1
GOVERNMENT OF RAJASTHAN
RURAL DEVELOPMENT & PANCHAYATI RAJ DEPARTMENT Watershed Development & Soil Conservation Department
Rajasthan, Jaipur
DETAILED PROJECT REPORT
INTEGRATED WATERSHED MANAGEMENT PROGRAMME
JAISALMER JSM/(IWMP) 30/11-12,
BLOCK- JAISALMER
----------------&&&&&&&&----------------
PROJECT IMPLEMENTING AGENCY ASSISTANT ENGINEER
(W.D. & S.C.) PANCHAYAT SAMITI - JAISALMER
2
CERTIFICATE
Certified that the undersigned have proposed the appropriate and need based
activities required in the watershed project area with active participation of
beneficiaries along with consultation of Watershed Committees(WCs). Approval of
watershed project plan and DPR as been obtained from WC, Gram Sabha. The plan
and DPR document of IWMP -30/2011-12 project, at P.S. Jaisalmer District
Jaisalmer is technically sound, viable and appropriate for implementation during the
period 2011- 2012.
We recommend that this plan be sanctioned and put to implementation.
Signature Signature Signature Signature Signature Signature
Chairman/ Secretary
WC
WDT
members
Junior
Engineer
P.S.----------
Assistant
Engineer & PIA
P.S.--------------
Project
Manager,WCDC
Distt. Jaisalmer
1
2
3
4
3
GOVERNMENT OF RAJASTHAN
RURAL DEVELOPMENT & PANCHAYAT RAJ DEPARTMENT
(WATERSHED DEVELOPMENT & SOIL CONSERVATION)
NAME OF PROJECT : IWMP/30/2011-12
EFFECTIVE AREA OF PROJECT : 6000
COST /HA- 15000
COST OF PROJECT : 900 LAC
BLOCK : PANCHAYAT SAMITI JAISALMER
DISTRICT : JAISALMER
PIA – ASSISTANT ENGINEER PROJECT MANAGER WCDC
W.D. & S.C., P.S. JAISALMER W.D. & S.C., DISTRICT JAISALMER
4
DETAILED PROJECT REPORT
INTEGRATED WATERSHED MANAGEMENT PROGRAMME
JAISALMER JSM/(IWMP)30/11-12,
BLOCK- JAISALMER
Salient Features of Project
No. of Gram Panchayat Covered 3
No. of Revenue Villages Covered 5
Total Project Area 6000
Total Project Cost 900
Total Proposed/ Estimated Cost 945.87
Total Cost Borned by Convergence 45.86
Expected Beneficiaries’s Contribution 42.24
Total Runoff Potential (Cum) 117280
Existing Runoff Storage (Cum) 21280
Proposed Runoff Storage/ Management (Cum) 27253
5
CHAPTER – I
INTRODUCTION
Location
Jaisalmer (IWMP-30), Basanpeer juni Project is located in jaisalmer Block, of
Jaisalmer District. The project area lies between the latitudes 70052-53
ñ43’
East&longitudes 2700-27
01’North. It is at a distance of 40 km from its Block head
quarters and 20 Km from the District head quarters of jaisalmer. There are 7
Numbers. of habitations (Revenue Villages) in the Project area Other details are
given below.
General features of watershed
S. No.
Name of Project(as per GOI) JAISALMER IWMP-30 2011-12
a) Name of Catchment Thaiyat,Basanpeer
juni,Bhagu ka Ganv,Ridwa,Asaych
b) Name of watershed area(local name)
Basanpeer Juni
c) Project Area 7400 ha. d) Net treatable Area 6000 ha.
e) Cost of Project 900 lac
f) Cost/hectare 0.15lac
g) Year of Sanction 2011-12 h) Watershed Code JSM/(IWMP)30
i) No. of Gram Panchayats in project area
3
j) No. of villages in project area 5
k) Type of Project Desertic
l) Elevation (metres) 195 mts.Wrt.MSL
m) Slope range (%)
Macro/micro Name of Gram Panchayat
Name of Villages Covered
Cluster 1.Basanpeer 1.Thaiyat 2.Basanpeer juni 3.Bhagu ka gonv 2.Hamira 1.Ridwa 3.Badoda govn 1.Asaych
6
The watershed falls in Agro climatic Zone I A, Arid western plain. The soil texture is
Sandy to Sandy Loam. The average rainfall is 207 mm. The temperatures in the area are in
the range between 45º C during summer and 15º C during winter. The major crops in the
area are Bajara, Guar, Moong, Moth, Til etc. Almost 55.81% land is under cultivation 16.74%
land fallow, 18.52% land is wasteland. There is no significant source of irrigation in project
area only a few areas is double cropped due to rain water harvesting (in-situ moisture
conservation) by earthen structures like KHADEEN and the area which is under field/contour
bunding executed in different programmes implemented under Watershed Development &
Soil Conservation programmes in preceding years.
Out of 549 Total Households 334 households are BPL (60.83% of Total
households) 137 are landless households (24.95% of Total households) 69 household
are small and marginal farmers (12.56%of Total household). Average land holding in
the area is 34.83 ha. 44.45%area of cultivable land is single cropped and 5.67 % is
double cropped. There is no significant source of irrigation in project area only a few
areas is double cropped due to rain water harvesting (in-situ moisture conservation).
The average annual rainfall (10 years) in the area is 207.00 mm. There are no major
streams in the Watershed area. The major festivals in the villages of Project area are
Deepawali, Holi, Akhsay-Tritiya, Rakhsabandhan, Dashehra, Gangour etc. At present
villages of Project area having 3561 population with Communities like Rajput, Devasi,
Rao-Bhat, Meghwal, Bheel, Kumhar, Darji and Brahmin,Muslims etc.
Climatic and Hydrological information
1. Average Annual Rainfall (mm)
S.No. Year Average Annual Rainfall(mm)
1 2012 231.9 2 2011 295.2 3 2010 361 4 2009 72 5 2008 112 6 2007 142 7 2006 501 8 2005 176 9 2004 42
10 2003 137
7
2. Average Monthly rainfall (last ten years)
S.No. Month Rainfall(mm)
1 June 31.59 2 July 47.43 3 August 90.13 4 September 24.68
3. Maximum rainfall intensity (mm)
S.No. Duration Rainfall
intensity(mm) 1 15 minute duration 40 mm 2 30 minute duration 58 mm 3 60 minute duration 69 mm
4. Temperature (Degree C)
S.No. Season Max Min
1 Summer Season 49º C 32º C 2 Winter Season 26º C 4º C 3 Rainy Season 35º C 24º C
5. Potential Evaporation Transpiration (PET) (mm/day)
S.No. Season PET
1 Summer 3200 mm 2 Winter 2464 mm 3 Rainy 2784 mm
6. Runoff
1 Peak Rate (cum/hr) 95.25 Cum/per hour
2 Total run off volume of rainy season (ha.m.)
50.76 ha-m
3 Time of return of maximum flood 5
years 10
years In-
Year Nil Nil Nil
4 Periodicity of Drought in village area
8
Other Developmental all Schemes in the Project Area
S. No
Scheme
Name of the
department
Key interventions
under the Scheme
Targeted Beneficiar
ies
Provisions Under
the Scheme
1 MAHANREGA
Rural Dev. &
Panchayati Raj
Department
Providing Employment
2838
155.00 lac
2 TFC - 23.50 lac
3 SFC - 16.75 lac
4 BRGF TSC - 29.50 lac
5 SGS IAY -
Details of infrastructure in the project areas
Parameters Status
1 No. of villages connected to the main road by an all-weather road
5
2 No. of villages provided with electricity 5 3 No. of households without access to drinking wate r 0 4 No. of educational institutions : P S HS VI
Primary(P)/Secondary(S)/Higher Secondary(HS)/ vocational institution(VI) 5 3 -
5 No. of villages with access to Primary Health Cen tre - 6 No. of villages with access to Veterinary Dispens ary 2 7 No. of villages with access to Post Office 3 8 No. of villages with access to Banks 2 9 No. of villages with access to Markets/ mandis -
10 No. of villages with access to Agro-industries - Total quantity of surplus milk Ltr.
11 No. of milk collection centres U S PA O (e.g. Union(U)/ Society(S)/ Private agency(PA)/ others (O))
0 0 0 5
12 No. of villages with access to Anganwadi Centre 7
13 Any other facilities with no. of villages (please specify)
---
14 Nearest KVK Jaisalmer 15 Cooperative society 3 16 NGOs 0 17 Credit institutions 0 0 0 0
(i) Bank 0 (ii) Cooperative Society 3 -
18 Agro Service Centre's 0
9
Institutional Arrangements (SLNA, DWDU, PIA, WDT, WC, Secretary)
DWDU Details
PIA particulars
WDT Particulars:
S.No Particulars Details of DWDU
1 PM ,DWDU Sh. Bhagirath Bishnoi Project Manager, IWMP, ZP, Jaisalmer
2 Address with contact no., website
PM WLDL District Jaisalmer, ZP Jaisalmer
3 Telephone 02992-250712 4 Fax 02992-250712 5 E-mail [email protected]
S.No Particulars Details of PIA
1 Name of PIA Sh.Jaimal singh indaliya
2 Designation Assist. Engineer
3 Address with contact
no., website
AEN. (IWMP) P.S. Jaisalmer
4 Telephone 02992-2528822
5 E-mail [email protected]
S. No
Name of WDT member
M/F
Age Qualification
Experience in
watershed
(Yrs)
Description of
professional training
Role/ Function
1
Smt Kamlesh F 29 B.A Soc. 2 Soci. Social Science tist
2 Sh Santosh Sharma
M 26 B.Sc
Agriculture 2
Agri.Graduat
Agri.Sciencetist
3 Sh. Sampat Nath
M 24 Diploma (2 Yr.Animal
Hus.) 1
Aninal Husbandry
Livestock Expert
4 Sh. Sanjay Tawar
F 24 B.A
(Sociology) 0.10 Sociology
Social Science tist
10
Details of Watershed Committees
S. No.
Name of WCs
Date of
Gram Sabh
a for WC
Date of Registration as
a Society
(dd/mm/yyyy
Designation Name M/F
SC/ ST/OBC
/ Genera
l
Landless/
MF/SF/ BF
Name of UG/SHG
Educational
qualification
1 Basanpeer Juni
26
.11
.20
12
President Jame khan/Hakim khan M OBC MF UG 5
Secretary
Member’s Vijay singh/Mangal singh
M Gem MF UG 8
Member Ratula/Jane khan M OBC MF UG 5
Member Padma/ purkharam F ST SF SHG 5
Member Chuni/Rawataram F ST SF SHG 5
Member Rojo/Dene khan F OBC BF SHG 5
Member Molabaksh/Ishe Khan M OBC MF UG 8
Member Sher khan/Loge khan M OBC MF UG 5
Member Bache Khan/Ali khan M OBC MF UG 5
Member Hasan khan/Ismile khan M OBC M UG 8
11
S. No.
Name of WCs
Date of
Gram Sabha
for WC
Date of Registra tion as
a Society (dd/mm/yyyy
Desig nation
Name M/F SC/
ST/OBC/ General
Landl ess/
MF/SF/ BF
Name of
UG/SHG
Edu cational
Quail fication
2
Asaych (Badoda
Ganv)
26
.11
.20
13
President Bhanwar singh/Mangal Singh M Gen MF UG 10 Secretary Kanwraj singh/jaisingh M Gen BF UG 12 Member Deepsingh/aamb sing M Gen MF UG 5 Member Bakhtu devi/sankra ram F ST MF SHG 5 Member Durgsingh/udaisingh (landless) M Gen SF UG 5 Member Khama kanwar/chatur singh F Gen SF SHG 12 Member Khet singh/Nathu singh M Gen MF UG 12 Member Rewant singh/Mool singh` M Gen MF UG 5 Member Chandan singh/Abhay singh M Gen BF UG 8 Member Manohar singh/shivdan singh M Gen BF UG 8
Member Swaroop singh/ranidan singh M Gen MF UG 10
12
Gram Panchayat Wise Details of Various User Groups Constituted
for Development of Activities
• Gram :-
• User Group Agriculture S.no Name Village 1 Vijay singh/Mangal singh Basanpeer
2 Ratula/Jane khan Basanpeer
3 Padma/ purkharam Basanpeer
4 Chuni/Rawataram Basanpeer
5 Rojo/Dene khan Basanpeer
• Gram :-
• User Group Non Agriculture S.no Name Village 1 Molabaksh/Ishe Khan Basanpeer
2 Sher khan/Loge khan Basanpeer
3 Bache Khan/Ali khan Basanpeer
4 Hasan khan/Ismile khan Basanpeer
5 Jame khan/Hakim khan Basanpeer
• Gram :-
• User Group Drainage Treatment S.no Name Village 1 Deepsingh/aamb sing Assayach
2 Bakhtu devi/sankra ram Assayach
3 Durgsingh/udaisingh (landless) Assayach
4 Khama kanwar/chatur singh Assayach
5 Khet singh/Nathu singh Assayach
• Gram :- :- User Group Agriculture S.no Name Village 1 Rewant singh/Mool singh` Assayach
2 Chandan singh/Abhay singh Assayach
3 Manohar singh/shivdan singh Assayach
4 Swaroop singh/ranidan singh Assayach
5 Bhanwar singh/Mangal Singh Assayach
13
Problems and Scope of Improvement in the Project Area
The socio economic conditions of the house holds of the project area reveal
that most of the house holds are engaged in only farming activities which purely
depend on the Monsoonal rainfall. The rainfall in the project area is very less and
very below to the state average, again it occurs only in a limited period and restricted
in a few storms. This further limits the opportunity to cultivate and sow the crops in
time and in diversified manner with variety of crops. The options before the farmers
in rain fed agriculture and given climatic conditions are very limited. The risk
appetite of farmers is very low as probability of good rains and its distribution over a
crop period is not regular as well as the economic conditions of local farmers is also
compromising. The quality of soil in most of the area is poor with a poor organic
matter and low nutritional contents. The top soil faces a lot of risk against water and
wind erosion. The texture of the soil is light by and large in entire area. The rills and
gullies are formed in private and community land at exposed and area those are
devoid of Vegetation. The Monsoonal rainfall when occurs in limited storms with
higher intensities it turns into runoff and most of it go in waste after fulfilling the
retentions of local depressions and some local structures which are constructed by
local community efforts and under different developmental schemes. The area faces
acute water shortage in summers. The quality of ground water is not good and it
cannot be used for agriculture, animal and human use.
