1
PROJECT DESCRIPTION FOR SCOPING LRT Line 6-A and Line-6B+C Project
PROJECT DESCRIPTION FOR SCOPING
1 Basic Project Information / Project Profile
Name of Project LRT Line-6 A and Line-6 B+C
Project Location Parañaque, Las Piñas and Muntinlupa Cities in Metro Manila and Bacoor and Dasmariñas Cities in Cavite Province
Nature of Project
New elevated railway system
The proposed LRT Line-6A and Line-6B+C is an Unsolicited Proposal for Public-Private Partnership (PPP) submitted to the Philippine Government through the Department of Transportation (DOTr) on 13 January 2017 (Annex 1). In a letter dated 23 July 2018, DOTr required Prime Asset Ventures, Inc. (PAVI) to submit an ECC among other requirements to expedite the National Economic Development Authority (NEDA) evaluation and approval of the project (Annex 2).
Project Size LRT Line-6A: commencing from Niog Station in Bacoor City to Governors Station in Dasmariñas City with 8 stations and approximate route length of 23.5 km. Alignment will traverse segments of Molino Boulevard, privately-controlled properties and segments of Molino-Paliparan Road
LRT Line-6B: commencing from NAIA Terminal 1/Terminal 2 Station until San Nicolas Station in Bacoor City with 10 stations and approximate route length of 16 km. Alignment will traverse segments of Dr. A. Santos Avenue, A. Canaynay Avenue, CAA Road, Marcos Alvarez Ave., M. Alvarez Extension and Alabang-Zapote Road and will pass through privately-controlled properties.
LRT Line-6C: commencing from Sucat Station until Lakefront Station with 6 stations and approximate length of 7.7 km. Alignment will traverse Dr. A. Santos Avenue.
Alabang Zapote LRT Line with four stations and approximate length of 5 km from Marcos Alvarez Station in Las Piñas City to Star Mall Station in Muntinlupa City. Alignment will traverse Alabang-Zapote Road.
Proponent Profile
PAVI is a 100% Filipino owned company that was incorporated on 18 August 2011 as an investment and holdings company with focus on building and development community infrastructure. PAVI and its subsidiaries have invested in various industries including power and water utilities, information technology, and telecommunications. Through the development and management of different types of infrastructure, PAVI aims to ensure that lives in its partner communities are made better and kept constantly connected. PAVI’s Prime Water Infrastructure Corp. has over 30 years industry experience by providing water and sewage management solutions in over 124 cities and municipalities within the 16 regions of the Philippines. Solorex Water Technologies, Inc. has over 25 years industry experience and is engaged in supplying water filtration, sterilization and purification equipment. PAVI also has interests in power systems infrastructure through Kratos Res, Inc., S Power Corporation and Powersource Group, and information and communication through ePrime and Streamtech.
Proponent’s Name
Prime Asset Ventures, Inc.
2
PROJECT DESCRIPTION FOR SCOPING LRT Line 6-A and Line-6B+C Project
Proponent’s Address
UG/F Worldwide Corporate Center
Highway Hills, Shaw Boulevard, Mandaluyong City
Authorized Representative
Tony Tan
Contact Details 02.226.3552 local 1041
EIA Preparer Seastems, Inc.
Room 103 Virata Hall, E. Jacinto Street
University of the Philippines, Diliman, Quezon City
+632.9201706 / [email protected]
2 Project Location and Access
The project will provide mass transportation services connecting Metro Manila and Cavite
Province along the Molino-Paliparan Road and in private lands located to the east of the
Molino Road.
