE

POINT 1

Page 3: Project Description · Chemsain Konsultant Sdn Bhd CK/EV703/7021/16 EIA C5-1 Revision No.: 1 Revision Date: Nov 2017 Project Description 5.1 Project Concept MEB intends to reclaim

#1

#3

#2

#1

#3

#2

#4

#5

FUTU

RE

DE

CO

MM

ISS

ION

ING

AR

EA

EXTEN

SION

15

17

14

22

1414

16

19

18

20

25

4

26

1

2

5

10

11

12

28

13

13

13

23

3

6

8

13

9

7

13

33

34

33

36

35

24

37

38

4041

39 30

27

21 29

31

32

33

CHEMSAIN KONSULTANT SDN. BHD.

LEGEND:

SHIPYARD

SHIPYARD

DISCHARGE

POINT 1

SHIPYARD

Page 4: Project Description · Chemsain Konsultant Sdn Bhd CK/EV703/7021/16 EIA C5-1 Revision No.: 1 Revision Date: Nov 2017 Project Description 5.1 Project Concept MEB intends to reclaim

DE

CO

MM

ISS

ION

ING

AR

EA

1

2

33

33

24

4041

39

CHEMSAIN KONSULTANT SDN. BHD.

FABRICATION

YARD

FABRICATION YARD

LEGEND:

ROAD

JUNCTION

1

FABRICATION YARD

Page 5: Project Description · Chemsain Konsultant Sdn Bhd CK/EV703/7021/16 EIA C5-1 Revision No.: 1 Revision Date: Nov 2017 Project Description 5.1 Project Concept MEB intends to reclaim

CHEMSAIN KONSULTANT SDN. BHD.

MIXED

DEVELOPMENT AND

INDUSTRIAL PARK

MARITIME INDUSTRIAL PARK

ROAD

JUNCTION

2

ROAD

JUNCTION

3

DISCHARGE

POINT 3

LEGEND:

DISCHARGE

POINT 2

Page 6: Project Description · Chemsain Konsultant Sdn Bhd CK/EV703/7021/16 EIA C5-1 Revision No.: 1 Revision Date: Nov 2017 Project Description 5.1 Project Concept MEB intends to reclaim

Chapter 5

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED DEVELOPMENT OF KUANTAN MARITIME HUB AT MUKIM SUNGAI KARANG, KUANTAN, PAHANG DARUL MAKMUR

Chemsain Konsultant Sdn Bhd CK/EV703/7021/16 EIA

C5-2 Revision No.: 1

Revision Date: Nov 2017

Figure 5.2.5: Proposed Navigation Channel

The main Project components that are associated with activities of potential environmental concerns

are listed in Table 5.2.1.

Table 5.2.1: Main Project Components Proposed Under Phase 1 Development Planning

Type of Development Main Components

Shipyard Workshops

Blasting Plant

Painting Plant

Dry Dock

Chemical Storage

Gas Tank Storage

Waste Storage

Sewage Treatment Plant

Fabrication Yard Workshops

Blasting Plant

Painting Plant

Chemical Storage

Gas Tank Storage

Waste Storage


Recommended