The animal husbandry is the part of most of the household’s economy.
Farmers are rearing cattle, goats, seeps, camels etc. but most of these animals are of
local breeds which are less productive and uneconomic as well It imposes increased
biotic pressure on natural resources of project area. The households are having some
surplus milk production but due to poor and unorganised marketing linkages, It does
not fetches rightful value. The other opportunity of allied activities for the support of
livelihood is almost absent. Most of the household are engaged in employment given
under NREGS but it does not suffice to lead a satisfactory life conditions for entire
family for the entire period of a year. In such a forcing situation some people having
skills in different trades prefer to migrate into nearby towns to have better earnings.
14
The socio economic conditions of the area can be improved through
increased production which can be achieved through expansion in cultivated area
and productivity enhancement 1371 ha land is arable wasteland and 1239 ha is
fallow can be brought under cultivation with the interventions of the present project.
The productivity of rain fed agriculture can be improved with interventions of soil
and water conservation activities with improved moisture regime. The crops can be
rescheduled imparting needful trainings to farmers to adopt the proven technologies
and package of practices. The cropping pattern as enormous possibilities to be
improved to attain a fair increment in productivity.
There is no significant source of irrigation in project area, only a few areas are
irrigated and with efforts this can be increased to 5%. The productivity gap of major
crops in the area as compared with District and with areas in the same agro climatic
zones indicate potential to increase the productivity. The demonstration of improved
package of practices, improved varieties, increased irrigation facilities and soil
conservation measures under the project can bridge this gap. Due to small land
holdings in the area focus of the project would be on diversification in agriculture
(horticulture, vegetables, medicinal plants Agro forestry, fodder crops and
diversification in Livelihoods (Agriculture, Animal husbandry, self employment) 1268
MT/year fodder scarcity can be met out through Pasture development and improving
seed varieties, putting more are under fodder cultivation, fodder treatment and
value addition to it, etc.
Improved animal Husbandry practices can increase the productivity of
livestock. The quality of animals can be improved by controlling population of stray
animals adopting castration of male animals those are of local breeds. Breed
improvement can be achieved through artificial inseminations, by distribution of
bulls, rams of improved breed. The scientific methods of milk collection, milk storage,
value addition to its quality and with assured marketing linkages can prove a
promising livelihood support. The females of the area can be organized through self
help groups to promote the habits of saving, thrift and credit. It can be pooled up
through revolving funds. Such organizations to be sensitized on gender issues,
elimination of social evils, education and health etc.
15
Some innovative concepts like establishment of Grain Bank, Seed Bank,
Fodder Bank, Milk Co operatives, federation of SHG’s may add a surety to self
sustained rural economy. Increased and positive involvement of Panchayati Raj
Institutions, Social Audits, techno- economic monitoring will further ensure expected
outcomes.
-------------------*---------------------------------*-----------------------------------*-------------------------------
16
CHAPTER – II
Socio economic Features, Problems and Scope
The project comprises of Eight villages of Four Gram Panchyats. The literacy level
is very low in general again it is very low amongst females. The traditional customs and
followings are persistent yet. The distribution of demography is scattered according to
their land holdings and resides in small habitations/ dhanis. Villages have less connectivity
with the market and other needful amenities. The evil of child marriages, consumption of
liquor, opium poppy and other such narcotic drugs is also observed during the household
survey of the project area. The productivity of the land, animal and household livelihood
activities is very low. To fetch the bread and butter for the family people are forced to
migrate. Most of the migration is of different trade labourers to nearby towns.
The above problems can be minimized by putting the available natural
resources to its optimum capacity without damaging them to irreversible level. The
interventions of IWMP can take care of the lands and whatever moisture is available
can be conserved to enhance the rain fed agriculture productivity. The practice of
animal husbandry can be used as strength of the area with the use of breed
improvement, improvement of animal health, ensuring the quality fodder and feed.
The animal produce, milk may be sold to nearby towns with the improved supply chain
and value addition to the produce on the theme of self help groups or cooperatives.
The institutional arrangements formed and to be formed in the course of time during
project period may improve the governance and the fair distribution of usufructs.
Table 2.1 Population & Household Details: Total Population
Male Female Total SC ST
1909 1653 3561 221 423
17
Household Details
BPL Household
L. Less
Small Farmer
M. Farmer
L. Farmer
Total Household
SC household
ST Household
334 137 9 45 24 549 37 60 Table 2.2 Development indicators
S. No.
Development Indicators State Project Area
1 Per capita income (Rs.) 21215 7400 2 Poverty ratio 0.22 0.18 3 Literacy (%) 0.60 0.55 4 Sex Ratio 921 956 5 infant mortality rate 6.3% 5.02% 6 maternal mortality ratio 0.38% 0.05%
The table indicates poor socio economic conditions as well as the health conditions.
The total geographical area of the project or cluster selected for the
treatments is 7400 ha. Out of which some area has been treated under different
schemes in preceding years. Some area like Stony wastes, habitations, roads, local
paths, water bodies etc. are not available for treatments as well as some flat lands of
slope 0-1% slope does not require any treatments, hence kept aside from effective
area of the project. The Gram Panchayat wise details are as follows:
Table 2.3(A) Proposed Land Under Treatment
S.
No.
Gram
Panchayat
Gram Panchayat Wise Details of Area, in ha
Total Geo
graphical
Area
Area
Already
Treated
Area not
Available for
Teatment
Area not
Requiring
Treatment
Net
Effective
Area
1 Basanpeer 4000 480 200 320 3000 2 Hamira 1600 - 100 - 1500
3 Badoda gaon
1800 - 170 130 1500
Total 7400 480 470 450 6000
18
Table 2.3(B) Land Use
Land Use Total area in Ha.
Private Panchayat Government Community Total Agriculture Land 3290 0 840 0 4130 Temporary fallow 0 0 591 0 591 Permanent fallow 380 0 268 0 648 Cultivated Rain fed 3290 0 840 0 4130 Cultivated irrigated 0 0 0 0 0 Net Sown Area 3710 0 0 0 3710 Net Area sown more than once
420 0
0 0
420 Forest Land 0 0 160 0 160 Waste Land 0 0 1371 0 1371 Pastures 0 0 200 0 200 Others 0 0 300 0 300
Total 3670 0 3730 0 7400
The project area has 1371 ha of cultivable wasteland 591 ha of fallow land
(total 1962 ha) can be brought under cultivation if some irrigation source can be
provided through Construction of WHS like Khadin, Tanka, Farm ponds etc. Through
demonstration of improved & hybrid rain fed varieties of seeds for the crops of
pulses, oil seeds, fodder, cereals etc. Construction of WHS can also increase in area
under Rabi crop in pedakast which is Negligible at present.
1371 ha. (18.52 % of the project area) is under wastelands and can be brought under
vegetative cover, with reasonable effort .Activities like Earthen check dams,
Vegetative filter strip, V-ditches, staggered trenches, WHS (Khadins), Afforestation of
wastelands and Pasture development will be taken up on these lands
Pasture development the land use table shows that there is 200 hectare pasture
land (2.70%) This emphasizes the need for taking up pastureland development works
through sowing of promising species of grasses and forestry plantation. The local
19
habitat of grass like Dhaman or Sewan which is very hardy and perennial in nature
will be established which will improve the availability of good fodder as well as it will
work as a binding agent for soil particles which in turn reduce the soil erosion.
Table 2.4 .(a) Agriculture and Horticulture Status and Fuel Availability.
Cropping Status S.No.
Season
Crop sown
Rainfed Irrigated Total
Variety
Area (ha)
Production
(Ton)
Productivity
(kg/ha)
Variety
Area (ha)
Production (Ton)
Productivity
(kg/ha)
Area (ha)
Production (Ton)
1 Kharif Bajra HHB 67 2303 812 353 - - - - 2303 812 Moong K 851 150 83 518 - - - - 160 83
Gaur
RBC 936
587 231 563 - - - - 587 331
Moth RMO 40 240 120 500 - - - - 240 120 2 Rabi
Mustured Bio902 - - - - 206 102.1
7 495 206
102.17
ZEERA RJ-19 - - - 84 32.25 384 84 32.32
WHEAT RAJ
3077 - - - - 130 273 2100 130 273
Table 2.4.b Abstract of cropped Area (ha)
The farmers are using indegenious & traditional varieties of Bajra, Guar,
Moong, Month, Til. The varieties for Bajra will be used those are developed by RSSC,
NSC, CAZRI like HSB 67, HSB 75, WCC 75 etc. The Moong of varieties like K 17,
CAZRI-8, Moth of varieties like JADIA, RMO 40, CAZRI etc, Sesame of latest varieties
will be introduced with the advice of WDT, resource persons and Department of
Agriculture. The crop rotation and the cropping pattern will be introduced like inter
cropping, mixed cropping etc. to enhance the out come. The crop rotation for this
area under practice is as follows:
Bajra - Fallow
Moong - Tarameera/Mustard
Moong - Fallow
Fallow - Tarameera/Mustard
Til - Fallow
Moth - Fallow
Area under Single crop 3290
Area under Double crop 420
Area under Multiple crop -
20
The table 2.4.b shows that only 420 ha (5.67%) is double cropped area and
that is also not on assured basis, it is only due to rain harvesting and moisture
conservation practices and some tube wells. Also the crop rotation shows that fallow
lands are there. This indicates that there is scope for change in crop rotation in fields
where there are fallow lands through Soil and Water conservation measures, crop
demonstration and diversification in agriculture.
Soil and Water conservation measures besides putting fallow lands under
cultivation can change the area under single cropping to double as well as multiple
cropping.
Table 2.4.(c) Productivity Gap Analysis ( The table can also be given in bar chart form)
Analysis of the above table indicate that besides national gap there is wide
gap in productivity within state and even within same agro climatic zones.
The reasons for this variation are:
• Farmers are using traditional varieties of Bajra, Guar, Moong, Month, Til
whereas the recommended varieties as mentioned above will definitely
improve the productivity.
• Lack of Availability of good quality seeds of desired crops and the availability of
variety in adequate quantities and the time for sowing to the farmers.
• Availability of water for cultivation (5.67% is irrigated )
The productivity gap and reasons of it indicate potential to increase the
productivity through crop demonstration .Crop demonstrations would be carried out
on improved crops/ varieties, improved agronomic practices. INM, IPM, Mixed
cropping, distribution of fodder seed mini kit. Demonstration of improved methods
Name of the crop
Productivity kg/ha
India Highest
Average in Rajasthan
Highest Average of Agro climatic zone
District Project Area
Bajra - 339 500 415 353 Moong - 679 750 625 518 Guar - 476 600 550 563 Moth - 650 725 600 500 Mustard - 1203 1250 980 495 Zeera - 510 530 - 384 Wheat - - - - 2100
21
and economics of fodder crops cultivation and also distribution it foundation seeds
of Forage Crops for further multiplication, introduction of fodder crops in the existing
crop rotations.
Table 2.5 Existing area under horticulture/ Vegetables / Floriculture (ha)
Activity Area Species Varieties Recommended varieties
Production (Kg/Ha)
Horticulture --- --- --- --- --- Vegetables --- --- --- --- --- Floriculture --- --- --- --- --- Medicinal Plants
--- --- --- --- ---
Table 2.6 Land holding Pattern in project area
Type of Farmer
Total
House
holds
Land holding (ha) irrigation
source wise
Land holding (ha)Social group
wise
Irrigated
(source) Rainfed Total Gen. SC ST OBC BPL
(i) Large farmer 9 0 1139 1139 456 148 194 341 0
(ii) Small farmer 45 0 1752 1752 700 228 298 526 0
(iii) Marginal farmer 24 0 826 826 140 107 140 249 0
(iv) Landless person 137 0 0 0 0 0 0 0 0
(V) No. of BPL households 334 0 413 413 165 54 70 124 0
Total 549 0 4130 4130 1651 537 702 1240 0
34.83% land holdings belong to small and marginal farmers who own 2578 ha
of total cultivated area. Horticulture/vegetables could be more Beneficial to Small
and marginal farmers as well as for large farmers with some irrigation facility.
Horticulture/vegetables will be promoted in a part of land with farm pond/Tanka
construction also.
The following activities will be more beneficial for small land holdings and for
diversification of agricultural practices.
Horticulture plantation, Medicinal and Aromatic Crops, floriculture: As discussed
earlier. Horticulture/vegetables could be more economical to Small and marginal
farmers with farm pond/Tanka construction. The project area is planned to put some
area adjacent to the water tanka and RWHS under medicinal crops like
Sonamukhi, Aloevera, Ashwagandha, Asperagus, Gugugals etc.
22
Agro forestry plantation: To increase the income of farmers and to establish the
shelter belt plantation against wind velocity to protect the lands from erosion due to
high wind velocities.
The limited financial provisions under project restrict to take up these activities. The
convergence with MNREGA or other line Departmental schemes will be sought to
implement it.
Setting of Vermi Compost Units: Keeping in view the side effect of residues of
chemicals and fertilizers on human health, the emphasis would be on cultivation of
organic produce through motivating farmers and providing assistance for production
of organic input, vermi compost, farm yard manure. The SHG would be motivated to
adopt this activity for income generating activity as well as for livelihood support.
Production and Distribution of Quality Seeds: There is need to ensure that good
quality seed is available for cultivators, for which adequate seed production would
be initiated in watershed areas with the assistance of private sector and agriculture
Department with the improved technologies and package of practices. The crop
demonstration of different crops suitable for the area and of promising outputs is
proposed under development plan. The convergence with Agriculture Department
and Horticulture Mission is envisaged.
Sprinklers and Pipelines: For efficient water management practices, emphasis would
be on demonstration of Drip and sprinklers with adequate financial support and
convergence/private partnership.
Establishment of Nurseries: Most of the planting material is procured from other
parts of the District/ State. The procurement of planting material from distant places
causes damage to the planting material and often results in untimely supply. Hence
nursery development activity has been planned in area. The nursery will be raised
through SHG with the support of revolving fund of project as well as groups’s own
resources.
