HNTB Corporation 610 Crescent Executive Court Telephone (407) 8050355 Infrastructure Solutions Suite 400 EFacsimile (866) 2051648 Lake Mary, FL 32746 www.hntb.com Date To August 8, 2014 Beata Styś‐Pałasz, PE, FDOT Kacia Monts, FDOT PROJECT CORRESPONDENCE From Luis E. Diaz, PE, HNTB  Subject EE Williamson Road Direct Connect Ramps to I4 Express Lanes   Purpose As part of the Interstate 4 (I4) “Beyond the Ultimate” PD&E Reevaluation Study in Seminole County, the Florida Department of Transportation (FDOT) has been asked by Seminole County to review the impacts of providing a direct connection from the proposed Express Lanes to EE Williamson Road. This connection would be provided only to and from the south (west) and would only be available to patrons using the proposed Express lanes on I4. A graphic showing this connection is provided in the attachments to this document.   Analysis This traffic analysis was based on traffic data developed as part of the I4 Systems Access Modification Report (SAMR) update that is being prepared to support the (I4) “Beyond the Ultimate” PD&E Reevaluation Study. The 2012 FDOT Project Traffic Forecasting Handbook and the Project Forecasting Procedure Topic No.525030120 were used to develop the Design Traffic for this project.   For the purposes of this EE Williamson Road evaluation, the traffic volumes provided for the facilities located within the study area (SR 434, Markham Woods Road, Lake Emma Road, EE Williamson Road and Lake Mary Boulevard) were adjusted to reflect growth patterns and travel behaviors in the area. Using the methodologies provided in the Project Traffic Forecasting Handbook, daily traffic volumes (from the Design Traffic Report) were converted to hourly traffic volumes (for both travel directions) for the morning and afternoon peak hours. Projected intersection turning movement traffic volumes were developed from the hourly volumes and were analyzed using the latest version of the Highway Capacity Software (HCS) to determine the projected intersection delay and level of service for the intersections. Attached are three figures showing the projected 2040 traffic for the different roadway intersections within the study area. The first shows the traffic without the connection between the Express Lanes and EE Williamson Road, the second shows the traffic with the connection and the third shows the difference between the two scenarios.   The information provided in these figures shows that the direct connection from the proposed Express Lanes to EE Williamson Road does not provide significant relief at either SR 434 or Lake Mary Blvd while adding approximately 25% more traffic to the east side of EE Williamson Road (where Woodland Elementary School is located) in the AM peak period. The largest reduction in traffic can be expected at the EB off ramp at SR 434, at approximately 6% reduction in the same AM peak period. Also found in the attachments to this document is a table providing results of HCS analysis that was performed at the different intersections impacted by the proposed connection. This table shows that there are no significant reductions in intersection delay or improvement in overall intersection level of service.    
Transcript
Page 1: PROJECT From CORRESPONDENCE - I-4 Beyond the ......2014/08/11  · 76 1,022 692 19 884 173 17 34 38 66 173 692 66 884 754 17 959 173 19 38 34 76 1,030 994 1,726 1,045 2,398 1,226 1,192

HNTB Corporation 610 Crescent Executive Court Telephone (407) 805‐0355Infrastructure Solutions  Suite 400 E‐Facsimile (866) 205‐1648 Lake Mary, FL 32746 www.hntb.com

Date To August 8, 2014  Beata Styś‐Pałasz, PE, FDOT 

Kacia Monts, FDOT 

PROJECT CORRESPONDENCE

FromLuis E. Diaz, PE, HNTB  

SubjectEE Williamson Road Direct Connect Ramps to I‐4 Express Lanes  

 Purpose As part of the Interstate 4 (I‐4) “Beyond the Ultimate” PD&E Reevaluation Study in Seminole County, the Florida Department of Transportation (FDOT) has been asked by Seminole County to review the impacts of  providing  a  direct  connection  from  the  proposed  Express  Lanes  to  EE  Williamson  Road.  This connection would be provided only to and from the south (west) and would only be available to patrons using  the  proposed  Express  lanes  on  I‐4.  A  graphic  showing  this  connection  is  provided  in  the attachments to this document.   Analysis This traffic analysis was based on traffic data developed as part of the I‐4 Systems Access Modification Report  (SAMR)  update  that  is  being  prepared  to  support  the  (I‐4)  “Beyond  the  Ultimate”  PD&E Reevaluation Study. The 2012 FDOT Project Traffic Forecasting Handbook and  the Project Forecasting Procedure Topic No.525‐030‐120 were used to develop the Design Traffic for this project.   For  the purposes of  this EE Williamson Road evaluation,  the  traffic volumes provided  for  the  facilities located within  the study area  (SR 434, Markham Woods Road, Lake Emma Road, EE Williamson Road and Lake Mary Boulevard) were adjusted  to  reflect growth patterns and  travel behaviors  in  the area. Using  the methodologies  provided  in  the  Project  Traffic  Forecasting Handbook,  daily  traffic  volumes (from the Design Traffic Report) were converted to hourly traffic volumes (for both travel directions) for the morning and afternoon peak hours. Projected  intersection turning movement traffic volumes were developed from the hourly volumes and were analyzed using the latest version of the Highway Capacity Software (HCS) to determine the projected intersection delay and level of service for the intersections. Attached are  three  figures  showing  the projected 2040  traffic  for  the different  roadway  intersections within the study area. The first shows the traffic without the connection between the Express Lanes and EE  Williamson  Road,  the  second  shows  the  traffic  with  the  connection  and  the  third  shows  the difference between the two scenarios.   The information provided in these figures shows that the direct connection from the proposed Express Lanes to EE Williamson Road does not provide significant relief at either SR 434 or Lake Mary Blvd while adding  approximately  25% more  traffic  to  the  east  side  of  EE Williamson  Road  (where Woodland Elementary School is located) in the AM peak period. The largest reduction in traffic can be expected at the EB off ramp at SR 434, at approximately 6% reduction in the same AM peak period. Also found in the attachments  to  this document  is a  table providing  results of HCS analysis  that was performed at  the different  intersections  impacted  by  the  proposed  connection.  This  table  shows  that  there  are  no significant reductions in intersection delay or improvement in overall intersection level of service.     