The proposed LRT Line-6A will commence at Niog Station in Barangay Niog 3, Bacoor City and
will traverse south-southwestward along Molino Boulevard. The alignment will then turn east
at Barangay Bayanan and then south at Barangay San Nicolas then west at Barangay Molino
6 passing through privately-controlled properties. From Barangay Molino 2 where the San
Nicolas Station will be located, the LRT Line-6A alignment will head southward along Molino
Road. Just before the Daang Hari Station, the LRT Line-6A alignment will head east-southeast,
passing through privately-controlled properties located in Barangays Molino 3 and Molino 4
of Bacoor City and Barangay Salawag of Dasmariñas City. Daang Hari, Alabang and San Pedro
Stations will be located in these areas. From San Pedro Station, the LRT Line-6 A alignment
will head southwest, then the alignment will follow the alignment of Paliparan Road until its
intersection with Governor’s Drive passing through Barangays Paliparan 1, Paliparan 2 and
Paliparan 3 of Dasmariñas City. The LRT Line-6A will be elevated except for the sections
between Daang Hari and San Pedro Stations within privately controlled properties where the
structure will be on embankment.
LRT Line-6B will commence at the NAIA Terminal 1/Terminal 2 Station which will be a single-
track commuter rail towards NAIA 1 from Sucat Station in Parañaque City. From Sucat Station,
LRT Line-6B will traverse Dr. Arcadio Santos Avenue towards the southeast. From Canaynay
Station along Dr. Arcadio Santos Avenue, the alignment will turn right at Angelina Canaynay
Avenue and head towards the southwest. The alignment will then traverse Angelina Canaynay
Avenue and will turn southwest towards CAA Road. The alignment will then traverse CAA
Road until it intersects Alabang-Zapote Road, after which the alignment will turn southeast
and traverse the Alabang-Zapote Road. The LRT Line-6B alignment will turn southwest at
Marcos Alvarez Avenue and will traverse this road until Marcos Alvarez Extension. The
alignment will then head west, passing through privately-controlled land until it intersects
3
PROJECT DESCRIPTION FOR SCOPING LRT Line 6-A and Line-6B+C Project
LRT Line-6A in the vicinity of Barangay Molino 6, Bacoor City. LRT Line-6B will be an elevated
structure.
The LRT Line-6C will commence from Sucat Station in Barangay San Dionisio, Parañaque City
and will follow the alignment of Dr. A. Santos Avenue towards the southeast, passing through
Barangays San Isidro, San Antonio and BF Homes of Parañaque City. The line will then
terminate at the Lake Front Station in Barangay Sucat, Muntinlupa City along the East Service
Road of the South Luzon Expressway (SLEX). LRT Line-6C will be an elevated structure.
The Alabang-Zapote Line will traverse Alabang-Zapote Road commencing from Marcos
Alvarez Station and will head east until it terminates at the Star Mall Station along the Manila
South Road east of the Alabang Viaduct. It will pass through barangays of Las Piñas and
Muntinlupa cities. The alignment will be on the Alabang-Zapote Road and will be an elevated
structure.
The project location map is presented in Figure 1 while the list of impact barangays is
presented in Table 1. The project alignment will be within the jurisdiction of 12 barangays of
Bacoor City, 4 barangays of Dasmariñas City, 9 barangays of Las Piñas City, 6 barangays of
Parañaque City, 4 barangays of Muntinlupa City and 4 barangays of Pasay City.
Table 1. List of Impact Barangays
Barangays City Barangays City 1. Bayanan Bacoor 19. BF International Las Piñas
2. Ligas 2 Bacoor 20.Manuyo Dos Las Piñas
3. Ligas 3 Bacoor 21.Pamplona Tres Las Piñas 4. San Nicolas 1 Bacoor 22.Pulang Lupa Dos Las Piñas
5. San Nicolas 2 Bacoor 23.Talon Uno Las Piñas
6. San Nicolas 3 Bacoor 24.Talon Dos Las Piñas
7. Molino 1 Bacoor 25.Talon Singko Las Piñas 8. Molino 2 Bacoor 26.Ayala-Alabang Muntinlupa
9. Molino 3 Bacoor 27.Alabang Muntinlupa
10. Molino 4 Bacoor 28.Cupang Muntinlupa 11. Molino 6 Bacoor 29.Sucat Muntinlupa
12. Niog 3 Bacoor 30.BF Homes Parañaque
13. Talaba 4 Bacoor 31.La Huerta Parañaque
14. Paliparan 1 Dasmariñas 32.San Antonio Parañaque 15. Paliparan 2 Dasmariñas 33.San Dionisio Parañaque
16. Paliparan 3 Dasmariñas 34.San Isidro Parañaque
17. Salawag Dasmariñas 35.Sto. Niño Parañaque
18. Almanza Uno Las Piñas
4
PROJECT DESCRIPTION FOR SCOPING LRT Line 6-A and Line-6B+C Project
Figure 1. Location map of LRT Line-6 A and Line-6 B+C (Modified LRT Line 6 FS, August 2018)
3 Project Rationale
The current traffic volume in Metro Manila and adjoining provinces already exceeds the
capacities of existing roads. Public transport accounts for about 69% of the daily traffic
demand while the remaining 31% is provided by private vehicles.
