+ All Categories
Home > Documents > Project Goals o Meet Strategic Action Plan Performance Measure Strategy 4.1.1: Utilize nature’s...

Project Goals o Meet Strategic Action Plan Performance Measure Strategy 4.1.1: Utilize nature’s...

Date post: 17-Jan-2016
Category:
Upload: vernon-james-welch
View: 219 times
Download: 0 times
Share this document with a friend
Popular Tags:
9
Water Plant #3 Concentrate Pre-treatment Project
Transcript
Page 1: Project Goals o Meet Strategic Action Plan Performance Measure Strategy 4.1.1: Utilize nature’s water supply resources effectively for water supply o.

Water Plant #3Concentrate Pre-treatment

Project

Page 2: Project Goals o Meet Strategic Action Plan Performance Measure Strategy 4.1.1: Utilize nature’s water supply resources effectively for water supply o.

Project Goalso Meet Strategic Action Plan Performance Measure Strategy 4.1.1: Utilize nature’s water supply resources effectively for water supplyo Meet the Conservation Policy Principles of The Cityo Meet the Best Management Practices of the St. Johns River Water Management Districto Meet the Department of Environmental Protection regulatory requirements

Water Plant #3 Concentrate Pre-treatment

Project

Page 3: Project Goals o Meet Strategic Action Plan Performance Measure Strategy 4.1.1: Utilize nature’s water supply resources effectively for water supply o.

Water Plant #3 Concentrate Pre-treatment

Project

Regulatory Requirements:o WTP#3 has a discharge permit limit for iron of 0.3 mg/Lo WTP#3 Concentrate is greater than 0.3 mg/Lo Florida Department of Environmental Protection

Administrative Order 154NE provides a schedule to meet the iron discharge limitation

o Concentrate is permitted as a source water at WTP#1o Color Compliance at WTP #1 is dependent on color

reduction treatment by ozone treatment at WTP#3

Page 4: Project Goals o Meet Strategic Action Plan Performance Measure Strategy 4.1.1: Utilize nature’s water supply resources effectively for water supply o.
Page 5: Project Goals o Meet Strategic Action Plan Performance Measure Strategy 4.1.1: Utilize nature’s water supply resources effectively for water supply o.

Contractor Selectiono Sawcross Inc. was determined to be the low bidder

at the Bid opening on May 1, 2014 to complete the Concentrate Pre-treatment Project at Water Plant #3

o At the May 13, 2014 workshop, staff presented the Sawcross Inc. contract for Council consideration

o Signing of the construction contract was held in abeyance until the State appropriated the $375,000.00 grant funding for the project

Water Plant #3 Concentrate Pre-treatment

Project

Page 6: Project Goals o Meet Strategic Action Plan Performance Measure Strategy 4.1.1: Utilize nature’s water supply resources effectively for water supply o.

Water Plant #3 Concentrate Pre-treatment

Project

Process Components:Primary Systemo Ozone system for color reduction o Recovers up to 750,ooo gallons per daySecondary Systemo Cartridge filtration system for iron reduction

Page 7: Project Goals o Meet Strategic Action Plan Performance Measure Strategy 4.1.1: Utilize nature’s water supply resources effectively for water supply o.

Funding:o Total Project Budget - $1,580,000o Design & Permitting - $162,345o Construction Cost including contingency - $1,407,680 o Source of Funds: 5 Year CIP bond fundso St. Johns River Water Management District (SJRWMD)

Cooperative Cost Share Grant - $494,800o Florida Legislative Funding Grant - $375,000

Water Plant #3 Concentrate Pre-treatment Project

Page 8: Project Goals o Meet Strategic Action Plan Performance Measure Strategy 4.1.1: Utilize nature’s water supply resources effectively for water supply o.

July 15, 2014 Council Actions:

o Resolution to initiate a Construction Contract with Sawcross Inc. for improvements at Water Plant#3

o Resolution to authorize the City Manager to finalize a Department of Environmental Protection Grant Funding agreement

Water Plant #3 Concentrate Pre-treatment

Project

Page 9: Project Goals o Meet Strategic Action Plan Performance Measure Strategy 4.1.1: Utilize nature’s water supply resources effectively for water supply o.

Questions?

Water Plant #3 Concentrate Pre-treatment Project


Recommended