FEBRUARY 2020
PREPARED FOR:
PREPARED BY:
Final Report
Project Level Traffic Forecast Feasibility Study B170791
SR 1415 (Yadkin Road) Road Improvements, from Fort Bragg Access Control Point (Gate 4)
to US 401 (Skibo Road) Fayetteville, Cumberland County, North Carolina
WBS # 47355.1.3
February 3, 2020 MEMORANDUM TO: Janet A. Whetstone-Perez, PE Transportation Mobility and Safety Unit North Carolina Department of Transportation FROM: Claudio Figueroa, PE VHB Engineering NC, P.C. SUBJECT: Traffic Forecast for B170791: SR 1415 (Yadkin Road) Road Improvements, from
Fort Bragg Access Control Point (Gate 4) to US 401 (Skibo Road), Fayetteville, Cumberland County, WBS #47355.1.3
This forecast has been reviewed and approved by the NCDOT Transportation Planning Division as of February 3, 2020.
Please find attached the 2019/2045 Traffic Forecast for the project mentioned above. The NCDOT Transportation Mobility and Safety Unit is studying the Feasibility Study B170791, which includes road improvements along SR 1415 (Yadkin Road) from the Fort Bragg Access Control Point (Gate 4) to US 401 (Skibo Road), in Fayetteville, Cumberland County.
No previous forecast has been developed for this project. The following people involved in local land use and/or transportation planning were contacted for additional information relative to the development of this forecast:
• Joel Strickland, Cumberland County Planning & Inspections Department Acting Director and Fayetteville Area Metropolitan Planning Organization (FAMPO) Director
• Dr. Gerald A. Newton, AICP, City of Fayetteville Development Services Director • Darius D. Sturdivant, NCDOT Division 6 Planning Engineer • Lee (Richie) Hines, Jr., NCDOT Division 6, District 2 Engineer • H.L. “Drew” Cox, NCDOT Division 6 Maintenance Engineer • Lee Jernigan, City of Fayetteville Traffic Engineer • David M. Nash, AICP, City of Fayetteville Senior Planner
The following scenarios are provided in this forecast:
1. Scenario 1 – 2019 Base Year No-Build Scenario 2. Scenario 2 – 2045 Design Year No-Build Scenario
For the purposes of this forecast, it is understood that the road improvements planned are primarily operational improvements that will not affect the capacity or substantially divert traffic. If the road improvements planned are updated in the future to include increasing capacity by adding lanes or other improvements that may cause a substantial diversion of traffic, then an updated Build scenario may be needed. If a Build scenario is needed, please contact the NCDOT Transportation Planning Division ([email protected]) to request a forecast supplement.
Ref: 38999.02 February 3, 2020 Page 2
Fiscal Constraint: Within an MPO, the design year forecasts assume the construction of projects as listed within the MPO’s Metropolitan Transportation Plan (MTP). This forecast is consistent with the current FAMPO 2045 MTP, adopted in May 2019.
Future Conditions and Development Activity: Relative growth and development are proposed in the study area between 2019 and 2045. Based on coordination with the City of Fayetteville and FAMPO staff, these developments are accurately reflected in the Fayetteville Area Metropolitan Organization’s Travel Demand Model (FAMPO TDMv2.1), which was used to develop the forecast.
Forecast Methodology: The 2019 Base Year No-Build traffic forecast was developed primarily from traffic counts taken for this forecast, as well as historic traffic counts and trends. All other scenarios were developed based on modeling results and existing traffic data, using FAMPO TDMv2.1, which was adopted in March 2019.
Due to the project proximity to the Fort Bragg military base, turning movement counts were collected from 5:00 AM to 9:00 PM to consider the shift changes in the military base. The effects of these shift changes in Fort Bragg are presented in the directionality of the peak hours, which caused the same directionality during both morning and afternoon peak hours.
Interpolation: To determine volumes during any intermediate years, straight-line interpolation may be used. AADT volumes may be extrapolated for up to two years immediately following 2045. If it is determined that any of these assumptions have become inconsistent with the project and surrounding area activity, a request should be made for updated projections at this location.