Innovative hi-tech/ Cash Economy Oriented Activities: Innovative hi-tech/ cash
crops/ activities/ projects like mushroom cultivation, medicinal plans etc which are
23
not in existence at present, can be implemented by individual farmers / private
partnerships as there is enormous scope of mushroom dry or wet in the nearby
tourist oriented hotels/ resorts. The Activity is proposed through SHG with proper
skill development through trainings at specified centres.
Drip irrigation: Drip irrigation will be promoted in all horticulture plantations,
vegetables and in nurseries for rational use of irrigation to achieve higher yields and
quality produce. Earthen pot/ pitcher irrigation will also be practised at water tank
based plantations.
Table 2.7 Livestock Status-animals/milk production/ average yield.
S. No.
Description of
animals
Population
in No.
Yield (milk/ mutton/
Wool)
Equ. cow
units
Dry matter requirement per year
(7Kg per animal.)
Total require
ment in M.T.
1 Cows Indigenous 1885 3.5 ltr. per
day 1885
4816175 4816.17 Hybrid 0 0 0 0 0
2 Buffaloes 20 6 ltr. per day 20 51100 51.00 3 Goat 15016 1 ltr. per day 7508 19182940 19182.94 4 Sheep 17348 0.5 ltr per
day 8674
22162070 22162.07 5 Camel 180 0 180 459900 459.9 6 Poultry 0 0 0 0 0
7 Piggery 0 0 0 0 0
Total 34449 0 18267 46672185 46672.08
In spite of the large number of livestock, production is less hence increase in
productivity across all species, is a major challenge. To reduce production of
unproductive cattle and to control the population of cattle, to improve the
productivity by improving the breeds by breeding management following activities
will be taken up
• Castration
• Artificial insemination
• Distribution of superior Breeding bulls for use in Cattle and Buffalo
• Breeding & distribution of crossbred rams
24
Besides breed improvement other animal husbandry practices like better health,
hygiene and feeding practices can increase productivity of livestock. Hence Activities
like Animal health camps, Urea-Molasses treatment demonstration, demonstration
of improved methods of conservation and utilization of Forage crops are proposed.
The Storage of fodder will be managed with the use of compressed fodder bricks
with nutritional value addition.
Table 2.8 Existing area under fodder (ha) S. No
Item Unit Area/Quantity
1 Existing Cultivable area under Fodder
Ha 3290/23030
2 Production of Green fodder Tonns/year 0/0 3 Production of Dry fodder Tonns/ Year 2394/16758 4 Area under Pastures Ha 1308/4578 5 Production of fodder Tonns/year 2394/16758 6 Existing area under Fuel
wood Ha 1038
7 Supplementary feed Kgs/ day 0 8 Silage Pits No 0 9 Availability of fodder Ton 45404
10 Deficiency/excess of fodder Ton 1268
The above table shows there is fodder deficiency (Requirement is 46672 and
availability 45404 Ton.)
To minimize the large and expanding gap between feed and fodder resource
availability and demand there is need for
Increase in area under fodder crops
Increase in productivity of fodder crops
Development of pastures
And reduction in large number of livestock production through replacement by
few but productive animals
25
Table 2.9 Agriculture implements
Farm Mechanization and Seed Banks: As discussed earlier 34.83% land holdings
belong to small and marginal farmers. The cultivation of 55.81% of total cultivated
area so owning of big farm implements by individual farmers is not economical so
SHG would be promoted to buy farm implements and rent to farmer. The concept of
fodder and Seed bank will be promoted on institutional basis in the project so that
resource poor people could be facilitated and ensured timely and locally available
seed and fodder material as per their need.
Table 2.10 NREGA Status No. of Card Holder, activities taken so far, employment status.
S. no.
Name of village Total No .of job
cards
Employment Status
Activity taken up so far
1 Thaiyat 120 16lac Gravel Road,
Tradditational water bodies,
forest/pasture enclosures etc.
2 Basanpeer juni 176 24 lac 3 Bhagu ka gaon 168 22.5lac 4 Ridwa 185 24.60 lac 4 Asayach 190 25 lac
Table 2.11 Migration Details
Name of
village
No. of persons
migra ting
No. of days per year of
migration
Major reason(s)
for migrating
Distance of destination
of migration from the village
(km)
Occupation during
migration
Income from such
occupation (Rs.
in lakh)
Thaiyat 15 280
Employment & Business
150-2000 Employment & Business
17
Basanpeer juni
35 280 38
Bhagu ka gaon
45 280 47
Ridwa 30 280 34
Asayach 10 280 12
S.No Implements Nos.
1 Tractor 43
2 Sprayers-manual/ power 15
3 Cultivators/Harrows 43
4 Seed drill 15
5 Any Other 14
26
The migration can be checked by creation of employment opportunities,
enhancing farm level economy, increased the income of the people engaged in
animal husbandry by dairy, poultry, proper marketing and value addition to the
produce (As discussed earlier) and diversification in livelihoods. Well planned animal
husbandry activities and dairying is envisaged to be taken as main on farm income
generating activity with convergence of other Departmental schemes. A scientific
and hyeigenic proof milk collection unit and milk storage unit (chilling Plant) is
envisaged to be installed on SHG concept. The marketing linkages and MOU with
Governmental as well as non- Government sector dairying units in Jaisalmer will be
ensured with intervention of District administration and allied Departments/ public
sector units.
The existing livelihoods of project Villages are given below
Table 2.12 (a) Major activities (On Farm)
Name of activity No. of
House holds Average annual income
/per House hold (in lac)
Cultivators 412 617 lac Dairying 485 72 lac Poultry - - Piggery - - Landless Agri. Labourers
137 226
Table 2.12(b) Major activities (Off Farm)
Table 2.12(b) Major activities (Off Farm)
Name of activity
Households/individuals Average annual income from
the Artisans 30 24.63 Carpenter 39 32.20 Blacksmith 8 8.00 Leather Craft 4 4.5 Porter 96 85.02 Mason 120 100.64
Others specify (Cycle
Repair ,STD,Craft
etc)
- -
27
The efforts for increase in income through off farm activities will be made
under livelihood component through assistance to SHG or individuals. Some home
based activities specially for women are being discussed in the meetings of SHG, the
same will be supported through revolving funds and loan from the banks against the
savings/ credits of concerned group
28
29
Table 2.13(a) Status of Existing SHG
S. No
Name of SHG
Members Activity involved
Monthly income
Fund avai.
Assistance available
Source of assistance
Training receive
1 Nagurani 10 Live stock 1000 11000 - - -
2 Haji Fateh mo. SHG Bhagu ka gawn
10 Live Stock 1000 1000
Livelihood system in three components Amount in lac
Area Section
Amount
Avilable
amount
in this
head
(9%)
SHG Individual Person SHG/SHG Fed.
Maximum
(100%)
Minimum
(60%)
Maximum
(10%)
Minimum
(0%)
Maximum
(30%)
Minimum
(0%)
IWMP
900.00 81.00 81.00 54.00 8.10 0.00 24.30 0.00
A) Revolving fund to SHGs – minimum 60% of livelihood component
(Maximum RF of Rs. 25000/- Permitted)
B ) Revolving fund to individual enterpreneur maximum 10% of livelihood
component (Maximum RF of Rs 25000/- permitted)
C) Grant in aid to Federation of SHGs – maximum 30% of livelihood component
(Maximum Grant in aid of 50% of work (project) or maximum of Rs. 200000/ (2.00
Lakh) permitted)
i ) if project cost is 4.00 lakh, grant would be 2.00 lakh
ii ) if project cost is 5.00 lakh, grant would be 2.00 lakh
iii ) if project cost is 3.00 lakh, grant in aid would be 1.75 lakh
30
MIES Format of Livelihood component under iwmp For Enterprising Format - 13
Individual
S.
no District Block
Project
Name
No of
Enterprising
Individual
Assistace
Provided from
project as seed
money
Amount
refunded
Activity
Block
Total
Total no of
project
Ditrict
total
Total of
block
Total no of
Project
For Enterprising Format - 14
SHG
S.
n District Block
Project
Name
No of
Enterprising
SHG
No of
Mem
bers
Group
corpus
Cost of
approv
ed sub
project
Assistace
provided
from
bank as
loan
Assistace
provided
from
IWMP as
grant
Other
if any
Activit
y
Project
Total
Total no of
enterprising
SHF
Block
Total
Total
no of
Project
Total no of
enterprising
SH
Total
no of
Project
Total no of
enterprising
SH
Block
Total
Block
Total
Total
no of
Project
Total no of
enterprising
SH
Block
Total
31
For SHG Federation Format - 15
S
.
n
Dist
rict Block
Project
Name
No of SHG
Fed.
No of
Mem
bers
Fed.
Corpus
Cost of
approv
ed sub
project
Assistace
provided
from
bank as
loan
Assistace
provided
from
IWMP as
grant
Other
if any
Activit
y
Project
Total
Total no of
enterprising
SHF
Block
Total
Total
no of
Project
Total no of
enterprising
SH
Total
no of
Project
Total no of
enterprising
SHF
Block
Total
Block
Total
Total
no of
Project
Total no of
enterprising
SH
Block
Total
For SHG Format - 16
S.
n District Block
Project
Name No of SHG
No of
Mem
bers
Group
Corpus
Assistace
provided
from
project as
seed
money
Amount
refunded
Activity
Block
Total
Total of
no.
project
Block
Total
Total of
no.
project
The table indicates existences of number of groups in the area also need to be strengthened
through trainings and financial assistance.
32
II. Technical Features Table 2.14 Ground Water
S. No
Source No. Funct ional
depth(m) Dry
Area irrigat
or
Water availability(
days)
1 Dug wells - - - - -
2 Shallow tube wells
- - - - -
3 Pumping Sets
- - - - -
4 Deep Tube Wells
15 140 0 320 365 days
Total 15 140 0 320 - Table 2.15 Availability of drinking water
S.No
Name of the
village
Drinking water
requirement
Ltrs/day
Present availability of
drinking water
Ltrs/day
No. of drinking water sources availab
le
No. Functio
nal
No. requir
es repair
s
No. Defunc
t
1 Thaiyat 32616 22650 1 1 - -
2 Basanpeer juni
63072 43800 5 5 - -
3 Bhagu ka gaon
84024 58350 2 2 - -
4 Ridwa 57096 39650 3 3 - - 5 Asayach 19584 13600 4 4
33
Table 2.16 Water Use efficiency
Name of major crop
Area (Hectare)
through water saving
devices(Drip/ Sprinklers)
through water
conserving agronomic practices #
Any other (pl.
specify) Total
Bajara - 2303 --- --- Guar - 587 --- --- Moong - 160 --- --- Month - 240 --- --- Mustrad 206 - --- --- Zeera 84 - --- --- Wheat 130 - - -
� The tables above indicate need for judicious use of available Water.
� Encouraging optimum use of water through installation of sprinklers/ drips on every
operational wells and other irrigation source.
Table 2.17 Slope details.
S.No. Slope percentage Area in hectares
1 0 to 3% 5080 2 3 to 8% 920 3 8 to 25% - 4 > 25% -
As most of the area has slope less than 3%, construction of contour bunds can solve the
problem of water erosion in agriculture fields and protect washing of top soil and
manures/fertilisers. The area having less than 2% slope can be improved by adopting scientific
tillage practices, agronomical practices and vegetative barriers.
The arable lands having slope more than 1% to be treated by constructing earthen bunds,
contour/ field bunding fortified with vegetative hedges of perennial grasses and locally suited agro
forestry plants.
34
Table 2.18 Soil details
S. No.
Major Soil Classes Area in
hectares
A Soil Depth
1 Sandy Loam 6000 2 Loam --- B Soil Depth :
1 0.00 to 7.50 6000 2 7.50 to 45.00 --- 3 > 45.00 --- C Soil fertility Status
Kg/ha Recomm.
N 50-70 80-90 P 20-30 40-50 K 10-15 20-30
Micronutrients 10-500
ppm 100-500
The analysis of table shows the need to improve and maintain soil fertility. Soil health card
to every farmer every crop season will be provided, which will include the recommendation for
Application of micro nutrient and fertilizers as per the crops those would be taken on the field.
Table 2.19 Erosion details
Cause Type of erosion Area
affected (ha)
Run off(mm/
year)
Average soil loss (Tonnes/
ha/ year)
Water erosion
A Sheet 1200
B Rill 1200 C Gully 0
Sub-Total 2400
Wind erosion 3600 15.5 NA
Total for project 6000
35
The need is:
• To check land degradation
• To reduce excessive biotic pressure by containing the number and controlling population of
livestock
• To check cultivation on sloping lands without adequate precautions of soil and water
conservation measures
• To discourage cultivation along susceptible nallah beds
• To check Faulty agriculture techniques
• To check Uncontrolled grazing and developed cattle tracks
• To check Deforestation of steep slopes
• To check erosive velocity of runoff, store Runoff, to arrest silt carried by runoff and to recharge
ground Water. Structures life Earthen check dams, Earthen embankment (Nadi) and Khadins
would be taken up.
36
CHAPTER - III Proposed Development Plan
A) Preparatory phase activities, Capacity Building Trainings and EPA
The IEC activities like Group meetings, door to door campaign, slogans and wall writings etc.
are carried out in all the habitations. A series of meetings were conducted with GP members,
community and discussed about the implementation of IWMP programme. The PRA exercises also
conducted in each and every habitation involving all the stake holders. User groups are also
formed to ensure beneficiaries effective and active participation since from beginning, planning
and in execution so that the can use them on sustained basis and can maintain even after the
completion of project.
Grama Sabhas were conducted for approval of entry point activities, for selecting the
watershed committee and approval of DPR.
S. No
Name of the Gram Panchayat
Date on which Grama Sabha approved EPA
1 Bsanpeer 26.11.2012 2 Hamira 26.11.2012 Badoda goun 26.11.2012
Details of Entry Point Activities under taken:
S.
N.