The proposed LRT Line-6A and Line-6 B+C project aims to provide a new public transportation
infrastructure from Metro Manila to Cavite Province to serve the developing areas of
Parañaque, Pasay, Las Piñas and Muntinlupa in Metro Manila and the cities of Bacoor and
Dasmariñas in Cavite Province. Residents from these areas commute to Metro Manila
regularly for work and other business.
The proposed LRT Line-6A and Line-6 B+C aims to extend the LRT Line-1 Extension alignment
from the Niog Station in Bacoor City down to Governor’s Drive in Dasmarinas City along
Molino/Paliparan Roads and adjacent areas.
The main project objectives are to provide a convenient and affordable mass transit system
for Cavite Province and adjacent cities and create business and employment opportunities
for communities and business establishments located within these areas.
5
PROJECT DESCRIPTION FOR SCOPING LRT Line 6-A and Line-6B+C Project
4 Project Details
4.1 Route Alignment and Stations
The project that is the subject of this ECC application aims to consolidate the LRT Line-6 A
(Niog to Governor’s Station with route length of 23.5 km) and LRT Line-6 B+C (NAIA T1/2 to
Bacoor with route length of 15.4 km and Sucat-Alabang Zapote with total length of 12.4 km).
It will consist of the following LRT lines:
1. LRT-6A from Niog Station to Governor’s Drive station (23.5 km)
2. LRT Line-6B with a single-track commuter railway from NAIA Station to Sucat Station
and a double-track elevated railway from Sucat Station to San Nicolas station with the
alignment mostly following the road alignments within Las Piñas City; route length is
15.4 km
3. LRT Line-6C consisting of elevated railway tracks from Sucat Station to Lake Front
Station following the alignment of Dr. A. Santos Avenue with total route length of 7.7
km
4. Alabang-Zapote Line from Marcos Alvarez Station to Star Mall Station following the
alignment of the Alabang-Zapote Road with total route length of 5 km
There will be three common stations between the LRT-6 B+C segments, namely Sucat,
Canaynay and Marcos Alvarez Stations.
LRT Line-6 A will commence from Niog Station in Bacoor City and will end at Governors Station
in Dasmariñas City with a total length of 23.5 km. The alignment from Niog Station to San
Nicolas Station will mostly pass through Molino Boulevard and privately-controlled
properties, after which the alignment will traverse Molino Road and will head southward until
it reaches Daang Hari Station that will be located on private property. The LRT Line-6A will be
an elevated structure from Niog Station to Daang Hari Station. From Daang Hari Station, the
LRT Line-6A alignment will be on embankment, passing through privately-controlled
properties until San Pedro Station. From San Pedro Station, the alignment will head southwest
and emerge at Paliparan Road as an elevated structure and follow the road alignment until
its intersection with Governor’s Drive. The Governor’s Drive Station will be the endpoint of
the LRT Line-6 A for this ECC application but there will be future plans to extend the LRT Line-
6 alignment to Tagaytay City.
The LRT Line-6B will commence from NAIA-T1/T2 in Pasay City and will follow the alignment
of Dr. A. Santos Avenue until Sucat Station in Barangay San Dionisio, Parañaque City. This
segment will consist of an elevated single-track commuter railway. From Sucat Station, the
LRT Line-6B will head southeast along Dr. A. Santos Avenue. From Canaynay Station, the
alignment will head south passing through the alignment of A. Canaynay Avenue, then turn
southeast along CAA Road then Alabang-Zapote Road. The alignment will head southwest
along Marcos Alvarez Avenue and will pass through private properties until it intersects the
LRT Line-6A in the vicinity of Barangay Molino 6, Bacoor City.
