“Knots Ahead of the Rest” HIRING OF FPSO FOR CLUSTER-7 12 th AUGUST 2013
Transcript
  • Knots Ahead of the Rest

    HIRING OF FPSO FOR CLUSTER-7

    12th

    AUGUST 2013

  • Overall Project Timeline

    2

  • Milestone Dates

    MILESTONE BASELINE ACTUAL

    Project Award 16-FEB-13 16-Feb-13

    Commence Long Lead Item Procurement 2-Apr-13 2-Apr-13

    Award to yard (Shipyard & Fabrication yard) 15-Jul-13

    Donor Vessel Arrive at Shipyard 6-Aug-13

    Commence Fabrication of Topsides 14-Oct-13

    Complete Fabrication of Topside Module 27-Jun-14

    FPSO Ready for Sailaway 30-Aug-14

    FPSO Ready for Startup 4-Nov-14

    Final Acceptance 15-Nov-14

  • Module/ Turret Lift Dates for Integration

    MILESTONE BASELINE LIFT

    DATES

    Deck Crane 16-Apr-14

    Module M15 Flare Tower 6-May-14

    Module M70 E House 15-May-14

    Module M55 Port Laydown / Chemical Injection Pkg 7-Jun-14

    Module M10 Internal Turret 10-Jun-14

    Module M60 Power Gen. Pkg / Fiscal Metering / Heli Refueling Skid 12-Jun-14

    Module M30 Export Gas Comp. Pkg / Fuel Gas Sys. / Gas Metering / TEG Pkg / Flash Gas Comp. Pkg

    14-Jun-14

    Module M20 Flare Knock Out Drum 16-Jun-14

    Module M35 Slug Catcher / CSU / PW Sys. / Cooling Medium Sys. 24-Jun-14

    Module M50 Laydown / Water Inj. Sys. / Hypochlorination Pkg / Air Comp. Pkg / N2 Pkg 28-Jun-14

  • FPSO Module Construction & Lift Dates

    5

    15-MAY-14

    M70 E-HOUSE

    12-JUN-14

    M60 POWER GEN. PKG

    / FISCAL METERING/

    HELIDECK FUEL SKID

    16-APR-14

    STBD CRANE

    28-JUN-14

    M50 LAYDOWN/ W.I.

    SYS/

    HYPOCHLORINATION

    PKG/ AIR COMP. PKG /

    N2 PKG

    24-JUN-14

    M35 CSU/ SLUG

    CATCHER/ PRODUCED

    WATER COOLING

    MEDIUM SYS

    14-JUN-14

    M30 EXPORT GAS

    COMP PKG/ FUEL

    GAS/ GAS METERING/

    TEG PKG / FLASH GAS

    COMP. PKG

    06-MAY-14

    M15 FLARE TOWER

    16-APR-14

    PORT CRANE

    07-JUN-14

    M55 PORT LAYDOWN/

    CHEMICAL INJ. PKG

    16-JUN-14

    M20 FLARE KOD

    10-JUN-14

    M10 INTERNAL

    TURRET

  • Overall Project Timeline

    6

  • Turret General Arrangement

    7

  • CHAIN / RISER PULL-IN PLAN

    8

  • C7 Internal Turret M10

    9

    CAISSON

    TURNTABLE

    CHAIN TABLE

    UPPER

    BEARING

    LOWER BEARING

    CAISSON RING

    STIFFENERS

    PLATFORM 1

    PLATFORM 2

    PLATFORM 3

    GEOSTATIONARY SIDE ROTATING (SHIP) SIDE

  • C7 Turret Internal Shaft arrangement

    10

  • C7 Turret pull-in arrangement as designed

    11

  • C7 Internal Turret Pull in 3D Arrangement

    12

    PULL IN

    PULLEY

    BEAM TURN

    AROUND

    SHAFT

    TRANSLATION

    IN AND OUT

  • C7 Turret Upper deck FEA results as designed

    13

  • C7 Turret Geostationary Area above Deck

    14

  • C7 Turret Piping as designed

    15

    PROPOSED PIPING

    SHOWN ON THE

    TURRET

    GEOSTATIONARY

    PART.

  • C7- Mooring pattern as designed

    16

    SYSTEM CHARACTERISTICS

    Chain size : 130mm R3S Wire rope : 114mm Spiral strand SPR2Plus

    PRETENSIONS

    Ballast 100 MT Loaded 80 MT

  • C7 Mooring - Loads as designed

    17

    MOORING STRENGTH ANALYSIS RESULTS

    Design Tensions :

    Intact Condition:

    Fairlead 754T Anchor 693T SLF Condition:

    Fairlead 998 MT Anchor 940T

    Design Offsets :

    Intact Condition 20.1m (24% of Depth) SLF Condition 22.7m (27% of Depth)

  • C7 - Turret Mooring Response as designed

    18

  • C7 Turret Shaft FEA results as designed

    19

  • C7 Turret -Chain Stopper Analysis Results

    20

    Section cut:

    Trunnion fillet stress surface bending stress

    Clacker Contact area

    overstressed

  • C7 Turret -Chain Stopper Analysis Results

    21

    Peak Strain = 0.010

  • C7 Turret Riser System

    22

  • 23

    C7 Turret Chain table Arrangement

  • C7 Turret MWA details

    24

  • TURRET INSTALLATION PROCEDURE

    25

    1. CAISSON INSTALLATION FROM TOP

    2. SHELL CUT AT DRYDOCK

    3. JACK UP THE CHAIN TABLE TO POSITION

    4. INSERT SHAFT FROM TOP

    5. FINAL WELDING AT DRYDOCK IWO SHAFT

  • CHAINTABLE INSTALLATION IN DRYDOCK

    26

  • MACHINING REQUIRED LOCATIONS - TURRET

    27

    TURNTABLE LINERS

    CRANE FLANGE

    SWIVEL STACK

    FOUNDATION PLATE

  • TURRET FABRICATION INTERFACES

    28

    SEPARATELY FABRICATED/CAST

  • Video on Installation

    29

    Video1

  • 30

    End of Presentation