Names of
village
Amount
earmarked
for EPA
Entry
Point
Activities
planned
Estimat
ed cost
Expenditure
incurred Balance
Expected
outcome
Actual
outcome
1 Thaiyat 3.00 3 3.00 0.75 2.25
Ensu
red
Drinki
ng
wate
r
faci
lity
and
lightin
g for
Ensu
red
Drinki
ng
wate
r
faci
lity
and 2
Basanpeer juni
6.00 6 6 1.50 4.50
3 Bhagu ka Goun
9.00 9 9.00 2.25 6.75
4 Ridwa 9.00 9 9.00 2.25 6.75
Asayach 9.00 9 9.00 2.25 6.75
37
The PRA exercise was carried out in all the villages on the dates shown below:
S. No
Name of the village/Habitation
Date on which PRA conducted
1 Thaiyat 02.10.2012 2 Basanpeer juni 04.10.2012 3 Bhagu ka govn 08.10.2012 4 Ridwa 17.10.2012 Asayach 18.10.2012
Transact walk were carried out involving the community for Social mapping, Resource
mapping. Detailed discussions and deliberations with all the primary stakeholders were carried
out.
Socio-economic survey was carried out for six mm period covering all the households and
primary data on demography, Land holdings, Employment status, Community activities etc. was
collected as mentioned in chapter 2.
State Remote Sensing Application centre jodhpur was assigned the work of preparing
various thematic layers using Cartosat-1 and LISS-3 imageries for Creation, development and
management of geo-spatial database depicting present conditions of land (terrain), water and
vegetation with respect to watershed under different ownerships at village level.
Various thematic layers provided by SRSAC are:
• Delineation of Macro/Micro watershed boundaries.
• Digitised Khasara maps of the villages falling in project area.
• Network of Drainage lines, existing water bodies, falling in the project area.
• Base maps (transport network, village/boundaries, and settlements).
• Land Use / Land cover map.
Based on GIS thematic layers, Field visits , PRA and analysis of benchmark data (as
discussed in chapter 2) final Treatment plan on revenue map for implementation has been framed.
Thus each intervention identified has been marked on Geo referenced Khasra Map with Contours
as provided by the SRSAC Jodhpur. (map enclosed in DPR as annexure ”A”
38
. CAPACITY BUILDING
Table- List of approved Training Institutes@ for Capacity Building in the
project area
1 2 3 4 5 6 7 8
S. No.
Name of Stakeholders
Name of the Training Institute
Full Address
with contact no., website &
Name & Designatio
n of the Head of Institute
Type of Institute#
Area(s) of speciali-zation$
Accredita-tion details
1 PIAs igprs Jaipur JLN Marg Jaipur
Directoed IGPRS
State Level
State Level Rajasthan Gov.
2 WDTs Panchayat Trg Centre
Mandor Road Jodhpur
Prin. PTC Jodhpur
Jodhpur Level
Jodhpur Level Jodhpur Level
3 UGs Agri. Sci. Centre Jaisalmer
Mohangarh Jaisalmer
Scein. District & Panchayat Level
District & Panchayat Level
Rajasthan Gov.
4 SHGs Agri. Sci. Centre Jaisalmer
Mohangarh Jaisalmer
Scein. District & Panchayat Level
District & Panchayat Level
Rajasthan Gov.
5 WCs PTC Mandor Road Jodhpur
Mandor Road Jodhpur
Prin. PTC Jodhpur
Jodhpur Level
Jodhpur Level Rural dev Dep
6 GPs PTC Mandor Road Jodhpur
Mandor Road Jodhpur
Prin. PTC Jodhpur
Jodhpur Level
Jodhpur Level Rural dev Dep
7 Communit
y
Agri. Sci. Centre Jaisalmer
Mohangarh Jaisalmer
Scein. Panchayat Level
Panchayat Level
Rajasthan Gov.
8 PM/SLNA igprs Jaipur JLN Marg Jaipur
Directoed IGPRS
State Level
State Level Rajasthan Gov.
39
lkj.kh %& ifj;kstuk {ks= esa {kerk lao/kZu laca/kh xfrfof/k;kW ¼HkkSfrd ,oa foRrh;½ ifj;kstuk ykxr dk 4 izfr'kr
1 2 3 5 6 7
Ø-la-
ifj;kstuk esa
lgHkkxh
O;fDr;ksa dh
la[;k
ifj;kstuk vof/k esa izf'kf{kr fd;s tkus okys O;fDr;ksa dh la[;k
ifj;kstuk vof/k esa vk;ksftr izf'k{k.kksa dh la[;k ifj;kstuk vof/k esa izf'kf{kr fd;s tkus okys O;fDr
fnolksa dh la[;k
izFke o"kZ
f}rh; o"kZ
r`rh; o"kZ
prqFkZ o"kZ
iape o"kZ
dqy izFke o"kZ
f}rh; o"kZ
r`rh; o"kZ
prqFkZ o"kZ
iape o"kZ
dqy izFke o"kZ
f}rh; o"kZ
r`rh; o"kZ
prqFkZ o"kZ
iape o"kZ
dqy
1 ih-vkbZ-,- 6 6 6 6 18 3 3 2 8 9 9 15 33 2 MCY;w-Mh-
Vh- 4 4 4 4 12 5 5 5 15 15 10 20 45
3 miHkksDRkk lewg
300 60 150 90 300 4 2 2 8 720 1500 540 2760
4 Lo;a lgk;rk lewg
240 48 120 74 242 4 3 4 11 576 1080 160 1816
5 tyxzg.k lfefr
24 12 12 8 32 4 3 4 11 96 72 96 264
6 xzke iapk;r
22 12 20 8 40 4 5 8 17 48 100 64 232
7 leqnk; 290 58 145 78 276 5 5 5 15 290 725 390 1405 8 'kSf{kf.kd
Hkze.k ¼vUrZjkT;½
100 0 100 50 150 0 1 1 2 0 700 700 1400
9 'kSf{kf.kd Hkze.k ¼jkT; dsvUnj½
100 0 100 0 100 0 1 0 1 0 1000 0 1000
10 ifj;ktuk izcU/kd @,l-,y-,u-,-
5 5 5 5 15 2 3 2 7 30 45 30 105
11 dqy HkkSfrd
1091 205 662 323 1185 31 31 33 95 1784 5241 2015 9060
12 dqy foRrh; ¼yk[kks es½
36.00 7.2 18.00 10.8 36.00 7.2 18.00 10.8 36.00 7.2 18.00 10.8 36.00
40
Table-, Education & Communication (IEC) activities in the project area (1% of total Project cost.)
1 2 3 4 5 6
S.
No.
Activity Executing
agency
Allocation out of 1% of total Project cost
Allocation in lacs Expected
Outcome
(may quantify,
wherever possible)
I year II year III
year
VIy
ear
V
year Total
1 ekWMy #QVkWi okVj gkjosZfVx LVªDplZ ¼iapk;r lfefr, jktho xkW/kh lsok dsUnz ;k vU; iapk;r lfefr Lrjh; utnhdh ljdkjh Hkou ½A
0-20 0.54 0.90 0.36 1.80
2 tyxzg.k {ks= xfrfof/k;kas dks n’kkZrk gqvk POP / CLAY / WOOD / PLASTIC ls cuk gqvk ekWMyA
0-10
0.27 0.45 0.18
0.90
3 MhLiys cksMZs@IysxDlh cksMZ@
4 okWy isfUVax&tyxzg.k xfrfof/k;ksa] y{;ks o izkfIr vkfn dks n’kkZrh gqbZ
0-25
0.68 1.13 0.45 2.25
5 tyxzg.k fodkl laca/kh eqfnzr iEiysVl@fyQ ysVl@ pkVZ@ iksLVj@ vkfnA
6 Ukkjk ys[ku
7 lQyrk dh dgkuh;ksa dh ohfM;ksaxzkQh@QksVksxzkQh@ y?kqfQYe ,oa
0-15 0.41 0.68 0.27 1.35
41
d`"kdks ls lk{kjkrdkj @ okrkZ
8 fucU/k o okn&fookn izfr;ksfxrk
9 jsfM;ksa@nwjn’kZu ij okrkZ o foKkiu
10 lkaLd`frd R;kSgkj @ esys vkfn ds volj ij iznZ’kuh
0-10
0-27 0.45 0.18 0.90
11 uqDdM+ ukVd
12 dViqryh izn’kZu
13 jkf= xks"Bh
0-20
0.54 0.90 0.36 1.80
14 Hkw laj{k.k lIrkg
15 psruk jSyh
16 tyxzg.k fodkl dk lans’k nsus okys lkaLd`frd dk;ZØe
17 d`"kd fnol dk vk;kstu ,oa {ks= Hkze.k fnol dk vk;kstu bR;kfn
18 dqy 1-00 2.70 4.50 1.80 9.00
42
State Remote Sensing Application Centre other agency was assigned the work of
preparing various thematic layers using Cartosat-1 and LISS-3 imageries for Creation,
development and management of geo-spatial database depicting present conditions of
land (terrain), water and vegetation with respect to watershed under different ownerships
at village level
Various thematic layers provided by SRSAC :
• Digitised Khasara maps of the villages falling in project area. • Base maps (transport network, village/boundaries, and settlements). • Land Use / Land cover map.
Based on GIS thematic layers, Field visits , PRA and analysis of benchmark data (as
discussed in chapter 2) final Treatment plan on revenue map for implementation has
been framed. Thus each intervention identified has been marked on revenue map
(map enclosed in DPR as annexure .The GIS based intervention map, PRA based
intervention map are annexed .
B)Livelihood Action Plan (LAP):
An awareness programme has been undertaken at Gram Sabha for communication &
sensitization of the target beneficiaries. Livelihood Action Plan is a pre requisite for availing
the funds under the livelihood component. LAP has been prepared by the PIA in consultation
with WDT, WC & the members of SHG,SC/ST, women, landless/ assetless households.
Details of funds available & their utilisation is as under :
(i) Total project cost Rs 900 Lacs.
(ii) Funds available under livelihood component is 9% of total project cost= Rs.81.00
Lacs.
(a) Seed money for SHGs as revolving fund = Rs. 48.60 Lacs.
(minimum 60% of livelihood component)
- - No. Of SHG to be formed 19 Nos.
--- No of persons (members) in SHGs 115 Nos.
(b) Seed money for enterprising individuals = Rs. 8.10 Lacs
(maximum 10% of livelihood component)
-- No of persons identified as enterprising individuals 23 Nos.
43
S.
Item Numbers
Revolving fund/
Seed money
% of
LAP
1 SHG
a Existing 4 48.60 60
b New 43
Sub Total 47
2 Enterprising individuals 43 8.10 10
3
Enterprising
SHG/Federations of
SHG
35 24.30 30
Total 125 81.00 100
Proposed Activities (On Farm)*
Name of activity* No of SHGs Revolving fund
Fisheries 0 0.00
Dairying 2 0.50
Poultry 2 0.50
Piggery 0 0
Goatry 4 1.00
Bee keeping 4 1.00
Sericulture 0 0
Nursery 0 0
Maize dehusker 2 0.50
Dal mill 0 0
Oil mill 0 0
Others (specify) 10 2.50
Total 24 6.00
44
Proposed Major activities (Off Farm)**
Name of activity* No of SHGs Revolving fund
Blacksmith 0
Leather Craft 12 3.00
Porter 6 1.5
Mason 0 0
Eco tourism 12 3.00
Agro processing 0 0
Blacksmith 0 0
Candle making 0 0
Dona Pattal 0 0
Sewing / Knitting 0 0
Tea Stall 0 0
General Store 0 0
Mechanic / Misc. shop 0
Others (specify) 7 3.25
Total
(c) Funds for Enterprising SHG/Federations of SHG
(Maximum 30 % of livelihood activities)= Rs.24.30 Lacs
The funding for major livelihood activities will enable the enterprising SHGs/SHG federation to avail a
composite loan for undertaking major livelihood activities or to upscale activities as recommended by
the WC & approved by WCDC in consultation with line departments.
Details of enterprising SHG/federation is given below :
S.No. Name of SHG/
SHG federation Project Name
Project Cost in
lacs
Grant in aid 50%
of project cost or 2
lacs whichever is
less
Bank loan
1 56 Ms;jh] eaMh]QSMjs”ku
lacf/kr vU; dk;Z
14.30 7.15 6.15
2 40 Lo;a lgk;rk lacf/kr
xfrfof/k;ks ds dk;Z
10.00 5.00 4.00
Total 24.3 12.15 10.15
45
* Details of project activities can be prepared in coming years after formation of SHG
federation or as the case may be.
C) Production Plan:
An awareness programme has been undertaken at Gram Sabha for communication &
sensitization of the target beneficiaries. Production System & micro enterprises Action Plan
is pre-requisite for availing the funds under the Production System & micro enterprises
component. Production plan has been prepared by the PIA in consultation with WDT, WC &
the members of Users Group. Details of funds available & their utilisation is as under :
(iii) Total project cost Rs.900 Lacs.
(iv) Funds available under Production System & Micro enterprises component is
10% of total project cost= Rs. 90 Lacs.
Proposed Activities for production system & Micro enterprises
Name of activity* No. of house holds
Cost of activity
WDF
A Production System
1 Fisheries 0 0 0 2 Dairying 10 3.75 0.75 3 Poultry 8 2.5 0.50 4 Piggery 0 0 0 5 Goatry 35 10.00 2.00 6 Bee keeping 0 0 0 7 Sericulture 0 0 0 8 Bio fuel , Medicinal plantation 0 0 0 B Others 0 0 0 1 Crop Demontration
a Integrated Nutrient Management 820 20 4 b Integrated PestManagement 820 8.00 2.00 c Distribution of seed / Mini kit of HYV
825 8.00 2.00
2 Introduction of Innovative Agril Activities 15 2.75 0.55
3 Distribution of Seed cum ferti. drill 5 1.25 0.25
4 Distribution of other Agricultural & plant protection equipment
8 2.00 0.20
5 Fodder production 250 3.75 0.75
6 Agro forestry 12 6.00 1.20
7 Agro Horticulture 4 1.00 0.20
46
8 Floriculture 0 0 0
9 Vegetable cultivation 5 1.25 0.25
10 Organic farming (Green Manuaring, Vermicompost, Nadep Compost)
20 2.00 0.40
11 Green House 0 0 0
12 Shed net 0 0 0
13 Nursery 3 0.75 0.15
Others (specify)
Total
C Microenterprises
1 Agro processing 2 0.50 0.10
2 Value Addition 0 0 0
3 Fruit preservation ( Chatni, Achar, Murabba, Jam, Jelly, Etc.)
2 0.50 0.10
4 Flour Mill 5 1.25 0.25
5 Dal mill 4 1.00 0.20
6 Oil mill 2 0.50 0.10
7 Maize dehusker 0 0 0
8 Para Vetnery services
a AI 432 3.00 0.60
b Castration 40 2.00 0.40
c Demo. Urea Molasis 115 3.50 0.70
9 Manger 230 23.00 4.60
10 Animal Shed 12 3.00 0.60
Others 10 2.50 0.50
Awareness Programme
-Slogan Wall Painting,
Scientific Animal Husbandry Practices ; Seminars / Debates / Pamphlet distribution/ Stickers/ Chetana Rally
Broadcasting / Telecasting Film Show
Visit- intra/ inter/ out of State/ Abroad
Fortnightly Meetings with Livestock keeper to discuss and decide all breedable females to be covered.
