project development 09-03-12
Popular Tags:
3
Labour packages: 1.Construction packages: Jet grounding Timber frame Staircases 2. Services packages archimedes screw water filters Boiler 3.Community Packages: Rammed earth walls rammed earth floors timberal vaulting roofs water system 1A. Jet grounding foundations below ground surface (ommited from next drawings to avoid confusion) 1B. Timber plat- form frames con- structed on top of foundations. 2A. Timber con- struction acts as shuttering sup- port for rammed earth walls built between the tim- ber frame con- struction by the community 3A. building grows as a when the community needs it. they define their own communal space adding roofs us- ing timberal vaulting and ce- ramic bricks and fast setting con- crete. jet grouting timber frame high strength mortar formwork attached rammed earth from timber platform timber construction- rammed earth construction
Transcript
Page 1: project development

Labour packages:

1.Construction packages:

Jet groundingTimber frameStaircases

2. Services packagesarchimedes screw water filters Boiler

3.Community Packages:Rammed earth wallsrammed earth floorstimberal vaulting roofs

water system

1A. Jet grounding foundations below ground surface

(ommited from next drawings to avoid confusion)

1B. Timber plat-form frames con-structed on top of foundations.

2A. Timber con-struction acts as shuttering sup-port for rammed earth walls built between the tim-ber frame con-struction by the community

3A. building grows as a when the community needs it. they define their own communal space adding roofs us-ing timberal vaulting and ce-ramic bricks and fast setting con-crete.

[Academic use only]

jet grouting

timber frame

high strengthmortar

formwork attached

rammed earth from timber platform

timber construction-rammed earth construction

Page 2: project development

[Academic use only]

Black- timber construction by contractororange- rammed earth by communitypink- community additional shelters and covers

[Academic use only]

1:100

1:200

plans and sections in progress

early plan- different construc-tion packages not yet shown

Page 3: project development

1:100

1:200

T+0 Jet grounding

T+1 removing ground

T+2 filling in with rammed earth

T+3 fixing timber columns

T+5 timber platform framing and bracing

1:200 Iso to show sequence of foun-dations and timber structure through two parts of the scheme

natural ground

retaining wall

BUILD SEQUENCE DRAWINGS close up