Personal involvement in the following projects: Mitochondria Energy – Fuel cell installation, Chamber of Mines PTSI R&D – Bowman Turbo Compounding Power Generator Willard Batteries - Installation of a new AGM battery production line Willard Batteries - Fume capture and extraction system: battery charge-house. Palabora Mining Co. - Design, fabrication and installation of water-cooled, 45MW waste steam condenser Anglo Platinum - Standby diesel power generation, 22 diesel generators / 10 sites / 66 MVA Anglo Platinum – Diesel powered emergency ventilation surface fans, 5 shaft sites Impala Platinum - Smelter off-gas emissions control plant: Wet SO2 scrubbers, ESP, Wet ESP, Lime slaking plant, Gypsum dewatering plant, Sulfacid plant expansion Lafarge Gypsum - Gypsum plasterboard plant: Bulk materials handling, 3 x fabric filter plants (product recovery bag-houses) Feasibility study – KENGEN Kenia geothermal heat recovery plant by ORC power generation Feasibility study – Lonmin CaSOx slurry filtration plant Feasibility study – Lonmin CaSOx oxidation and de- watering plant Feasibility study – Lonmin Sonic injection air supply plant Feasibility study – Impala Platinum Springs 24MW Hydrogen fuel cell plant
Transcript

Personal involvement in the following projects:

• Mitochondria Energy – Fuel cell installation, Chamber of Mines

• PTSI R&D – Bowman Turbo Compounding Power Generator

• Willard Batteries - Installation of a new AGM battery production line

• Willard Batteries - Fume capture and extraction system: battery charge-house.

• Palabora Mining Co. - Design, fabrication and installation of water-cooled, 45MW waste steam condenser

• Anglo Platinum - Standby diesel power generation, 22 diesel generators / 10 sites / 66 MVA

• Anglo Platinum – Diesel powered emergency ventilation surface fans, 5 shaft sites

• Impala Platinum - Smelter off-gas emissions control plant: Wet SO2 scrubbers, ESP, Wet ESP, Lime slaking plant, Gypsum dewatering plant, Sulfacid plant expansion

• Lafarge Gypsum - Gypsum plasterboard plant: Bulk materials handling, 3 x fabric filter plants (product recovery bag-houses)

• Feasibility study – KENGEN Kenia geothermal heat recovery plant by ORC power generation

• Feasibility study – Lonmin CaSOx slurry filtration plant • Feasibility study – Lonmin CaSOx oxidation and de-

watering plant • Feasibility study – Lonmin Sonic injection air supply plant • Feasibility study – Impala Platinum Springs 24MW

Hydrogen fuel cell plant

CV submitted by:

WYNAND MARAIS MECHANICAL ENGINEER

Mobile: 072 982 1941 email: [email protected]

CHAMBER OF MINES

• Natural gas fuelled Hydrogen fuel cell

• 100kW unit • Date: 2014

CV submitted by:

WYNAND MARAIS MECHANICAL ENGINEER

Mobile: 072 982 1941 email: [email protected]

CV submitted by:

WYNAND MARAIS MECHANICAL ENGINEER

Mobile: 072 982 1941 email: [email protected]


Recommended