Creation Of Disease Free Zone: Livestock’s health c overage
Establishment of Pashudhan Seva Kendra (PSK) (Convergence with peer department)
Deworming to reduce worm load and enhance disease resistance. (Convergence with peer department)
Distribution of mineral mixture. (Convergence with peer department)
Free of Cost Vaccination in IWMP area Livestock for H.S., B.Q., F.M.D., PPR, ETV and Sheep Pox.
47
Ensure Hygenic measures to check Zonosis.(DAH/ IWMP)
Construction of Animal Sheds with Manger and Portab le Manger With accessories
Provision of Cattle Water Troughs.
Infertility Management: To ensure Livestock’s Produ ctivity
Expansion of AI Coverage/ reduction in no.of infertile females.
PCPD+ COMBAT INFERTILITY+ CAMPS INFERTILITY RLDB+ CAMPS INFERTILITY SC COMPONENT
Breed Improvment: To ensure Livestock’s Productivity enhancement
A.I. (Convergence with peer department)
Incentive based Mass Castration at Door Step of Scrub Bulls to Check ND Recycling.
Registration of bulls (Convergence with peer department)
Bull / Buck Distribution for NS-.Gir, Murrah And Sirohi /Jamunapari Breed Bulls/ Bucks Should Be Distributed For 3yrs 6 (3 In Each Iwmp Area, Where Ever A.I. Facility Is Not Available Round’s O Clock. On 100% Subsidized Rate To WC.
Financial Incentive to the Inseminator for Calf Borns.
Convergence with peer Department/DAH/Agriculture/ATMA/ Board/ Trust/ Goseva
An Assistance to control Malnutrition: Protein Supplementation
Feed & fodder production enhancement.
48
49
50
51
52
53
54
Project 30
Activity Unit Qty.Unit
cost
Total
cost
Labour
Component
Material
component
Cost from
Project
Fund
Conver
gence
Fund
Beneficiary
Contribution
(A) Preparatory phase activities capacity building training & EPA
Admn. 10% 0 0 90.00 0.00 90.00 90.00 0.00 0.00
Monitoring 1% 0 0 9.00 0.00 9.00 9.00 0.00 0.00
Evaluation 1% 0 0 9.00 0.00 9.00 9.00 0.00 0.00
EPA 4% 0 0 36.00 0.00 36.00 36.00 0.00 0.00
I&CB 5% 0 0 45.00 0.00 45.00 45.00 0.00 0.00
DPR 1% 0 0 9.00 0.00 9.00 9.00 0.00 0.00
Total (A) 198.00 0.00 198.00 198.00 0.00 0.00
(B) Natural resource management (56%)
Conservation measures for arable land (private land)
Field Bunding ha 1510 0.093 140.43 140.43 0.00 140.43 0.00 17
Earthen Structure 1 No. 29 1.2 34.80 34.80 0.00 34.80 0.00 5
Earthen Structure 2 No. 22 1.75 38.50 38.50 0.00 38.50 0.00 6
Earthen Structure 3 No. 17 2 34.00 34.00 0.00 34.00 0.00 5
Tanka 1 No. 70 0.62 43.40 26.04 17.36 43.40 0.00 7
Tanka 2 No. 65 0.7 45.50 27.30 18.20 45.50 0.00 7
Khadin No. 5 Site wise 48.56 29.14 19.42 48.56 0.00 7
Conservation measures for non arable land
Pasture Development ha 0 0 0.00 0.00 0.00 0.00 0.00 0
V-ditch ha 209 0.0192 4.01 4.01 0.00 3.96 0.00 1
Water Harvesting
StructureNo. 9 3 27.00 16.20 10.80 27.00 0.00 4
Afforestation ha 40 1.6 64.00 19.20 44.80 88.00 0.00 10
Tanka 3 No. 17 1.4 23.80 14.28 9.52 26.60 0.00 4
Draunage line treatment
MMS, Gaboin No. 0 0 0.00 0.00 0.00 0.00 0.00 0
LSCD No. 0 0 0.00 0.00 0.00 0.00 0.00 0
WHS No. 0 0 0.00 0.00 0.00 0.00 0.00 0
Gully Plugs (ECD) No. 0 0 0.00 0.00 0.00 0.00 0.00 0
Ground water structure No. 0 0 0.00 0.00 0.00 0.00 0.00 0
Total (B) 1993.00 12.38 504.00 383.90 120.10 504.00 0.00 72
(C) Production system and micro enterprise (10%)
Production measures for arable land
Arid Horticulture ha 116 0.3 34.80 12.60 22.20 26.50 0.00 7
Sprinklers & Drip irrigation ha 64 0.3 19.20 0.00 19.20 7.00 0.00 4
Vegetables No. 1417 0.005 7.09 0.00 7.09 6.08 0.00 1
Medicinal plants No. 84 0.005 0.42 0.13 0.29 0.35 0.00 0
Vermi compost No. 45 0.1 4.50 1.35 3.15 3.50 0.00 1
Crop Demonstration No. 33 0.015 0.50 0.15 0.35 25.50 0.00
Micro Enterprise 0.00 0
Dairy No. 38 0.25 9.50 0.00 9.50 7.00 0.00 2
Poultry No. 21 0.25 5.25 0.00 5.25 1.60 0.00 1
Animal camp/Breed improovement No. 45 0.05 2.25 0.00 2.25 8.07 0.00 0
Local Artisans/craft No. 14 0.25 3.50 0.00 3.50 2.20 0.00 1
Food Processing No. 12 0.25 3.00 0.00 3.00 2.20 0.00 1
Total (C) 1889.00 1.78 90.00 14.22 75.78 90 0 18
D.Livelihood Activities (9%)Revolving Fund to SHG (60 % minimum of 9% amount)
60% 194 0.25 48.60 0.00 48.60 48.60 0.00 0
Revolving Fund to enterprising individual (10 % maximum of 9% amount)
10% 32 0.25 8.10 0.00 8.10 8.10 0.00 0
Grant in aid to Federation of SHG individual (30 % maximum of 9% amount)
30% 24 1.00 24.30 0.00 24.30 24.30 0.00 0
Total (D) 81.00 0.00 81.00 81.00 0.00 0
(E) Consolidation 27.00 0.00 27.00 27.00 0.00 0
Total (E) 0 0 27.00 0.00 27.00 27.00 0.00 0
Grand Total 900.00 398.12 501.88 900.00 0.00 90
CHAPTER-IV Activity wise Total Abstract of cost
IWMP 30 Tables1
Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin Phy Fin
Admn. 0 0 10% 90.00 9.00 9.00 22.50 22.50 13.50 13.50 0 90.000
Monitoring 0 0 1% 9.00 0.90 0.90 2.25 2.25 1.35 1.35 0 9.000
Evaluation 0 0 1% 9.00 0.90 0.90 2.25 2.25 1.35 1.35 0 9.000
EPA 0 0 4% 36.00 3.60 3.60 9.00 9.00 5.40 5.40 0 36.000
I & CB 0 0 5% 45.00 11.25 11.25 6.75 6.75 4.50 4.50 0 45.000
DPR 0 0 1% 9.00 4.50 4.50 0.00 0.00 0.00 0.00 0 9.000
(22%)Total (A) 198.00 30.15 30.15 42.75 42.75 26.10 26.10 0 198.000
(B) Natural resource management (56%)
Conservation measures for arable land(private land)
Field Bunding ha 1510 0.093 140.43 0 17 24.58 264 24.58 491 45.64 491 45.64 1263 140.430
Earthen Structure 1 No. 29 1.2 34.80 5 6.09 5 6.09 9 11.31 9 11.31 29 34.800
Earthen Structure 2 No. 22 1.75 38.50 4 6.74 4 6.74 7 12.51 7 12.51 22 38.500
Earthen Structure 3 No. 17 2 34.00 3 5.95 3 5.95 6 11.05 6 11.05 17 34.000
Tanka 1 No. 70 0.62 43.40 12 7.60 12 7.60 23 14.11 23 14.11 70 43.400
Tanka 2 No. 65 0.7 45.50 11 7.96 11 7.96 21 14.79 21 14.79 65 45.500
Khadin No. 5 Site wise 48.56 1 8.50 1 8.50 2 15.78 2 15.78 5 48.560
Conservation measures for non arable land
Pasture Development ha 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.000
V-ditch ha 209 0.0192 4.01 37 0.70 37 0.70 68 1.30 68 1.30 209 4.01
Water Harvesting Structure No. 9 3 27.00 2 4.73 2 4.73 3 8.78 3 8.78 9 27.000
Afforestation ha 40 1.6 64.00 7 11.20 7 11.20 13 20.80 13 20.80 40 64.000
Tanka 3 No. 17 1.4 23.80 3 4.17 3 4.17 6 7.74 6 7.74 17 23.800
Drainage line treatment
MMS, Gabin No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.000
LSCD No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.000
WHS No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.000
Gully Plugs (ECD) No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.000
Ground water structure No. 0 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.000
Total (B) 504.00 102 88.20 348.78 88.20 647.73 163.80 647.73 163.80 1745.75 504.00
(C) Production System and micro enterprise(10%)
Production measures for arable land
Arid Horticulture ha 116 0.3 34.80 20 6.09 20 6.09 38 11.31 38 11.31 116 34.800
Sprinklers & Drip irrigation ha 64 0.3 19.20 11 3.36 11 3.36 21 6.24 21 6.24 64 19.200
Vegetables No. 1417 0.005 7.09 248 1.24 248 1.24 461 2.30 461 2.30 1417 7.085
Medicinal plants No. 84 0.005 0.42 15 0.07 15 0.07 27 0.14 27 0.14 84 0.420
Vermi compost No. 45 0.1 4.50 8 0.79 8 0.79 15 1.46 15 1.46 45 4.500
Crop Demonstration No. 35 0.015 0.53 6 0.09 6 0.09 11 0.17 11 0.17 35 0.525
Micro Enterprise 0.00 0 0.000
Dairy No. 38 0.25 9.00 7 1.58 7 1.58 12 2.93 12 2.93 38 9.000
Poultry No. 21 0.25 1.90 4 0.33 4 0.33 7 0.62 7 0.62 21 1.900
Animal camp/Breed improovement No. 45 0.05 8.17 8 1.43 8 1.43 15 2.66 15 2.66 45 8.170
Local Artisans/craft No. 14 0.25 2.20 2 0.39 2 0.39 5 0.72 5 0.72 14 2.200
Food Processing No. 12 0.25 2.20 2 0.39 2 0.39 4 0.72 4 0.72 12 2.200
Total (C) 90.00 331 15.75 330.93 15.75 614.58 29.25 614.58 29.25 1891.00 90.00
D.Livelihood Activities (9%)
Revolving Fund to SHG (60 % minimum of 9% amount) 194 0.25 48.60 0 8.51 0.00 8.51 0.00 15.80 0.00 15.80 0.00 48.60Revolving Fund to enterprising individual (10 % maximum of 9% amount) 32 0.25 8.10 0 1.42 0.00 1.42 0.00 2.63 0.00 2.63 0.00 8.10
Grant in aid to Federation of SHG individual (30 % maximum of 9% amount) 24 1.00 24.30 0 4.25 0.00 4.25 0.00 7.90 0.00 7.90 0.00 24.30
Total (D) 81.00 0 14.18 0.00 14.18 0.00 26.33 0.00 26.33 0.00 81.00
(E) Consolidation (3%) 0 0 27.00 0 4.73 0 4.73 0 8.78 0 8.78 0 27.000
Grand Total 900.00 30.15 30.15 165.60 165.60 254.25 254.25 900.00
Yearwise % Targets 90
(A) Preparatory phase activities capacity building trainings & EPA
5th year 6th year Total 2nd year 3nd YearActivity Unit Qty.
