Project Description: University and Bay / “Four Corners”...The site has featured prominently in...

Date post: 18-Jan-2021
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
4
Core Principles Project Description A significant site in the heart of East Palo Alto, the “Four Corners” site at University and Bay has been vacant for over 30 years. Over the years, community members have consistently lamented, “when will anything ever be built here?” The site has featured prominently in previous planning processes (Ravenswood / Four Corners TOD Specific Plan and the East Palo Alto General Plan), which called for a vibrant, mixed-use “downtown” at this location. In late 2019, Sand Hill Property Company purchased the property. As a property owner and housing provider in East Palo Alto, we have been deeply invested in the city for the past several years, we understand the importance of this site to the communi- ty, and we want to help realize the City’s vision for itself. INITIAL PROPOSAL - MAY 2020 (Subject to change with community input) Project Description: University and Bay / “Four Corners” WHY? WHAT? WHERE? WHEN? * Consistent with the prior planning principles, the General Plan, and community input, we plan to create and catalyze a vibrant, mixed-use “downtown” at University and Bay. At the heart of the plan are a new public “town square” and a central public plaza surrounded by ground-floor retail, restaurants, and community uses, including a new East Palo Alto Library directly across from City Hall. 1. Respect what came before us 2. Create and catalyze a vibrant, mixed use “Main Street” 3. Create places to live and gather 4. Improve mobility and access 5. Create jobs and local revenue 1 of 4 “Statement of Intent” / preliminary pre-application to the City First community meeting / listening session Second community meeting Pre-Application update based on community input Third community meeting Ongoing Community Engagement January 2020 February 2020 April 2020 May 2020 June 2020 Summer 2020 → 2021 and beyond *Additional milestones will be added to the timeline as the project moves forward
Transcript
Page 1: Project Description: University and Bay / “Four Corners”...The site has featured prominently in previous planning processes (Ravenswood / Four Corners TOD Specific Plan and the

Core Principles Project Description

A significant site in the heart of East Palo Alto, the “Four Corners” site at University and Bay has been vacant for over 30 years. Over the years, community members have consistently lamented, “when will anything ever be built here?” The site has featured prominently in previous planning processes (Ravenswood / Four Corners TOD Specific Plan and the East Palo Alto General Plan), which called for a vibrant, mixed-use “downtown” at this location. In late 2019, Sand Hill Property Company purchased the property. As a property owner and housing provider in East Palo Alto, we have been deeply invested in the city for the past several years, we understand the importance of this site to the communi-ty, and we want to help realize the City’s vision for itself.

INITIAL PROPOSAL - MAY 2020(Subject to change with community input)

Project Description:University and Bay / “Four Corners”

WHY?

WHAT?

WHERE? WHEN?*

Consistent with the prior planning principles, the General Plan, and community input, we plan to create and catalyze a vibrant, mixed-use “downtown” at University and Bay. At the heart of the plan are a new public “town square” and a central public plaza surrounded by ground-floor retail, restaurants, and community uses, including a new East Palo Alto Library directly across from City Hall.

1. Respect what came before us

2. Create and catalyze a vibrant, mixed use “Main Street”

3. Create places to live and gather

4. Improve mobility and access

5. Create jobs and local revenue

1 of 4

“Statement of Intent” / preliminarypre-application to the City

First community meeting /listening session

Second community meeting

Pre-Application updatebased on community input

Third community meeting

Ongoing Community Engagement

January 2020

February 2020

April 2020

May 2020

June 2020

Summer 2020 →2021 and beyond

*Additional milestones will be added to the timeline as the projectmoves forward

Page 2: Project Description: University and Bay / “Four Corners”...The site has featured prominently in previous planning processes (Ravenswood / Four Corners TOD Specific Plan and the

Building on these Core Principles, our proposed vibrant, mixed-use “downtown” at University and Bay includes key highlights such as:

• Public space and community amenities that can be enjoyed by all East Palo Alto residents, such as a new town square, central plaza, and community space, such as a new East Palo Alto Library

• Mixed-income housing that can serve a diversity of income levels, from affordable to workforce to market rate

• New mixed-income housing with a “main street” of ground-floor retail along Bay Road, addressing a desire for retail, restaurants, and neighborhood-serving services

• Employment uses, including life-science and laboratory space, which can provide a diversity of employment opportunities for East Palo Alto residents

• A design that is pedestrian-friendly, bike-friendly, and easily and safely accessible by all modes of transportation

• Amenities like public open space and neighborhood amenities within a few blocks of nearby housing, businesses and community institutions

• Buildings that respect their neighbors and the neighborhood through a combination of setbacks, trees and vegetation, and attractive architecture and screening

• Sufficient parking at grade on internal surface streets, in a parking structure, and through one level of underground parking

Project Proposal

INITIAL PROPOSAL - MAY 2020(Subject to change with community input)

Honor and respect the previous engagement processes, planning principles, and the General Plan; recognize and respect local history

Respect what came before usBased on the Ravenswood / Four Corners TOD Specific Plan, the East Palo Alto General Plan, and Community InputCore Principles

Combine a wide range of uses in an inviting and complimentary way, including retail, restaurant, housing, employ-ment, community-serving uses, and public open space; create conditions to support other local businesses to grow and thrive

Create a vibrant, mixed-use "Main Street"

Build a place that can be both a “home” and a “destination;” create mixed-income housing and community gathering place for all of EPA, including a new public “town square”, a public plaza/courtyard, and neighborhood amenities

Create places to live and gather

Create a safe walkable, bikeable, transit-friendly destination that is easy to move through and around, connected to the neighborhood, and improves this “heart” of the city for all East Palo Alto residents to access and enjoy

Improve mobility and access

Create an employment and economic engine that provides opportunities for small business and tax revenue for the City and schools

Create jobs and local revenue

WHAT?