If you have any questions or VHB can be of further assistance, please feel free to contact me by telephone at 984-960-5106 or by email at [email protected].
cc: (via e-mail as PDF attachment)
Joel Strickland, Fayetteville Area MPO James Dunlop, Congestion Management Brenda Moore, PE, CPM Highway Design Branch Clark Morrison, Ph.D., PE, Pavement Management Darius D. Sturdivant, Division 6 Planning Engineer Behshad Norowzi, CPM, NCDOT TPD Planning Team Supervisor Keith G. Dixon, Transportation Planning Division NCDOT GIS Unit File Copy: B170791, Cumberland
18
2
BrunswickRoad
SR 1406(Fillyaw Road)
YorkRoad
Summer HillRoad
HorseshoeRoad (North)
3
1
P R O J E C T S T A R T
SouthwickDrive
211
4
203
20
194
8
193
84
168
9
171
2019 AVERAGE ANNUAL DAILY TRAFFICNo-Build AlternativeSCENARIO 1 (SHEET 1 OF 3)
TIP B170791DIVISION 6COUNTY CumberlandLOCATION SR 1415 (Yadkin Road) from Fort Bragg
Gate 4 and US 401 (Skibo Road)PROJECT SR 1415 (Yadkin Road)
Road ImprovementsDATE 02.03.2020WBS 47355.1.3
AM AM peak hourPM PM peak hourD Peak hour directional split (%)
indicated direction of D(d, t) Duals, TTSTs (%)K Design hour factor (%)X Movement prohibited1- Less than 50 VPD
## No. of vehicles per day(VPD) in 100sExisting roadwayProposed roadway
55
29
3
6
not to scale
K(d,t)AMD K(d,t)
PMD
65(2,1)AM
765
(2,1)AM
760
(2,1)AM
760
(2,1)AM
7
60(2,1)AM7
PM 9(2,1)65
55(3,1)AM7
PM 8(2,1)60
60(2,1)AM
760
(2,1)AM
760
(2,1)AM
7
55(5,1)AM8
PM 9(5,1)55
12
2
221
14PM 9(2,1)55
M A T C H L I N EAA
4
1
SR 1415(Yadkin Road)
SR 1415(Yadkin Road)
Airborne One Driveway1
1-
1 55(2,1)AM12
2
6Rent-A-WheelDriveway
1-
1-
1-
5 MilfordRoad
7
1
8
65(2,1)AM8
PM 9(2,1)60
60 (2,1)AM 7
SR 1406(Fillyaw Road) 1
1-
1
PM 12(2,1)55 5
3
3
65 (2,1)AM 9
55 (2,1)AM 7
55 (2,1)AM 12 60 (2,1)
AM 7
PM8 (2,1) 65
PM7 (2,1) 60
PM7 (3,1) 60
PM7 (2,1) 100
PM9
(2,1)65
PM9
(2,1)60
PM9
(2,1)60
PM9
(2,1)60
PM9
(2,1)60
PM9
(2,1)60
PM9
(2,1)65
187
28
12
HomesteadDrive
HorseshoeRoad (South)
SR 1408(Bonanza Drive)
SR 1437(Santa Fe Drive)
N. PlatteRoad
162
6
162
160
190
59
228
6
224
4
221
2019 AVERAGE ANNUAL DAILY TRAFFICNo-Build Alternative
AM AM peak hourPM PM peak hourD Peak hour directional split (%)
indicated direction of D(d, t) Duals, TTSTs (%)K Design hour factor (%)X Movement prohibited1- Less than 50 VPD
5
1
3
1
not to scale
K(d,t)AMD K(d,t)
PMD
60(2,1)AM
760
(2,1)AM
760
(2,1)AM
760
(2,1)AM
7
60(4,1)AM7
55(3,1)AM7
PM 9(2,1)60
PM 8(2,1)60
60(2,1)AM
760
(2,1)AM
760
(2,1)AM
7
187
M A T C H L I N EBB
11
SR 1415(Yadkin Road)
M A T C H L I N EAA
10 214PM 8(2,1)55
SR 1437(Santa Fe Drive)
10
49
25
69
3
3
BrookfieldDrive
55(2,1)AM7
PM 9(2,1)60 16
5
## No. of vehicles per day(VPD) in 100sExisting roadwayProposed roadway
SCENARIO 1 (SHEET 2 OF 3)
TIP B170791DIVISION 6COUNTY CumberlandLOCATION SR 1415 (Yadkin Road) from Fort Bragg
