+ All Categories
Home > Documents > Project: D/O

Project: D/O

Date post: 30-Dec-2015
Category:
Upload: timon-velasquez
View: 21 times
Download: 1 times
Share this document with a friend
Description:
Project: D/O. Background Info. Salmon require a D/O of more than 9 mg/l. 5 mg/l is considered very poor. 3mg/l and the organism suffer greatly. Question. - PowerPoint PPT Presentation
9
Project: D/O
Transcript
Page 1: Project: D/O

Project: D/O

Page 2: Project: D/O

Background Info Salmon require a D/O

of more than 9 mg/l. 5 mg/l is considered very poor. 3mg/l and the organism suffer greatly.

Page 3: Project: D/O

Question Does the river now contain enough oxygen

to hold and sustain salmon when silt and sediment enters the river in high quantities during and after dam removal?

Page 4: Project: D/O

Hypothesis We think that the river’s oxygen will not

support salmon during and after dam removal while silt is in the river.

Page 5: Project: D/O

Procedure 1. Grab materials and quality check.2. Use GPS to find coordinates of test site.3. Use multimeter to find dissolved oxygen

levels. Refer to multimeder protocol.4. Record data. 5. Check and record air temperature and time

done. 6. Repeat for a total of 5 locations with different

amounts of suspended silt.

Page 6: Project: D/O

Data

8.5

9

9.5

10

10.5

11

11.5

D/O

Rockhole

Old campground

new bridge

mouth of river

Isi campground

Page 7: Project: D/O

Conclusion We found that the rivers D/O is high

enough for salmon and was sustainable to hold a population.

However, we didn’t have a proper method of measuring silt and suspended sediment, so our conclusions are inconclusive!

Page 8: Project: D/O

Differences If we had another chance we would

measure the silt and suspended sediment in the water to see if it would effect it differently

Page 9: Project: D/O

Citations Carter, Katherine. Environmental Scientist

California Regional Water Quality Control Board North Coast Region.


Recommended