Page 2: PROJECT From CORRESPONDENCE - I-4 Beyond the ......2014/08/11  · 76 1,022 692 19 884 173 17 34 38 66 173 692 66 884 754 17 959 173 19 38 34 76 1,030 994 1,726 1,045 2,398 1,226 1,192

 ATTACHMENTS 

Page 3: PROJECT From CORRESPONDENCE - I-4 Beyond the ......2014/08/11  · 76 1,022 692 19 884 173 17 34 38 66 173 692 66 884 754 17 959 173 19 38 34 76 1,030 994 1,726 1,045 2,398 1,226 1,192
Page 4: PROJECT From CORRESPONDENCE - I-4 Beyond the ......2014/08/11  · 76 1,022 692 19 884 173 17 34 38 66 173 692 66 884 754 17 959 173 19 38 34 76 1,030 994 1,726 1,045 2,398 1,226 1,192

3 32

3

3

2 3

3

2

3

1

3

1

4

3

22

1

3

22

3

4

1

4

1

4

3

3

2

1

1

2

3

3

E. E. William

son Road

Lake MaryBoulevard

International

Parkway

Lake Emma

Road

DouglasAvenue

RaymondAvenue

Markham Woods Road

Rangeline Road Lincolnwood Lane

4

4

4

4

21

434

NNot to ScaleNot to Scale

Sheet 1 of 3Segment 2 - 2040 No Connection to EE Williamson - DDHV

1,472

2,250

725

1,192

2,024

717

1,345

1,302

2,062

717

911

14

163

136435 14

1815 17

14

590 754

474

18

136

163474 17

1414 14

15

754 590

435

11

13

15706 393

9191 442

240

21

551

92421

15

13551 442

11240 393

191

24

706

1,030

2,208

725

1,525

LEGEND2,8702,310

AM Peak DDHVPM Peak DDHV

Number ofDirectional Lanes

1

I-4 SAMR UpdateDesign Traffic

472

594

479

334

522

346

4142,622343

4722,778380

472

522

414

380

594

343

4792,778346

4722622334

1,258

1,214

1,745 1,016

2,4101,192

1,226

1,045

2,010 994

2,3491,030

173

754

69276 1,022

17319 884

17

34 38

66

173

692

75466 884

17317 959

19

38 34

76

1,030

994

1,726 1,045

2,398 1,226

1,192

1,016

2,038 1,214

2,136 1,258

185

7

31

407

5

74

272,43974

1682,734429

168

5

27

429

7

74

312,73474

1852,439407

578

221

363526

715

195

3201,703526

4461,627742

446

195

320526

742

221

3631,627526

5781,703715

1

4

Page 5: PROJECT From CORRESPONDENCE - I-4 Beyond the ......2014/08/11  · 76 1,022 692 19 884 173 17 34 38 66 173 692 66 884 754 17 959 173 19 38 34 76 1,030 994 1,726 1,045 2,398 1,226 1,192