Unit
Cost
4th yearTotal
cost
1st year
ANNUAL ACTION PLAN-(THROUGH PROJECT FUND)
IWMP 30 Tables1
Project 30
Total
cost
Cost from
Project
Fund
Conver
gence
Fund
Beneficiary
Contribution
(A) Preparatory phase activities capacity building training & EPA
Admn. 10% 0 0 22.50 22.50 0.00 0.00
Monitoring 1% 0 0 2.25 2.25 0.00 0.00
Evaluation 1% 0 0 2.25 2.25 0.00 0.00
EPA 4% 0 0 9.00 9.00 0.00 0.00
I&CB 5% 0 0 11.25 11.25 0.00 0.00
DPR 1% 0 0 2.25 2.25 0.00 0.00
Total (A) 49.50 49.50 0.00 0.00
(B) Natural resource management (56%)
Conservation measures for arable land (private land)
Field Bunding ha 377 0.093 35.1 26.65 0.00 2.69
Earthen Structure 1 No. 7 1.2 8.4 8.40 0.00 0.72
Earthen Structure 2 No. 5 1.75 8.8 8.75 0.00 0.79
Earthen Structure 3 No. 4 2 8.0 8.00 0.00 0.60
Tanka 1 No. 17 0.62 10.5 10.54 0.00 0.47
Tanka 2 No. 16 0.7 11.2 11.20 0.00 0.79
Khadin No. 1 Site wise 15.5 15.50 0.00 1.48
Conservation measures for non arable land 0.0 0.00
Pasture Development ha 0 0 0.0 0.00 0.00 0.00
V-ditch ha 50 0.0192 1.0 0.96 0.00 0.00
Water Harvesting
StructureNo. 2 3 6.0 6.00 0.00 0.00
Afforestation ha 10 1.6 16.0 16.00 0.00 0.00
Tanka 3 No. 4 1.4 5.6 5.60 0.00 0.00
Draunage line treatment 0 0.0 0.00
MMS, Gaboin No. 0 0 0.0 0.00 0.00 0.00
LSCD No. 0 0 0.0 0.00 0.00 0.00
WHS No. 0 0 0.0 0.00 0.00 0.00
Gully Plugs (ECD) No. 0 0 0.0 0.00 0.00 0.00
Ground water structure No. 0 0 0.0 0.00 0.00 0.00
Total (B) 126.01 117.60 0.00 7.54
(C) Production system and micro enterprise (10%)
Production measures for arable land
Arid Horticulture ha 29 0.3 8.70 8.70 0.00 0.90
Sprinklers & Drip irrigation ha 16 0.3 4.80 4.80 0.00 0.30
Vegetables No. 341 0.005 1.71 1.71 0.00 0.11
Medicinal plants No. 21 0.005 0.11 0.11 0.00 0.04
Vermi compost No. 11 0.1 1.10 1.10 0.00 0.15
Crop Demonstration No. 9 0.015 0.14 0.14 0.00 0.79
Micro Enterprise
Dairy No. 7 0.25 1.75 1.75 0.00 0.00
Poultry No. 2 0.25 0.50 0.50 0.00 0.00
Animal camp/Breed improovement No. 39 0.05 1.95 1.95 0.00 0.00
Local Artisans/craft No. 4 0.25 1.00 1.00 0.00 0.10
Food Processing No. 3 0.25 0.75 0.75 0.00 0.00
Total (C) 22.50 22.50 0.00 2.39
D.Livelihood Activities (9%) 0.00
Revolving Fund to SHG (60 % minimum of 9% amount)
60% 49 0.25 12.15 12.15 0.00 0.00
Revolving Fund to enterprising individual (10 % maximum of 9% amount)
10% 8 0.25 2.03 2.03 0.00 0.00
Grant in aid to Federation of SHG individual (30 % maximum of 9% amount)
30% 6 1.00 6.08 6.08 0.00 0.00
Total (D) 20.25 20.25 0.00 0.00
(E) Consolidation 6.75 6.75 0.00 0.00
Total (E) 0 0 6.75 6.75 0.00 0.00
Grand Total 225.00 216.59 0.00 9.93
Proposed Development Plan
Activity Unit Qty.Unit
cost
GP: Hameera
IWMP 30 Tables1
Total
cost
Cost from
Project
Fund
Conver
gence
Fund
Beneficiary
Contribution
(A) Preparatory phase activities capacity building training & EPA
Admn. 10% 0 0 22.50 22.50 0.00 0.00
Monitoring 1% 0 0 2.25 2.25 0.00 0.00
Evaluation 1% 0 0 2.25 2.25 0.00 0.00
EPA 4% 0 0 9.00 9.00 0.00 0.00
I&CB 5% 0 0 11.25 11.25 0.00 0.00
DPR 1% 0 0 2.25 2.25 0.00 0.00
Total (A) 49.50 49.50 0.00 0.00
(B) Natural resource management (56%)
Conservation measures for arable land (private land)
Field Bunding ha 377 0.093 35.1 26.65 0.00 2.69
Earthen Structure 1 No. 7 1.2 8.4 8.40 0.00 0.72
Earthen Structure 2 No. 5 1.75 8.8 8.75 0.00 0.79
Earthen Structure 3 No. 4 2 8.0 8.00 0.00 0.60
Tanka 1 No. 17 0.62 10.5 10.54 0.00 0.47
Tanka 2 No. 16 0.7 11.2 11.20 0.00 0.79
Khadin No. 1 Site wise 15.5 15.50 0.00 1.48
Conservation measures for non arable land 0.0 0.00
Pasture Development ha 0 0 0.0 0.00 0.00 0.00
V-ditch ha 50 0.0192 1.0 0.96 0.00 0.00
Water Harvesting
StructureNo. 2 3 6.0 6.00 0.00 0.00
Afforestation ha 10 1.6 16.0 16.00 0.00 0.00
Tanka 3 No. 4 1.4 5.6 5.60 0.00 0.00
Draunage line treatment 0 0.0 0.00
MMS, Gaboin No. 0 0 0.0 0.00 0.00 0.00
LSCD No. 0 0 0.0 0.00 0.00 0.00
WHS No. 0 0 0.0 0.00 0.00 0.00
Gully Plugs (ECD) No. 0 0 0.0 0.00 0.00 0.00
Ground water structure No. 0 0 0.0 0.00 0.00 0.00
Total (B) 126.01 117.60 0.00 7.54
(C) Production system and micro enterprise (10%)
Production measures for arable land
Arid Horticulture ha 29 0.3 8.70 8.70 0.00 0.90
Sprinklers & Drip irrigation ha 16 0.3 4.80 4.80 0.00 0.30
Vegetables No. 341 0.005 1.71 1.71 0.00 0.11
Medicinal plants No. 21 0.005 0.11 0.11 0.00 0.04
Vermi compost No. 11 0.1 1.10 1.10 0.00 0.15
Crop Demonstration No. 9 0.015 0.14 0.14 0.00 0.79
Micro Enterprise
Dairy No. 7 0.25 1.75 1.75 0.00 0.00
Poultry No. 2 0.25 0.50 0.50 0.00 0.00
Animal camp/Breed improovementNo. 39 0.05 1.95 1.95 0.00 0.00
Local Artisans/craft No. 4 0.25 1.00 1.00 0.00 0.10
Food Processing No. 3 0.25 0.75 0.75 0.00 0.00
Total (C) 22.50 22.50 0.00 2.39
D.Livelihood Activities (9%) 0.00
Revolving Fund to SHG (60 % minimum of 9% amount)
60% 49 0.25 12.15 12.15 0.00 0.00
Revolving Fund to enterprising individual (10 % maximum of 9% amount)
10% 8 0.25 2.03 2.03 0.00 0.00
Grant in aid to Federation of SHG individual (30 % maximum of 9% amount)
30% 6 1.00 6.08 6.08 0.00 0.00
Total (D) 20.25 20.25 0.00 0.00
(E) Consolidation 6.75 6.75 0.00 0.00
Total (E) 0 0 6.75 6.75 0.00 0.00
Grand Total 225.00 216.59 0.00 9.93
Proposed Development Plan Area - 1500 ha
Activity Unit Qty.Unit
cost
GP: BADODRA GAON
IWMP 30 Tables1
Total
cost
Cost from
Project
Fund
Conver
gence
Fund
Beneficiary
Contribution
(A) Preparatory phase activities capacity building training & EPA
Admn. 10% 0 0 45.00 45.00 0.00 0.00
Monitoring 1% 0 0 4.50 4.50 0.00 0.00
Evaluation 1% 0 0 4.50 4.50 0.00 0.00
EPA 4% 0 0 18.00 18.00 0.00 0.00
I&CB 5% 0 0 22.50 22.50 0.00 0.00
DPR 1% 0 0 4.50 4.50 0.00 0.00
Total (A) 99.00 99.00 0.00 0.00
(B) Natural resource management (56%)
Conservation measures for arable land (private land)
Field Bunding ha 755 0.093 70.22 70.22 0.00 5.38
Earthen Structure 1 No. 14 1.2 16.80 16.80 0.00 1.44
Earthen Structure 2 No. 11 1.75 19.25 19.25 0.00 1.58
Earthen Structure 3 No. 8 2 16.00 16.00 0.00 1.20
Tanka 1 No. 35 0.62 21.70 21.70 0.00 0.94
Tanka 2 No. 32 0.7 22.40 22.40 0.00 1.58
Khadin No. 3 Site wise 26.00 26.00 0.00 2.96
Conservation measures for non arable land 0 0.00
Pasture Development ha 0 0 0.00 0.00 0.00 0.00
V-ditch ha 105 0.0192 2.01 2.01 0.00 0.00
Water Harvesting
StructureNo. 5 3 13.50 13.50 0.00 0.00
Afforestation ha 20 1.6 32.00 32.00 0.00 0.00
Tanka 3 No. 9 1.4 11.90 11.90 0.00 0.00
Draunage line treatment 0 0.00 0.00
MMS, Gaboin No. 0 0 0.00 0.00 0.00 0.00
LSCD No. 0 0 0.00 0.00 0.00 0.00
WHS No. 0 0 0.00 0.00 0.00 0.00
Gully Plugs (ECD) No. 0 0 0.00 0.00 0.00 0.00
Ground water structure No. 0 0 0.00 0.00 0.00 0.00
Total (B) 251.77 251.77 0.00 15.08
(C) Production system and micro enterprise (10%)
Production measures for arable land
Arid Horticulture ha 56 0.3 16.80 16.80 0.00 1.80
Sprinklers & Drip irrigation ha 32 0.3 9.60 9.60 0.00 0.60
Vegetables No. 480 0.005 2.40 2.40 0.00 0.22
Medicinal plants No. 42 0.005 0.21 0.21 0.00 0.08
Vermi compost No. 23 0.1 2.25 2.25 0.00 0.30
Crop Demonstration No. 18 0.015 0.26 0.26 0.00 1.58
Micro Enterprise
Dairy No. 20 0.25 5.00 5.00 0.00 0.00
Poultry No. 4 0.25 1.00 1.00 0.00 0.00
Animal camp/Breed improovement No. 80 0.05 4.00 4.00 0.00 0.00
Local Artisans/craft No. 8 0.25 2.00 2.00 0.00 0.20
Food Processing No. 6 0.25 1.50 1.50 0.00 0.00
Total (C) 45.02 45.02 0.00 4.78
D.Livelihood Activities (9%)Revolving Fund to SHG (60 % minimum of 9% amount)
60% 97 0.25 24.30 24.30 0.00 0.00
Revolving Fund to enterprising individual (10 % maximum of 9% amount)
10% 16 0.25 4.05 4.05 0.00 0.00
Grant in aid to Federation of SHG individual (30 % maximum of 9% amount)
30% 12 1.00 12.15 12.15 0.00 0.00
Total (D) 40.50 40.50 0.00 0.00
(E) Consolidation 13.50 13.50 0.00 0.00
Total (E) 0 0 13.50 13.50 0.00 0.00
Grand Total 450.00 449.79 0.00 19.86
Proposed Development Plan Area -3000 Ha
Activity Unit Qty.Unit
cost
GP: BASANPEER
IWMP 30 Tables1
Project 30
1 3 4 5 6
S.
No
.
Unit of
measurement
Pre-project
Status
Expected Post-
project Status Remarks
1 Meters 145.00 144.50
2 No. 6 12
3 TDS 2,400 2,350
4 KLPD 63.02 64.20
5 Ha 72.00 100.00
6 Description 0.00 0.00
7
Ha 2,900.00 3,000.00
Ha 72.00 100.00 0 17
Ha 0.00 0.00
8 Ha 3,050.00 3,050.00
9
q/ha 3.55 4.25
q/ha 0.00 0.00
q/ha 0.00 12.00
q/ha 5.00 5.25
10
ton 664.56 838.10
ton 0.00 0.00
ton 0.00 33.60
ton 33.50 35.17
11 Ha 320.00 375.00
12 Ha 0.00 25.00
13 Ha 320.00 375.00
14 Ha 3,600.00 3,600.00
15 Q 1,754,100.00 1,920,000.00
16 Litres/day 2,450.00 3,000.00
17 No. 2 80
18 No. 8 22
19 Rs.in lac 0.17 0.28
20 No. 157 85
21 No. 0.00 10
90
SHGs Active
No. of enterprising individuals
Income
Migration
SHG Federations formed
Area under vegetation
Area under horticulture
Area under fuel
Area under Fodder
Fodder production
Milk production
Yield of Mustard
production of major crops of area
Production of Bajra
Production of Wheat
Production of Gram
Production of Mustard
Area under multiple crop
Change in cultivated Area
Yield of major crops of area
Yield of Bajra
Yield of Wheat
Yield of Gram
Availability of drinking water
Change in irrigated Area
Change in cropping/ land use pattern
Area under agricultural crop
Area under single crop
Area under double crop
CHAPTER – VI EXPECTED OUT COMES
2
Item
Status of water table (Depth to Ground
water level)
Ground water structures repaired/
rejuvenated
Quality of drinking water
IWMP 30 Tables1
No. L B H Qty. Rate Amount1 Dag belling, 5-10 cm deep LS Mtr 2 100 200 0.40 80.002 Jungle clearance, ordinary jungle 82 Sqm 1 100 3.45 345 1.30 448.503 Earth work for embankment in dry or
wet in layers of 15 cm, breaking ofclods, picking of grasses, pebbles etc.& dressing in given profile including1.5 mtr of lift & 50 mtr of lead, inhard soil
119(b)
Cum 1 100(0.45+5.
25)/2 1.2 342 84.00 28728.004 Sowing of grass seeds on ridges in 3
layers114
Mtr 3 100 300 1.00 300.005 Supply of grass seeds (Dhaman/
Sewan/Stylo Hamata etc,)LS
Kg 3 1 3 80.00 240.00Sub Total 29796.50
Add: Contingencies @ 3% 893.90Grand Total 30690
306.904Or Rate per mtr = say 310.00/mtr
OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI JAISALMER
Detailed & Abstract of Estimate for Field Bunding
S.No.
ItemItemRef.