2 of 4

2

1

3

4

8

8

5 56

7

Proposed Site Plan

Structure

Life Science/Laboratory

Life Science/Laboratory with Ground Floor Retail

Residential with Ground Floor

Retail

UN

IVER

SITY A

VEN

UE

BAY ROAD

Residential with Ground Floor Retail

50’

CITY HALL/

EXISTING EPA LIBRARY

1 Public Town Square

2 Public Plaza/Courtyard

3

4 Internal Retail Street

5

6 Bus Stop

7

8

Proposed Program

Community Space

(New EPA Library)

Retail

Residential

Life Science/Laboratory

Off-Street Parking

On-Street Parking

Height*

* All maximum heights are at or below General Plan allowances

Property Line

(New EPA Library)

2

UNIVERSITY AVE. & BAY RD. | PLANNING PRE-APPLICATION PLANS

Page 3: Project Description: University and Bay / “Four Corners”...The site has featured prominently in previous planning processes (Ravenswood / Four Corners TOD Specific Plan and the

INITIAL PROPOSAL - MAY 2020(Subject to change with community input)

3 of 4

2

1

3

4

8

8

5 56

7

Proposed Site Plan

Structure

Life Science/Laboratory

Life Science/Laboratory with Ground Floor Retail

Residential with Ground Floor

RetailU

NIV

ERSITY

AV

ENU

E

BAY ROAD

Residential with Ground Floor Retail

50’

CITY HALL/

EXISTING EPA LIBRARY

1 Public Town Square

2 Public Plaza/Courtyard

3

4 Internal Retail Street

5

6 Bus Stop

7

8

Proposed Program

Community Space

(New EPA Library)

Retail

Residential

Life Science/Laboratory

Off-Street Parking

On-Street Parking

Height*

* All maximum heights are at or below General Plan allowances

Property Line

(New EPA Library)

2

UNIVERSITY AVE. & BAY RD. | PLANNING PRE-APPLICATION PLANS

WHAT?

1. Public Town Square2. Public Plaza/Courtyard3. Local & Small Business Marketplace4. Internal Retail Street5. “Main Street Retail”6. Bus Stop7. Signaled Intersection8. Neighborhood Connector Property Line

Project Proposal

*Maximum heights are at or below General Plan allowances

Size

Community Space (New EPA library)

Retail

Residential

Life Sciences / Laboratory

Off-Street Parking

On-Street Parking

Height*

Approx. 6.1 Acres

20,000 square feet

20,000 square feet

180 units

500,000 square feet

Approx. 1,300 spaces

Approx. 30 spaces

Residential - 7 stories max.

Life Sciences / Laboratory - 8 stories

Page 4: Project Description: University and Bay / “Four Corners”...The site has featured prominently in previous planning processes (Ravenswood / Four Corners TOD Specific Plan and the

“Sta

tem

ent

of In

tent

” /

prel

imin

ary

pre-

appl

icat

ion

to th

e City

Firs

t com

mun

itym

eetin

g /

liste

ning

sess

ion

Seco

ndco

mm

unity

mee

ting

Third

com

mun

itym

eetin

gPr

e-Ap

plic

atio

nup

date

bas

ed o

nco

mm

unity

inpu

t

Janu

ary

2020

Febr

uary

2020

April

2020

May

2020

June

2020

INITIAL PROPOSAL - MAY 2020(Subject to change with community input)

Prop

osed

Tim

elin

e / N

ext S

teps

4 of 4

HOW

?W

HEN

?+

Ongo

ing

Com

mun

ity E

ngag

emen

t•

Regu

lar e

ngag

emen

t with

Eas

t Pal

o re

siden

ts, i

nclu

ding

com

mun

ity m

eetin

gs•

Com

mun

ity U

pdat

es +

Fee

dbac

k (w

ww.

univ

ersit

yand

bay.c

om)

• Pu

blic

Hea

ring

(Pla

nnin

g Co

mm

issio

n, C

ity C

ounc

il)•

Stak

ehol

der M

eetin

gs (n

eigh

borh

ood

and

com

mun

ity g

roup

s)

Mov

ing

forw

ard,

we

inte

nd to

cont

inue

a ro

bust

com

mun

ity e

ngag

emen

t pro

cess

and

wor

k to

deve

lop

this

site

in

fulfi

llmen

t of t

he vi

sion

artic

ulat

ed b

y the

Eas

t Pal

o Al

to co

mm

unity

.

Subm

it fo

rmal

appl

icat

ion

Sum

mer

2020

Late

2020

2021

and

beyo

nd

Ongo

ing

com

mun

ityen

gage

men

t


Recommended