3 32

3

3

2 3

3

2

3

1

1

3

1

4

3

22

1

3

22

3

4

1

4

1

4

3

3

2

1

1

2

3

3

E. E. William

son Road

Lake MaryBoulevard

International

Parkway

Lake Emma

Road

DouglasAvenue

RaymondAvenue

Markham Woods Road

Rangeline Road Lincolnwood Lane

4

4

4

4

4

21

434

NNot to ScaleNot to Scale

Sheet 2 of 3Segment 2 - 2040 With Connection to EE Williamson - DDHV

1,472

2,187

715

1,258

1,214

1,745 920

2,4101,142

472

594

429

334

522

346

3742,622343

1,142

1,901

707

1,302

4722,778380

990

911

1,726 1,045

2,398 1,226

578

221

363539

680

195

3201,685544

4461,614711185

7

31

407

5

74

272,39774

1682,651429

1,302

2,009

707

1,226

1,045

2,009 911

2,349990

472

522

374

380

594

343

14

179

148473 14

1815 17

14

590 754

518

18

148

179518 17

1414 14

15

754 590

473

14

13

15706 511

11209 548

268

21

551

112421

15

13551 548

14268 511

209

24

706

149 644

60 642

50

126

126 642

50 644

60

149

4292,778346

990

2,062

209176

176209

715

1,472

4722,622334

1,142

920

2,038 1,214

2,136 1,258

446

195

320544

711

221

3631,614539

5781,685680168

5

27

429

7

74

312,65174

1852,397407

LEGEND2,8702,310

AM Peak DDHVPM Peak DDHV

Number ofDirectional Lanes

1

I-4 SAMR UpdateDesign Traffic

173

754

69276 960

17319 841

17

34 38

66

173

692

75466 841

17317 906

19

38 34

76

Page 6: PROJECT From CORRESPONDENCE - I-4 Beyond the ......2014/08/11  · 76 1,022 692 19 884 173 17 34 38 66 173 692 66 884 754 17 959 173 19 38 34 76 1,030 994 1,726 1,045 2,398 1,226 1,192

3 32

3

3

2 3

3

2

3

1

1

3

1

4

3

22

1

3

22

3

4

1

4

1

4

3

3

2

1

1

2

3

3

E. E. William

son Road

Lake MaryBoulevard

International

Parkway

Lake Emma

Road

DouglasAvenue

RaymondAvenue

911

Markham Woods Road

Rangeline Road Lincolnwood Lane

4

4

4

4

4

21

434

NNot to ScaleNot to Scale

Sheet 3 of 3Segment 2 - 2040 With Connection to EE Williamson - Difference

-53-10

-96

-50

-40

-40

-123

-10

-43

-40

-83

+13

-35

-96

-83

-43-10

-40

+16

+12+38

+44+12

+16+44

+38

+118

+106

+106

+118

149

60

50

126

126

50

60

149

-50

-50

-146

209176

176209

-10

-53

-50

-96

+18

-30

-83

-96

LEGEND2,8702,310

AM Peak DDHVPM Peak DDHV

Number ofDirectional Lanes

1

I-4 SAMR UpdateDesign Traffic

-83

-10

-10

-10

-10

-40-50

+18 +28

+28 +18 -30

-35-13-18

+18+13

-18-13

+2+3

+3+2

Page 7: PROJECT From CORRESPONDENCE - I-4 Beyond the ......2014/08/11  · 76 1,022 692 19 884 173 17 34 38 66 173 692 66 884 754 17 959 173 19 38 34 76 1,030 994 1,726 1,045 2,398 1,226 1,192

Intersection Delay (s)Intersection LOS

Intersection Delay (s)Intersection LOS

Intersection Delay (s)Intersection LOS

Intersection Delay (s)Intersection LOS

Intersection Delay (s)Intersection LOS

Intersection Delay (s)Intersection LOS

Intersection Delay (s)Intersection LOS

Intersection Delay (s)Intersection LOS

2040 LOS and Overall Intersection DelayEE Wiliamson Road Express Lane ConnectionTraffic Analysis

31.4

12.4 12.9 - -

B B - -

Lake Mary Blvd at Lake Emma Rd

With E.E. Williamson Road Connection Without E.E. Williamson Road Connection

AM PM AM

85.7 80.6 67 55.7

Lake Mary Blvd at Intl

Pkwy

With E.E. Williamson Road Connection Without E.E. Williamson Road Connection

AM PM AM PM

F F E E

32.7 31 33.4

46.6 54.2 41.6 46.3

E.E. Williamson

Rd at Lincolnwood

Ln

With E.E. Williamson Road Connection Without E.E. Williamson Road Connection

AM PM AM PM

PM

D D D D

E.E. Williamson Rd at I-4

With E.E. Williamson Road Connection Without E.E. Williamson Road Connection

AM PM AM

98.4 113.4 108.1 124.7

E.E. Williamson

Rd at Markham Woods Rd

With E.E. Williamson Road Connection Without E.E. Williamson Road Connection

AM PM AM

F F F F

PM

SR 434 at I-4 EB

With E.E. Williamson Road Connection Without E.E. Williamson Road Connection

AM PM AM PM

31 30.9 31.6 31.5

C C C C

SR 434 at I-4 WB

With E.E. Williamson Road Connection Without E.E. Williamson Road Connection

AM PM AM

With E.E. Williamson Road Connection Without E.E. Williamson Road ConnectionSR 434 at

Douglas Ave AM PM AM PM

228.3 233.2 234.2 241.2

PM

F F F F

F F F F

PM

C C C C

131.8 125.1 137.4 134.1


Recommended