UnitDetails of Measurement
IWMP Estimate 1 1
Length 250 mtr
No. L B H Qty. Rate Amount1 Dag belling, 5-10 cm deep LS Mtr 2 250 500 0.40 200.002 Jungle clearance, ordinary jungle 82 Sqm 1 250 7 1750 1.30 2275.003 Earth work for embankment in dry or
wet in layers of 15 cm, breaking ofclods, picking of grasses, pebbles etc.& dressing in given profile including1.5 mtr of lift & 50 mtr of lead, inhard soil
119(b)
Cum 1 250 (1+7)/2 1.5 1500 84.00 126000.004 Sowing of grass seeds on ridges in 10
layers114
Mtr 10 250 2500 1.00 2500.005 Supply of grass seeds (Dhaman/
Sewan/Stylo Hamata etc,)LS
Kg 10 0.5 5 80.00 400.006 Pitiching 15-23 cm size hammer
dressed stones with all lifts and leadsincluding packing of stones inrequired profile
124
Cum 1 20 10 0.2 40 910.00 36400.00Sub Total 167775.00
Add: Contingencies @ 3% 5033.25Grand Total 172808
Or say Rs. 175000.00
OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI JAISALMER
Detailed & Abstract of Estimate for Earthen Structure
S.No.
ItemItemRef.
UnitDetails of Measurement
IWMP Estimate 1 2
Length 150 mtr
No. L B H Qty. Rate Amount1 Dag belling, 5-10 cm deep LS Mtr 2 150 300 0.40 120.002 Jungle clearance, ordinary jungle 82 Sqm 1 150 7 1050 1.30 1365.003 Earth work for embankment in dry or
wet in layers of 15 cm, breaking ofclods, picking of grasses, pebbles etc.& dressing in given profile including1.5 mtr of lift & 50 mtr of lead, inhard soil
119(b)
Cum 1 150 (1+7)/2 1.5 900 84.00 75600.004 Sowing of grass seeds on ridges in 10
layers114
Mtr 10 150 1500 1.00 1500.005 Supply of grass seeds (Dhaman/
Sewan/Stylo Hamata etc,)LS
Kg 10 0.5 5 80.00 400.006 Pitiching 15-23 cm size hammer
dressed stones with all lifts and leadsincluding packing of stones inrequired profile
124
Cum 1 20 10 0.2 40 910.00 36400.00Sub Total 115385.00
Add: Contingencies @ 3% 3461.55Grand Total 118847
Or say Rs. 120000.00
OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI JAISALMER
Detailed & Abstract of Estimate for Earthen Structure
S.No.
ItemItemRef.
UnitDetails of Measurement
IWMP Estimate 1 3
Length 300 mtr
No. L B H Qty. Rate Amount1 Dag belling, 5-10 cm deep LS Mtr 2 300 600 0.40 240.002 Jungle clearance, ordinary jungle 82 Sqm 1 300 7 2100 1.30 2730.003 Earth work for embankment in dry or
wet in layers of 15 cm, breaking ofclods, picking of grasses, pebbles etc.& dressing in given profile including1.5 mtr of lift & 50 mtr of lead, inhard soil
119(b)
Cum 1 300 (1+7)/2 1.5 1800 84.00 151200.004 Sowing of grass seeds on ridges in 10
layers114
Mtr 10 300 3000 1.00 3000.005 Supply of grass seeds (Dhaman/
Sewan/Stylo Hamata etc,)LS
Kg 10 0.5 5 80.00 400.006 Pitiching 15-23 cm size hammer
dressed stones with all lifts and leadsincluding packing of stones inrequired profile
124
Cum 1 20 10 0.2 40 910.00 36400.00Sub Total 193970.00
Add: Contingencies @ 3% 5819.10Grand Total 199789
Or say Rs. 200000.00
OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI JAISALMER
Detailed & Abstract of Estimate for Earthen Structure
S.No.
ItemItemRef.
UnitDetails of Measurement
IWMP Estimate 1 4
No. L B H Qty. Rate Amount1 Dag belling, 5-10 cm deep LS Mtr 1 100 100 0.40 40.002 Jungle clearance, ordinary jungle 82 Sqm 1 100 3.45 345 1.30 448.503 Earth work for excavation in
foundation trenches in dry or moistsoil & back filling of soil in jhiri &disposal of excavated of soil inrequired profile including 1.5 mtr oflift & 50 mtr of lead, in hard soil
2(b)
Cum ,1/2 100 0.9 0.45 20.25 81.00 1640.254 Sowing of grass seeds on ridges in 1
row114
Mtr 1 100 100 1.00 100.005 Supply of grass seeds (Dhaman/
Sewan/Stylo Hamata etc,)LS
Kg 1 1 1 80.00 80.00Sub Total 2308.75
Add: Contingencies @ 3% 69.26Grand Total 2378
Or per mtr. cost is Rs. 23.78 Say Rs. 24.00/mtr.
OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI JAISALMER
Detailed & Abstract of Estimate for V-ditch
S.No.
ItemItemRef.
UnitDetails of Measurement
IWMP Estimate 1 5
Per ha.
No. L B H Qty. Rate Amount1 Earth work for excavation in
foundation trenches in dry or moistsoil & back filling of soil in jhiri &disposal of excavated of soil inrequired profile including 1.5 mtr oflift & 50 mtr of lead, in hard soil
2(b)
V-ditch/Contour Cum 20x1/2 100 0.6 0.3 180 81.00 14580.002 Digging of pits for foresty Plants of
the size 45 x 45 x 45 cm in hard soil112(b)
No. 400 400 7.00 2800.003 Plantation of foresty plants in flat
lands113(b)
No. 400 400 3.00 1200.004 Making of balls of grass seeds, FYM,
snad & clay in the ratio of 1:2:2including beating & screening ofFYM & clay, cleaning of grass seeds
F/3-2
Per 6 Kg 6 60.00 60.00
5 Making of thawala in 50 cm dia insemi circular pattern, in flat lands
117(b)No. 400 400 1.70 680.00
6 Sowing of grass seeds on ridges in 1row
114Mtr 20 100 2000 1.00 2000.00
7 Watering of plants @ 15 ltr per plantwith available water, 20 watering peryear for 3 years pasture enclosure3 x 20 x 400
115
No. 24000 24000 2.00 48000.008 Supply of potable water for watering
of plants by tractor mounted watertanker with a lead upto 10 km
LS
Tanker 120 120 500.00 60000.009 Hoeing & weeding 15 cm deep & in
45 cm dia in semi circular patterntwice a year2 x 3 x 400
116
No. 2400 2400 1.00 2400.0010 Application of insecticide and
fertilizers to plants excluding cost ofinsecticide and fertilizers, twice a year3 x 2 x 400
F/F-5
No. 2400 2400 0.28 672.0011 Protection of plants from frost/loo
using grass or other localy availblematerials (by making a Jhonpa of 0.6mtr dia of plant height and coveringthe plant by it)
F/G-5
No. 400 400 3.56 1424.0012 Supply of FYM/fertilizers &
insecticides LS
No. 2400 2400 10.00 24000.0013 Supply of grass seeds (Dhaman/
Sewan/Stylo Hamata etc,)LS
Kg 6 80.00 480.00
OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI JAISALMER
Detailed & Abstract of Estimate for Silvi-Pasture Model
S.No.
ItemItemRef.
UnitDetails of Measurement
IWMP Estimate 1 6
No. L B H Qty. Rate AmountS.
No.Item
ItemRef.
UnitDetails of Measurement
14 Suppy of foresty plant including 20%gap filling per year & taking intoconsidration the mortality of plantsduring transportation & rehandling &including of transportation from alllead & lifts400 + 80 + 40 + 20 + 50
LS
No. 590 590 10.00 5900.0015 Provision for watch and ward for 3
years 3 x 12 x 30 man days for 10 ha areaminimum
LS
No. 1080 1080 135.00 14580.00Sub Total 178776.00
16 Fencing : Provision for barbed wirefencing with RCC posts as perenclosed detailed estimate,considering minimum area of encloser10 ha. & average length of fencing is125 mtr./ha.
As per estimate
Mtr 125 125 1000.00 125000.00Sub Total 125000.00
Total 303776.00Add: Contingencies @ 3% 9113.28
Grand Total 312889Say Rs. 310000.00/ha.
IWMP Estimate 1 7
Per ha.
No. L B H Qty. Rate Amount1 Surveying of Proposed Area Ha 1 1 182.06 182.061 Earth work for excavation in
foundation trenches in dry or moistsoil & back filling of soil in jhiri &disposal of excavated of soil inrequired profile including 1.5 mtr oflift & 50 mtr of lead, in hard soil
2(b)
V-ditch/Contour furrow at every 25Mtr interval 4x1/2 100 0.6 0.3 36
Cum 36 81.00 2916.002 Digging of pits for foresty Plants of
the size 45 x 45 x 45 cm in hard soil112(b)
No. 400 400 7.00 2800.003 Plantation of foresty plants in flat
lands113(b)
No. 400 400 3.00 1200.004 Making of balls of grass seeds, FYM,
snad & clay in the ratio of 1:2:2including beating & screening ofFYM & clay, cleaning of grass seeds
F/3-2
Per 6 Kg 6 60.00 60.00
5 Making of thawala in 50 cm dia insemi circular pattern, in flat lands,every year upto 3 years
117(b)
No. 1200 1200 1.70 2040.006 Sowing of grass seeds on ridges in 1
row114
Mtr 20 100 2000 1.00 2000.007 Watering of plants @ 15 ltr per plant
with available water, 12 watering peryear for 3 years pasture enclosure3 x 12 x 400
115
No. 14400 14400 2.00 28800.008 Supply of potable water for watering
of plants by tractor mounted watertanker with a lead upto 10 km
LS
Tanker 50 50 500.00 25000.009 Hoeing & weeding 15 cm deep & in
45 cm dia in semi circular patterntwice a year2 x 3 x 400
116
No. 2400 2400 1.00 2400.0010 Application of insecticide and
fertilizers to plants excluding cost ofinsecticide and fertilizers, twice a year3 x 2 x 400
F/F-5
No. 2400 2400 0.36 864.0011 Protection of plants from frost/loo
using grass or other localy availblematerials (by making a Jhonpa of 0.6mtr dia of plant height and coveringthe plant by it)
F/G-5
No. 400 400 3.56 1424.0012 Supply of FYM/fertilizers &
insecticides LS
No. 2400 2400 10.00 24000.00
OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI JAISALMER
Detailed & Abstract of Estimate for Silvi-Pasture Model
S.No.
ItemItemRef.
UnitDetails of Measurement
IWMP Estimate 1 8
No. L B H Qty. Rate AmountS.
No.Item
ItemRef.
UnitDetails of Measurement
13 Supply of grass seeds (Dhaman/Sewan/Stylo Hamata etc,)
LSKg 6 80.00 480.00
14 Suppy of foresty plant including 20%gap filling per year & taking intoconsidration the mortality of plantsduring transportation & rehandling &including of transportation from alllead & lifts400 + 80 + 40 + 20 + 50
LS
No. 590 590 10.00 5900.0015 Provision for watch and ward for 3
years 3 x 12 x 30 man days for 10 ha areaminimum
LS
No. 1080 1080 135.00 14580.00Sub Total 114464.00
16 Fencing : Provision for barbed wirefencing with RCC posts as perenclosed detailed estimate,considering minimum area of encloser10 ha. & average length of fencing is125 mtr./ha.
As per estimate
Mtr 125 125 320.00 40000.00Sub Total 40000.00
Total 154464.00Add: Contingencies @ 3% 4633.92
Grand Total 159098Say Rs. 160000.00/ha.
IWMP Estimate 1 9
Per 100 mtr
No. L B H Qty. Rate Amount1 Earth work for excavation in
foundation trenches in dry or moistsoil & back filling of soil in jhiri &disposal of excavated of soil inrequired profile including 1.5 mtr oflift & 50 mtr of lead, in hard soil.(Pits for fixing Stone Patti posts, 5mtr interval))
2(b)
Cum 20 0.6 0.45 0.6 3.24 81.00 262.442 Supply of Stone Patties, 7' long Sqm 20 2.15 0.3 12.9 465.00 5998.50
20 7 1 0.25 35Cum 0.991 204.00 202.15
4 P& F of Goat proof jali LS Mtr 1 100 100 100.00 10000.00LS 5 100 500
Kg 82 90.00 7380.006 P& F of MS gate as per instruction of
Engineer inchargeLS
Kg 100 100 70.00 7000.00Sub Total 30843.09
Add: Contingencies @ 3% 925.29Grand Total 31768
Estimated cost is Rs. 320/mtr
UnitDetails of Measurement
Or say Rs. 32000.00
Carriage of stone patties, Avg. 40 Km lead. (7'X1'X0.25')
Supply, Drawing & fixing of barbed wire strands with binding wires and clips, Barbed wire for fencing including transportation, 5 Strands
3
5
OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI JAISALMER
Detailed & Abstract of Estimate for Barbed Wire Fencing with Stone Patti Posts
S.No.
ItemItemRef.
IWMP Estimate 1 10
Per 100 mtr
No. L B H Qty. Rate Amount1 Earth work for excavation in
foundation trenches in dry or moistsoil & back filling of soil in jhiri &disposal of excavated of soil inrequired profile including 1.5 mtr oflift & 50 mtr of lead, in hard soil
2(b)
Cum 53 0.45 0.45 0.6 6.44 81.00 521.602 PCC in 1:3:6 (1Cement :3 Course
Sand :6 Graded stone aggregate 20mm nominal size for fixing of posts
102(b)
Cum 53 0.45 0.45 0.6 6.44 2229.00 14353.653 RCC in 1:2:4 for pre-casting of RCC
posts with curing etc.37(a)
Cum 53 2.1 0.1 0.1 1.113 2960.00 3294.484 P&F centering & shuttering 45(a) Sqm 53 2.1 0.4 44.52 100.00 4452.005 P & F mild steel bars for
reinforcement, 01.5% of RCC46
Kg 131.1 59.00 7732.296 Transporation of pre-casted RCC
posts LS
No. 53 53 30.00 1590.007 Providing & drawing the barbed wire
through hooks provided in posts andtightening the same and fixing withthe binding wire in 6 strands withdiagonally double bracing, each 10thpost & corner post to be reinforcedwith slanted supports both way
LS
Mtr 100 100 650.00 65000.00Sub Total 96944.01
Add: Contingencies @ 3% 2908.32Grand Total 99852
Estimated cost is Rs. 1000/mtr
OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI JAISALMER
Or say Rs. 100000.00
Detailed & Abstract of Estimate for Barbed Wire Fencing with Precasted RCC Posts
S.No.
ItemItemRef.
