+ All Categories
Home > Documents > Project Management. Elena

Project Management. Elena

Date post: 04-Jun-2018
Category:
Upload: leo-kleo
View: 220 times
Download: 0 times
Share this document with a friend
16
 AIESEC Chisinau, AIESEC in Moldova | Str. Căpriana nr. 50 | ASEM | bl.C, 502 A  Republica Moldova |Telefon: +373 22 402769 | www.chisinau.aiesec.md  
Transcript

8/13/2019 Project Management. Elena

http://slidepdf.com/reader/full/project-management-elena 1/16

 AIESEC Chisinau, AIESEC in Moldova | Str. Căpriana nr. 50 | ASEM | bl.C, 502 A 

Republica Moldova |Telefon: +373 22 402769 | www.chisinau.aiesec.md 

8/13/2019 Project Management. Elena

http://slidepdf.com/reader/full/project-management-elena 2/16

 AIESEC Chisinau, AIESEC in Moldova | Str. Căpriana nr. 50 | ASEM | bl.C, 502 A 

Republica Moldova |Telefon: +373 22 402769 | www.chisinau.aiesec.md 

 Agenda:1. Project2. Project/Process

3. Project management processes4. Project management constraints5. Project management tree6. Project planning matrix7. Risk management

8/13/2019 Project Management. Elena

http://slidepdf.com/reader/full/project-management-elena 3/16

a specific set of operations designed toaccomplish a singular goal

has a defined beginning and end intime

 AIESEC Chisinau, AIESEC in Moldova | Str. Căpriana nr. 50 | ASEM | bl.C, 502 A 

Republica Moldova |Telefon: +373 22 402769 | www.chisinau.aiesec.md 

Project

It’s a temporary group activity designed toproduce a unique product, service or result.

8/13/2019 Project Management. Elena

http://slidepdf.com/reader/full/project-management-elena 4/16

Time-bound . Have clear

beginning and end states 

On-going with no clearly

defined beginning and end

states 

Follow a specific cycle of

Initiation, Definition, Planning,

Execution,

Monitoring/Evaluating and

Close

Repeatable: Design ->

Modeling -> Execution ->

Monitoring -> Optimization ->

Design -> 

Customer targeted  Customer driven 

 AIESEC Chisinau, AIESEC in Moldova | Str. Căpriana nr. 50 | ASEM | bl.C, 502 A 

Republica Moldova |Telefon: +373 22 402769 | www.chisinau.aiesec.md 

Project vs Process

8/13/2019 Project Management. Elena

http://slidepdf.com/reader/full/project-management-elena 5/16

 AIESEC Chisinau, AIESEC in Moldova | Str. Căpriana nr. 50 | ASEM | bl.C, 502 A 

Republica Moldova |Telefon: +373 22 402769 | www.chisinau.aiesec.md 

Project managementprocesses:

Initiating

Planning

Executing

Monitoring

Controlling

Closing

8/13/2019 Project Management. Elena

http://slidepdf.com/reader/full/project-management-elena 6/16

 AIESEC Chisinau, AIESEC in Moldova | Str. Căpriana nr. 50 | ASEM | bl.C, 502 A 

Republica Moldova |Telefon: +373 22 402769 | www.chisinau.aiesec.md 

Project management- is the application of knowledge, skills and

techniques to execute projects effectively and

efficiently.

- is the application of knowledge and expertiseto the development of Project Scope and a

Project Plan, which meets or exceeds

stakeholder requirements. 

8/13/2019 Project Management. Elena

http://slidepdf.com/reader/full/project-management-elena 7/16

 AIESEC Chisinau, AIESEC in Moldova | Str. Căpriana nr. 50 | ASEM | bl.C, 502 A 

Republica Moldova |Telefon: +373 22 402769 | www.chisinau.aiesec.md 

Effectively vs efficientlydoing the right task,

completing activities and

achieving goals. 

doing things in an optimal

way, for example doing it the

fastest or in the least

expensive way. It could be thewrong thing, but it was done

optimally. 