6
PROJECT DESCRIPTION FOR SCOPING LRT Line 6-A and Line-6B+C Project
The LRT Line-6C will commence from Sucat Station and will follow the alignment of Dr. A.
Santos Avenue, heading eastward towards Lake Front Station along the East Service Road of
the South Luzon Expressway. This segment will have an elevated structure with six stations
on strategic areas along Dr. A. Santos Avenue.
The Alabang-Zapote Line will commence from Marcos Alvarez Station and will follow the
alignment of Alabang-Zapote Road, heading south-eastward towards Star Mall Station
located along the Manila South Road east of the Alabang Viaduct of the South Luzon
Expressway.
The proposed stations and the barangay location of the stations is tabulated in Table 2. Figure
2 shows the barangay location map of the project alignment. It may be gleaned from Table 3
that there will be three common stations in the LRT Line-6 B+C, namely Sucat, Canaynay and
Marcos Alvarez Stations.
Table 2. Alignment Design Specifications (Modified LRT Line 6 FS, August 2018)
4.2 Route Alignment Design Specifications
The horizontal/vertical alignment design of LRT Line-6 A and Line-6 B+C have the following
basic policies:
• Select a route alignment that will minimize land acquisition issues and impacts along
the route
• Reduce initial investment costs and operation and maintenance costs
• Provide fast, convenient, safe and comfortable riding and services for users
• Increase passenger comfort particularly passenger transfers to other modes,
connectivity to other railway lines, feeder systems, station square, etc.
The major alignment design parameters are presented in Table 2 above.
7
PROJECT DESCRIPTION FOR SCOPING LRT Line 6-A and Line-6B+C Project
Table 3. Barangay Location of LRT Line 6 Stations
Station Barangay City/Municipality Structure Remarks LRT Line-6A
Niog Niog 3 Bacoor Elevated Commercial area on both sides
San Nicolas Molino II Bacoor Elevated Within private property
Daang Hari Molino IV Bacoor Embankment Station on Vista Mall parking lot; SM Molino located across Vista Mall; empty lot across Daang Hari Road
Alabang Molino IV Bacoor Embankment Station within Vista Alabang
San Pedro Salawag Dasmarinas Embankment Station within Vista Alabang
La Salle Salawag Dasmarinas Elevated Station on Molino-Paliparan Road; empty lot nearby
GMA Paliparan III Dasmarinas Elevated Empty lots in vicinity of proposed station Governor’s Drive
Paliparan I Dasmarinas Elevated Station near corner of Paliparan Road and Governor’s Drive; commercial area
LRT Line-6B
NAIA Brgy. 194 Pasay Elevated Commercial area on both sides of Dr. A. Santos Ave.; single track line
Sucat San Dionisio Paranaque Elevated Beside SM Sucat within LRTA property; station on Dr. A. Santos Ave.