UnitDetails of Measurement
IWMP Estimate 1 11
Village: …………………………………….Khasra No.: …………………………………. 20000 Ltr Capacity (Circular)
No. L B H Qty. Rate AmountEarth work in excavation and disposalof earth in given profile including 1.5mtr of lift & 50 mtr of lead, in hard soil
119(b)
Water Tank 16.83Inlets 2 1 1 1 2.00
18.83 81.00 1525.102 in disintegrated rocks and one aditional
lift119©
Cum 16.83 139.00 2339.15PCC in Foundation Providing andlaying cement concrete incdudingcurring compection etc.complete inspecified grade excluding the cost ofcentering and shuttering - All work upto plinth level. 1:4:8 (1cement : 4coarse sand : 8 graded stone aggregate40 mm nominal size).
11(c)a
Water Tank 2.88Inlets 2 1 1 0.3 0.60
Cum 3.48 1723.00 5996.04Cement Concrete flooring in 1:2:4using crusher broken aggregate of 12mm size , 50 mm thick, in Bottom ofTank
58(a)
5.93at top of the Tanka 9.63Inlets 2 1 1 2.00
Sqm 17.56 224.00 3933.44Stone Masonry For FoundationRandom Rubble stone masonry forfoundation and plinth in cement sandmortar above 30cm thick wall in:cement mortar 1:6 (1cement : 6sand)
24(a)a
Water Tank 13.05Inlets 2 2.4 0.3 3.25 4.68
Cum 17.73 1625.00 28811.256 P/L stone slab roofing in good quality
slabs including filling of joints in CM1:4 complete
36Sqm 9.61 933.00 8966.13
Plaster in CM (1:4 ), 25 mm thick 67(a)Inner Wall of Water tank 30.22
Outer walls of water Tank 6.59Inlets 2 3 0.6 3.60
Sqm 40.41 163.00 6586.838 P/F Lid over Opening, Mesh in inlets,
Display boards etc. LS
No. 1 1.00 2000.00 2000.00
Total 60157.95Add: Contingencies @ 3% 1804.74
Grand Total 61963
3
4
OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI JAISALMER
Detailed & Abstract of Estimate for Water Tank
S.No.
ItemItemRef.
UnitDetails of Measurement
5
7
Say Rs. 0.62 lac
1x∏x3.125x0.38x3.5
1x∏x2.75x3.5
1x∏x3.5x0.60
∏/4x3.5x3.5
0.5x(∏/4x3.5x3.5x3.5)
1x(∏/4x2.75x2.75)
1x(∏/4x3.5x3.5)
0.5x(∏/4x3.5x3.5x3.5)
1
1x(∏/4x3.5x3.5x0.30)
IWMP Estimate 1 12
No. L B H Qty. Rate AmountS.
No.Item
ItemRef.
UnitDetails of Measurement
JEnIWMP …….
AEn & PIA IWMP ……….
IWMP Estimate 1 13
Village: …………………………………….Khasra No.: …………………………………. 22000 Ltr Capacity (Rect+Semi Circular)
No. L B H Qty. Rate AmountEarth work in excavation and disposalof earth in given profile including 1.5mtr of lift & 50 mtr of lead, in hard soil
119(b)
Water Tank (Semi circular part) 10.05Water Tank (Rectangular part) 8.00Inlets 2 1 1 1 2.00
Cum 20.05 81.00 1623.89in disintegrated rocks and one aditionallift
119©
Water Tank (Semi circular part) 10.05Water Tank (Rectangular part) 8.00
Cum 18.05 139.00 2508.67PCC in Foundation Providing andlaying cement concrete incdudingcurring compection etc.complete inspecified grade excluding the cost ofcentering and shuttering - All work upto plinth level. 1:4:8 (1cement : 4coarse sand : 8 graded stone aggregate40 mm nominal size).
11(c)a
Water Tank (Semi circular part) 2.41Water Tank (Rectangular part) 1.92Inlets 2 1 1 0.3 0.60
Cum 4.93 1723.00 8497.01Cement Concrete flooring in 1:2:4using crusher broken aggregate of 12mm size , 50 mm thick, in Bottom of
58(a)
At bottom or floorWater Tank (Semi circular part) 4.71Water Tank (Rectangular part) 4.90Inlets 2 1 1 0.3 0.60at top of the Tanka
Water Tank (Semi circular part) 8.04Water Tank (Rectangular part) 6.40
Sqm 24.65 224.00 5521.68Stone Masonry For FoundationRandom Rubble stone masonry forfoundation and plinth in cement sandmortar above 30cm thick wall in:cement mortar 1:6 (1cement : 6sand)
24(a)a
Water Tank (Semi circular part) 8.07Water Tank (Rectangular part) 3.64
Inlets 2 2.4 0.3 3.25 4.68Cum 16.39 1625.00 26637.25
6 P/L stone slab roofing in good qualityslabs including filling of joints in CM1:4 complete
36
Water Tank (Semi circular part) 8.04Water Tank (Rectangular part) 6.40Patti as lintel 1.92
Unit
1
Details of Measurement
1x(∏/4x3.2x3.2x0.30)
0.5x(2.0x3.2x2.5)
0.5x(∏/4x3.2x3.2x2.5)
0.5x(∏/4x3.2x3.2x2.5)
2
5
1x∏x2.825x0.35x2.60
2x2.0x0.35x2.60
1x(2.0x3.2x0.30)
0.5x(2.0x3.2x2.5)
3
OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI JAISALMER
Detailed & Abstract of Estimate for Water Tank
S.No.
ItemItemRef.
4
1x(∏/4x3.2x3.2)
2x3.2x0.30
1x(2.00x3.2)
1x(∏/4x2.45x2.45)
1x(2.0x2.45)
1x(∏/4x3.2x3.2)
1x(2.0x3.2)
IWMP Estimate 1 14
No. L B H Qty. Rate AmountUnit
Details of MeasurementS.No.
ItemItemRef.
Sqm 16.36 933.00 15262.39Plaster in CM (1:4 ), 25 mm thick 67(a)
Inner Wall, semi circular 20.00Inner Wall, Rectangular 10.40
Outer walls, semi circular 6.03Outer walls, Rectangular 2.40
Inlets 2 3 0.6 3.60Sqm 42.43 163.00 6916.19
8 P/F Lid over Opening, Mesh in inlets,Display boards etc.
LSNo. 1 1.00 1000.00 1000.00
Total 67967.08Add: Contingencies @ 3% 2039.01
Grand Total 70006
AEn & PIA IWMP ……….
1x∏x3.2x0.60
2x2.0x0.60
Say Rs. 0.70 lac
JEnIWMP …….
71x∏x2.45x2.60
2x2.0x2.60
IWMP Estimate 1 15
Village: …………………………………….Khasra No.: …………………………………. 30000 Ltr Capacity (Circular)
No. L B H Qty. Rate AmountEarth work in excavation and disposal ofearth in given profile including 1.5 mtrof lift & 50 mtr of lead, in hard soil
119(b)
Water Tank 23.75Inlets 2 1 1 1 2.00Peripheri wall 3.23
Cum 28.98 81.00 2347.562 in disintegrated rocks and one aditional
lift, Water Tank119© Cum 23.75 139.00 3301.24
PCC in Foundation Providing andlaying cement concrete incdudingcurring compection etc.complete inspecified grade excluding the cost ofcentering and shuttering - All work up toplinth level. 1:4:8 (1cement : 4 coarsesand : 8 graded stone aggregate 40 mmnominal size).
11(c)a
Water Tank 2.13Inlets 2 1 1 0.3 0.60Peripheri wall 4.31
Cum 7.04 1723.00 12123.91Cement Concrete flooring in 1:2:4 usingcrusher broken aggregate of 12 mm size, 50 mm thick, in Bottom of Tank
58(a) 9.62
at top of the Tanka 14.18
Inlets 2 1 1 2.00
Copping over periphery wall 14.37
Sqm 40.16 224.00 8996.02
Stone Masonry For Foundation RandomRubble stone masonry for foundationand plinth in cement sand mortar above30cm thick wall in: cement mortar 1:6(1cement : 6sand)
24(a)a
Water Tank 16.18Inlets 2 2.4 0.3 3.25 4.68Peripheri wall, first footing 6.46Peripheri wall, second footing 14.37
Cum 41.69 1625.00 67750.726 P&F Stone lintels in mortar of
masonary, 15 cm thick.Sqm 1 3 0.3 0.90 679.00 611.10
7 P/L stone slab roofing in good qualityslabs including filling of joints in CM1:4 complete
36 Sqm 14.18 933.00 13229.07
Plaster in CM (1:4 ), 25 mm thick 67(a)Inner Wall of Water tank 38.47
Outer walls of water Tank 8.01Inlets 2 3 0.6 3.60
Sqm 50.07 163.00 8161.749 Flush or ruled pointing in CM(1:3) over
stone masonary70 (a) Sqm 95.77 61.00 5841.97
10 Laying, watering and ramming ofavailable (excavated) quary rubbish/murrum for preparation of catchment
85- 97 (d)
Cum 49.44 239.00 11816.79
11 P/F Lid over Opening, Mesh in inlets,Display boards etc.
LS No. 1 1.00 2000.00 2000.00
Total 136180.10Add: Contingencies @ 3% 4085.40
Grand Total 140266
OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI JAISALMER
Detailed & Abstract of Estimate for Water Tank
S.No.
ItemItemRef.
UnitDetails of Measurement
1
0.5x(∏/4x4.25x4.25x3.35)
0.5x(∏/4x4.25x4.25x3.35)
3
1x(∏/4x15.25x0.6x0.45)
0.5x(∏/4x4.25x4.25x0.30)
1x(∏x15.25x0.6x0.15)
4 1x(∏/4x3.5x3.5)
1x(∏/4x4.25x4.25)
5
1x∏x3.875x0.38x3.5
∏/4x4.25x4.25
1x(∏x15.25x0.45x0.30)
1x(∏x15.25x0.30x1.00)
1x(∏x15.25x0.30)
81x∏x3.5x3.5
1x∏x4.25x0.60
Say Rs. 1.40 lac
JEnIWMP …….
AEn & PIA IWMP ……….
2x(∏x15.25x1.00)
1x(∏x9.675x10.85x0.15)
IWMP Estimate 1 16
Village: …………………………………….Khasra No.: …………………………………. 40000 Ltr Capacity (Rect+Semi Circular)
No. L B H Qty. Rate AmountEarth work in excavation and disposalof earth in given profile including 1.5mtr of lift & 50 mtr of lead, in hard soil
119(b)
Water Tank (Semi circular part) 15.39Water Tank (Rectangular part) 15.40Inlets 2 1 1 1 2.00
Cum 32.79 81.00 2655.67in disintegrated rocks and one aditionallift
119©
Water Tank (Semi circular part) 15.39Water Tank (Rectangular part) 15.40
Cum 30.79 139.00 4279.25PCC in Foundation Providing andlaying cement concrete incdudingcurring compection etc.complete inspecified grade excluding the cost ofcentering and shuttering - All work upto plinth level. 1:4:8 (1cement : 4coarse sand : 8 graded stone aggregate40 mm nominal size).
11(c)a
Water Tank (Semi circular part) 2.88Water Tank (Rectangular part) 2.89Inlets 2 1 1 0.3 0.60
Cum 6.37 1723.00 10979.60Cement Concrete flooring in 1:2:4using crusher broken aggregate of 12mm size , 50 mm thick, in Bottom of
58(a)
At bottom or floorWater Tank (Semi circular part) 4.71Water Tank (Rectangular part) 7.56Inlets 2 1 1 0.3 0.60at top of the Tanka
Water Tank (Semi circular part) 9.62Water Tank (Rectangular part) 9.63
OFFICE OF THE ASSISTANT ENGINEER, IWMP, PANCHAYAT SAMITI JAISALMER
Detailed & Abstract of Estimate for Water Tank
S.No.
ItemItemRef.
UnitDetails of Measurement
1
0.5x(∏/4x3.5x3.5x3.2)
0.5x(2.75x3.5x3.2)
2
0.5x(∏/4x3.5x3.5x3.2)
0.5x(2.75x3.5x3.2)
3
1x(∏/4x3.5x3.5x0.30)
1x(2.75x3.5x0.30)
4
1x(∏/4x2.75x2.75)
1x(2.75x2.75)
1x(∏/4x3.5x3.5)
1x(2.75x3.5)
IWMP Estimate 1 17
No. L B H Qty. Rate AmountS.
No.Item
ItemRef.
UnitDetails of Measurement
Sqm 32.12 224.00 7193.92Stone Masonry For FoundationRandom Rubble stone masonry forfoundation and plinth in cement sandmortar above 30cm thick wall in:cement mortar 1:6 (1cement : 6sand)
24(a)a
Water Tank (Semi circular part) 11.93Water Tank (Rectangular part) 6.69
Inlets 2 2.4 0.3 3.25 4.68Cum 23.30 1625.00 37862.50
6 P&F Stone lintels in mortar ofmasonary, 15 cm thick.
Sqm 2 3 0.3 1.80 679.00 1222.20
7 P/L stone slab roofing in good qualityslabs including filling of joints in CM1:4 complete
36
Water Tank (Semi circular part) 8.04Water Tank (Rectangular part) 8.80
Sqm 16.84 933.00 15710.23Plaster in CM (1:4 ), 25 mm thick 67(a)
Inner Wall, semi circular 27.63Inner Wall, Rectangular 17.60
Outer walls, semi circular 6.59Outer walls, Rectangular 3.30
Inlets 2 3 0.6 3.60Sqm 58.73 163.00 9572.34
8 P/F Lid over Opening, Mesh in inlets,Display boards etc.
LSNo. 1 1.00 2000.00 2000.00
Total 91475.71Add: Contingencies @ 3% 2744.27
Grand Total 94220
5
1x∏x3.125x0.38x3.20
2x2.75x0.38x3.20
1x(∏/4x3.2x3.2)
Say Rs. 0.94 lac
JEnIWMP …….
AEn & PIA IWMP ……….
1x(2.75x3.2)
71x∏x2.75x3.20
2x2.75x3.20
1x∏x3.50x0.60
2x2.75x0.60
IWMP Estimate 1 18