Effort oriented -no  Effort oriented -yes 

Process Oriented -no  Process Oriented -yes 

Goal oriented -yes  Goal oriented - no 

Time oriented - no  Time oriented - yes 

8/13/2019 Project Management. Elena

http://slidepdf.com/reader/full/project-management-elena 8/16

 AIESEC Chisinau, AIESEC in Moldova | Str. Căpriana nr. 50 | ASEM | bl.C, 502 A 

Republica Moldova |Telefon: +373 22 402769 | www.chisinau.aiesec.md 

Scope

a) Project scope: the work that needs to be

accomplished to deliver a product, service, orresult with the specified features and functions.

b) Product scope: The features and functions that

characterize a product, service, or result

8/13/2019 Project Management. Elena

http://slidepdf.com/reader/full/project-management-elena 9/16

 AIESEC Chisinau, AIESEC in Moldova | Str. Căpriana nr. 50 | ASEM | bl.C, 502 A 

Republica Moldova |Telefon: +373 22 402769 | www.chisinau.aiesec.md 

Projectanswers basic questions about the project:

Why? - What is the problem or value proposition

addressed by the project? Why is it being sponsored?What? - What is the work that will be performed on theproject? (major product?)Who? - Who will be involved and what will be theirresponsibilities within the project? (organized?)

When? - What is the project timeline and when willparticularly meaningful points, referred to as milestones, becomplete?

8/13/2019 Project Management. Elena

http://slidepdf.com/reader/full/project-management-elena 10/16

 AIESEC Chisinau, AIESEC in Moldova | Str. Căpriana nr. 50 | ASEM | bl.C, 502 A 

Republica Moldova |Telefon: +373 22 402769 | www.chisinau.aiesec.md 

Stakeholdersentities that have an interest in a given project 

These stakeholders may be inside or outsidean organization which:1. sponsor a project,2. have an interest or a gain upon

a successful completion of a project;1. may have a positive or negative influence in

the project completion.

8/13/2019 Project Management. Elena

http://slidepdf.com/reader/full/project-management-elena 11/16

 AIESEC Chisinau, AIESEC in Moldova | Str. Căpriana nr. 50 | ASEM | bl.C, 502 A 

Republica Moldova |Telefon: +373 22 402769 | www.chisinau.aiesec.md 

8/13/2019 Project Management. Elena

http://slidepdf.com/reader/full/project-management-elena 12/16

 AIESEC Chisinau, AIESEC in Moldova | Str. Căpriana nr. 50 | ASEM | bl.C, 502 A 

Republica Moldova |Telefon: +373 22 402769 | www.chisinau.aiesec.md 

Project managementconstraints

8/13/2019 Project Management. Elena

http://slidepdf.com/reader/full/project-management-elena 13/16

 AIESEC Chisinau, AIESEC in Moldova | Str. Căpriana nr. 50 | ASEM | bl.C, 502 A 

Republica Moldova |Telefon: +373 22 402769 | www.chisinau.aiesec.md 

Project managementtree

8/13/2019 Project Management. Elena

http://slidepdf.com/reader/full/project-management-elena 14/16

 AIESEC Chisinau, AIESEC in Moldova | Str. Căpriana nr. 50 | ASEM | bl.C, 502 A 

Republica Moldova |Telefon: +373 22 402769 | www.chisinau.aiesec.md 

InterventionLogic

Indicators ofachievement

Sources ofverification

 Assumptions

Goal What toobtain?

Key indicators of goalachievement

How, when, bywhom info will becollected.

External factorsfor longsustainability

Objectives What toachieve?

What indicatorsclearly show thatobjectives achieved

Sources of info forthis indicators

Necessaryfactors andconditions

Results/Outputs

What toreceive?

How result will bemeasurable? Q,T,R

Methods requiredto get info about

indicators

Externalconditions to

obtain results Activities What to do?

consequences

What will be meansrequired to implementactivities 

 Action costs? Availablesources foractivities?

Pre-conditions?

Project planning matrix

8/13/2019 Project Management. Elena

http://slidepdf.com/reader/full/project-management-elena 15/16

 AIESEC Chisinau, AIESEC in Moldova | Str. Căpriana nr. 50 | ASEM | bl.C, 502 A 

Republica Moldova |Telefon: +373 22 402769 | www.chisinau.aiesec.md 

Risk managementthe identification, assessment,

and prioritization of risks

followed by coordinated andeconomical application ofresources to minimize,

monitor, and control the

probability and/or impact ofunfortunate events or to

maximize the realization ofopportunities.

8/13/2019 Project Management. Elena

http://slidepdf.com/reader/full/project-management-elena 16/16

 AIESEC Chisinau, AIESEC in Moldova | Str. Căpriana nr. 50 | ASEM | bl.C, 502 A 

Republica Moldova |Telefon: +373 22 402769 | www chisinau aiesec md

Thank you forattention!

Trainer: Elena Ursu e-mail:[email protected]


Recommended