Canaynay San Dionisio Paranaque Elevated Commercial area on both sides; station on Dr. A. Santos Ave.; land acquisition at curve section in the vicinity of Liana’s Supermarket
Naga Road Pulang Lupa Dos
Las Pinas Elevated On A. Canaynay Ave.; commercial & residential area
Alabang Zapote Road
Talon Dos Las Pinas Elevated Corner of A. Canaynay & Alabang-Zapote Road; heavily built up area; land acquisition in curve section
Marcos Alvarez
Talon Kwatro
Las Pinas Elevated Corner of Alabang-Zapote Road and Marcos Alvarez Ave. near Lozada Overpass; commercial/ residential area; acquisition of private land for station
Apollo Talon Singko Las Pinas Elevated On Marcos Alvarez Ave.; commercial/ residential area on both sides
Queen’s Row
Talon Singko Las Pinas Elevated On Marcos Alvarez Ave. Extension
LRT Line-6C (Sucat and Canaynay Stations shared with LRT Line-6B) El Grande San Isidro Paranaque Elevated Commercial area on both sides of Dr. A. Santos
Avenue
San Antonio San Antonio Paranaque Elevated Commercial area on both sides of Dr. A. Santos Avenue
St. James San Antonio/ St. James
Paranaque Elevated Commercial area on both sides of Dr. A. Santos Avenue
Lake Front Sucat Muntinlupa Elevated Commercial and residential area along East Service Road of South Luzon Expressway
Alabang-Zapote Line (Marcos Alvarez Station shared with LRT Line-6B)
Town Center Ayala Alabang
Muntinlupa Elevated Commercial area on both sides of Alabang-Zapote Road
Madrigal Alabang Muntinlupa Elevated Commercial and institutional areas on both sides of Alabang-Zapote Road
Star Mall Alabang Muntinlupa Elevated Commercial area on both sides of Manila South Road
8
PROJECT DESCRIPTION FOR SCOPING LRT Line 6-A and Line-6B+C Project
Figure 2. Barangay Location Map of LRT Line 6 (Seastems, 2018)
9
PROJECT DESCRIPTION FOR SCOPING LRT Line 6-A and Line-6B+C Project
4.2.1 LRT Line-6B (Airport-Sucat-Bacoor Line)
Connection with the LRT Line 1 Extension is a key and important issue for the Cavite Line to
provide convenient passenger service, increase patronage and ridership. Two alternative
plans will be studied: (1) construction of Sucat Station close to SM and/or Dr. Santos Station
of LRT Line 1 Extension for passenger transfer; and (2) extend Cavite Line to NAIA and
construct a station to provide transfer service at NAIA Station of LRT Line 1 Extension.
There are some sections of the proposed LRT Line-6 B+C Cavite Line where the carriageway is
anticipated to encroach on private properties due to narrow road width. Road width of major
roads along the alignment of the Cavite Line is provided in Table 4.
Table 4. Road width of major roads (Modified LRT Line 6 FS, August 2018)
Road Name Typical Road Width (m)
Dr. A. Santos Avenue 32-33
Angelina Canaynay Avenue 14-18
Alabang Zapote Road 17-20
Marcos Alvarez Avenue 14
Marcos Alvarez Avenue Extension 11-13
4.2.2 LRT Line-6C (Sucat Line)
The Sucat line will run a straight line above the Dr. A. Santos Avenue that has an approximate
width of 33 m. There is no serious land acquisition issue along this route. However, there are
existing flyover structures of Skyway in the Sucat intersection, thus the Sucat Line will be built
as an underpass structure beneath the Skyway.
4.2.3 Canaynay Station Crossover Track
Canaynay Station will be a transit station between the Cavite Line and Sucat Line with two
platforms and four tracks. The eastbound track of the Sucat Line will crossover the Cavite Line
(at third level) between Canaynay Station and El Grande Station.
4.3 Engineering Design
The project design specifications will be in accordance with international and Philippine
standards and all applicable portions of the following codes and standards: AAASHTO, ACI
318, ASTM, DPWH.
Elevated structures will comply with the latest minimum vertical clearance requirement of
the Department of Public Works and Highways (DPWH). Obstacles limitation surfaces (OLS)
of NAIA as defined by international specifications will also be considered in planning the
elevated structure linking Sucat Station with NAIA Station.
The standard superstructure will be composed of four I-girders with a span length of 30
meters consisting of reinforced concrete slab. The carriageway width will be 9 m. The
substructure and foundation will consist of single column piers with bored pile or rigid frame
10
PROJECT DESCRIPTION FOR SCOPING LRT Line 6-A and Line-6B+C Project
type pier with bored piles. The pier will be a 28 MPa reinforced concrete structure with 18m
long (variable) and 2,500mm diameter bored pile.
The superstructures will be elevated by about 6.5 to 7.2 m from the existing roads.
The minimum radius of curvature will be 100 m and 50 m in some areas to limit land
acquisition. The average train speed will be 30-35 kph while maximum design speed will be
70 kph.