Gate 4 and US 401 (Skibo Road)PROJECT SR 1415 (Yadkin Road)
Road ImprovementsDATE 02.03.2020WBS 47355.1.3
SR 1415(Yadkin Road)
Big Apple Restaurant & Sports Pub Driveway2
1
1 65(2,1)AM7
8
9 Kingdom Plaza Driveway1
1
1- 65(2,1)AM12
PM 7(2,1)55
Song's Barber Shop Driveways 1
1
1-55(2,1)AM7
7
12 Driveways1-PM 9(2,1)551-
1-
21
55 (2,1)AM 7
55 (2,1)AM 7 55 (2,1)
AM 7
55 (2,1)AM 7
100 (2,1)AM 7
PM11 (2,1) 60 PM7 (4,1) 60
PM7 (3,1) 65 PM7 (2,1) 65
PM9 (2,1) 60
PM9
(2,1)60
PM9
(2,1)60
PM9
(2,1)60
PM9
(2,1)60
PM9
(2,1)60
PM9
(2,1)60
PM9
(2,1)60
176
2019 AVERAGE ANNUAL DAILY TRAFFICNo-Build AlternativeSCENARIO 1 (SHEET 3 OF 3)
TIP B170791DIVISION 6COUNTY CumberlandLOCATION SR 1415 (Yadkin Road) from Fort Bragg
Gate 4 and US 401 (Skibo Road)PROJECT SR 1415 (Yadkin Road)
Road ImprovementsDATE 02.03.2020WBS 47355.1.3
AM AM peak hourPM PM peak hourD Peak hour directional split (%)
indicated direction of D(d, t) Duals, TTSTs (%)K Design hour factor (%)X Movement prohibited1- Less than 50 VPD
## No. of vehicles per day(VPD) in 100sExisting roadwayProposed roadway
not to scale
K(d,t)AMD K(d,t)
PMD
SR 1415(Yadkin Road)
McPherson Church Rd
M A T C H L I N EBB
P R O J E C T E N D
187
60(2,1)AM
7
PM9
(2,1)60
SR 3499(Lake Valley Drive) 63
6
57
PM 8(2,1)60
14 SR 3499(Lake Valley Drive)5
3
2 55(3,1)AM7
98
66US 401
(Skibo Road)485
55(3,2)AM7
PM 8(3,2)55
16 US 401(Skibo Road)388
47
20
PM 8(3,2)55
210
55(2,1)AM
7
PM9
(2,1)55
187
60(2,1)AM
7
PM9
(2,1)60
CimarronDrive6
3
3
13
151
60(2,1)AM
7
PM9
(2,1)60
137
60(2,1)AM
7
PM9
(2,1)60
Walmart Driveway55
24
30 55(2,1)AM7
15WalgreensDriveway 14
8
5
55 (2,1)AM 7
60 (2,1)AM 7
55 (2,1)AM 7
55(3,2)AM7
PM7 (2,1) 55
PM7 (3,1) 65
PM8 (2,1) 55 PM8 (2,1) 55
154
21
4
BrunswickRoad
SR 1406(Fillyaw Road)
YorkRoad
Summer HillRoad
HorseshoeRoad (North)
3
2
P R O J E C T S T A R T
SouthwickDrive
237
5
230
25
220
9
220
99
192
10
196
2045 AVERAGE ANNUAL DAILY TRAFFICNo-Build AlternativeSCENARIO 2 (SHEET 1 OF 3)
TIP B170791DIVISION 6COUNTY CumberlandLOCATION SR 1415 (Yadkin Road) from Fort Bragg
Gate 4 and US 401 (Skibo Road)PROJECT SR 1415 (Yadkin Road)
Road ImprovementsDATE 02.03.2020WBS 47355.1.3
AM AM peak hourPM PM peak hourD Peak hour directional split (%)
indicated direction of D(d, t) Duals, TTSTs (%)K Design hour factor (%)X Movement prohibited1- Less than 50 VPD
## No. of vehicles per day(VPD) in 100sExisting roadwayProposed roadway
64
35
3
7
not to scale
K(d,t)AMD K(d,t)
PMD
65(2,1)AM
765
(2,1)AM
760
(2,1)AM
760
(2,1)AM
7
60(2,1)AM7
PM 9(2,1)65
55(3,1)AM7
PM 8(2,1)60
60(2,1)AM
760
(2,1)AM
760
(2,1)AM
7
55(5,1)AM8
PM 9(5,1)55
13
3
247
16PM 9(2,1)55
M A T C H L I N EAA
4
1
SR 1415(Yadkin Road)
SR 1415(Yadkin Road)
Airborne One Driveway1
1-
1 55(2,1)AM12
2
6Rent-A-WheelDriveway
1-
1-
1-
5 MilfordRoad
8
2
10
65(2,1)AM8
PM 9(2,1)60
60 (2,1)AM 7
SR 1406(Fillyaw Road) 1
1-
1