An embankment type will be used in the section between Daang Hari and San Pedro Stations
to reduce construction costs (Modified LRT Line 6 FS, August 2018).
Standard station types will consist of: (1) side platform with two platforms and two tracks; (2)
side platform with two platforms and four tracks; and (3) island platform with one platform
and two tracks. Side platforms (20m x110 m) will be used for all stations except at Apollo and
Queen’s Row Stations where island platform types will be used (13m x 110m). Stations will
be equipped with elevators/escalators, utilities, circulation, lighting, security measures and
auxiliary spaces for ticket sales, passenger information, station administration and
commercial use.
A ballast-less track type will be applied between Sucat Station and Daang Hari Station and
Sucat Line to reduce track maintenance costs. A ballasted track type will be used for other
sections to reduce the initial investment cost.
The major features for track design are provided in Table 5.
Table 5. Track Design Requirements (Modified LRT Line 6 FS, August 2018).
4.4 Depot and Facilities
A depot will be constructed and will consist of the following facilities:
• Parking for trains not currently used for operations
• Maintenance area for car body modifications and replacement of bogies, traction
equipment and other major components
• LRT maintenance building consisting of specialized workshops, components storage
area, maintenance managing offices, worker’s changing area, etc.
• Operation control center and administration building
• Fixed infrastructures maintenance facilities
11
PROJECT DESCRIPTION FOR SCOPING LRT Line 6-A and Line-6B+C Project
About 3 hectares of land will be required for the depot and other facilities. The proposed
depot location will be in the vicinity of San Pedro Station within privately-controlled
properties.
5 Possible Right of Way (ROW) Issues
The Feasibility Study for the LRT Line 6 Project identified the following possible ROW issues
along the project alignment. Possible solutions to ROW issues are provided in the matrix.
Table 6. Possible Right of Way Issues (Modified LRT Line 6 FS, August 2018)
Location Issues Solution and Remarks
Sucat Station Availability of the station square of Line 1 Extension Station
Need to negotiate with LRTA Alternative solution will be to plan the station a little bit north of Line 1 Ext. Station
Corner of Dr. Santos and Canaynay 1km+750m
Land acquisition in the curve section Use R = 50m
Alabang Zapote Station 5km+250m
Land acquisition Road W = 18m In front of jeepney station with stalls
Redevelopment of jeepney station with stalls as station square An alternate solution will be to use the island platform type to reduce width of carriageway (W – 13-15m)
Corner of Canaynay and Alabang Zapote 5km+500m
Land acquisition in a curve section Modify radius of curvature to R = 70-80m
Marcos Alvarez Station along Alabang Zapote 6km+750m
Land acquisition of the station Move the station about 100m to the west or move in front of the parking space of the commercial business and change alignment slightly. An alternate solution will be to use the island platform type to reduce width of carriageway
Marcos Alvarez 7km+000
Land acquisition in a curve section Shift the track center and change the radius of curvature to R=50m Acquire the vacant land and avoid serious relocation issues at the corner
Marcos Alvarez Extension 9km+250m
Land acquisition in a curve section Land acquisition in this curve section is inevitable. Minimize impacts by changing the alignment
Marcos Alvarez Extension 10km+000
Land acquisition in a curve section Modify radius of curvature to R = 50-70m
6 Estimated Project Cost
The estimated project cost is PHP 64.6 B.
7 Project Schedule
The project construction is planned to commence in mid 2019 or as soon as approvals and
permits are secured while operation is planned to commence in mid 2023. Schedules may
change depending on timely acquisition of permits and government approvals. The PAVI
Consortium plans to have an O&M concession service period of 30 years.
12
PROJECT DESCRIPTION FOR SCOPING LRT Line 6-A and Line-6B+C Project
Annex 1. PAVI Letters to DOTr
13
PROJECT DESCRIPTION FOR SCOPING LRT Line 6-A and Line-6B+C Project
14
PROJECT DESCRIPTION FOR SCOPING LRT Line 6-A and Line-6B+C Project
Annex 2. DOTr Letter to PAVI