PM 12(2,1)55 5
4
3
65 (2,1)AM 9
55 (2,1)AM 7
55 (2,1)AM 12 60 (2,1)
AM 7
PM8 (2,1) 65
PM7 (2,1) 60
PM7 (3,1) 60
PM7 (2,1) 100
PM9
(2,1)65
PM9
(2,1)60
PM9
(2,1)60
PM9
(2,1)60
PM9
(2,1)60
PM9
(2,1)60
PM9
(2,1)65
213
33
16
HomesteadDrive
HorseshoeRoad (South)
SR 1408(Bonanza Drive)
SR 1437(Santa Fe Drive)
N. PlatteRoad
178
6
178
175
213
70
254
7
251
5
247
2045 AVERAGE ANNUAL DAILY TRAFFICNo-Build Alternative
AM AM peak hourPM PM peak hourD Peak hour directional split (%)
indicated direction of D(d, t) Duals, TTSTs (%)K Design hour factor (%)X Movement prohibited1- Less than 50 VPD
5
2
4
1
not to scale
K(d,t)AMD K(d,t)
PMD
60(2,1)AM
760
(2,1)AM
760
(2,1)AM
760
(2,1)AM
7
60(4,1)AM7
55(3,1)AM7
PM 9(2,1)60
PM 8(2,1)60
60(2,1)AM
760
(2,1)AM
760
(2,1)AM
7
204
M A T C H L I N EBB
11
SR 1415(Yadkin Road)
M A T C H L I N EAA
10 234PM 8(2,1)55
SR 1437(Santa Fe Drive)
14
56
28
80
3
3
BrookfieldDrive
55(2,1)AM7
PM 9(2,1)60 19
7
## No. of vehicles per day(VPD) in 100sExisting roadwayProposed roadway
SCENARIO 2 (SHEET 2 OF 3)
SR 1415(Yadkin Road)
Big Apple Restaurant & Sports Pub Driveway2
1
1 65(2,1)AM7
8
9 Kingdom Plaza Driveway1
1
1- 65(2,1)AM12
PM 7(2,1)55
Song's Barber Shop Driveways 1
1
1-55(2,1)AM7
7
12 Driveways1-PM 9(2,1)551-
1-
26
55 (2,1)AM 7
55 (2,1)AM 7 55 (2,1)
AM 7
55 (2,1)AM 7
100 (2,1)AM 7
PM11 (2,1) 60 PM7 (4,1) 60
PM7 (3,1) 65 PM7 (2,1) 65
PM9 (2,1) 60
PM9
(2,1)60
PM9
(2,1)60
PM9
(2,1)60
PM9
(2,1)60
PM9
(2,1)60
PM9
(2,1)60
PM9
(2,1)60
192
TIP B170791DIVISION 6COUNTY CumberlandLOCATION SR 1415 (Yadkin Road) from Fort Bragg
Gate 4 and US 401 (Skibo Road)PROJECT SR 1415 (Yadkin Road)
Road ImprovementsDATE 02.03.2020WBS 47355.1.3
2045 AVERAGE ANNUAL DAILY TRAFFICNo-Build AlternativeSCENARIO 2 (SHEET 3 OF 3)
AM AM peak hourPM PM peak hourD Peak hour directional split (%)
indicated direction of D(d, t) Duals, TTSTs (%)K Design hour factor (%)X Movement prohibited1- Less than 50 VPD
## No. of vehicles per day(VPD) in 100sExisting roadwayProposed roadway
not to scale
K(d,t)AMD K(d,t)
PMD
SR 1415(Yadkin Road)
McPherson Church Rd
M A T C H L I N EBB
P R O J E C T E N D
204
60(2,1)AM
7
PM9
(2,1)60
SR 3499(Lake Valley Drive) 70
8
62
PM 8(2,1)60
14 SR 3499(Lake Valley Drive)6
4
2 55(3,1)AM7
112
76US 401
(Skibo Road)552
55(3,2)AM7
PM 8(3,2)55
16 US 401(Skibo Road)441
54
23
PM 8(3,2)55
233
55(2,1)AM
7
PM9
(2,1)55
204
60(2,1)AM
7
PM9
(2,1)60
CimarronDrive6
3
3
13
166
60(2,1)AM
7
PM9
(2,1)60
152
60(2,1)AM
7
PM9
(2,1)60
Walmart Driveway59
26
32 55(2,1)AM7
15WalgreensDriveway 16
9
6
55 (2,1)AM 7
60 (2,1)AM 7
55 (2,1)AM 7
55(3,2)AM7
PM7 (2,1) 55
PM7 (3,1) 65
PM8 (2,1) 55 PM8 (2,1) 55
169
TIP B170791DIVISION 6COUNTY CumberlandLOCATION SR 1415 (Yadkin Road) from Fort Bragg
Gate 4 and US 401 (Skibo Road)PROJECT SR 1415 (Yadkin Road)
Road ImprovementsDATE 02.03.2020WBS 47355.1.3
www.vhb.com